ODOT contract 260048 bid tabulation
CLE-SR 125-08.95 (FOUR LANE RESURFACING). Let by Ohio DOT on January 29, 2026, CLE. 2 bids received; low bid $2,820,429 by John R Jurgensen Company, +4.5% against the engineer's estimate of $2,698,000.
- Owner
- Ohio DOT
- Letting
- 29 JAN 2026
- Pay items
- 48
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | John R Jurgensen Company | $2,820,429 | Low | +5.0% |
| 2 | Barrett Paving Materials Inc | $3,057,046 | +8.0% | +13% |
Engineer's estimate: $2,698,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. John R Jurgensen Company | 2. Barrett Paving Materials Inc |
|---|---|---|---|---|---|
| 1 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 2 | Pavement repair (253E02000) | CY | 850 | $400.42 | $350.00 |
| 3 | Pavement repair (253E02000) | CY | 900 | $431.70 | $400.00 |
| 4 | Non-tracking tack coat (407E20000) | GAL | 13,468 | $4.50 | $4.00 |
| 5 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 4,157 | $300.75 | $295.00 |
| 6 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 4.58 | $2,380.00 | $2,500.00 |
| 7 | Pavement planing, asphalt concrete, class A, 1" (897E01010) | SY | 149,643 | $1.44 | $2.90 |
| 8 | Patching planed surface (897E02000) | SY | 1,499 | $4.31 | $5.00 |
| 9 | RPM (621E00100) | EACH | 1,005 | $36.00 | $36.00 |
| 10 | Raised pavement marker removed (621E54000) | EACH | 1,005 | $14.43 | $10.00 |
| 11 | Center line (644E00300) | MI | 4.96 | $3,875.00 | $3,875.00 |
| 12 | Stop line (644E00500) | FT | 71 | $7.00 | $7.00 |
| 13 | Transverse/diagonal line (644E00700) | FT | 747 | $7.00 | $7.00 |
| 14 | School symbol marking, 96" (644E01110) | EACH | 1 | $400.00 | $400.00 |
| 15 | Lane arrow (644E01300) | EACH | 13 | $112.00 | $112.00 |
| 16 | Lane reduction arrow (644E01350) | EACH | 2 | $112.00 | $112.00 |
| 17 | Two way left turn arrow (644E01370) | EACH | 2 | $200.00 | $208.00 |
| 18 | Edge line, 6", type A4 (645E00118) | MI | 0.05 | $25,000 | $25,000 |
| 19 | Lane line, 6", type A4 (645E00220) | MI | 0.05 | $9,000.00 | $9,000.00 |
| 20 | Center line, type A4 (645E00312) | MI | 0.03 | $40,000 | $40,000 |
| 21 | Speed measurement marking, type B125 (647E21012) | EACH | 10 | $674.76 | $300.00 |
| 22 | Wet reflective traffic paint, edge line, 6" (807E10010) | MI | 9.41 | $2,600.00 | $2,600.00 |
| 23 | Wet reflective traffic paint, lane line, 6" (807E10110) | MI | 8.61 | $1,100.00 | $1,100.00 |
| 24 | Wet reflective traffic paint, channelizing line, 1 (807E10310) | FT | 819 | $2.00 | $2.00 |
| 25 | Wet reflective traffic paint, dotted line, 6" (807E10410) | FT | 484 | $1.40 | $1.40 |
| 26 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 18.02 | $1,400.00 | $1,400.00 |
| 27 | Grooving for 6" recessed pavement marking, (asphalt) (850E10110) | FT | 484 | $1.00 | $1.00 |
| 28 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 819 | $2.00 | $2.00 |
| 29 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 50 | $133.30 | $90.00 |
| 30 | Portable changeable message sign (614E18600) | SNMT | 8 | $925.00 | $4,300.00 |
| 31 | Work zone lane line, class I, 6", 642 paint (614E20110) | MI | 4 | $500.00 | $500.00 |
| 32 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 8.61 | $500.00 | $500.00 |
| 33 | Work zone center line, class I, 642 paint (614E21100) | MI | 2 | $880.00 | $880.00 |
| 34 | Work zone center line, class III, 642 paint (614E21550) | MI | 5.10 | $880.00 | $880.00 |
| 35 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 4 | $660.00 | $660.00 |
| 36 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 9.41 | $660.00 | $660.00 |
| 37 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 82 | $0.85 | $0.85 |
| 38 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 819 | $0.85 | $0.85 |
| 39 | Work zone dotted line, class I, 8", 642 paint (614E24204) | FT | 48 | $1.60 | $1.60 |
| 40 | Work zone dotted line, class III, 8", 642 paint (614E24614) | FT | 484 | $1.60 | $1.60 |
| 41 | Work zone stop line, class I, 642 paint (614E26200) | FT | 12 | $3.00 | $3.00 |
| 42 | Work zone stop line, class III, 642 paint (614E26610) | FT | 71 | $3.00 | $3.00 |
| 43 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 19 | $30.00 | $30.00 |
| 44 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 19 | $30.00 | $30.00 |
| 45 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $8,440.07 | $11,965 |
| 46 | Maintaining traffic (614E11000) | LS | 1 | $218,467 | $342,000 |
| 47 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $5,130.95 | $5,000.00 |
| 48 | Mobilization (624E10000) | LS | 1 | $125,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 29, 2026. Compiled by Mirage Metrics.