| 1 | Clearing and grubbing (201E11000) | LS | 1 | $3,096.00 |
| 2 | Wearing course removed (202E23500) | SY | 357 | $46.55 |
| 3 | Guardrail removed (202E38000) | FT | 3,594 | $2.10 |
| 4 | Excavation, as per plan (203E10001) | CY | 30 | $17.20 |
| 5 | Embankment (203E20000) | CY | 50 | $51.60 |
| 6 | Subgrade compaction (204E10000) | SY | 129 | $2.58 |
| 7 | Reshaping under guardrail (209E15000) | STA | 34 | $47.25 |
| 8 | Guardrail, type MGS (606E15050) | FT | 3,125 | $20.58 |
| 9 | Anchor assembly, MGS type E (MASH 2016) (606E26150) | EACH | 4 | $2,588.25 |
| 10 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,386.00 |
| 11 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 4 | $2,651.25 |
| 12 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 1 | $609.00 |
| 13 | Combination curb and gutter, type 4, as per plan (609E23001) | FT | 73 | $59.38 |
| 14 | Seeding and mulching, class 2 (659E00510) | SY | 1,678 | $3.10 |
| 15 | Commercial fertilizer (659E20000) | TON | 0.23 | $609.00 |
| 16 | Lime (659E31000) | ACRE | 0.35 | $31.51 |
| 17 | Water (659E35000) | MGAL | 5 | $1.07 |
| 18 | Erosion control (832E30000) | EACH | 4,000 | $1.00 |
| 19 | Pavement planing, asphalt concrete, 1.0" (254E01000) | SY | 122 | $47.25 |
| 20 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 33,665 | $2.36 |
| 21 | Full depth pavement sawing (255E20000) | FT | 110 | $6.68 |
| 22 | Aggregate base (304E20000) | CY | 43 | $150.74 |
| 23 | 12" concrete base, class QC 1P, as per plan (305E16011) | SY | 71 | $245.60 |
| 24 | Non-tracking tack coat (407E20000) | GAL | 2,092 | $4.20 |
| 25 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 1,403 | $262.50 |
| 26 | Asphalt concrete intermediate course, type 1, (449) (441E70200) | CY | 3 | $2,887.50 |
| 27 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 54 | $630.00 |
| 28 | Rumble strips, shoulder (asphalt concrete) (618E40600) | MI | 2.45 | $2,940.00 |
| 29 | Conduit, 2", 725.04 (625E25400) | FT | 404 | $34.10 |
| 30 | Pull box, 725.08, 18" (625E30700) | EACH | 4 | $5,665.50 |
| 31 | Pull box removed (625E31510) | EACH | 4 | $516.00 |
| 32 | RPM (621E00100) | EACH | 152 | $40.43 |
| 33 | Raised pavement marker removed (621E54000) | EACH | 101 | $20.64 |
| 34 | Barrier reflector, type 1 (one way) (626E00102) | EACH | 12 | $11.55 |
| 35 | Barrier reflector, type 2 (one way) (626E00110) | EACH | 55 | $13.65 |
| 36 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 48 | $21.00 |
| 37 | Sign, flat sheet (630E80100) | SF | 14 | $26.25 |
| 38 | Removal of ground mounted sign and disposal (630E84900) | EACH | 4 | $15.75 |
| 39 | Edge line, 6", type 1 (642E00104) | MI | 2.78 | $1,044.75 |
| 40 | Lane line, 6", type 1 (642E00204) | MI | 1.23 | $866.25 |
| 41 | Channelizing line, 8", type 1 (642E00400) | FT | 2,490 | $0.53 |
| 42 | Dotted line, 6", type 1 (642E01510) | FT | 950 | $0.58 |
| 43 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $92.40 |
| 44 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 4 | $2,646.00 |
| 45 | Work zone increased penalties sign (614E12484) | EACH | 4 | $131.25 |
| 46 | Barrier reflector, type 1 (one-way) (614E13310) | EACH | 48 | $18.90 |
| 47 | Object marker, one way (614E13350) | EACH | 42 | $23.10 |
| 48 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $1,155.00 |
| 49 | Work zone edge line, class I, 6" (614E22010) | MI | 2.05 | $1,522.50 |
| 50 | Work zone channelizing line, class I, 8" (614E23000) | FT | 518 | $2.10 |
| 51 | Work zone dotted line, class I (614E24000) | FT | 3,454 | $0.37 |
| 52 | Water (616E10000) | MGAL | 1 | $1.05 |
| 53 | Portable barrier, unanchored (622E41100) | FT | 1,764 | $31.00 |
| 54 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 20 | $787.50 |
| 55 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $92,614 |
| 56 | Portions of structure removed, as per plan (202E11301) | CY | 13 | $1,770.46 |
| 57 | Removal misc.: beam seat debris (202E98000) | LS | 1 | $2,580.00 |
| 58 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $12,831 |
| 59 | Galvanized steel reinforcement (509E26000) | LB | 12,805 | $2.61 |
| 60 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 5,487 | $1.68 |
| 61 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 62 | $29.88 |
| 62 | Class QC2 concrete with QC/QA, superstructure (511E33418) | CY | 27 | $2,030.21 |
| 63 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 59 | $1,753.16 |
| 64 | Class QC1 concrete, substructure (511E50210) | CY | 15 | $3,157.00 |
| 65 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 414 | $22.73 |
| 66 | Concrete repair by epoxy injection (512E10600) | FT | 12 | $493.13 |
| 67 | Surface preparation of existing structural steel (514E00050) | SF | 2,737 | $17.85 |
| 68 | Field painting of existing structural steel, prime coat (514E00056) | SF | 2,737 | $7.35 |
| 69 | Field painting structural steel, intermediate coat (514E00060) | SF | 2,737 | $7.35 |
| 70 | Field painting structural steel, finish coat (514E00066) | SF | 2,737 | $7.35 |
| 71 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 5 | $157.50 |
| 72 | Final inspection repair (514E10000) | EACH | 2 | $525.00 |
| 73 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $19,887 |
| 74 | Scupper, misc.:air (518E12500) | EACH | 6 | $2,729.90 |
| 75 | Patching concrete structure (519E11100) | SF | 1 | $285.00 |
| 76 | Portions of structure removed, as per plan (202E11201) | LS | 1 | $92,614 |
| 77 | Portions of structure removed, as per plan (202E11301) | CY | 14 | $1,736.14 |
| 78 | Removal misc.: beam seat debris (202E98000) | LS | 1 | $2,580.00 |
| 79 | Removal misc.: temporary support (202E98000) | LS | 1 | $3,096.00 |
| 80 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $12,831 |
| 81 | Galvanized steel reinforcement (509E26000) | LB | 12,795 | $2.61 |
| 82 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 5,581 | $1.68 |
| 83 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 66 | $29.88 |
| 84 | Class QC2 concrete with QC/QA, superstructure (511E33418) | CY | 24 | $2,041.88 |
| 85 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 59 | $1,753.16 |
| 86 | Class QC1 concrete, substructure (511E50210) | CY | 16 | $3,156.38 |
| 87 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 412 | $22.72 |
| 88 | Concrete repair by epoxy injection (512E10600) | FT | 13 | $466.72 |
| 89 | Surface preparation of existing structural steel (514E00050) | SF | 2,728 | $17.85 |
| 90 | Field painting of existing structural steel, prime coat (514E00056) | SF | 2,728 | $7.35 |
| 91 | Field painting structural steel, intermediate coat (514E00060) | SF | 2,728 | $7.35 |
| 92 | Field painting structural steel, finish coat (514E00066) | SF | 2,728 | $7.35 |
| 93 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 5 | $157.50 |
| 94 | Final inspection repair (514E10000) | EACH | 2 | $525.00 |
| 95 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $25,368 |
| 96 | Scupper, misc.:pair (518E12500) | EACH | 9 | $2,615.23 |
| 97 | Special - composite fiber wrap system (519E00100) | SF | 85 | $81.75 |
| 98 | Patching concrete structures with trowelable mortar (843E50000) | SF | 28 | $156.63 |
| 99 | Special - composite fiber wrap system (519E00100) | SF | 254 | $81.75 |
| 100 | Patching concrete structure (519E11100) | SF | 9 | $156.63 |
| 101 | Patching concrete structure, as per plan (519E11101) | SF | 135 | $179.85 |
| 102 | Concrete repair by epoxy injection (512E10600) | FT | 90 | $99.25 |
| 103 | Reset bearing, as per plan (516E46701) | EACH | 1 | $1,641.75 |
| 104 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $27,468 |
| 105 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $28,118 |
| 106 | Maintaining traffic (614E11000) | LS | 1 | $87,492 |
| 107 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $5,070.00 |
| 108 | Mobilization (624E10000) | LS | 1 | $127,355 |