ODOT contract 250118 bid tabulation
ERI-SR 60-00.00 (TWO LANE RESURFACING). Let by Ohio DOT on February 27, 2025, ERI. 3 bids received; low bid $1,074,201 by Erie Blacktop Inc, -10% against the engineer's estimate of $1,199,000.
- Owner
- Ohio DOT
- Letting
- 27 FEB 2025
- Pay items
- 51
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Erie Blacktop Inc | $1,074,201 | Low | -10% |
| 2 | Kokosing Construction Company Inc | $1,089,096 | +1.0% | -9.0% |
| 3 | Gerken Paving Inc | $1,216,834 | +13% | +1.0% |
Engineer's estimate: $1,199,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Erie Blacktop Inc | 2. Kokosing Construction Company Inc | 3. Gerken Paving Inc |
|---|---|---|---|---|---|---|
| 1 | Guardrail removed (202E38000) | FT | 187.50 | $2.10 | $2.00 | $2.00 |
| 2 | Anchor assembly removed, type E (202E42010) | EACH | 2 | $152.25 | $150.00 | $145.00 |
| 3 | Anchor assembly removed, type T (202E42040) | EACH | 1 | $99.75 | $150.00 | $95.00 |
| 4 | Anchor assembly removed, type B (202E42050) | EACH | 7 | $115.50 | $150.00 | $110.00 |
| 5 | Bridge terminal assembly removed (202E47000) | EACH | 2 | $78.75 | $250.00 | $75.00 |
| 6 | Embankment, as per plan (203E20001) | CY | 12 | $79.80 | $65.00 | $76.00 |
| 7 | Linear grading (209E60500) | MI | 6.40 | $1,750.00 | $3,700.00 | $2,100.00 |
| 8 | Grading mailbox approaches (209E80000) | EACH | 69 | $90.00 | $20.00 | $560.00 |
| 9 | Guardrail, type MGS (606E15050) | FT | 375 | $20.40 | $19.00 | $19.40 |
| 10 | Raising type 5 guardrail (606E17000) | FT | 100 | $7.15 | $9.50 | $6.80 |
| 11 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 5 | $2,510.00 | $2,400.00 | $2,390.00 |
| 12 | Anchor assembly, MGS type T (606E26550) | EACH | 5 | $1,386.00 | $1,100.00 | $1,320.00 |
| 13 | Anchor assembly rebuilt, type T (606E27900) | EACH | 2 | $945.00 | $650.00 | $900.00 |
| 14 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 2 | $2,610.00 | $2,275.00 | $2,485.00 |
| 15 | Barrier reflector, type 2 (BI-directional) (614E13312) | EACH | 19 | $12.60 | $11.00 | $12.00 |
| 16 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 14 | $700.00 | $375.00 | $1,200.00 |
| 17 | Monument assembly reconstructed to grade, as per plan (623E39601) | EACH | 5 | $1,600.00 | $1,100.00 | $2,750.00 |
| 18 | Post construction survey monument verification and report (623E51000) | LS | 1 | $11,000 | $1,500.00 | $3,500.00 |
| 19 | Special - mailbox support system, single (690E50100) | EACH | 1 | $190.00 | $450.00 | $550.00 |
| 20 | Erosion control (832E30000) | EACH | 500 | $1.00 | $1.00 | $1.00 |
| 21 | Catch basin adjusted to grade (611E98630) | EACH | 1 | $1,450.00 | $1,400.00 | $3,250.00 |
| 22 | Partial depth pavement repair (442) (251E01030) | CY | 420 | $220.00 | $220.00 | $250.00 |
| 23 | Partial depth pavement repair (442) (251E01030) | CY | 180 | $450.00 | $245.00 | $445.00 |
| 24 | Pavement repair (253E02000) | CY | 42 | $300.00 | $345.00 | $350.00 |
| 25 | Pavement repair (253E02000) | CY | 18 | $700.00 | $370.00 | $625.00 |
| 26 | Pavement planing, asphalt concrete(2.00?) (254E01000) | SY | 52,595 | $1.55 | $1.60 | $2.40 |
| 27 | Pavement planing, asphalt concrete (3.00") (254E01000) | SY | 381 | $3.30 | $10.00 | $2.90 |
| 28 | Patching planed surface (254E01600) | SY | 245 | $12.50 | $1.25 | $28.00 |
| 29 | Tack coat (407E10000) | GAL | 24 | $2.55 | $2.00 | $2.50 |
| 30 | Tack coat (407E10000) | GAL | 4,774 | $2.55 | $2.00 | $2.50 |
| 31 | Prime coat, as per plan (408E10001) | GAL | 3,281 | $4.80 | $4.00 | $5.50 |
| 32 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E00201) | CY | 2,183 | $214.00 | $242.00 | $213.00 |
| 33 | Asphalt concrete intermediate course, 12.5 MM, type A (449), as per plan (442E22301) | CY | 17 | $250.00 | $600.00 | $465.00 |
| 34 | Compacted aggregate (617E10100) | CY | 461 | $78.00 | $30.00 | $90.00 |
| 35 | RPM (621E00100) | EACH | 365 | $43.60 | $34.00 | $41.50 |
| 36 | Raised pavement marker removed (621E54000) | EACH | 365 | $7.00 | $2.50 | $5.50 |
| 37 | Edge line, 6", type 1 (642E00104) | MI | 6.40 | $1,000.00 | $850.00 | $1,100.00 |
| 38 | Center line, type 1 (642E00300) | MI | 3.20 | $1,210.00 | $990.00 | $1,100.00 |
| 39 | Stop line (644E00500) | FT | 135 | $15.75 | $14.00 | $25.00 |
| 40 | Edge line, 6" (646E10010) | MI | 0.46 | $10,500 | $5,800.00 | $7,550.00 |
| 41 | Center line (646E10200) | MI | 0.23 | $15,750 | $5,800.00 | $14,765 |
| 42 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 50 | $89.25 | $95.00 | $100.00 |
| 43 | Work zone marking sign (614E12460) | EACH | 34 | $94.50 | $94.50 | $125.00 |
| 44 | Asphalt concrete for maintaining traffic (614E13000) | CY | 25 | $285.00 | $100.00 | $550.00 |
| 45 | Work zone center line, class III, 642 paint (614E21550) | MI | 6.88 | $1,260.00 | $1,190.00 | $1,100.00 |
| 46 | Work zone stop line, class III, 642 paint (614E26610) | FT | 270 | $3.15 | $6.00 | $3.00 |
| 47 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $4,250.00 | $4,350.00 | $5,500.00 |
| 48 | Maintaining traffic (614E11000) | LS | 1 | $35,000 | $75,000 | $64,000 |
| 49 | Field office, type B (619E16010) | MNTH | 4 | $2,850.00 | $2,200.00 | $3,000.00 |
| 50 | Construction layout stakes and surveying (623E10000) | LS | 1 | $3,850.00 | $3,000.00 | $15,815 |
| 51 | Mobilization (624E10000) | LS | 1 | $50,000 | $54,450 | $34,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 27, 2025. Compiled by Mirage Metrics.