ODOT contract 250098 bid tabulation
NOB-CR 56-South Access (INTERSECTION). Let by Ohio DOT on February 13, 2025, NOB. 3 bids received; low bid $556,886 by Shelly & Sands Inc, -8.7% against the engineer's estimate of $610,000.
- Owner
- Ohio DOT
- Letting
- 13 FEB 2025
- Pay items
- 66
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $556,886 | Low | -9.0% |
| 2 | LMS Construction Inc | $649,832 | +17% | +7.0% |
| 3 | Alan Stone Co Inc | $765,051 | +37% | +25% |
Engineer's estimate: $610,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. LMS Construction Inc | 3. Alan Stone Co Inc |
|---|---|---|---|---|---|---|
| 1 | Special - tree removed, 4"-12" (201E20010) | EACH | 2 | $1,200.00 | $500.00 | $1,300.00 |
| 2 | Pavement removed (202E23000) | SY | 2,706 | $8.00 | $20.00 | $15.00 |
| 3 | Walk removed (202E30000) | SF | 62 | $8.00 | $20.00 | $15.00 |
| 4 | Curb removed (202E32000) | FT | 543 | $5.00 | $12.00 | $15.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 216 | $12.00 | $8.00 | $60.00 |
| 6 | Fence removed (202E75000) | FT | 95 | $5.00 | $7.00 | $5.00 |
| 7 | Excavation (203E10000) | CY | 229 | $26.00 | $30.00 | $45.00 |
| 8 | Embankment (203E20000) | CY | 279 | $10.00 | $50.00 | $80.00 |
| 9 | Subgrade compaction (204E10000) | SY | 416 | $2.00 | $6.00 | $6.00 |
| 10 | Cement (206E10500) | TON | 26 | $257.00 | $500.00 | $290.00 |
| 11 | Curing coat, as per plan (206E11001) | SY | 1,263 | $0.50 | $1.22 | $0.50 |
| 12 | Cement stabilized subgrade, 12 inches deep (206E15010) | SY | 1,263 | $15.75 | $17.00 | $25.00 |
| 13 | Test rolling (206E20000) | HR | 1 | $900.00 | $300.00 | $270.00 |
| 14 | Mixture design for chemically stabilized soils (206E30000) | LS | 1 | $3,800.00 | $3,000.00 | $4,300.00 |
| 15 | Special - restoration from temporary drive removal (690E98400) | LS | 1 | $2,500.00 | $10,000 | $4,800.00 |
| 16 | Topsoil (659E00300) | CY | 40 | $100.00 | $20.00 | $35.00 |
| 17 | Seeding and mulching (659E10000) | SY | 360 | $9.00 | $5.00 | $7.50 |
| 18 | Repair seeding and mulching (659E14000) | SY | 18 | $9.00 | $5.00 | $9.00 |
| 19 | Inter-seeding (659E15000) | SY | 18 | $9.00 | $5.00 | $9.50 |
| 20 | Commercial fertilizer (659E20000) | TON | 0.06 | $1,250.00 | $10,000 | $640.00 |
| 21 | Lime (659E31000) | ACRE | 0.08 | $150.00 | $5,000.00 | $920.00 |
| 22 | Water (659E35000) | MGAL | 3 | $1.00 | $10.00 | $110.00 |
| 23 | 6" conduit, type E (611E01400) | FT | 100 | $15.00 | $25.00 | $20.39 |
| 24 | 6" conduit, type F (611E01500) | FT | 100 | $15.00 | $25.00 | $22.62 |
| 25 | 12" conduit, type B (611E04400) | FT | 216 | $40.00 | $50.00 | $77.99 |
| 26 | 12" conduit, type C (611E04600) | FT | 100 | $45.00 | $50.00 | $89.13 |
| 27 | Inspection well (611E99720) | EACH | 5 | $650.00 | $1,500.00 | $1,135.35 |
| 28 | Aggregate base (304E20000) | CY | 416 | $90.00 | $135.00 | $140.00 |
| 29 | Non-tracking tack coat (407E20000) | GAL | 65 | $3.50 | $3.75 | $35.00 |
| 30 | Asphalt concrete surface course, type 1, (446), PG64-22 (441E10000) | CY | 69 | $450.00 | $460.00 | $430.00 |
| 31 | 10" reinforced concrete pavement, class QC 1P (451E15010) | SY | 1,263 | $123.00 | $97.00 | $150.00 |
| 32 | 10" non-reinforced concrete pavement, class QC 1P (452E14010) | SY | 609 | $103.00 | $95.00 | $200.00 |
| 33 | Fence, type 47 (607E15000) | FT | 95 | $50.00 | $25.00 | $55.00 |
| 34 | 5" concrete walk (608E12000) | SF | 62 | $29.00 | $15.00 | $9.00 |
| 35 | Curb, type 6 (609E26000) | FT | 543 | $56.00 | $40.00 | $35.00 |
| 36 | Ground mounted support, no. 3 post (630E03100) | FT | 56 | $50.00 | $20.00 | $55.00 |
| 37 | Removal of ground mounted sign and reerection (630E85100) | EACH | 5 | $250.00 | $150.00 | $290.00 |
| 38 | Removal of ground mounted post support and disposal (630E86002) | EACH | 4 | $40.00 | $15.00 | $45.00 |
| 39 | Removal of pavement marking (644E30000) | FT | 2,950 | $0.50 | $1.00 | $0.60 |
| 40 | Removal of pavement marking (644E30010) | SF | 64 | $1.00 | $1.00 | $1.00 |
| 41 | Removal of pavement marking (644E30020) | EACH | 1 | $100.00 | $100.00 | $110.00 |
| 42 | Edge line, 6" (646E10010) | MI | 0.22 | $9,000.00 | $3,000.00 | $10,000 |
| 43 | Center line (646E10200) | MI | 0.30 | $9,000.00 | $9,000.00 | $10,000 |
| 44 | Channelizing line, 8" (646E10300) | FT | 657 | $3.00 | $3.00 | $3.50 |
| 45 | Stop line (646E10400) | FT | 49 | $11.00 | $12.00 | $15.00 |
| 46 | Crosswalk line, 24" (646E10520) | FT | 93 | $10.00 | $10.00 | $10.00 |
| 47 | Transverse/diagonal line (646E10600) | FT | 220 | $11.00 | $8.00 | $15.00 |
| 48 | Island marking (646E10800) | SF | 64 | $10.00 | $10.00 | $10.00 |
| 49 | Lane arrow (646E20300) | EACH | 16 | $155.00 | $150.00 | $180.00 |
| 50 | Traffic compacted surface, type A or B (410E12000) | CY | 5 | $180.00 | $180.00 | $180.00 |
| 51 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 24 | $115.00 | $85.00 | $100.00 |
| 52 | Asphalt concrete for maintaining traffic (614E13000) | CY | 15 | $650.00 | $170.00 | $550.00 |
| 53 | Portable changeable message sign, as per plan (614E18601) | SNMT | 4 | $1,100.00 | $1,500.00 | $1,700.00 |
| 54 | Work zone center line, class I, 642 paint (614E21100) | MI | 0.23 | $1,100.00 | $3,250.00 | $3,700.00 |
| 55 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 0.45 | $995.00 | $1,950.00 | $2,200.00 |
| 56 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 62 | $1.00 | $7.00 | $8.00 |
| 57 | Work zone dotted line, class I, 4", 642 paint (614E24200) | FT | 151 | $0.75 | $3.00 | $3.50 |
| 58 | Work zone stop line, class I, 642 paint (614E26200) | FT | 150 | $8.00 | $5.00 | $5.50 |
| 59 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 5 | $90.00 | $175.00 | $200.00 |
| 60 | Work zone word on pavement, 72", class I, 642 paint (614E31200) | EACH | 2 | $60.00 | $275.00 | $310.00 |
| 61 | Business entrance sign (614E40050) | EACH | 6 | $120.00 | $100.00 | $110.00 |
| 62 | Water (616E10000) | MGAL | 20 | $50.00 | $1.00 | $1.00 |
| 63 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $3,000.00 | $35,000 | $4,800.00 |
| 64 | Maintaining traffic (614E11000) | LS | 1 | $55,100 | $78,000 | $60,500 |
| 65 | Construction layout stakes and surveying (623E10000) | LS | 1 | $7,000.00 | $5,000.00 | $14,000 |
| 66 | Mobilization (624E10000) | LS | 1 | $25,000 | $34,800 | $22,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 13, 2025. Compiled by Mirage Metrics.