ODOT contract 250458 bid tabulation
CLI-Culverts FY26 (CULVERT REPLACEMENT). Let by Ohio DOT on October 9, 2025, CLI. 2 bids received; low bid $479,556 by Madex Construction Co, +29% against the engineer's estimate of $371,000.
- Owner
- Ohio DOT
- Letting
- 09 OCT 2025
- Pay items
- 22
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Madex Construction Co | $479,556 | Low | +29% |
| 2 | Axis Civil Construction LLC | $582,173 | +21% | +57% |
Engineer's estimate: $371,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Madex Construction Co | 2. Axis Civil Construction LLC |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $7,562.52 | $15,000 |
| 2 | Special - pipe cleanout over 48" (202E70130) | FT | 186 | $71.37 | $300.00 |
| 3 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $10,365 | $7,500.00 |
| 4 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $10,365 | $8,500.00 |
| 5 | Right-of-way monument, type B (623E40520) | EACH | 4 | $868.42 | $400.00 |
| 6 | Rock channel protection, type B with filter (601E32100) | CY | 20 | $430.48 | $275.00 |
| 7 | Topsoil (659E00300) | CY | 86 | $86.84 | $65.00 |
| 8 | Seeding and mulching (659E10000) | SY | 775 | $5.79 | $6.00 |
| 9 | Commercial fertilizer (659E20000) | TON | 0.10 | $1,157.90 | $800.00 |
| 10 | Lime (659E31000) | ACRE | 0.16 | $289.50 | $500.00 |
| 11 | Water (659E35000) | MGAL | 4.20 | $1.13 | $1.00 |
| 12 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 |
| 13 | Concrete masonry (602E20000) | CY | 2.66 | $2,509.77 | $4,900.00 |
| 14 | Field paving of existing pipe, 92" X 66" CMP (611E96550) | FT | 46 | $434.82 | $380.00 |
| 15 | Special - grouting voids around corrugated metal pipes (611E96650) | CY | 2 | $4,631.58 | $12,000 |
| 16 | Conduit, misc.: CMP repair method A (611E97700) | SF | 125 | $115.79 | $175.00 |
| 17 | Cured-in-place pipe liner, 49" X 33" (899E10000) | FT | 102 | $1,100.00 | $1,050.00 |
| 18 | Cured-in-place pipe liner, 54" (899E10000) | FT | 42 | $1,435.79 | $1,610.00 |
| 19 | Cured-in-place pipe liner, 58" X 36" (899E10000) | FT | 84 | $1,157.89 | $1,390.00 |
| 20 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $10,653 | $5,000.00 |
| 21 | Maintaining traffic (614E11000) | LS | 1 | $27,331 | $50,000 |
| 22 | Mobilization (624E10000) | LS | 1 | $50,619 | $50,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 9, 2025. Compiled by Mirage Metrics.