NYSDOT contract D265337 bid tabulation
RT 34 BRIDGE REPLACEMENT OVER SENECA RIVER. Let by New York State DOT on January 9, 2025, Cayuga, Region 03. 4 bids received; low bid $24,221,390 by Vector Construction Corp.
- Owner
- New York State DOT
- Letting
- 09 JAN 2025
- Pay items
- 164
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vector Construction Corp | $24,221,390 | Low |
| 2 | Economy Paving Co Inc | $24,242,042 | 0.0% |
| 3 | Cold Spring Construction Company | $24,275,845 | 0.0% |
| 4 | Slate Hill Constructors Inc | $30,527,359 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vector Construction Corp | 2. Economy Paving Co Inc | 3. Cold Spring Construction Company | 4. Slate Hill Constructors Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $48,000 | $185,000 | $75,000 | $150,000 |
| 2 | (202.120001) | LS | 1 | $1,950,000 | $2,500,000 | $2,500,000 | $6,400,000 |
| 3 | Removal of Substructures (202.19) | CY | 612 | $140.00 | $155.00 | $200.00 | $280.00 |
| 4 | Unclassified Excavation and Disposal (203.02) | CY | 5,378 | $21.00 | $15.00 | $25.00 | $50.00 |
| 5 | Embankment In Place (203.03) | CY | 10,402 | $27.00 | $20.00 | $13.50 | $50.00 |
| 6 | Select Granular Fill (203.07) | CY | 151 | $80.00 | $55.00 | $56.00 | $110.00 |
| 7 | Settlement Rods (203.12) | EACH | 35 | $331.00 | $250.00 | $300.00 | $825.00 |
| 8 | Select Granular Subgrade (203.20) | CY | 4,379 | $60.00 | $65.00 | $65.00 | $85.00 |
| 9 | Select Structural Fill (203.21) | CY | 585 | $68.00 | $75.00 | $80.00 | $95.00 |
| 10 | (203.24010017) | 69 | $46.00 | $10.00 | $43.00 | $100.00 | |
| 11 | (203.51990006) | 832 | $11.00 | $1.00 | $15.00 | $11.00 | |
| 12 | Structure Excavation (206.01) | CY | 5,495 | $24.00 | $25.00 | $24.00 | $50.00 |
| 13 | Trench and Culvert Excavation (206.0201) | CY | 406 | $34.00 | $5.00 | $32.00 | $50.00 |
| 14 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 100 | $45.00 | $1.00 | $33.00 | $37.00 |
| 15 | Geotextile Drainage (207.22) | SY | 166 | $5.00 | $1.00 | $5.00 | $14.00 |
| 16 | Prefabricated Composite Integral Abutment Drain (207.27) | SY | 226 | $18.00 | $8.85 | $19.00 | $20.00 |
| 17 | (208.01030022) | 17 | $130.00 | $135.00 | $160.00 | $150.00 | |
| 18 | Mulch – Temporary (209.100101) | SY | 22,500 | $0.81 | $1.00 | $0.80 | $1.30 |
| 19 | Seed and Mulch – Temporary (209.1003) | SY | 7,000 | $0.86 | $1.00 | $0.85 | $1.30 |
| 20 | (209.11010024) | 1 | $261.00 | $150.00 | $250.00 | $550.00 | |
| 21 | Silt Fence - Temporary (209.13) | LF | 50 | $7.00 | $5.00 | $40.50 | $10.00 |
| 22 | Turbidity Curtain – Temporary (209.1501) | LF | 235 | $34.00 | $20.00 | $58.00 | $17.00 |
| 23 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 635 | $6.00 | $10.00 | $6.25 | $5.75 |
| 24 | Soil Stabilizers, Class IV Type A (209.2101) | SY | 12,198 | $0.95 | $1.00 | $0.95 | $1.75 |
| 25 | (209.23010009) | 4,372 | $9.85 | $7.50 | $12.50 | $10.50 | |
| 26 | Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312) | SF | 102 | $175.00 | $10.00 | $85.00 | $190.00 |
| 27 | Subbase Course, Optional Type (304.15) | CY | 3,334 | $73.00 | $75.00 | $72.00 | $90.00 |
| 28 | (404.0001) | TON | 229 | $70.00 | $70.00 | $70.00 | $70.00 |
| 29 | (404.0189) | TON | 9 | $105.00 | $140.00 | $200.00 | $110.00 |
| 30 | (404.0972) | TON | 846 | $105.00 | $120.00 | $116.00 | $110.00 |
| 31 | (404.1979) | TON | 1,328 | $93.00 | $110.00 | $97.00 | $100.00 |
| 32 | (404.2589) | TON | 2,390 | $85.00 | $110.00 | $98.00 | $90.00 |
| 33 | (404.4489) | TON | 19 | $190.00 | $160.00 | $185.00 | $195.00 |
| 34 | (404.4589) | TON | 28 | $190.00 | $160.00 | $150.00 | $195.00 |
| 35 | Diluted Tack Coat (407.0102) | GAL | 791 | $2.00 | $3.40 | $7.00 | $2.20 |
| 36 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 13,688 | $0.30 | $0.35 | $0.01 | $0.30 |
| 37 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 584 | $15.00 | $25.00 | $15.00 | $15.00 |
| 38 | Steel H-Piles (HP 14x89) (551.014089) | LF | 10,176 | $72.00 | $28.50 | $16.00 | $2.50 |
| 39 | Splices for Steel H-Piles (551.12) | EACH | 76 | $10.00 | $1.00 | $0.01 | $20.00 |
| 40 | Furnishing Equipment for Driving Piles (551.13) | LS | 1 | $560,000 | $1,000,000 | $1,000,000 | $1,300,000 |
| 41 | Shields and Shoring (552.17) | SF | 2,456 | $1.00 | $0.10 | $1.25 | $5.00 |
| 42 | (553.010001) | EACH | 1 | $350,000 | $500,000 | $250,000 | $175,000 |
| 43 | (553.010002) | EACH | 1 | $350,000 | $500,000 | $250,000 | $175,000 |
| 44 | Footing Concrete, Performance (555.0011) | CY | 277 | $680.00 | $600.00 | $800.00 | $1,000.00 |
| 45 | Concrete for Structures, Performance (555.0021) | CY | 649 | $1,200.00 | $850.00 | $1,150.00 | $1,100.00 |
| 46 | (555.02000001) | 456 | $762.00 | $450.00 | $715.00 | $850.00 | |
| 47 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $2.75 | $2.75 | $2.75 | $2.75 |
| 48 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $5.00 | $5.00 | $5.00 | $5.00 |
| 49 | Galvanized Bar Reinforcement for Structures (556.0203) | LB | 196,564 | $2.06 | $2.00 | $2.50 | $2.20 |
| 50 | Stud Shear Connectors for Bridges (556.03) | EACH | 9,486 | $5.20 | $5.00 | $7.25 | $5.60 |
| 51 | (557.1019) | SY | 287 | $435.00 | $435.00 | $490.00 | $500.00 |
| 52 | (557.1119) | SY | 3,370 | $515.00 | $450.00 | $500.00 | $540.00 |
| 53 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 3,615 | $0.01 | $0.10 | $0.01 | $0.10 |
| 54 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $6.63 | $6.63 | $6.63 | $6.63 |
| 55 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 3,385 | $6.00 | $7.00 | $7.65 | $7.50 |
| 56 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 30,464 | $0.45 | $0.55 | $0.55 | $1.10 |
| 57 | Protective Sealing of New Structural Concrete (559.02) | SF | 5,961 | $1.10 | $0.90 | $1.25 | $2.50 |
| 58 | (564.0501) | LS | 1 | $7,600,000 | $7,750,000 | $7,200,000 | $6,000,000 |
| 59 | Type M.R. Expansion Bearing (226 to 450 k) (565.1522) | EACH | 12 | $7,000.00 | $5,650.00 | $6,000.00 | $7,500.00 |
| 60 | Type M.R. Expansion Bearing (676 to 900 k) (565.1524) | EACH | 12 | $9,000.00 | $8,250.00 | $9,000.00 | $12,000 |
| 61 | Modular Expansion Joint System - Two Cell (566.02) | LF | 82 | $2,100.00 | $1,950.00 | $2,250.00 | $2,200.00 |
| 62 | Transition Bridge Railing (568.70) | LF | 160 | $160.00 | $155.00 | $160.00 | $170.00 |
| 63 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 1,376 | $230.00 | $160.00 | $210.00 | $215.00 |
| 64 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $9.92 | $9.92 | $9.92 | $9.92 |
| 65 | Lead-Exposure Control Plan (570.01) | LS | 1 | $1.00 | $100.00 | $250.00 | $3,000.00 |
| 66 | Medical Testing (570.02) | DOL | 1,500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 67 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 1,500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 68 | Decontamination Facilities (570.04) | CALENDAR WEEK | 5 | $1.00 | $100.00 | $350.00 | $600.00 |
| 69 | (570.10) | LS | 1 | $1.00 | $100.00 | $0.01 | $1.00 |
| 70 | (572.00020101) | LS | 1 | $1,750,000 | $1,400,000 | $1,700,000 | $1,500,000 |
| 71 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 36 | $60.00 | $35.00 | $170.00 | $320.00 |
| 72 | Field Drill Holes in Existing Structural Steel (586.10) | EACH | 36 | $16.00 | $50.00 | $75.00 | $100.00 |
| 73 | Treated Timber and Lumber (594.03) | CF | 5 | $300.00 | $10.00 | $140.00 | $1,100.00 |
| 74 | (594.04020603) | 24 | $90.00 | $1.00 | $20.00 | $95.00 | |
| 75 | Culvert-End Safety Grate (603.0101) | SF | 30 | $30.00 | $35.00 | $35.00 | $70.00 |
| 76 | (603.6002) | LF | 82 | $80.00 | $75.00 | $115.00 | $95.00 |
| 77 | (603.6005) | LF | 54 | $95.00 | $115.00 | $175.00 | $110.00 |
| 78 | (603.6007) | LF | 115 | $170.00 | $155.00 | $235.00 | $135.00 |
| 79 | (603.7302) | EACH | 4 | $3,000.00 | $2,035.00 | $2,400.00 | $2,750.00 |
| 80 | (603.7305) | EACH | 2 | $4,200.00 | $3,675.00 | $3,750.00 | $4,000.00 |
| 81 | (603.7307) | EACH | 2 | $4,600.00 | $5,145.00 | $4,500.00 | $4,700.00 |
| 82 | Underdrain Filter, Type II (605.1001) | CY | 10 | $140.00 | $200.00 | $225.00 | $195.00 |
| 83 | (605.1602) | LF | 112 | $20.00 | $2.15 | $30.00 | $140.00 |
| 84 | Box Beam Guide Railing (606.10) | LF | 2,612 | $43.00 | $45.00 | $42.00 | $45.00 |
| 85 | Box Beam Guide Railing End Assembly Type I with 18 ft Extension (606.120103) | EACH | 8 | $4,500.00 | $4,215.00 | $4,400.00 | $4,600.00 |
| 86 | Box Beam Guide Railing End Assembly Type IIA (606.120201) | EACH | 2 | $1,800.00 | $1,750.00 | $1,775.00 | $1,900.00 |
| 87 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 2,192 | $4.00 | $5.00 | $5.50 | $5.00 |
| 88 | (607.41010010) | 440 | $6.50 | $5.50 | $5.25 | $5.50 | |
| 89 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 11 | $70.00 | $70.00 | $70.00 | $70.00 |
| 90 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 228 | $155.00 | $145.00 | $250.00 | $160.00 |
| 91 | Stone Curb – Bridge (Type A) (609.0301) | LF | 57 | $120.00 | $120.00 | $162.00 | $170.00 |
| 92 | Compost (610.10) | CY | 1,009 | $47.00 | $35.00 | $50.56 | $92.00 |
| 93 | Topsoil - Roadside (610.1402) | CY | 1,453 | $52.00 | $30.00 | $115.00 | $110.00 |
| 94 | Turf Establishment - Roadside (610.1601) | SY | 990 | $32.00 | $3.50 | $3.25 | $1.60 |
| 95 | (610.16030224) | 12,098 | $1.10 | $1.00 | $1.15 | $3.75 | |
| 96 | Turf Establishment – Performance (610.1605) | SY | 398 | $20.00 | $20.00 | $21.00 | $17.00 |
| 97 | Watering Vegetation (610.19) | 1,000 GALLONS | 1,763 | $5.00 | $1.00 | $60.00 | $24.00 |
| 98 | (617.01010024) | 500 | $4.00 | $5.00 | $5.25 | $5.50 | |
| 99 | (617.10000024) | 10 | $120.00 | $100.00 | $175.00 | $150.00 | |
| 100 | (617.11000024) | LS | 1 | $6,000.00 | $100.00 | $250.00 | $3,000.00 |
| 101 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $80,000 | $500,000 | $200,000 | $2,350,000 |
| 102 | Type III Construction Barricades (619.04) | EACH | 49 | $135.00 | $200.00 | $100.00 | $50.00 |
| 103 | (619.111112) | EACH | 2 | $22,000 | $10,000 | $15,000 | $8,250.00 |
| 104 | Temporary Positive Barrier – Category 1 (Pinning Prohibited) (619.1711) | LF | 40 | $33.00 | $25.00 | $60.00 | $110.00 |
| 105 | Mailboxes (619.27) | EACH | 3 | $300.00 | $500.00 | $300.00 | $100.00 |
| 106 | (619.99230101) | LS | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 107 | (619.99230201) | 14 | $240.00 | $250.00 | $50.00 | $250.00 | |
| 108 | Stone Filling (Light) (620.03) | CY | 70 | $140.00 | $75.00 | $210.00 | $145.00 |
| 109 | Stone Filling (Heavy) (620.05) | CY | 1,861 | $135.00 | $125.00 | $130.00 | $160.00 |
| 110 | Bedding Material, Type 1 (620.0801) | CY | 367 | $95.00 | $115.00 | $140.00 | $120.00 |
| 111 | (621.05020004) | 2,727 | $4.00 | $0.10 | $3.00 | $11.00 | |
| 112 | (621.51000015) | 44 | $12.00 | $1.00 | $13.00 | $60.00 | |
| 113 | Survey Operations (625.01) | LS | 1 | $55,000 | $30,000 | $80,000 | $60,000 |
| 114 | (625.09010015) | LS | 1 | $14,000 | $1,000.00 | $4,000.00 | $1,000.00 |
| 115 | (627.50140008) | 106 | $10.00 | $1.00 | $5.00 | $5.00 | |
| 116 | (634.99010017) | LS | 1 | $4,400.00 | $5,000.00 | $5,700.00 | $5,500.00 |
| 117 | (634.99020017) | LS | 1 | $7,500.00 | $3,000.00 | $5,500.00 | $3,250.00 |
| 118 | Concrete Cylinder Curing Equipment (637.04) | EACH | 2 | $1,000.00 | $3,000.00 | $250.00 | $3,000.00 |
| 119 | Engineer’s Field Office – Type 1 (637.11) | MONTH | 18 | $2,700.00 | $3,000.00 | $2,600.00 | $3,400.00 |
| 120 | Rain Gauge (637.26) | EACH | 1 | $200.00 | $100.00 | $40.00 | $75.00 |
| 121 | Office Technology and Supplies (637.34) | DOL | 2,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 122 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 123 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 124 | (639.21010011) | LS | 1 | $75,000 | $75,000 | $75,000 | $75,000 |
| 125 | (642.31510024) | 100 | $20.00 | $35.00 | $37.00 | $40.00 | |
| 126 | (645.13070010) | 4 | $210.00 | $500.00 | $420.00 | $265.00 | |
| 127 | (645.13080010) | 52 | $26.00 | $25.00 | $21.00 | $55.00 | |
| 128 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 57 | $40.00 | $40.00 | $39.00 | $65.00 |
| 129 | Type A Sign Posts with Extra Embedment (645.8104) | EACH | 10 | $210.00 | $205.00 | $210.00 | $350.00 |
| 130 | Reference Marker Panel (646.21) | EACH | 2 | $45.00 | $40.00 | $40.00 | $70.00 |
| 131 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 53 | $19.00 | $20.00 | $17.00 | $40.00 |
| 132 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 3 | $16.00 | $15.00 | $15.00 | $66.00 |
| 133 | Steel Post, 2.0 lb/ft (646.32) | EACH | 30 | $70.00 | $70.00 | $65.00 | $155.00 |
| 134 | Brackets for Barrier and Multidirectional Mounting (646.50) | EACH | 4 | $70.00 | $70.00 | $65.00 | $220.00 |
| 135 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 5 | $60.00 | $50.00 | $125.00 | $43.00 |
| 136 | Remove and Dispose Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.51) | EACH | 4 | $30.00 | $50.00 | $125.00 | $50.00 |
| 137 | (647.83001002) | 1 | $15.00 | $50.00 | $125.00 | $18.00 | |
| 138 | Miscellaneous Metals (656.01) | LB | 159 | $5.00 | $1.00 | $10.00 | $12.00 |
| 139 | (665.98000103) | LS | 1 | $100,000 | $50,000 | $100,000 | $140,000 |
| 140 | Cast Iron Junction Boxes (670.40) | EACH | 8 | $1,800.00 | $3,000.00 | $2,600.00 | $1,750.00 |
| 141 | Photoelectric Controls (670.60) | EACH | 2 | $90.00 | $20.00 | $475.00 | $230.00 |
| 142 | (670.75040011) | 60 | $4.00 | $25.00 | $6.00 | $3.50 | |
| 143 | Concrete Work Pad (5 feet x 5 feet x 4 inches) (680.5003) | EACH | 1 | $900.00 | $2,000.00 | $2,500.00 | $775.00 |
| 144 | (680.510501) | EACH | 4 | $2,200.00 | $2,000.00 | $2,500.00 | $3,000.00 |
| 145 | (680.520103) | LF | 10 | $20.00 | $6.00 | $30.00 | $11.00 |
| 146 | (680.520106) | LF | 110 | $40.00 | $30.00 | $37.00 | $17.50 |
| 147 | (680.520110) | LF | 55 | $90.00 | $50.00 | $72.00 | $65.00 |
| 148 | (680.520203) | LF | 14 | $80.00 | $6.50 | $80.00 | $11.00 |
| 149 | (680.520406) | LF | 900 | $70.00 | $35.00 | $100.00 | $70.00 |
| 150 | (680.520410) | LF | 10 | $300.00 | $120.00 | $750.00 | $390.00 |
| 151 | Riser Assembly, 2-inch Diameter (680.700606) | EACH | 1 | $800.00 | $2,500.00 | $1,300.00 | $1,300.00 |
| 152 | (680.730310) | LF | 2,600 | $8.00 | $5.00 | $4.50 | $10.00 |
| 153 | (680.80620103) | 1 | $13,000 | $10,000 | $10,000 | $9,000.00 | |
| 154 | (680.90920103) | 1 | $2,500.00 | $2,000.00 | $3,000.00 | $1,600.00 | |
| 155 | (680.950104) | LF | 800 | $5.00 | $10.00 | $6.25 | $3.50 |
| 156 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 8,926 | $0.80 | $0.50 | $1.00 | $1.25 |
| 157 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 4,496 | $0.80 | $0.50 | $1.00 | $1.25 |
| 158 | (690.01000105) | LS | 1 | $210,000 | $75,000 | $65,000 | $300,000 |
| 159 | (691.04000020) | 21,000 | $1.00 | $1.00 | $1.00 | $1.00 | |
| 160 | Field Change Payment (FCP) (697.03) | DOL | 2,150,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 161 | Asphalt Price Adjustment (698.04) | DOL | 10,613 | $1.00 | $1.00 | $1.00 | $1.00 |
| 162 | Fuel Price Adjustment (698.05) | DOL | 3,980 | $1.00 | $1.00 | $1.00 | $1.00 |
| 163 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 | $1.00 |
| 164 | Mobilization (699.040001) | LS | 1 | $920,000 | $899,977 | $933,000 | $1,000,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of January 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.