ODOT contract 260153 bid tabulation
LAW-SR 141/CR 7E-02.45 (INTERSECTION). Let by Ohio DOT on March 26, 2026, LAW. 3 bids received; low bid $257,739 by Shelly Company, +13% against the engineer's estimate of $229,000.
- Owner
- Ohio DOT
- Letting
- 26 MAR 2026
- Pay items
- 43
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly Company | $257,739 | Low | +13% |
| 2 | Axis Civil Construction LLC | $272,886 | +6.0% | +19% |
| 3 | Alan Stone Co Inc | $338,022 | +31% | +48% |
Engineer's estimate: $229,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly Company | 2. Axis Civil Construction LLC | 3. Alan Stone Co Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $7,000.00 | $7,500.00 | $4,900.00 |
| 2 | Pavement removed (202E23000) | SY | 1,857 | $12.00 | $12.50 | $20.00 |
| 3 | Excavation (203E10000) | CY | 79 | $66.00 | $35.00 | $30.00 |
| 4 | Embankment (203E20000) | CY | 256 | $52.00 | $35.00 | $90.00 |
| 5 | Subgrade compaction (204E10000) | SY | 766 | $2.85 | $5.00 | $8.50 |
| 6 | Special - mailbox removed and reset (690E50350) | EACH | 1 | $300.00 | $325.00 | $630.00 |
| 7 | Soil analysis test (659E00100) | EACH | 2 | $200.00 | $150.00 | $170.00 |
| 8 | Topsoil (659E00300) | CY | 159 | $68.00 | $62.00 | $80.00 |
| 9 | Seeding and mulching (659E10000) | SY | 1,430 | $3.75 | $2.60 | $2.50 |
| 10 | Repair seeding and mulching (659E14000) | SY | 72 | $1.00 | $2.60 | $4.50 |
| 11 | Inter-seeding (659E15000) | SY | 72 | $0.01 | $3.15 | $5.00 |
| 12 | Commercial fertilizer (659E20000) | TON | 0.20 | $1,500.00 | $1,250.00 | $650.00 |
| 13 | Lime (659E31000) | ACRE | 0.30 | $200.00 | $150.00 | $930.00 |
| 14 | Water (659E35000) | MGAL | 8 | $1.00 | $1.00 | $120.00 |
| 15 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 |
| 16 | Valve box adjusted to grade (638E10800) | EACH | 2 | $590.00 | $1,000.00 | $1,100.00 |
| 17 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 111 | $263.00 | $390.00 | $400.00 |
| 18 | Aggregate base (304E20000) | CY | 126 | $113.00 | $142.00 | $5.00 |
| 19 | Non-tracking tack coat (407E20000) | GAL | 98 | $4.10 | $6.00 | $4.00 |
| 20 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 33 | $447.00 | $490.00 | $540.00 |
| 21 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 33 | $452.00 | $480.00 | $520.00 |
| 22 | Longitudinal joint adhesive (875E10000) | LB | 7.40 | $70.00 | $115.00 | $600.00 |
| 23 | Ground mounted support, no. 3 post (630E03100) | FT | 54.40 | $25.00 | $25.00 | $30.00 |
| 24 | Sign, flat sheet (630E80100) | SF | 29.50 | $40.00 | $40.00 | $45.00 |
| 25 | Removal of ground mounted sign and disposal (630E84900) | EACH | 6 | $100.00 | $100.00 | $120.00 |
| 26 | Removal of ground mounted post support and disposal (630E86002) | EACH | 4 | $100.00 | $100.00 | $120.00 |
| 27 | Edge line, 4" (644E00100) | MI | 0.12 | $8,150.00 | $8,150.00 | $23,000 |
| 28 | Center line (644E00300) | MI | 0.10 | $13,000 | $13,000 | $37,000 |
| 29 | Stop line (644E00500) | FT | 16 | $12.00 | $12.00 | $35.00 |
| 30 | Dotted line, 4" (644E01500) | FT | 106 | $2.00 | $2.00 | $6.00 |
| 31 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 48 | $92.00 | $75.00 | $100.00 |
| 32 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 2 | $3,560.00 | $3,200.00 | $4,100.00 |
| 33 | Work zone center line, class I (614E21000) | MI | 0.13 | $9,950.00 | $14,450 | $11,000 |
| 34 | Work zone edge line, class I, 4" (614E22000) | MI | 0.19 | $6,650.00 | $7,500.00 | $7,700.00 |
| 35 | Pavement for maintaining traffic, class B (615E25000) | SY | 61 | $170.00 | $132.00 | $300.00 |
| 36 | Water (616E10000) | MGAL | 2 | $8.00 | $1.00 | $1.00 |
| 37 | Portable barrier, unanchored (622E41100) | FT | 334 | $48.00 | $35.00 | $35.00 |
| 38 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,500.00 | $4,200.00 | $7,000.00 |
| 39 | Maintaining traffic (614E11000) | LS | 1 | $35,000 | $25,000 | $25,000 |
| 40 | Construction layout stakes and surveying (623E10000) | LS | 1 | $7,000.00 | $12,000 | $15,000 |
| 41 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $1,500.00 | $800.00 | $5,000.00 |
| 42 | Post construction survey monument verification and report (623E51000) | LS | 1 | $1,500.00 | $800.00 | $5,000.00 |
| 43 | Mobilization (624E10000) | LS | 1 | $14,000 | $30,000 | $40,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of March 26, 2026. Compiled by Mirage Metrics.