Philmor Contracting Inc: KYTC bid record
Philmor Contracting Inc submitted 13 bids on Kentucky Transportation Cabinet contracts in the data, from 25 SEP 2020 to 24 OCT 2024, and was the low bidder on 3 of them (23%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Kentucky Transportation Cabinet
- Low bid volume
- $15,677,633
- Latest bid
- 24 OCT 2024
- Data through
- 22 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 0 | 0% |
| 2021 | 3 | 1 | 33% |
| 2022 | 3 | 2 | 67% |
| 2023 | 1 | 0 | 0% |
| 2024 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 10 | 5 | 1 | 20% |
| District 4 | 3 | 0 | 0% |
| District 6 | 2 | 1 | 50% |
| District 12 | 1 | 1 | 100% |
| District 11 | 1 | 0 | 0% |
| District 8 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Fabric-geotextile class 2 for pipe | SY | 11 | 11 (100%) | $2.00 | $2.00 | |
| Agricultural limestone | TON | 11 | 10 (91%) | $90.00 | $100.00 | |
| Fuel adjustment | DOL | 10 | 10 (100%) | $1.00 | $1.00 | |
| Asphalt seal coat | TON | 10 | 8 (80%) | $1,142.50 | $1,370.39 | |
| Delineator for guardrail BI directional white | EACH | 9 | 8 (89%) | $15.00 | $14.19 | |
| Guardrail terminal section no 1 | EACH | 9 | 8 (89%) | $80.00 | $85.06 | |
| Perforated pipe-4 in | LF | 9 | 8 (89%) | $6.31 | $15.00 | |
| Seeding and protection | SY | 11 | 7 (64%) | $0.50 | $0.85 | |
| Maintenance fertilizer | TON | 11 | 7 (64%) | $1,200.00 | $1,248.00 | |
| Initial fertilizer | TON | 11 | 7 (64%) | $1,200.00 | $1,200.00 | |
| Temp mulch | SY | 11 | 7 (64%) | $0.28 | $0.28 | |
| Asphalt seal aggregate | TON | 10 | 7 (70%) | $162.00 | $261.98 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hinkle Construction Services LLC | 8 | 3 of 8 |
| Frederick & May Construction Co | 7 | 4 of 7 |
| Walker Construction & Materials LLC | 5 | 1 of 5 |
| Louisville Paving Company Inc | 5 | 2 of 5 |
| Kay & Kay Contracting LLC | 5 | 0 of 5 |
| Hicon Construction LLC | 2 | 0 of 2 |
| L-M Asphalt Partners LTD D/B/A Ats Construction | 2 | 1 of 2 |
| Lawrence Construction and Leasing Inc | 2 | 1 of 2 |
| Eaton Asphalt Paving Co Inc and Subsidiary | 2 | 0 of 2 |
| Dudley Construction Company Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 24 OCT 2024 | 24-1015 | District 8 | SLIDE REPAIR BURNSIDE - WHITLEY CITY ROAD (US-27) | 2 of 5 | $4,817,447 | +64% |
| 22 AUG 2024 | 24-1109 | District 10 | GRADE & DRAIN WITH ASPHALT SURFACE KY 476 | 4 of 5 | $718,266 | +54% |
| 23 FEB 2023 | 23-1006 | District 11 | GRADE, DRAIN & SURFACE WITH BRIDGE DR. THOMAS WALKER PARK ROAD(KY-459) | 2 of 3 | $7,790,391 | +4.0% |
| 20 OCT 2022 | 22-1056 | District 10 | ASPHALT SURFACE WITH GRADE & DRAIN NEW ROUTE(CS-1014) | 1 of 3 | $1,767,825 | Low, 8.0% under the second |
| 18 AUG 2022 | 22-1339 | District 10 | GRADE & DRAIN WITH ASPHALT SURFACE US 460 | 2 of 5 | $7,900,704 | +5.0% |
| 21 JUL 2022 | 22-1328 | District 12 | GRADE & DRAIN WITH ASPHALT SURFACE HUDDY-McVEIGH ROAD (KY 199) | 1 of 2 | $5,330,466 | Low, 11% under the second |
| 21 MAY 2021 | 21-1316 | District 6 | GRADE & DRAIN WITH ASPHALT SURFACE BLANCHET ROAD (CR 1138) | 5 of 8 | $2,894,511 | +12% |
| 29 JAN 2021 | 21-1301 | District 6 | GRADE & DRAIN WITH ASPHALT SURFACE HANDS PIKE (KY 1501) | 1 of 8 | $8,579,342 | Low, 0.0% under the second |
| 29 JAN 2021 | 21-1302 | District 10 | GRADE, DRAIN & SURFACE WITH BRIDGE POMPEII ROAD (KY 2026) | 2 of 6 | $1,301,545 | +6.0% |
| 11 DEC 2020 | 20-1323 | District 4 | GRADE & DRAIN WITH ASPHALT SURFACE CAMPBELLSVILLE BYPASS/HEARTLAND PARKWAY | 3 of 8 | $9,346,483 | +3.0% |
| 11 DEC 2020 | 20-3100 | District 4 | CULVERT REPLACEMENT BURBA ROAD (KY 2735) | 2 of 8 | $187,745 | +16% |
| 23 OCT 2020 | 20-1311 | District 4 | GRADE & DRAIN WITH ASPHALT SURFACE SPRINGFIELD ROAD (US 150) | 2 of 4 | $8,074,813 | +1.0% |
| 25 SEP 2020 | 20-1315 | District 10 | GRADE & DRAIN WITH ASPHALT SURFACE BERT T COMBS MOUNTAIN PARKWAY (PW 9000) | 4 of 4 | $1,936,760 | +77% |
How this record was read
KYTC Bid Tab Award Sheets, November 2019 to October 2026. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; KYTC's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.