ODOT contract 250062 bid tabulation
RIC-IR 71-15.76 (SLIDE REPAIR). Let by Ohio DOT on January 30, 2025, RIC. 3 bids received; low bid $1,560,887 by Smith Paving & Excavating Inc, +73% against the engineer's estimate of $904,000.
- Owner
- Ohio DOT
- Letting
- 30 JAN 2025
- Pay items
- 42
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Smith Paving & Excavating Inc | $1,560,887 | Low | +73% |
| 2 | Shelly & Sands Inc | $1,618,813 | +4.0% | +79% |
| 3 | Great Lakes Construction Co | $1,633,500 | +5.0% | +81% |
Engineer's estimate: $904,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Smith Paving & Excavating Inc | 2. Shelly & Sands Inc | 3. Great Lakes Construction Co |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $297,000 | $459,000 | $333,500 |
| 2 | Guardrail removed (202E38000) | FT | 455 | $2.00 | $2.00 | $3.00 |
| 3 | Anchor assembly removed, type B (202E42050) | EACH | 1 | $135.00 | $135.00 | $250.00 |
| 4 | Embankment (203E20000) | CY | 250 | $29.00 | $45.00 | $82.00 |
| 5 | Subgrade compaction (204E10000) | SY | 1,080 | $2.50 | $10.00 | $2.50 |
| 6 | Guardrail, type MGS (606E15050) | FT | 300 | $21.20 | $22.00 | $18.00 |
| 7 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 1 | $2,740.00 | $2,740.00 | $2,200.00 |
| 8 | Bridge terminal assembly, type 1 (606E35000) | EACH | 3 | $2,625.00 | $2,625.00 | $2,350.00 |
| 9 | Concrete barrier, single slope, type D, as per plan (622E10161) | FT | 3,240 | $175.00 | $127.00 | $162.25 |
| 10 | Barrier transition, as per plan (622E10201) | EACH | 3 | $12,500 | $6,500.00 | $15,000 |
| 11 | Concrete barrier end section, type D (622E25000) | EACH | 3 | $5,500.00 | $6,500.00 | $8,600.00 |
| 12 | Concrete barrier, end anchorage, reinforced, type D, as per plan (622E25051) | EACH | 1 | $6,250.00 | $6,500.00 | $3,775.00 |
| 13 | Barrier reflector, type 2 (one way) (626E00110) | EACH | 8 | $12.50 | $13.00 | $10.00 |
| 14 | Scaling (862E00500) | HR | 125 | $750.00 | $625.00 | $775.00 |
| 15 | Excavation, as per plan (862E00611) | CY | 125 | $60.00 | $75.00 | $90.00 |
| 16 | Soil analysis test (659E00100) | EACH | 2 | $150.00 | $150.00 | $50.00 |
| 17 | Topsoil (659E00300) | CY | 323 | $68.00 | $50.00 | $60.00 |
| 18 | Seeding and mulching (659E10000) | SY | 2,906 | $2.00 | $1.50 | $3.00 |
| 19 | Repair seeding and mulching (659E14000) | SY | 145 | $3.00 | $1.50 | $1.25 |
| 20 | Inter-seeding (659E15000) | SY | 145 | $3.00 | $1.50 | $0.10 |
| 21 | Commercial fertilizer (659E20000) | TON | 0.40 | $2,000.00 | $1,250.00 | $750.00 |
| 22 | Lime (659E31000) | ACRE | 0.60 | $800.00 | $150.00 | $50.00 |
| 23 | Water (659E35000) | MGAL | 16.08 | $20.00 | $1.00 | $1.25 |
| 24 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 |
| 25 | Aggregate base (304E20000) | CY | 180 | $80.00 | $93.00 | $155.00 |
| 26 | 9" non-reinforced concrete pavement, class QC 1P (452E13010) | SY | 900 | $101.00 | $150.00 | $178.00 |
| 27 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $95.00 | $110.00 | $100.00 |
| 28 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 2 | $2,560.00 | $2,250.00 | $2,000.00 |
| 29 | Work zone increased penalties sign (614E12484) | EACH | 4 | $275.00 | $275.00 | $150.00 |
| 30 | Barrier reflector, type 1 (one way) (614E13310) | EACH | 86 | $20.00 | $10.00 | $6.50 |
| 31 | Object marker, one way (614E13350) | EACH | 86 | $25.00 | $15.00 | $14.65 |
| 32 | Portable changeable message sign (614E18600) | SNMT | 8 | $950.00 | $1,000.00 | $750.00 |
| 33 | Work zone lane line, class I, 6", 740.06, type I (614E20210) | MI | 0.32 | $5,950.00 | $6,500.00 | $8,850.00 |
| 34 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 1.41 | $4,500.00 | $4,900.00 | $11,400 |
| 35 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.60 | $10,000 | $10,750 | $11,800 |
| 36 | Work zone dotted line, class I, 6", 740.06, type I (614E24402) | FT | 1,680 | $2.75 | $3.00 | $2.45 |
| 37 | Portable barrier, unanchored (622E41100) | FT | 4,290 | $39.00 | $20.00 | $30.00 |
| 38 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $15,000 | $9,500.00 | $15,000 |
| 39 | Maintaining traffic (614E11000) | LS | 1 | $50,000 | $129,000 | $24,000 |
| 40 | Field office, type B (619E16010) | MNTH | 4 | $2,500.00 | $5,500.00 | $6,000.00 |
| 41 | Construction layout stakes and surveying (623E10000) | LS | 1 | $5,000.00 | $25,000 | $5,000.00 |
| 42 | Mobilization (624E10000) | LS | 1 | $75,000 | $80,000 | $83,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.