MoDOT contract 260918-C04 bid tabulation
JKU0066 - ROUTE 40 - JACKSON COUNTY. Let by Missouri DOT on September 18, 2026, Jackson, Kansas City. 3 bids received; low bid $8,957,977 by Amino Bros. Co., Inc..
- Owner
- Missouri DOT
- Letting
- 18 SEP 2026
- Pay items
- 203
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Amino Bros. Co., Inc. | $8,957,977 | Low |
| 2 | Realm Construction Inc. | $8,993,900 | 0.0% |
| 3 | Radmacher Brothers Excavating Co., Inc. | $9,521,778 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Amino Bros. Co., Inc. | 2. Realm Construction Inc. | 3. Radmacher Brothers Excavating Co., Inc. |
|---|---|---|---|---|---|---|
| 0010 | Removal of improvements (2022010) | LS | 1 | $409,719 | $446,397 | $235,853 |
| 0020 | Unclassified excavation (2035000) | CY | 6,565 | $40.50 | $41.65 | $32.85 |
| 0030 | Compacting embankment (2036000) | CY | 1,513 | $13.90 | $25.55 | $2.55 |
| 0040 | Compacting in cut (2037075) | STA | 38.80 | $2,729.00 | $2,053.15 | $3,160.00 |
| 0050 | Class 3 excavation (2063000) | CY | 1,753 | $4.70 | $58.85 | $21.35 |
| 0060 | Misc.linear grading for ADA facilities (2079903) | LF | 1,762 | $9.05 | $27.20 | $16.35 |
| 0070 | Shaping slopes, class III (2153000) | 100F | 5 | $989.00 | $969.55 | $1,355.00 |
| 0080 | Type 1 aggregate for base (4 in. thick) (3040143) | SY | 2,362 | $23.95 | $25.25 | $23.00 |
| 0090 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 112 | $23.95 | $25.25 | $38.80 |
| 0100 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 14,233 | $18.90 | $18.50 | $25.65 |
| 0110 | Misc.optional pavement (4019905) | SY | 5,683 | $102.00 | $85.90 | $126.25 |
| 0120 | Asphaltic concrete mixture PG 76-22 (SP125C mix) (4030105) | TON | 3,713.60 | $114.00 | $163.85 | $160.00 |
| 0130 | Asphaltic concrete mixture PG 64-22 (SP190C mix) (4030206) | TON | 2,649.80 | $110.00 | $141.25 | $137.75 |
| 0140 | Tack coat - non-tracking (4071007) | GAL | 2,115 | $4.95 | $5.65 | $5.50 |
| 0150 | Concrete pavement (9 1/2 in. non-reinforced, 15 FT. joints) (5021333) | SY | 1,991.40 | $98.65 | $90.95 | $124.75 |
| 0160 | Misc.truck apron (pigmented & textured concrete) (5029905) | SY | 117.80 | $193.00 | $222.25 | $203.50 |
| 0170 | Pipe collar, type A (6044011) | EACH | 4 | $1,623.00 | $2,526.00 | $4,344.50 |
| 0180 | Misc.steel plate (6049904) | SF | 73 | $54.40 | $274.45 | $220.00 |
| 0190 | Chain-link fence (48 in.) (6071011A) | LF | 30 | $122.00 | $119.80 | $60.65 |
| 0200 | Concrete curb ramp (6081010) | SY | 155.30 | $281.00 | $178.75 | $127.00 |
| 0210 | Truncated domes (6081012) | SF | 534 | $23.05 | $24.60 | $43.20 |
| 0220 | 8 in. concrete median strip (6083008) | SY | 2,047 | $135.00 | $98.35 | $97.40 |
| 0230 | Concrete sidewalk, 4 in. (6086004) | SY | 1,121.30 | $88.30 | $63.30 | $73.10 |
| 0240 | Concrete sidewalk, 8 in. (6086008) | SY | 3.10 | $735.00 | $71.00 | $213.50 |
| 0250 | Misc.modified paved approach, 8 in. (6089905) | SY | 111.50 | $132.00 | $102.50 | $125.00 |
| 0260 | Concrete gutter type A (6091041) | LF | 55 | $81.90 | $56.00 | $57.45 |
| 0270 | Curb and gutter type B (6091052) | LF | 697 | $64.90 | $36.50 | $53.10 |
| 0280 | Integral curb (over 6 in. height) type B (6092022) | LF | 94 | $59.75 | $42.85 | $21.10 |
| 0290 | Misc.curb and gutter (apwa standard CG-1) (6099903) | LF | 1,866 | $56.75 | $30.05 | $48.05 |
| 0300 | Misc.modified type B gutter (6099903) | LF | 215 | $138.00 | $61.05 | $79.45 |
| 0310 | Furnishing type 2 rock blanket (6113020) | CY | 91 | $124.00 | $109.05 | $81.15 |
| 0320 | Placing type 2 rock blanket (6113040) | CY | 91 | $69.40 | $66.70 | $72.90 |
| 0330 | Impact attenuator 40 MPH (sand barrel array) (6122008) | EACH | 1 | $3,210.00 | $3,107.50 | $3,033.00 |
| 0340 | Impact attenuator 45 MPH (sand barrel array) (6122009) | EACH | 5 | $3,502.00 | $3,390.00 | $3,308.50 |
| 0350 | Impact attenuator 55 MPH (sand barrel array) (6122012) | EACH | 2 | $4,378.00 | $4,237.50 | $4,136.00 |
| 0360 | Replacement sand barrel (6122020) | EACH | 7 | $292.00 | $282.50 | $275.75 |
| 0370 | Impact attenuator (relocation) (6122030) | EACH | 7 | $630.00 | $610.20 | $595.50 |
| 0380 | Truck mounted attenuator (TMA) (6123001) | LS | 1 | $55,156 | $33,900 | $15,248 |
| 0390 | Furnishing and placing concrete material for full depth pavement repair (6131010) | SY | 70 | $454.00 | $359.20 | $268.50 |
| 0400 | Subgrade compaction (6 in. depth) (pavement repair) (6131012) | SY | 7 | $94.35 | $1.05 | $134.75 |
| 0410 | Type 1 or 5 aggregate for base (4 in. thick) (pavement repair) (6131013) | SY | 7 | $88.05 | $1.05 | $147.25 |
| 0420 | Full depth pavement repair saw cut (for perimeter and internal saw cuts) (6131014) | LF | 126 | $9.20 | $2.30 | $13.25 |
| 0430 | Dowel bar (furnishing and installation with baskets) for full depth pavement repair (6131017) | EACH | 110 | $20.80 | $5.40 | $28.95 |
| 0440 | Manhole frame and cover, type 1-B (6143011) | EACH | 6 | $679.00 | $817.45 | $818.25 |
| 0450 | Manhole frame and cover, type 3 (6143013) | EACH | 22 | $448.00 | $828.55 | $459.75 |
| 0460 | Changeable message sign with communication interface, contractor furnished retained (6161099) | EACH | 8 | $8,825.00 | $8,542.80 | $8,338.00 |
| 0470 | Misc.lump sum temporary traffic control (6169901) | LS | 1 | $85,799 | $83,055 | $81,062 |
| 0480 | Misc.ADA compliant moveable barricade (6169902) | EACH | 10 | $117.00 | $113.00 | $110.25 |
| 0490 | Concrete traffic barrier, type A (6171000) | LF | 20 | $420.00 | $210.70 | $514.00 |
| 0500 | Concrete traffic barrier, type D (6173100) | LF | 1,237 | $178.00 | $99.20 | $142.50 |
| 0510 | Temporary traffic barrier, contractor furnished retained (6173600D) | LF | 1,805 | $31.70 | $31.10 | $51.70 |
| 0520 | Relocating temporary traffic barrier (6175010A) | LF | 2,930 | $16.15 | $15.85 | $24.65 |
| 0530 | Mobilization (6181000) | LS | 1 | $401,172 | $518,966 | $567,189 |
| 0540 | Pavement edge treatment (6191000) | LF | 4,735 | $11.60 | $16.10 | $9.75 |
| 0550 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 80 | $321.00 | $310.75 | $303.25 |
| 0560 | Preformed thermoplastic pavement marking, straight arrow (6200024) | EACH | 14 | $321.00 | $310.75 | $303.25 |
| 0570 | Preformed thermoplastic pavement marking, combination STR/LT/RT (6200027) | EACH | 5 | $525.00 | $508.50 | $496.25 |
| 0580 | Temporary removable marking tape 4 in., white (6205301B) | LF | 33,253 | $1.75 | $1.70 | $1.65 |
| 0590 | Temporary removable marking tape 4 in., yellow (6205303B) | LF | 9,588 | $1.75 | $1.70 | $1.65 |
| 0600 | Pavement marking removal (6207001) | LF | 54,076 | $0.25 | $0.25 | $0.20 |
| 0610 | Pavement marking removal (symbols) (6207002) | EACH | 16 | $70.05 | $67.80 | $66.15 |
| 0620 | Misc.multi-component liquid pavement marking, 12 in. solid white (6209903) | LF | 666 | $11.65 | $11.30 | $11.05 |
| 0630 | Misc.multi-component liquid pavement marking, 24 in. solid white (6209903) | LF | 1,747 | $23.35 | $22.60 | $22.05 |
| 0640 | Misc.multi-component liquid pavement marking, 24 in. solid yellow (6209903) | LF | 244 | $23.35 | $22.60 | $22.05 |
| 0650 | Misc.multi-component liquid pavement marking, 6 in. solid white (6209903) | LF | 24,194 | $1.15 | $1.15 | $1.10 |
| 0660 | Misc.multi-component liquid pavement marking, 6 in. solid yellow (6209903) | LF | 10,991 | $1.15 | $1.15 | $1.10 |
| 0670 | Flowable backfill (6214600A) | CY | 3 | $425.00 | $252.00 | $431.25 |
| 0680 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 21,336 | $4.40 | $6.50 | $6.35 |
| 0690 | Permanent erosion control geotextile (6240103A) | SY | 136 | $28.25 | $2.40 | $4.25 |
| 0700 | Contractor furnished surveying and staking (6274000) | LS | 1 | $48,415 | $47,460 | $35,292 |
| 0710 | Type C barrier (7034411) | LF | 16 | $492.00 | $320.85 | $659.50 |
| 0720 | Type C barrier transition (7034413) | LF | 102 | $720.00 | $245.25 | $194.00 |
| 0730 | 12 in. pipe group A (7261012) | LF | 26 | $123.00 | $126.30 | $119.75 |
| 0740 | 15 in. pipe group A (7261015) | LF | 26 | $127.00 | $124.75 | $108.75 |
| 0750 | 18 in. pipe group A (7261018) | LF | 885 | $148.00 | $130.30 | $157.50 |
| 0760 | 24 in. pipe group A (7261024) | LF | 98 | $147.00 | $137.40 | $142.50 |
| 0770 | 48 in. pipe group A (7261048) | LF | 356 | $324.00 | $234.25 | $304.25 |
| 0780 | Precast concrete manhole - 48 in. (7310048) | FT | 9 | $1,034.00 | $1,335.25 | $1,226.00 |
| 0790 | Precast concrete manhole - 60 in. (7310060) | FT | 16 | $1,021.00 | $1,374.70 | $1,321.00 |
| 0800 | Precast concrete manhole - 72 in. (7310072) | FT | 20 | $1,029.00 | $1,480.20 | $1,510.00 |
| 0810 | Precast concrete drop inlet 3 FT X 2 FT-6 in. (7311030) | FT | 18 | $683.00 | $1,200.35 | $1,222.00 |
| 0820 | Precast concrete drop inlet 3 FT X 3 FT (7311033) | FT | 18 | $1,020.00 | $1,316.15 | $1,292.50 |
| 0830 | Precast concrete drop inlet 5 FT X 3 FT (7311053) | FT | 117 | $1,185.00 | $1,389.15 | $1,414.50 |
| 0840 | 15 in. or allowed substitute group A flared end section (7320615A) | EACH | 1 | $1,176.00 | $1,681.30 | $2,286.00 |
| 0850 | 24 in. or allowed substitute group A flared end section (7320624A) | EACH | 1 | $1,448.00 | $2,009.00 | $2,850.00 |
| 0860 | Mulching (8025006) | ACRE | 1.20 | $2,421.00 | $2,373.00 | $2,316.00 |
| 0870 | Kentucky bluegrass sodding (8032000A) | SY | 452 | $23.50 | $23.05 | $22.50 |
| 0880 | Seeding - cool season grasses (8051000A) | ACRE | 0.90 | $3,009.00 | $2,949.30 | $2,878.50 |
| 0890 | Sediment trap excavation (8061003) | CY | 10.60 | $103.00 | $55.00 | $21.90 |
| 0900 | Sediment trap rock (8061004) | CY | 4 | $262.00 | $211.65 | $92.70 |
| 0910 | Rock ditch check (8061005) | LF | 96 | $79.85 | $117.40 | $28.50 |
| 0920 | Alternate ditch check (8061006) | LF | 900 | $6.55 | $6.45 | $6.30 |
| 0930 | Curb inlet check (8061007A) | EACH | 33 | $138.00 | $135.60 | $132.25 |
| 0940 | Sediment removal (8061016) | CY | 116 | $113.00 | $58.05 | $34.80 |
| 0950 | Temporary seeding (8061017) | ACRE | 0.30 | $7,954.00 | $7,797.00 | $2,757.00 |
| 0960 | Silt fence (8061019) | LF | 422 | $5.65 | $5.55 | $5.40 |
| 0970 | MGS guardrail (6061060) | LF | 538 | $33.45 | $32.80 | $33.10 |
| 0980 | MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061) | LF | 100 | $38.05 | $37.30 | $38.60 |
| 0990 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 4 | $4,347.00 | $4,261.25 | $4,411.50 |
| 1000 | MGS end anchor (6061080) | EACH | 5 | $1,559.00 | $1,527.80 | $1,654.50 |
| 1010 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 6 | $3,485.00 | $3,416.00 | $3,860.00 |
| 1020 | Lighting pole, 30 FT. or 9.0 M, type at (9011030) | EACH | 16 | $3,374.00 | $4,006.40 | $3,910.00 |
| 1030 | Bracket arm, 15 FT. or 4.6 M (9011115) | EACH | 16 | $1,521.00 | $1,677.25 | $1,637.00 |
| 1040 | Luminaire, LED-A (9011311) | EACH | 16 | $824.00 | $439.85 | $429.25 |
| 1050 | Base mounted control station 240 volt - 4 circuit (9012230) | EACH | 2 | $10,770 | $10,741 | $10,483 |
| 1060 | Conduit, 2 in. rigid, in trench (9013002) | LF | 10 | $69.90 | $21.60 | $21.05 |
| 1070 | Conduit, 3 in. rigid, in trench (9013003) | LF | 80 | $77.15 | $23.20 | $22.65 |
| 1080 | Conduit, 2 in. rigid, median (9013502) | LF | 10 | $60.35 | $21.60 | $21.05 |
| 1090 | Conduit, 3 in. rigid, pushed (9014003) | LF | 1,980 | $37.15 | $42.35 | $41.30 |
| 1100 | Conduit, 4 in. rigid, pushed (9014004) | LF | 170 | $52.50 | $46.65 | $45.50 |
| 1110 | Conduit, 2 in. rigid, external on structure (9014502) | LF | 460 | $90.50 | $63.65 | $62.15 |
| 1120 | Trenching type I (9015010) | LF | 890 | $22.05 | $13.15 | $12.85 |
| 1130 | Pull box, preformed class 1 (9016110) | EACH | 25 | $2,004.00 | $1,946.50 | $1,899.50 |
| 1140 | Cable, 2 AWG 1 conductor (9017002) | LF | 310 | $10.75 | $4.70 | $4.60 |
| 1150 | Cable, 8 AWG 1 conductor (9017008) | LF | 1,170 | $5.50 | $2.80 | $2.70 |
| 1160 | Cable, 10 AWG 1 conductor, pole and bracket (9017110) | LF | 1,800 | $4.05 | $2.05 | $2.00 |
| 1170 | Wire, 8 AWG, bare neutral (9017208) | LF | 590 | $5.50 | $2.75 | $2.70 |
| 1180 | Cable-conduit, 1 in., 2 conductors and 1 bare neutral, 8 AWG (9017407) | LF | 4,080 | $11.00 | $7.45 | $7.25 |
| 1190 | Pole foundation (30 FT. or 9.0 M mounting height) (9018230) | EACH | 16 | $2,838.00 | $1,738.75 | $1,697.00 |
| 1200 | Power supply assembly, type 2, 240/120 volt service, lighting only (9018612) | EACH | 2 | $14,649 | $9,346.05 | $9,122.00 |
| 1210 | Misc.NEMA 4X rated junction box (9019902) | EACH | 12 | $1,865.00 | $477.90 | $466.50 |
| 1220 | Misc.wallpack 150W HPS EQ. LED fixture (9019902) | EACH | 6 | $1,066.00 | $1,149.15 | $1,121.50 |
| 1230 | Signal head, type 3T (9020113) | EACH | 6 | $1,660.00 | $1,616.20 | $1,577.50 |
| 1240 | Signal head, type 4T (9020114) | EACH | 2 | $1,703.00 | $1,645.15 | $1,605.50 |
| 1250 | Signal head, type 5S (9020215) | EACH | 1 | $1,856.00 | $1,743.80 | $1,799.50 |
| 1260 | Signal head, type 3B (9020513) | EACH | 49 | $1,336.00 | $1,440.75 | $1,406.00 |
| 1270 | Signal head, type 4B (9020514) | EACH | 3 | $1,750.00 | $1,800.70 | $1,757.50 |
| 1280 | Signal head, type 1S, pedestrian (9020811) | EACH | 30 | $1,038.00 | $927.50 | $905.25 |
| 1290 | SH-flat sheet - signal sign (9020833) | SF | 208 | $109.00 | $57.35 | $55.95 |
| 1300 | Signal sign, mounting hardware (9020834) | EACH | 24 | $89.35 | $312.50 | $305.00 |
| 1310 | Signal head, optically limited, type 3B (9021413) | EACH | 4 | $9,314.00 | $5,179.75 | $5,055.00 |
| 1320 | Signal head, optically limited, type 4B (9021414) | EACH | 2 | $10,815 | $7,103.65 | $6,933.00 |
| 1330 | Post, signal 4 FT. (9022704) | EACH | 1 | $1,304.00 | $1,270.00 | $1,239.50 |
| 1340 | Post, signal 8 FT. (9022708) | EACH | 20 | $1,530.00 | $1,459.30 | $1,424.00 |
| 1350 | Post, signal 15 FT. (9022715) | EACH | 8 | $1,975.00 | $2,068.70 | $2,019.00 |
| 1360 | Post, type C, 25 FT. arm or 7.6 M arm (9023225) | EACH | 1 | $10,961 | $12,599 | $12,297 |
| 1370 | Post, type C, 30 FT. arm or 9.1 M arm (9023230) | EACH | 1 | $13,043 | $14,480 | $14,133 |
| 1380 | Post, type C, 35 FT. arm or 10.7 M arm (9023235) | EACH | 1 | $14,140 | $15,637 | $15,262 |
| 1390 | Post, type C, 40 FT. arm or 12.2 M arm (9023240) | EACH | 3 | $18,402 | $19,992 | $19,513 |
| 1400 | Post, type C, 50 FT. arm or 15.2 M arm (9023250) | EACH | 2 | $21,024 | $23,030 | $22,477 |
| 1410 | Post, type C, 55 FT. arm (9023255) | EACH | 1 | $26,790 | $28,960 | $28,267 |
| 1420 | Post, type BL, longest arm 50 FT. or 15.2 M (9023450) | EACH | 1 | $35,907 | $37,719 | $36,814 |
| 1430 | Accessible pedestrian signal (9024921) | EACH | 32 | $1,360.00 | $1,151.25 | $1,123.50 |
| 1440 | Conduit, 2 in., trench with tracer wire (9025200) | LF | 101 | $65.85 | $22.45 | $21.90 |
| 1450 | Conduit, 4 in., trench with tracer wire (9025400) | LF | 726 | $61.20 | $27.15 | $26.45 |
| 1460 | Conduit, 4 in., pushed with tracer wire (9027400) | LF | 1,507 | $42.65 | $45.75 | $44.60 |
| 1470 | Cable, 8 AWG 1 conductor, power (9028208) | LF | 390 | $2.90 | $3.05 | $3.00 |
| 1480 | Cable, 16 AWG 2 conductor (9028308) | LF | 6,910 | $1.75 | $2.30 | $2.25 |
| 1490 | Cable, 16 AWG 5 conductor (9028310) | LF | 7,310 | $2.30 | $2.75 | $2.70 |
| 1500 | Cable, 16 AWG 7 conductor (9028311) | LF | 12,180 | $2.90 | $3.15 | $3.10 |
| 1510 | Power supply assembly, type 2 (9028620) | EACH | 2 | $13,130 | $9,334.05 | $9,110.00 |
| 1520 | Power supply assembly, type-2 with 120V lighting control cabinet (9028621) | EACH | 2 | $14,366 | $9,335.05 | $9,110.00 |
| 1530 | Pull box, preformed class 1 (9028810) | EACH | 6 | $1,912.00 | $1,796.60 | $1,753.50 |
| 1540 | Pull box, preformed class 2 (9028811) | EACH | 11 | $2,692.00 | $2,548.65 | $2,487.50 |
| 1550 | Pull box, preformed class 3 (9028812) | EACH | 5 | $4,435.00 | $3,689.55 | $3,601.00 |
| 1560 | Pull box, concrete, double, type A (9028821) | EACH | 3 | $15,491 | $9,824.90 | $9,589.00 |
| 1570 | Base, concrete (9029100) | CY | 44.90 | $3,513.00 | $2,435.90 | $2,377.50 |
| 1580 | Temporary traffic signals (9029400) | LS | 1 | $26,306 | $3,572.95 | $3,487.00 |
| 1590 | Misc.cabinet modification (9029902) | EACH | 1 | $2,164.00 | $2,900.65 | $2,831.00 |
| 1600 | Misc.CCTV camera system (9029902) | EACH | 5 | $6,883.00 | $9,684.95 | $9,452.00 |
| 1610 | Misc.KC district video detection system (9029902) | EACH | 5 | $40,728 | $44,154 | $43,094 |
| 1620 | Misc.NEMA TS2/EV cabinet assembly (without controller) (9029902) | EACH | 4 | $24,877 | $31,691 | $30,930 |
| 1630 | Misc.new load switch in existing controller assembly (9029902) | EACH | 1 | $111.00 | $112.75 | $110.00 |
| 1640 | Concrete footings, embedded (9031010) | CY | 1.80 | $3,312.00 | $3,246.50 | $1,654.50 |
| 1650 | I-beam posts (9031210) | LB | 560 | $10.35 | $10.20 | $7.45 |
| 1660 | Pipe posts (9031220) | LB | 560 | $8.05 | $7.95 | $6.60 |
| 1670 | Breakaway assembly (perforated square steel tube) (9031241) | EACH | 8 | $520.00 | $509.65 | $468.75 |
| 1680 | 2 in. PSST post - 12 GA. (9031270A) | LF | 272 | $19.90 | $19.50 | $22.05 |
| 1690 | Concrete post anchor for 2 in. PSST. - 7 GA. (9031274) | EACH | 17 | $755.00 | $740.15 | $248.25 |
| 1700 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 528 | $21.90 | $21.50 | $24.25 |
| 1710 | Concrete post anchor for 2.5 in. PSST. - 7 GA. (9031285) | EACH | 33 | $814.00 | $797.80 | $275.75 |
| 1720 | SH-flat sheet (9035004A) | SF | 202 | $32.30 | $31.65 | $24.25 |
| 1730 | ST-structural (9035011A) | SF | 1,104 | $36.90 | $36.20 | $33.10 |
| 1740 | Aluminum backing bars (9035030) | LF | 230 | $36.30 | $35.60 | $27.55 |
| 1750 | SHF-flat sheet fluorescent (9035069A) | SF | 118 | $39.20 | $38.45 | $27.55 |
| 1760 | Misc.sign no. 12, type S tubular two tube, 74 FT. (9039901) | LS | 1 | $118,558 | $116,218 | $124,625 |
| 1770 | Misc.sign no. 19, type S tubular two tube, 87 FT. (9039901) | LS | 1 | $146,839 | $143,942 | $154,403 |
| 1780 | Misc.sign no. 20, type S tubular two tube, 70 FT. - 3 in. (9039901) | LS | 1 | $120,248 | $117,875 | $125,728 |
| 1790 | Misc.sign no. 26 type S tubular one tube, 71 FT. (9039901) | LS | 1 | $66,373 | $65,063 | $78,304 |
| 1800 | Misc.sign no. 31, type S tubular two tube, 85 FT. - 9 in. (9039901) | LS | 1 | $143,720 | $140,884 | $151,094 |
| 1810 | Misc.relocate and remount existing sign to new post (9039902) | EACH | 70 | $167.00 | $163.85 | $275.75 |
| 1820 | Conduit, 3 in., rigid, in trench (9105201) | LF | 181 | $44.10 | $23.40 | $22.85 |
| 1830 | Conduit, 3 in., rigid, pushed (9107201) | LF | 846 | $37.40 | $40.90 | $39.90 |
| 1840 | Fiber optic cable, 6-strand, single mode (9108350) | LF | 898 | $5.20 | $2.50 | $2.40 |
| 1850 | Fiber optic cable, 24-strand, 18 single mode, 6 multimode (9108352) | LF | 802 | $14.50 | $5.55 | $5.40 |
| 1860 | Pull box, preformed class 5 (9108816) | EACH | 6 | $5,255.00 | $4,880.25 | $4,763.00 |
| 1870 | Misc.fiber optic splicing, testing and documentation (9109901) | LS | 1 | $10,976 | $33,228 | $32,430 |
| 1880 | Misc.fiber optic patch panel (9109902) | EACH | 5 | $1,962.00 | $940.10 | $917.50 |
| 1890 | Misc.network switch (install only) (9109902) | EACH | 5 | $789.00 | $168.15 | $164.00 |
| 1900 | Misc.lowering scout ITS conduits (9109903) | LF | 96 | $53.35 | $54.25 | $52.95 |
| 1910 | Misc.soil nail wall system (7039904) | SF | 3,331 | $129.00 | $175.85 | $241.75 |
| 1920 | Concrete and masonry protection system (7110300) | LS | 1 | $7,608.00 | $7,458.00 | $7,279.00 |
| 1930 | Sacrificial graffiti protection system (7110400) | LS | 1 | $7,608.00 | $7,458.00 | $7,279.00 |
| 1940 | Fabricated sign support brackets (7121060) | LS | 1 | $17,868 | $17,515 | $8,602.00 |
| 1950 | Concrete crack filler (7040163) | SY | 1,117 | $28.25 | $27.70 | $62.15 |
| 1960 | Surface preparation for applying epoxy-mastic primer (7125102) | LS | 1 | $23,055 | $22,600 | $22,058 |
| 1970 | Gray epoxy-mastic primer (7125961) | LS | 1 | $11,989 | $11,752 | $11,470 |
| 1980 | Open cell foam joint seal (7172054) | LF | 78 | $121.00 | $85.50 | $309.00 |
| 1990 | (120 in.) pedestrian fence (structures) (6071068) | LF | 268 | $278.00 | $272.35 | $270.25 |
| 2000 | Type D barrier (7034219A) | LF | 294 | $259.00 | $104.30 | $152.25 |
| 2010 | Concrete crack filler (7040163) | SY | 1,117 | $28.25 | $27.70 | $62.15 |
| 2020 | Misc.cored slab drain (7129902) | EACH | 7 | $3,746.00 | $2,056.90 | $2,202.00 |
| 2030 | Open cell foam joint seal (7172054) | LF | 78 | $121.00 | $85.50 | $309.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of September 18, 2026. Compiled by Mirage Metrics.