ODOT contract 15571 bid tabulation

Or224: se 17th ave - se rusk road. Let by Oregon DOT on January 9, 2025, Region 1. 5 bids received.

Owner
Oregon DOT
Letting
09 JAN 2025
Pay items
172
Data through
13 AUG 2026

Bidders

RankTotal bidAgainst the low bid
1Low
2
3
4
5
ODOT contract 15571: bids by rank

Bid tabulation

LinePay itemUnitQuantityRank 1Rank 2Rank 3Rank 4Rank 5
1Level 3, 1/2 inch ACP (0745-0302000M)TON8,230$160.00$148.00$125.00$160.00$160.00
2Filling abandoned structures (0490-0117000E)EACH2$3,000.00$1,800.00$9,220.00$630.00$2,050.00
342 inch diameter signal support drilled shaft (0963-0102000F)LF86$1,200.00$925.00$890.00$1,010.00$1,120.00
4Removal of curbs (0310-0101000F)LF1,586$10.00$7.00$35.00$17.00$9.00
5Temporary traffic signal, clackamas hwy (OR224) at SE monroe ST (0227-0158000A)LS1$25,000$25,000$20,000$22,600$36,000
6Radar speed trailer (0222-0167500E)EACH2$4,000.00$12,950$17,700$5,650.00$17,400
7Temporary plastic drums (0224-0145000E)EACH470$40.00$65.00$70.00$57.00$65.00
8Traffic signal installation, clackamas hwy (OR224) at monroe (0990-0101000A)EACH1$300,000$255,000$235,000$265,600$296,000
9Removal of impact attenuator (0310-0105000E)EACH1$4,000.00$2,400.00$11,800$1,620.00$3,200.00
10Adjusting boxes (0490-0100000E)EACH13$200.00$275.00$551.00$49.50$650.00
11Removal of surfacings for curb ramp construction (0310-0106101J)SY2,417$40.00$35.00$157.00$55.00$25.00
12Sediment barrier, type 3 (0280-0115030F)LF100$4.00$11.00$8.10$5.40$7.50
13Temporary reflective pavement markers (0225-0148000E)EACH50$25.00$20.00$20.00$22.50$25.00
14Sequential arrow signs (0222-0162000E)EACH6$500.00$5,000.00$8,360.00$5,830.00$3,900.00
15Replace surface mounted tubular markers (0224-0143000E)EACH6$125.00$225.00$1,560.00$57.00$235.00
16Temporary flexible pavement markers (0225-0149000E)EACH9,540$0.75$0.75$7.00$2.80$3.50
17Structural steel maintenance (0560-0109000A)LB70$71.43$142.86$92.86$64.29$133.00
186 inch concrete surfacing (0759-0140000J)SF640$30.00$24.00$14.20$17.25$19.50
19Concrete islands (0759-0122000J)SF2,577$30.00$30.00$13.68$21.00$37.25
20Asphalt pavement sawcutting (0310-0119000F)LF3,516$10.00$5.00$5.00$4.50$8.00
21Aggregate base (0641-0102000M)TON1,385$25.00$110.00$206.00$120.00$115.00
22General structural concrete, class 3300 (0540-0311000K)CY0.34$40,000$4,600.00$25,000$3,490.00$12,500
23Guardrail posts (0812-0106000E)EACH268$175.00$80.00$135.00$190.00$93.75
24Traffic signal modification, clackamas hwy (OR224) at SE 37TH ave (0990-0102000A)EACH1$40,000$40,000$35,000$39,600$44,100
25Perforated steel square tube anchor sign supports (0930-0117000A)LB1,021$14.69$11.75$10.87$12.24$13.42
26Signs, wide angle sheeting, sheet aluminum (0940-0205100J)SF106$32.00$34.00$36.00$40.75$44.00
27Traffic signal modification, clackamas hwy (OR224) at SE harrison ST (0990-0102000A)EACH1$70,000$70,000$63,000$71,200$79,400
28Stripe removal (0225-0154000F)LF2,868$0.87$0.90$0.85$0.95$1.10
29Inlet protection, type 3 (0280-0114030E)EACH58$35.00$125.00$108.00$62.00$100.00
30Concrete manholes, shallow (0470-0105000E)EACH5$11,000$8,000.00$6,500.00$7,650.00$1,900.00
31Bridge approach slab cold plane pavement removal, 2 inches deep (0503-0103100J)SY520$5.00$30.00$3.40$30.75$31.00
32Temporary pavement bars (0225-0153200J)SF9,600$1.50$3.25$3.15$3.60$4.00
33Midwest guardrail system, type 3 (0810-0146100F)LF25$85.00$85.00$65.00$89.00$99.00
34Compost erosion blanket (0280-0105100J)SY522$4.00$5.00$8.10$6.80$7.50
35Concrete inlets, type G-1 (0470-0313000E)EACH1$6,000.00$5,000.00$4,033.91$2,870.00$4,000.00
36Traffic signal modification, clackamas hwy (OR224) at SE rusk RD (0990-0102000A)EACH1$30,000$30,000$23,000$26,000$29,000
37Traffic signal modification, clackamas hwy (OR224) WB off ramp at SE lake RD (0990-0102000A)EACH1$2,000.00$5,000.00$500.00$570.00$630.00
38Signs, wide angle sheeting, extruded aluminum (0940-0204100J)SF455$40.00$42.00$40.00$45.25$49.00
39Core correlation of nuclear gauge readings (0745-0900000E)EACH4$3,000.00$3,000.00$2,900.00$1,130.00$2,000.00
40Guardrail height conversion, type 2A (0810-0147000E)EACH1$3,000.00$1,300.00$1,500.00$1,550.00$1,485.00
41Green bicycle lane, preformed thermoplastic film (0868-0100000J)SF140$18.00$24.00$18.00$20.25$22.25
42Remove and reinstall existing signs (0905-0101000A)LS1$3,000.00$5,000.00$960.00$1,080.00$1,190.00
43Portable changeable message signs (0222-0164000E)EACH4$10,000$12,000$24,200$15,900$14,700
44Removal of surfacings (0310-0103000J)SY561$45.00$22.00$108.00$55.00$17.00
45Traffic signal modification, clackamas hwy (OR224) at SE oak ST (0990-0102000A)EACH1$90,000$85,000$78,000$88,100$98,300
46Signs, standard sheeting, sheet aluminum (0940-0202000J)SF421$30.00$32.00$31.00$35.00$38.00
47Repair temporary impact attenuator, truck mounted (0226-0141400E)EACH10$0.01$1.00$1.00$1,700.00$12,500
48Lawn seeding (1030-0138000J)SY522$3.50$4.00$4.70$4.00$4.30
49Longitudinal pavement markings - paint (0860-0200000F)LF400$6.00$6.00$6.00$6.80$7.50
50Bridge identification markers (0842-0401000E)EACH4$500.00$275.00$650.00$230.00$375.00
51Extra for hand dug guardrail post holes (0810-0145000E)EACH20$200.00$350.00$250.00$200.00$422.00
52Cold plane pavement removal, 2 inches deep (0620-0120000J)SY18,408$3.50$6.00$4.50$6.70$3.70
53General structural concrete, class 3300 (0540-0311000K)CY0.29$40,000$5,000.00$25,000$71,000$12,500
54Adjusting guardrail (0812-0101000F)LF3,350$7.00$6.50$12.00$6.80$7.75
55Emulsified asphalt for tack coat (0730-0100000M)TON50$0.01$1.00$0.02$1.10$780.00
56Traffic control supervisor (0223-0169000E)EACH381$0.01$950.00$700.00$250.00$500.00
57Mainline video inspection (0415-0100000F)LF850$15.00$25.00$29.00$15.50$35.00
58Reinforcement, grade 60 (0530-0104000O)LB159$7.00$12.00$25.00$18.00$31.00
59Pollution control plan (0290-0100000A)LS1$2,000.00$2,000.00$15,000$1,300.00$1,250.00
60Temporary traffic signal, clackamas hwy (OR224) SB off ramp at SE lake RD (0227-0158000A)LS1$5,000.00$10,000$2,200.00$2,490.00$10,000
61Temporary traffic signal, clackamas hwy (OR224) at SE rusk RD (0227-0158000A)LS1$5,000.00$8,000.00$2,200.00$2,490.00$10,000
62Thermoplastic, extruded, surface, profiled (0865-0116600F)LF53,430$1.85$2.10$1.85$2.10$2.30
63Securing concrete barrier (0820-0400000F)LF12.50$55.00$135.00$125.00$140.00$155.00
64Railroad flagger services (0223-0170000E)EACH22$250.00$2,000.00$3,600.00$1,700.00$1,800.00
6512 inch storm sewer pipe, 5 FT depth (0445-035012AF)LF341$250.00$300.00$173.00$250.00$240.00
66Cold plane pavement removal, 4 - 5 inches deep (0620-0114000J)SY1,347$3.50$11.00$30.00$9.60$15.00
67Removal of guardrail (0310-0113000A)LF1,925$6.23$4.68$5.19$5.87$5.19
68Wood sign posts (0910-0100000K)FBM188$20.00$22.00$26.00$29.50$32.25
69Concrete driveways (0759-0126000J)SF468$30.00$30.00$15.61$21.00$18.70
70Cold plane pavement removal, 4 inches deep (0620-0123000J)SY22,286$3.50$8.50$6.17$8.50$7.10
71Concrete inlets, type G-2 (0470-0315000E)EACH15$6,000.00$5,400.00$6,210.00$3,060.00$4,225.00
72Lead compliance plan (0294-0500000A)LS1$2,000.00$3,000.00$9,500.00$1,080.00$1,250.00
73Removal of inlets (0310-0104000E)EACH4$1,000.00$900.00$5,600.00$1,340.00$700.00
74Erosion and sediment control manager (0280-0110000A)LS1$3,000.00$5,000.00$15,000$8,310.00$172,000
75Connection to existing structures (0490-0104000E)EACH17$1,750.00$2,750.00$2,800.00$1,320.00$2,300.00
76Temporary traffic signal, clackamas hwy (OR224) at SE freeman WY (0227-0158000A)LS1$5,000.00$8,000.00$2,200.00$2,490.00$10,000
77Bark mulch (1040-0190000K)CY2.40$350.00$75.00$364.00$310.00$335.00
78Remove existing signs (0905-0100000A)LS1$10,000$10,000$425.00$480.00$525.00
79Traffic signal modification, clackamas hwy (OR224) at SE freeman WY (0990-0102000A)EACH1$80,000$75,000$70,000$79,100$88,200
80Traffic signal modification, clackamas hwy (OR224) at SE 17TH ave (0990-0102000A)EACH1$20,000$20,000$13,800$15,600$17,395
81Signs, standard sheeting, extruded aluminum (0940-0201000J)SF130$45.00$50.00$38.00$43.00$47.00
82Bar removal (0225-0156000J)SF1,692$4.00$7.50$7.50$8.50$9.50
83Removal of pipes (0310-0100000F)LF93$110.00$45.00$105.00$30.00$70.00
84Repair temporary impact attenuator, narrow site system (0226-0141300E)EACH1$0.01$4,200.00$4,000.00$4,520.00$5,000.00
854 inch concrete surfacing (0759-0138000J)SF302$25.00$14.00$13.45$16.00$17.00
86Cold plane pavement removal, 4.5 inches deep (0620-0124000J)SY15,553$3.50$9.00$7.35$9.00$8.10
87Level 4, 1/2 inch ACP (0745-0402000M)TON7,906$140.00$143.00$135.00$150.00$169.00
88Delineators, type 1 (0840-0100000E)EACH138$80.00$85.00$130.00$57.00$136.00
89Truncated domes on new surfaces (0759-0510000J)SF681$60.00$35.00$33.12$22.50$40.00
90Temporary barrier (0226-0126100F)LF300$0.01$40.00$29.30$33.00$36.50
91Temporary impact attenuator, truck mounted (0226-0138000E)EACH5$2,000.00$25,000$45,800$45,000$12,500
92Pavement legend, type B-HS: arrows (0867-0103100E)EACH60$400.00$425.00$400.00$450.00$495.00
93Mono-directional white type iar markers (0855-0101100E)EACH792$8.50$8.50$8.50$9.60$10.00
94Extra for new curb ramps (0759-0154100E)EACH55$1,500.00$2,200.00$1,258.01$980.00$1,500.00
95Inlet protection, type 4 (0280-0114040E)EACH5$50.00$125.00$175.00$62.00$162.00
96Concrete curbs, curb and gutter (0759-0103000F)LF1,981$40.00$72.00$56.28$70.00$55.80
97Clearing and grubbing (0320-0100000R)ACRE0.20$5,000.00$50,000$324,000$22,100$24,000
98Extra for manholes over existing sewers (0490-0123000E)EACH3$8,000.00$4,500.00$5,000.00$3,000.00$2,050.00
99Precompressed foam silicone joint seal (0585-0215000A)LF163$92.02$88.96$85.28$214.11$105.52
100PG 64-22ER asphalt in level 3 1/2 inch ACP (0745-0620100M)TON496$0.01$1.00$0.01$1.10$1.00
101Guardrail terminals, non-flared (0810-0129000E)EACH3$6,000.00$4,000.00$4,650.00$5,030.00$4,460.00
102Cold plane pavement removal, 1 - 2 inches deep (0620-0111000J)SY1,600$3.50$7.00$22.80$7.10$7.00
103Adjusting inlets (0490-0105000E)EACH20$400.00$2,000.00$1,040.00$890.00$1,170.00
104Commercial asphalt concrete pavement (0740-0100000M)TON1$750.00$500.00$0.01$570.00$1,160.00
105Reinforcement, grade 60 (0530-0104000O)LB161$7.00$12.00$25.00$20.00$31.00
106Removal of electrical systems (0950-0101000A)LS1$10,000$20,000$3,500.00$3,960.00$4,400.00
107Temporary walks (0228-0167680J)SF4,100$10.00$10.00$12.50$16.00$8.00
108Concrete barrier (0820-0100000F)LF12.50$200.00$160.00$150.00$170.00$186.00
109Guardrail terminals, downstream anchor terminal (0810-0132200E)EACH2$3,000.00$2,100.00$1,500.00$2,540.00$2,420.00
110Pavement legend, type B-HS: "only" (0867-0107100E)EACH2$1,400.00$1,500.00$1,400.00$1,580.00$1,735.00
111Perforated steel square tube slip base sign supports (0930-0114000A)LB2,240$13.39$15.63$10.18$11.52$12.63
112Cold plane pavement removal, 3 inches deep (0620-0122000J)SY4,510$3.50$8.00$13.30$8.50$6.50
113Precompressed foam silicone joint seal (0585-0215000A)LF155$96.77$93.55$85.16$174.19$105.81
114Temporary signs (0222-0102000J)SF2,900$25.00$28.00$41.00$20.00$37.00
115Concrete curbs, modified (0759-0102000F)LF20$110.00$75.00$50.95$45.00$62.00
116Pavement bar, type B-HS (0867-0145100J)SF7,130$14.95$15.00$15.00$17.00$18.50
117Drainage curbs (0480-0100000F)LF1,557$25.00$35.00$25.60$29.00$31.00
118Removal of concrete barrier (0310-0200000F)LF12.50$100.00$210.00$945.00$40.00$38.00
119Pavement legend, type B-HS: shared lane marking (0867-0174000E)EACH2$375.00$400.00$375.00$420.00$465.00
120Temporary traffic signal, clackamas hwy (OR224) at SE harrison ST (0227-0158000A)LS1$5,000.00$8,000.00$2,200.00$2,490.00$10,000
121Temporary barricades, type II (0224-0104000E)EACH70$50.00$75.00$67.00$57.00$50.00
122Flagger station lighting (0223-0168100E)EACH5$500.00$7,500.00$3,200.00$1,130.00$2,500.00
123Legend removal (0225-0155100J)SF214$4.00$8.00$7.50$8.50$9.50
124Bridge approach slab cold plane pavement removal, 2 inches deep (0503-0103100J)SY506$5.00$30.00$3.40$30.75$31.00
125Impact attenuator, type K (0830-0124000E)EACH1$75,000$68,000$54,500$79,100$83,175
126Contaminated soil disposal (0294-0200010M)TON231$25.00$125.00$220.00$210.00$125.00
127Sediment barrier, type 8 (0280-0115080F)LF280$5.00$9.00$10.80$3.50$10.00
128Bridge removal work (0501-0100000A)SF11$909.09$1,090.91$6,818.18$681.82$2,818.18
129Concrete walks (0759-0128000J)SF13,694$21.00$14.00$11.46$15.00$12.50
130Guardrail transition (0810-0126000E)EACH5$6,000.00$4,000.00$4,850.00$5,420.00$4,715.00
131Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E)EACH6$375.00$400.00$375.00$420.00$465.00
132Sign support footings (0920-0100000A)CY4.30$5,813.95$5,813.95$10,651$12,047$13,221
133Traffic signal modification, clackamas hwy (OR224) EB off ramp at SE lake RD (0990-0102000A)EACH1$25,000$25,000$18,500$20,900$23,000
134Guardrail connections (0810-0128000E)EACH17$1,000.00$900.00$500.00$650.00$1,030.00
135Crosswalk closure supports (0902-0101000E)EACH3$2,000.00$1,350.00$1,350.00$1,530.00$1,675.00
136PG 70-22ER asphalt in level 4 1/2 inch ACP (0745-0640100M)TON477$0.01$1.00$0.01$1.10$1.00
137Structural steel maintenance (0560-0109000A)LB70$71.43$142.86$92.86$85.71$133.00
13812 inch ductile iron pipe, 5 FT depth (0445-060012AF)LF509$350.00$365.00$182.00$250.00$235.00
139Subgrade geotextile (0350-0105000J)SY350$5.00$1.50$11.60$1.50$3.70
140Flaggers (0223-0168000T)HR1,000$82.00$78.00$70.50$90.00$90.00
141Control joint (0585-0300000A)LF151$59.60$52.98$51.32$178.81$63.74
142Concrete inlets, type CG-3 (0470-0309000E)EACH2$6,000.00$5,000.00$5,667.82$3,500.00$3,900.00
143Removal of structures and obstructions (0310-0106000A)LS1$350,000$75,000$95,000$570.00$225,000
144Straw bale (0280-0119000E)EACH5$150.00$65.00$416.00$12.50$130.00
145Temporary pavement legends (0225-0153100E)EACH76$75.00$150.00$150.00$170.00$187.00
146Temporary barricades, type III (0224-0105000E)EACH30$50.00$225.00$166.00$57.00$170.00
147Temporary striping (0225-0153000F)LF50,498$0.17$0.17$0.16$0.20$0.20
148Removal of walks and driveways (0310-0102000J)SY270$50.00$36.00$125.00$55.00$18.00
149Concrete inlets, type CG-2 (0470-0307000E)EACH1$6,000.00$5,500.00$5,083.91$3,410.00$3,750.00
150Moving temporary impact attenuators, narrow site system (0226-0137000E)EACH2$0.01$1,750.00$1,500.00$1,700.00$1,900.00
151Temporary impact attenuator, narrow site system (0226-0134000E)EACH2$0.01$4,000.00$3,500.00$3,960.00$4,400.00
152Concrete curbs, standard curb (0759-0110000F)LF354$40.00$65.00$39.06$60.00$43.50
153Concrete repair (1999-9Z90000J)SF27.13$200.00$250.00$450.00$630.00$3,150.00
154Concrete curbs, low profile mountable curb (0759-0106000F)LF91$45.00$75.00$41.24$45.00$49.70
155Control joint (0585-0300000A)LF159$56.60$55.35$51.26$78.62$64.15
156Remove and reinstall existing concrete barrier (0820-0500000F)LF100$35.00$75.00$70.00$120.00$87.00
157Bridge removal work (0501-0100000A)SF9.70$1,237.11$1,237.11$7,731.96$515.46$3,195.88
158Inlet protection, type 11 (0280-0114110E)EACH3$65.00$225.00$256.00$62.00$236.00
159Continuous sinusoidal rumble strips (0857-0103000L)MI0.68$2,650.00$2,950.00$2,650.00$2,990.00$3,280.00
160Signs, standard sheeting, plywood (0940-0203000J)SF246$30.00$32.00$33.00$37.25$40.00
161Cold plane pavement removal, 6 inches deep (0620-0125000J)SY4,257$3.50$12.00$15.10$11.50$12.80
162Guardrail blocks (0812-0108000E)EACH268$60.00$30.00$25.00$57.00$33.50
163Bridge approach slab cold plane pavement removal, 2 inches deep (0503-0103100J)SY106$5.00$140.00$44.60$80.00$66.00
164Midwest guardrail system, type 2A (0810-0146100F)LF1,575$45.00$35.00$30.00$47.50$40.25
165Curb marking, paint (0869-0200000F)LF40$20.00$10.00$8.00$9.00$10.00
166Mobile barrier (0226-0148000U)DAY2$0.01$10,000$25,000$22,600$18,000
167Bicycle channelizing devices (0228-0141950F)LF500$60.00$50.00$12.50$20.00$36.00
168BI-directional yellow type iar markers (0855-0103100E)EACH598$8.50$8.50$8.50$9.60$10.00
169Pedestrian channelizing devices (0228-0141600F)LF1,000$60.00$34.00$10.50$20.00$36.00
170Gap pattern sinusoidal rumble strips (0857-0104000L)MI1.16$2,650.00$2,950.00$2,650.00$2,990.00$3,280.00
171Temporary curb ramp, parallel (0228-0167670E)EACH21$500.00$2,500.00$1,500.00$600.00$3,320.00
172Minor adjustment of manholes (0490-0120000E)EACH10$1,000.00$2,000.00$2,980.00$1,020.00$1,790.00
ODOT contract 15571: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.

Every contract let that day: ODOT letting of January 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy