ODOT contract 250118 bid tabulation

ERI-SR 60-00.00 (TWO LANE RESURFACING). Let by Ohio DOT on February 27, 2025, ERI. 3 bids received; low bid $1,074,201 by Erie Blacktop Inc, -10% against the engineer's estimate of $1,199,000.

Owner
Ohio DOT
Letting
27 FEB 2025
Pay items
51
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Erie Blacktop Inc$1,074,201Low-10%
2Kokosing Construction Company Inc$1,089,096+1.0%-9.0%
3Gerken Paving Inc$1,216,834+13%+1.0%
ODOT contract 250118: bids by rank

Engineer's estimate: $1,199,000.

Bid tabulation

LinePay itemUnitQuantity1. Erie Blacktop Inc2. Kokosing Construction Company Inc3. Gerken Paving Inc
1Guardrail removed (202E38000)FT187.50$2.10$2.00$2.00
2Anchor assembly removed, type E (202E42010)EACH2$152.25$150.00$145.00
3Anchor assembly removed, type T (202E42040)EACH1$99.75$150.00$95.00
4Anchor assembly removed, type B (202E42050)EACH7$115.50$150.00$110.00
5Bridge terminal assembly removed (202E47000)EACH2$78.75$250.00$75.00
6Embankment, as per plan (203E20001)CY12$79.80$65.00$76.00
7Linear grading (209E60500)MI6.40$1,750.00$3,700.00$2,100.00
8Grading mailbox approaches (209E80000)EACH69$90.00$20.00$560.00
9Guardrail, type MGS (606E15050)FT375$20.40$19.00$19.40
10Raising type 5 guardrail (606E17000)FT100$7.15$9.50$6.80
11Anchor assembly, MGS type E (MASH 2016) (606E26150)EACH5$2,510.00$2,400.00$2,390.00
12Anchor assembly, MGS type T (606E26550)EACH5$1,386.00$1,100.00$1,320.00
13Anchor assembly rebuilt, type T (606E27900)EACH2$945.00$650.00$900.00
14MGS bridge terminal assembly, type 1 (606E35002)EACH2$2,610.00$2,275.00$2,485.00
15Barrier reflector, type 2 (BI-directional) (614E13312)EACH19$12.60$11.00$12.00
16Monument assembly adjusted to grade, as per plan (623E39501)EACH14$700.00$375.00$1,200.00
17Monument assembly reconstructed to grade, as per plan (623E39601)EACH5$1,600.00$1,100.00$2,750.00
18Post construction survey monument verification and report (623E51000)LS1$11,000$1,500.00$3,500.00
19Special - mailbox support system, single (690E50100)EACH1$190.00$450.00$550.00
20Erosion control (832E30000)EACH500$1.00$1.00$1.00
21Catch basin adjusted to grade (611E98630)EACH1$1,450.00$1,400.00$3,250.00
22Partial depth pavement repair (442) (251E01030)CY420$220.00$220.00$250.00
23Partial depth pavement repair (442) (251E01030)CY180$450.00$245.00$445.00
24Pavement repair (253E02000)CY42$300.00$345.00$350.00
25Pavement repair (253E02000)CY18$700.00$370.00$625.00
26Pavement planing, asphalt concrete(2.00?) (254E01000)SY52,595$1.55$1.60$2.40
27Pavement planing, asphalt concrete (3.00") (254E01000)SY381$3.30$10.00$2.90
28Patching planed surface (254E01600)SY245$12.50$1.25$28.00
29Tack coat (407E10000)GAL24$2.55$2.00$2.50
30Tack coat (407E10000)GAL4,774$2.55$2.00$2.50
31Prime coat, as per plan (408E10001)GAL3,281$4.80$4.00$5.50
32Asphalt concrete surface course, 9.5 MM, type A (4 (442E00201)CY2,183$214.00$242.00$213.00
33Asphalt concrete intermediate course, 12.5 MM, type A (449), as per plan (442E22301)CY17$250.00$600.00$465.00
34Compacted aggregate (617E10100)CY461$78.00$30.00$90.00
35RPM (621E00100)EACH365$43.60$34.00$41.50
36Raised pavement marker removed (621E54000)EACH365$7.00$2.50$5.50
37Edge line, 6", type 1 (642E00104)MI6.40$1,000.00$850.00$1,100.00
38Center line, type 1 (642E00300)MI3.20$1,210.00$990.00$1,100.00
39Stop line (644E00500)FT135$15.75$14.00$25.00
40Edge line, 6" (646E10010)MI0.46$10,500$5,800.00$7,550.00
41Center line (646E10200)MI0.23$15,750$5,800.00$14,765
42Law enforcement officer with patrol car for assistance (614E11110)HR50$89.25$95.00$100.00
43Work zone marking sign (614E12460)EACH34$94.50$94.50$125.00
44Asphalt concrete for maintaining traffic (614E13000)CY25$285.00$100.00$550.00
45Work zone center line, class III, 642 paint (614E21550)MI6.88$1,260.00$1,190.00$1,100.00
46Work zone stop line, class III, 642 paint (614E26610)FT270$3.15$6.00$3.00
47Premium for contract performance bond and for payment bond (103E05000)LS1$4,250.00$4,350.00$5,500.00
48Maintaining traffic (614E11000)LS1$35,000$75,000$64,000
49Field office, type B (619E16010)MNTH4$2,850.00$2,200.00$3,000.00
50Construction layout stakes and surveying (623E10000)LS1$3,850.00$3,000.00$15,815
51Mobilization (624E10000)LS1$50,000$54,450$34,000
ODOT contract 250118: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of February 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way