ODOT contract 268006 bid tabulation

ROS-US 23/SR 159 Interchange TP (PARKING AREAS). Let by Ohio DOT on April 17, 2026, ROS. 2 bids received; low bid $3,395,547 by Sunesis Construction Co, -8.8% against the engineer's estimate of $3,723,000.

Owner
Ohio DOT
Letting
17 APR 2026
Pay items
84
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Sunesis Construction Co$3,395,547Low-9.0%
2Complete General Construction Company$3,566,460+5.0%-4.0%
ODOT contract 268006: bids by rank

Engineer's estimate: $3,723,000.

Bid tabulation

LinePay itemUnitQuantity1. Sunesis Construction Co2. Complete General Construction Company
1Clearing and grubbing, as per plan (201E11001)LS1$11,000$15,000
2Pavement removed (202E23000)SY1,330$13.25$11.00
3Excavation (203E10000)CY6,544$26.03$24.00
4Embankment (203E20000)CY4,496$13.16$11.00
5Proof rolling (204E45000)HR6$266.96$375.00
6Cement (206E10500)TON485$224.00$210.00
7Curing coat (206E11000)SY18,757$1.20$1.25
8Cement stabilized subgrade, 12 inches deep (206E15010)SY18,757$3.55$6.75
9Fence, misc.: wooden slat fence (607E98000)FT72$187.50$187.50
10Preconstruction survey monument verification and report (623E50000)LS1$2,850.00$1,500.00
11Post construction survey monument verification and report (623E51000)LS1$2,850.00$1,500.00
12Special - bollard (690E50600)EACH8$795.00$795.00
13Inspection and compaction testing of unbound materials (878E25000)LS1$25,704$33,000
14Rock channel protection, type C with geotextile fabric (601E32204)CY15.10$146.16$110.00
15Soil analysis test (659E00100)EACH2$85.00$85.00
16Topsoil (659E00300)CY1,351.50$11.57$35.00
17Seeding and mulching (659E10000)SY6,888$3.92$1.28
18Repair seeding and mulching (659E14000)SY436$1.28$1.28
19Inter-seeding (659E15000)SY436$1.00$1.00
20Commercial fertilizer (659E20000)TON1.22$500.00$500.00
21Lime (659E31000)ACRE1.80$10.00$10.00
22Water (659E35000)MGAL49$1.00$1.00
23Slope erosion protection (670E00500)SY3,451$1.75$1.75
24Storm water pollution prevention plan (832E15000)LS1$1,250.00$2,000.00
25Storm water pollution prevention inspections (832E15002)LS1$5,400.00$7,500.00
26Storm water pollution prevention inspection software (832E15010)LS1$9,374.30$9,375.00
27Erosion control (832E30000)EACH20,000$1.00$1.00
28Concrete masonry (602E20000)CY0.50$3,961.84$3,500.00
296" base pipe underdrains (605E14000)FT1,843$17.77$13.00
306" conduit, type F for underdrain outlets (611E00510)FT80$50.28$43.00
3115" conduit, type C (611E06100)FT574$97.45$85.00
3218" conduit, type C (611E07600)FT273$130.76$100.00
3321" conduit, type C (611E09100)FT106$149.64$125.00
3424" conduit, type C (611E10600)FT78$151.39$115.00
35Catch basin, no. 3 (611E98150)EACH6$5,352.57$5,650.00
36Manhole, no. 3 (611E99574)EACH7$5,228.69$5,100.00
37Aggregate base (304E20000)CY4,166$95.36$66.00
38Stabilized crushed aggregate (411E10000)CY54$132.32$140.00
398" non-reinforced concrete pavement, class QC 1P (452E12010)SY18,648$85.05$96.00
40Curb, type 7 (609E28000)FT1,915$36.96$35.00
41Connection, fused pull apart (625E00450)EACH9$170.00$140.00
42Connection, unfused permanent (625E00480)EACH1$170.00$200.00
43Light pole (installation only), as per plan (625E10503)EACH1$696.00$600.00
44Light pole (installation only), as per plan (625E10503)EACH8$2,024.00$2,100.00
45Light pole foundation, 24" X 8' deep (625E14100)EACH1$2,284.00$4,250.00
46Light tower foundation, misc.: 36" X 13' deep (625E15700)EACH3$8,238.00$7,500.00
47Light tower foundation, misc.: 36" X 8' deep (625E15700)EACH5$5,988.00$6,500.00
48No. 4 AWG 2400 volt distribution cable (625E23200)FT5,419$4.58$4.25
49No. 10 AWG pole and bracket cable (625E23400)FT490$1.87$1.00
50Conduit, 3", 725.04 (625E25500)FT1,709$42.76$30.00
51Luminaire, conventional, solid state (LED), type I (625E26252)EACH1$568.00$240.00
52Luminaire, high mast, solid state (LED), type V, 2 (625E26262)EACH12$2,033.00$1,300.00
53Trench (625E29000)FT1,498$8.81$5.50
54Trench in paved area (625E29400)FT158$20.89$18.00
55Pull box, 725.08, 24" (625E30706)EACH2$1,582.00$1,600.00
56Ground rod (625E32000)EACH17$770.00$300.00
57Power service, as per plan (625E34001)EACH1$15,900$10,000
58Underground warning marking tape (625E36010)FT1,709$0.19$1.50
59Ground mounted support, no. 3 post (630E03100)FT62$17.67$17.00
60Ground mounted support, no. 4 post (630E04100)FT203$18.71$18.00
61Ground mounted structural beam support, W8X18 (630E07000)FT95$57.17$55.00
62Ground mounted structural beam support, W10X22 (630E07500)FT149$67.56$65.00
63Sign, flat sheet (630E80100)SF686$22.87$22.00
64Ground mounted structural beam support foundation (630E84500)EACH10$1,335.69$1,085.00
65Removal of ground mounted sign and disposal (630E84900)EACH5$15.59$15.00
66Removal of ground mounted sign and reerection (630E85100)EACH5$72.76$70.00
67Removal of ground mounted post support and disposal (630E86002)EACH9$20.79$20.00
68Removal of pavement marking (642E30000)FT2,144$1.20$1.20
69Work zone edge line, class I, 6", 642 paint (614E22110)MI0.35$5,700.00$9,500.00
70Work zone channelizing line, class I, 8", 642 paint (614E23200)FT1,068$0.90$2.45
71Water (616E10000)MGAL110$16.78$95.00
87Edge line, 6" (646E10010)MI0.12$5,200.00$13,150
88Center line (646E10200)MI0.06$6,800.00$19,980
89Channelizing line, 12" (646E10310)FT224$2.55$4.00
90Stop line (646E10400)FT53$12.50$13.50
91Transverse/diagonal line, as per plan (646E10601)FT1,910$1.80$3.50
92Parking lot stall marking (646E20200)FT6,210$1.75$2.85
93Lane arrow (646E20300)EACH4$200.00$160.00
94Word on pavement, 72" (646E20400)EACH2$200.00$215.00
95Premium for contract performance bond and for payment bond (103E05000)LS1$17,549$22,500
96Maintaining traffic (614E11000)LS1$49,709$32,500
97Field office, type A (619E16000)MNTH6$843.34$1,800.00
98Construction layout stakes and surveying (623E10000)LS1$24,650$42,500
99Mobilization (624E10000)LS1$89,628$175,000
ODOT contract 268006: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of April 17, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy