ATH-SR 329-13.64 (SIDEWALK). Let by Ohio DOT on July 17, 2025, ATH. 4 bids received; low bid $356,110 by Axis Civil Construction LLC.

Owner
Ohio DOT
Letting
17 JUL 2025
Pay items
50
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Axis Civil Construction LLC$356,110Low
2MC Kee Paving & Sealing LLC$387,748+9.0%
3Alan Stone Co Inc$396,785+11%
4Shelly & Sands Inc$431,113+21%
ODOT contract 250337: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Axis Civil Construction LLC2. MC Kee Paving & Sealing LLC3. Alan Stone Co Inc4. Shelly & Sands Inc
1Clearing and grubbing (201E11000)LS1$5,000.00$500.00$5,100.00$2,700.00
2Pavement removed (202E23000)SY410$25.00$22.50$20.00$34.00
3Pavement removed, as per plan (202E23001)SY207$32.00$18.00$25.00$34.00
4Walk removed (202E30000)SF1,670$3.80$8.00$3.00$4.00
5Curb and gutter removed (202E32500)FT113$16.00$10.00$40.00$15.00
6Excavation (203E10000)CY168$40.00$20.00$20.00$60.00
7Embankment (203E20000)CY18$40.00$28.00$90.00$47.00
8Pavement repair, as per plan (253E02001)CY15$399.00$365.00$620.00$755.00
9Stabilized crushed aggregate, as per plan (411E10001)CY11$85.00$90.00$110.00$325.00
107" non-reinforced concrete pavement, class QC MS (452E11050)SY36$345.00$115.00$190.00$178.00
115" concrete walk (608E12000)SF4,987$8.40$18.50$8.50$10.75
12Curb ramp (608E52000)SF2,227$19.00$24.00$20.00$19.55
13Curb, type 4-C (609E24510)FT60$50.00$31.00$140.00$90.50
14Curb, type 6 (609E26000)FT983$28.00$25.00$75.00$64.00
15Special - gas valve box adjusted to grade (611E99700)EACH1$800.00$250.00$60.00$286.00
16Delineator, post surface mounted (620E60000)EACH24$200.00$210.00$110.00$216.00
17Special - mailbox removed and reset (690E50350)EACH2$250.00$175.00$670.00$81.01
18Topsoil (659E00300)CY27$50.00$65.00$120.00$156.00
19Seeding and mulching (659E10000)SY245$10.00$10.50$7.50$22.00
20Repair seeding and mulching (659E14000)SY13$10.00$10.50$25.00$2.00
21Inter-seeding (659E15000)SY13$10.00$10.50$25.00$2.00
22Commercial fertilizer (659E20000)TON0.04$1,250.00$1,500.00$650.00$965.00
23Lime (659E31000)ACRE0.05$150.00$175.00$940.00$540.00
24Water (659E35000)MGAL0.66$1.00$1.00$120.00$1.11
25Erosion control (832E30000)EACH7,800$1.00$1.00$1.00$1.00
26Special - pipe cleanout, 24" and under (202E70110)FT210$45.00$50.00$30.00$18.25
276" conduit, type B (611E00900)FT10$29.00$90.00$15.00$74.00
2812" conduit, type B (611E04400)FT77$145.00$110.00$210.00$123.00
29Catch basin, no. 2-2A (611E98450)EACH3$4,500.00$1,850.00$4,200.00$3,145.00
30Manhole adjusted to grade (611E99654)EACH1$900.00$600.00$680.00$1,215.00
31Service box adjusted to grade (638E10900)EACH1$500.00$250.00$200.00$286.00
32Subgrade compaction (204E10000)SY477$3.50$1.00$9.00$5.50
33Asphalt concrete base, PG64-22, (449) (301E56000)CY58$380.00$290.00$400.00$330.00
34Aggregate base (304E20000)CY79$170.00$90.00$150.00$242.00
35Non-tracking tack coat (407E20000)GAL62$7.99$4.00$4.00$3.30
36Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY28$420.00$290.00$420.00$545.00
37Concrete median (609E72000)SY69$175.00$145.00$170.00$177.00
38Ground mounted support, no. 2 post (630E02100)FT201$17.50$12.00$20.00$19.00
39Sign, flat sheet (630E80100)SF226$25.00$15.00$30.00$27.00
40Removal of ground mounted sign and reerection (630E85100)EACH4$125.00$100.00$150.00$135.00
41Removal of pavement marking, as per plan (642E30001)FT45$65.00$22.00$75.00$21.60
42Edge line, 4" (644E00100)MI0.32$11,470$7,500.00$13,000$7,410.00
43Stop line (644E00500)FT43$15.00$11.00$20.00$10.75
44Crosswalk line, 12" (644E00620)FT446$5.50$5.00$6.50$4.75
45Crosswalk line, 24" (644E00630)FT320$12.25$9.50$15.00$9.35
46Water (616E10000)MGAL0.56$1.34$1.00$2.00$390.00
47Premium for contract performance bond and for payment bond (103E05000)LS1$4,500.00$5,700.00$5,000.00$2,350.00
48Maintaining traffic, as per plan (614E11001)LS1$15,000$10,500$10,000$45,000
49Construction layout stakes and surveying (623E10000)LS1$6,500.00$9,500.00$7,000.00$7,700.00
50Mobilization (624E10000)LS1$20,000$45,000$11,000$10,000
ODOT contract 250337: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of July 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy