MoDOT contract 250418-F02 bid tabulation
J6P3623 - ROUTE 67 - ST LOUIS COUNTY. Let by Missouri DOT on April 18, 2025, St Louis, St. Louis. 4 bids received; low bid $6,300,000 by Pace Construction Company, LLC.
- Owner
- Missouri DOT
- Letting
- 18 APR 2025
- Pay items
- 142
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pace Construction Company, LLC | $6,300,000 | Low |
| 2 | Gershenson Construction Co., Inc. | $6,342,411 | +1.0% |
| 3 | Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction | $6,839,592 | +9.0% |
| 4 | N.B. West Contracting Company | $7,232,977 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pace Construction Company, LLC | 2. Gershenson Construction Co., Inc. | 3. Byrne & Jones Enterprises, Inc. dba Byrne & Jones Construction | 4. N.B. West Contracting Company |
|---|---|---|---|---|---|---|---|
| 0010 | Removal of improvements (2022010) | LS | 1 | $64,800 | $320,000 | $500,000 | $590,554 |
| 0020 | Class 3 excavation (2063000) | CY | 207 | $209.00 | $7.00 | $40.00 | $1.00 |
| 0030 | Culvert cleanout (2063500) | EACH | 15 | $1,500.00 | $250.00 | $1,000.00 | $300.00 |
| 0040 | Misc.modified linear grading class 2 (2079909) | STA | 57 | $3,157.00 | $2,100.00 | $2,000.00 | $1,300.00 |
| 0050 | Shaping slopes, class III (2153000) | 100F | 9 | $1,600.00 | $1,600.00 | $1,600.00 | $1,600.00 |
| 0060 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 6,730 | $8.00 | $13.00 | $7.25 | $9.00 |
| 0070 | 5 3/4 inches, bituminous pavement (4010105) | SY | 219 | $89.00 | $35.00 | $175.00 | $105.00 |
| 0080 | Bituminous pavement mixture PG64-22, (BP-1) (4011209) | TON | 3,817 | $83.00 | $106.00 | $95.00 | $100.00 |
| 0090 | Misc.asphaltic concrete mixture PG 76-22 (SP125CLP mix), fiber reinforced (4039910) | TON | 15,440 | $115.00 | $118.00 | $135.00 | $139.00 |
| 0100 | Tack coat - non-tracking (4071007) | GAL | 17,670 | $3.90 | $1.00 | $3.60 | $3.25 |
| 0110 | Misc.concrete pavement (11 1/2 in. non-reinforced, 15 FT. joints, high early strength, rapid set) (5029905) | SY | 775 | $210.00 | $190.00 | $96.00 | $186.00 |
| 0120 | Adjusting basin or inlet (6042020) | EACH | 3 | $2,739.00 | $1,570.00 | $2,200.00 | $2,400.00 |
| 0130 | Pipe collar, type A (6044011) | EACH | 1 | $3,145.00 | $1,745.00 | $3,000.00 | $1,200.00 |
| 0140 | Misc.pullbox adjust to grade (6049902) | EACH | 13 | $1,400.00 | $1,400.00 | $1,200.00 | $1,400.00 |
| 0150 | Misc.sanitary manhole adjust to grade (6049902) | EACH | 2 | $1,765.00 | $1,375.00 | $2,500.00 | $1,250.00 |
| 0160 | Misc.utility concrete encasement (6049902) | EACH | 2 | $5,500.00 | $1,935.00 | $2,000.00 | $600.00 |
| 0170 | Truncated domes (6081012) | SF | 465 | $27.10 | $28.00 | $40.50 | $35.00 |
| 0180 | 6 in. concrete median strip (6083006) | SY | 1,575 | $182.00 | $90.00 | $147.00 | $110.00 |
| 0190 | Paved approach, 8 in. (6085008) | SY | 1,160 | $142.00 | $104.00 | $90.00 | $160.00 |
| 0200 | Concrete sidewalk, 4 in. (6086004) | SY | 2,295 | $67.00 | $54.00 | $65.00 | $68.00 |
| 0210 | Misc.concrete curb ramp (6089902) | EACH | 41 | $4,200.00 | $2,500.00 | $1,800.00 | $2,500.00 |
| 0220 | Misc.island tubular marker (6089902) | EACH | 87 | $85.00 | $85.00 | $85.00 | $200.00 |
| 0230 | Misc.monolithic curb and sidewalk variable depth (6089905) | SY | 258 | $103.00 | $90.00 | $93.00 | $210.00 |
| 0240 | Concrete curb (6 in. height and under) type S (6091010) | LF | 317 | $45.00 | $51.00 | $30.00 | $72.00 |
| 0250 | Curb and gutter type B (6091052) | LF | 1,367 | $61.00 | $57.00 | $33.00 | $52.00 |
| 0260 | Integral curb (6 in. height and under) type A (6092011) | LF | 100 | $120.00 | $27.00 | $42.75 | $20.00 |
| 0270 | Furnishing type 1 rock ditch liner (6096010A) | CY | 44 | $75.00 | $56.00 | $40.00 | $70.00 |
| 0280 | Furnishing type 2 rock ditch liner (6096020) | CY | 26 | $75.00 | $56.00 | $55.00 | $70.00 |
| 0290 | Placing type 1 rock ditch liner (6096041) | CY | 44 | $120.00 | $35.00 | $110.00 | $25.00 |
| 0300 | Placing type 2 rock ditch liner (6096042) | CY | 26 | $102.00 | $60.00 | $140.00 | $25.00 |
| 0310 | Rock lining (6097000) | CY | 7 | $580.00 | $160.00 | $250.00 | $200.00 |
| 0320 | Misc.variable height curb (30 in. max. height) (6099903) | LF | 612 | $56.00 | $105.00 | $33.50 | $80.00 |
| 0330 | Slope protection (6116010A) | SY | 279 | $108.00 | $60.00 | $200.00 | $120.00 |
| 0340 | Furnishing and placing concrete material for full depth pavement repair (6131010) | SY | 481 | $230.00 | $255.00 | $87.50 | $240.00 |
| 0350 | Subgrade compaction (6 in. depth) (pavement repair) (6131012) | SY | 481 | $25.00 | $1.00 | $10.60 | $0.01 |
| 0360 | Type 1 or 5 aggregate for base (4 in. thick) (pavement repair) (6131013) | SY | 481 | $7.00 | $1.00 | $11.60 | $5.00 |
| 0370 | Full depth pavement repair saw cut (for perimeter and internal saw cuts) (6131014) | LF | 603 | $8.00 | $10.00 | $5.00 | $7.00 |
| 0380 | Dowel bar (drilling, furnishing and installation) for full depth pavement repair (6131015) | EACH | 361 | $10.00 | $15.00 | $13.00 | $10.00 |
| 0390 | Furnishing and placing concrete material for class A partial depth pavement repair (6132018) | CY | 11.20 | $1,466.00 | $2,320.00 | $452.20 | $1,260.00 |
| 0400 | Removal for class A partial depth pavement repair (6132019) | SY | 80.20 | $134.00 | $315.00 | $500.00 | $125.00 |
| 0410 | Changeable message sign without communication interface, contractor furnished, contractor retained (6161098A) | EACH | 2 | $4,250.00 | $2,800.00 | $2,800.00 | $2,800.00 |
| 0420 | Misc.temporary traffic control (6169901) | LS | 1 | $19,800 | $40,000 | $24,260 | $54,260 |
| 0430 | Temporary traffic barrier, contractor furnished commission retained (6173602B) | LF | 310 | $32.00 | $81.50 | $81.50 | $81.50 |
| 0440 | Mobilization (6181000) | LS | 1 | $407,512 | $500,000 | $571,500 | $576,697 |
| 0450 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 915 | $18.00 | $18.00 | $18.00 | $18.00 |
| 0460 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 127 | $280.00 | $280.00 | $280.00 | $280.00 |
| 0470 | Preformed thermoplastic pavement marking, straight arrow (6200024) | EACH | 1 | $250.00 | $250.00 | $250.00 | $250.00 |
| 0480 | Preformed thermoplastic pavement marking, combination STR/LT/RT (6200027) | EACH | 3 | $450.00 | $450.00 | $450.00 | $450.00 |
| 0490 | Preformed thermoplastic pavement marking, 30 in white midblock (6200036) | EACH | 140 | $180.00 | $180.00 | $180.00 | $180.00 |
| 0500 | Preformed thermoplastic pavement marking, 12 in white, yield line triangles (6200042) | EACH | 192 | $75.00 | $75.00 | $75.00 | $75.00 |
| 0510 | 4 in. yellow high build waterborne pavement marking paint, type L beads (6205901A) | LF | 50,324 | $0.21 | $0.21 | $0.21 | $0.21 |
| 0520 | 6 in. white high build waterborne pavement marking paint, type L beads (6205902A) | LF | 58,343 | $0.30 | $0.30 | $0.30 | $0.30 |
| 0530 | Misc.temporary pavement marking paint (6209901) | LS | 1 | $16,600 | $100.00 | $58,500 | $10,000 |
| 0540 | Misc.curb reflectors (6209902) | EACH | 261 | $27.50 | $27.50 | $27.50 | $40.00 |
| 0550 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 176,579 | $2.25 | $2.35 | $2.15 | $2.90 |
| 0560 | Coldmilling concrete pavement for removal of surface (6221011) | SY | 119 | $19.00 | $10.50 | $10.00 | $25.20 |
| 0570 | Contractor furnished surveying and staking (6274000) | LS | 1 | $100.00 | $30,000 | $32,000 | $7,500.00 |
| 0580 | 18 in. pipe group C (7250418) | LF | 29 | $240.00 | $98.00 | $125.00 | $237.00 |
| 0590 | 24 in. pipe group C (7250424) | LF | 35 | $365.00 | $150.00 | $235.00 | $250.00 |
| 0600 | 30 in. pipe group C (7250430) | LF | 16 | $458.00 | $220.00 | $190.00 | $265.00 |
| 0610 | 12 in. pipe group A (7261012) | LF | 324 | $101.00 | $82.00 | $100.00 | $160.00 |
| 0620 | Precast concrete drop inlet 2 FT X 2 FT (7311022) | FT | 4 | $1,201.00 | $765.00 | $1,200.00 | $835.00 |
| 0630 | 12 in. or allowed substitute group C flared end section (7320812A) | EACH | 8 | $1,313.00 | $1,200.00 | $3,320.00 | $900.00 |
| 0640 | 24 in. or allowed substitute group C flared end section (7320824A) | EACH | 1 | $810.00 | $1,375.00 | $4,100.00 | $1,000.00 |
| 0650 | 30 in. or allowed substitute group C flared end section (7320830A) | EACH | 1 | $1,570.00 | $1,385.00 | $4,460.00 | $1,100.00 |
| 0660 | 18 in. or allowed substitute safety slope end section (7321014A) | EACH | 1 | $2,250.00 | $1,925.00 | $4,000.00 | $2,800.00 |
| 0670 | 24 in. or allowed substitute safety slope end section (7321016A) | EACH | 1 | $2,865.00 | $2,600.00 | $4,100.00 | $3,500.00 |
| 0680 | 30 in. or allowed substitute safety slope end section (7321017A) | EACH | 1 | $4,900.00 | $4,900.00 | $4,460.00 | $5,600.00 |
| 0690 | Misc.6.5 FT X 4 FT drainage flume (7329902) | EACH | 2 | $9,200.00 | $4,440.00 | $1,780.00 | $4,800.00 |
| 0700 | Misc.6.5 FT X 8 FT drainage flume (7329902) | EACH | 1 | $10,200 | $6,035.00 | $1,860.00 | $5,200.00 |
| 0710 | Mulching (8025006) | ACRE | 1 | $2,600.00 | $2,600.00 | $3,500.00 | $3,500.00 |
| 0720 | Turf type tall fescue sodding (8031000A) | SY | 1,126 | $12.00 | $12.00 | $14.00 | $12.00 |
| 0730 | Seeding - cool season grasses (8051000A) | ACRE | 1 | $3,500.00 | $3,500.00 | $4,500.00 | $2,600.00 |
| 0740 | Rock ditch check (8061005) | LF | 690 | $14.00 | $1.00 | $17.00 | $3.00 |
| 0750 | Curb inlet check (8061007A) | EACH | 16 | $125.00 | $50.00 | $200.00 | $25.00 |
| 0760 | Sediment removal (8061016) | CY | 123 | $26.00 | $1.00 | $50.00 | $0.01 |
| 0770 | Silt fence (8061019) | LF | 4,265 | $3.05 | $3.05 | $4.50 | $0.01 |
| 0780 | MGS guardrail (6061060) | LF | 1,538 | $32.00 | $32.00 | $32.00 | $32.00 |
| 0790 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 3 | $4,600.00 | $4,600.00 | $4,600.00 | $4,600.00 |
| 0800 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 11 | $4,200.00 | $4,200.00 | $4,200.00 | $4,200.00 |
| 0810 | Type C crashworthy end terminal (MASH) (6063020) | EACH | 1 | $32,000 | $32,000 | $32,000 | $32,000 |
| 0820 | Conduit, 2 in. rigid, in trench (9013002) | LF | 395 | $14.00 | $14.00 | $16.00 | $15.00 |
| 0830 | Conduit, 3 in. rigid, pushed (9014003) | LF | 1,160 | $27.00 | $27.00 | $24.00 | $27.00 |
| 0840 | Trenching type II (9015020) | LF | 3,423 | $14.00 | $14.00 | $8.50 | $14.00 |
| 0850 | Pull box, preformed class 1 (9016110) | EACH | 19 | $1,740.00 | $1,740.00 | $1,680.00 | $1,740.00 |
| 0860 | Cable, 6 AWG 1 conductor (9017006) | LF | 5,190 | $1.95 | $1.95 | $1.55 | $1.95 |
| 0870 | Cable, 10 AWG 1 conductor, pole and bracket (9017110) | LF | 3,200 | $1.25 | $1.25 | $1.00 | $1.25 |
| 0880 | Wire, 6 AWG, bare neutral (9017206) | LF | 2,590 | $1.25 | $1.25 | $1.45 | $1.25 |
| 0890 | Cable-conduit, 1 in., 2 conductors and 1 bare neutral, 6 AWG (9017404) | LF | 4,010 | $6.00 | $6.00 | $4.10 | $6.50 |
| 0900 | Pole foundation (45 FT. or 13.5 M mounting height) (9018245) | EACH | 32 | $2,035.00 | $2,035.00 | $2,000.00 | $2,035.00 |
| 0910 | Misc.45' top mount pole, type at (9019902) | EACH | 29 | $3,433.00 | $3,433.00 | $3,290.00 | $3,433.00 |
| 0920 | Misc.combination pad mounted power supply and lighting control, 240V lighting only (9019902) | EACH | 1 | $11,000 | $11,000 | $11,620 | $11,000 |
| 0930 | Misc.LED B top mounted luminaire (9019902) | EACH | 32 | $437.00 | $437.00 | $573.00 | $437.00 |
| 0940 | Signal head, type 3T (9020113) | EACH | 1 | $1,041.00 | $1,041.00 | $1,160.00 | $1,041.00 |
| 0950 | Signal head, type 3S (9020213) | EACH | 2 | $1,041.00 | $1,041.00 | $1,072.00 | $1,041.00 |
| 0960 | Signal head, type 3B (9020513) | EACH | 15 | $1,040.00 | $1,040.00 | $1,450.00 | $1,040.00 |
| 0970 | Signal head, type 4B (9020514) | EACH | 6 | $1,090.00 | $1,090.00 | $1,697.00 | $1,090.00 |
| 0980 | SH-flat sheet - signal sign (9020833) | SF | 141 | $38.00 | $38.00 | $36.00 | $38.00 |
| 0990 | Signal sign, mounting hardware (9020834) | EACH | 14 | $260.00 | $260.00 | $320.00 | $260.00 |
| 1000 | Post, signal 8 FT. (9022708) | EACH | 6 | $1,385.00 | $1,385.00 | $1,300.00 | $1,385.00 |
| 1010 | Post, signal 15 FT. (9022715) | EACH | 1 | $2,135.00 | $2,135.00 | $2,284.00 | $2,135.00 |
| 1020 | Post, type C, 25 FT. arm or 7.6 M arm (9023225) | EACH | 1 | $10,184 | $10,184 | $10,675 | $10,184 |
| 1030 | Post, type C, 30 FT. arm or 9.1 M arm (9023230) | EACH | 2 | $11,702 | $11,702 | $12,334 | $11,702 |
| 1040 | Post, type C, 35 FT. arm or 10.7 M arm (9023235) | EACH | 1 | $11,945 | $11,945 | $12,945 | $11,945 |
| 1050 | Post, type C, 40 FT. arm or 12.2 M arm (9023240) | EACH | 1 | $13,296 | $13,296 | $14,383 | $13,296 |
| 1060 | Post, type C, 45 FT. arm or 13.7 M arm (9023245) | EACH | 1 | $13,429 | $13,429 | $14,500 | $13,429 |
| 1070 | Post, type B, longest arm 45 FT. or 13.7 M (9023345) | EACH | 1 | $21,297 | $21,297 | $22,914 | $21,297 |
| 1080 | Controller assembly housing, NEMA TS2 controller (9024283) | EACH | 2 | $18,480 | $18,480 | $20,966 | $18,480 |
| 1090 | Conduit, 3 in., trench with tracer wire (9025300) | LF | 410 | $15.00 | $15.00 | $20.00 | $15.00 |
| 1100 | Conduit, 3 in., pushed with tracer wire (9027300) | LF | 590 | $33.00 | $33.00 | $26.00 | $33.00 |
| 1110 | Cable, 8 AWG 1 conductor, power (9028208) | LF | 270 | $2.00 | $2.00 | $1.45 | $2.00 |
| 1120 | Cable, 16 AWG 2 conductor (9028308) | LF | 2,000 | $2.00 | $2.00 | $1.25 | $2.00 |
| 1130 | Cable, 16 AWG 5 conductor (9028310) | LF | 2,010 | $2.50 | $2.50 | $1.40 | $2.50 |
| 1140 | Cable, 16 AWG 7 conductor (9028311) | LF | 5,960 | $2.65 | $2.65 | $1.60 | $2.65 |
| 1150 | Pull box, preformed class 2 (9028811) | EACH | 10 | $2,240.00 | $2,240.00 | $2,230.00 | $2,240.00 |
| 1160 | Pull box, concrete, double, type A (9028821) | EACH | 2 | $6,860.00 | $6,860.00 | $6,200.00 | $6,860.00 |
| 1170 | Base, concrete (9029100) | CY | 29 | $2,300.00 | $2,300.00 | $1,480.00 | $2,300.00 |
| 1180 | Misc.traffic signal maintenance & programming (9029901) | LS | 1 | $9,500.00 | $9,500.00 | $10,000 | $9,500.00 |
| 1190 | Misc.accessible pedestrian pushbutton and signing (9029902) | EACH | 10 | $845.00 | $845.00 | $1,491.00 | $845.00 |
| 1200 | Misc.atc traffic signal controller (9029902) | EACH | 2 | $5,400.00 | $5,400.00 | $5,600.00 | $5,400.00 |
| 1210 | Misc.combination pad mounted 120V/240V power supply and lighting controller with UPS - TS2 traffic signal cabinet (9029902) | EACH | 2 | $26,000 | $26,000 | $26,500 | $26,000 |
| 1220 | Misc.countdown pedestrian signal head, type 1S (9029902) | EACH | 10 | $650.00 | $650.00 | $800.00 | $650.00 |
| 1230 | Misc.network connected signal monitor (9029902) | EACH | 2 | $1,542.00 | $1,542.00 | $1,600.00 | $1,542.00 |
| 1240 | Misc.signal cabinet base wrap and cabinet shift (9029902) | EACH | 1 | $2,200.00 | $2,200.00 | $5,000.00 | $2,200.00 |
| 1250 | Misc.SL district traffic signal detection system (9029902) | EACH | 3 | $36,000 | $36,000 | $50,000 | $36,000 |
| 1260 | Misc.temporary generator for signal power (9029902) | EACH | 3 | $450.00 | $450.00 | $3,300.00 | $450.00 |
| 1270 | Concrete footings, embedded (9031010) | CY | 6.10 | $3,200.00 | $3,200.00 | $3,200.00 | $3,200.00 |
| 1280 | Structural steel posts (9031210) | LB | 480 | $8.00 | $8.00 | $8.00 | $8.00 |
| 1290 | Pipe posts (9031220) | LB | 3,170 | $10.00 | $10.00 | $10.00 | $10.00 |
| 1300 | 2 in. PSST post - 12 GA. (9031270A) | LF | 830 | $28.00 | $28.00 | $28.00 | $28.00 |
| 1310 | Driven post anchor for 2 in. PSST - 7 GA. (9031273A) | EACH | 38 | $250.00 | $250.00 | $250.00 | $250.00 |
| 1320 | Concrete post anchor for 2 in. PSST. - 7 GA. (9031274) | EACH | 26 | $400.00 | $400.00 | $400.00 | $400.00 |
| 1330 | SH-flat sheet (9035004A) | SF | 1,087 | $36.00 | $36.00 | $36.00 | $36.00 |
| 1340 | ST-structural (9035011A) | SF | 445 | $36.00 | $36.00 | $36.00 | $36.00 |
| 1350 | SHF-flat sheet fluorescent (9035069A) | SF | 390 | $38.00 | $38.00 | $38.00 | $38.00 |
| 1360 | Misc.ITS asset management tool (9109901) | LS | 1 | $1,800.00 | $1,800.00 | $5,300.00 | $1,800.00 |
| 1370 | Misc.fiber optic fusion splice (9109902) | EACH | 80 | $45.00 | $45.00 | $68.00 | $45.00 |
| 1380 | Misc.fiber optic jumper (9109902) | EACH | 8 | $20.00 | $20.00 | $70.00 | $20.00 |
| 1390 | Misc.fiber optic pigtail (9109902) | EACH | 8 | $20.00 | $20.00 | $75.00 | $20.00 |
| 1400 | Misc.underground splice closure (9109902) | EACH | 2 | $2,200.00 | $2,200.00 | $1,400.00 | $2,200.00 |
| 1410 | Misc.wall-mounted interconnect center (9109902) | EACH | 2 | $1,400.00 | $1,400.00 | $1,600.00 | $1,400.00 |
| 1420 | Misc.fiber optic cable, 24 strand, single mode (9109903) | LF | 150 | $4.00 | $4.00 | $5.00 | $4.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of April 18, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.