TDOT contract CN263061 bid tabulation
The repair of the bridge on s.r. 13 over the duck river (l.m. 7.71). Let by Tennessee DOT on August 14, 2026, Humphreys County. 1 bid received; low bid $5,976,400 by Dement Construction Group, LLC.
- Owner
- Tennessee DOT
- Letting
- 14 AUG 2026
- Pay items
- 16
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Dement Construction Group, LLC | $5,976,400 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Dement Construction Group, LLC |
|---|---|---|---|---|
| 1 | Temporary silt fence (with backing) (209-08.02) | LF | 2,100 | $4.25 |
| 2 | Sediment filter bag (15' X 15') (209-09.03) | EACH | 1 | $1,000.00 |
| 3 | Mineral aggregate, type B base, grading (see plans) (303-02) | TON | 50 | $150.00 |
| 4 | Mineral aggregate (size 57) (303-10.01) | TON | 10 | $150.00 |
| 5 | Structure repairs (foundations) (604-10.15) | LS | 1 | $4,675,000 |
| 6 | Bridge deck repairs (partial depth of slab) (604-10.50) | SY | 15 | $1,500.00 |
| 7 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 9,000 | $30.40 |
| 8 | High-visibility construction fence (707-08.11) | LF | 1,500 | $2.50 |
| 9 | Machined rip-rap (class A-1) (709-05.06) | TON | 50 | $125.00 |
| 10 | Machined rip-rap (class C) (709-05.09) | TON | 475 | $125.00 |
| 11 | Traffic control (712-01) | LS | 1 | $350,000 |
| 12 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 1.60 | $7,500.00 |
| 13 | Mobilization (717-01) | LS | 1 | $550,000 |
| 14 | Geotextile (type III)(erosion control) (740-10.03) | SY | 100 | $20.00 |
| 15 | Water (seeding & sodding) (801-03) | MG | 3 | $250.00 |
| 16 | Sodding (new sod) (803-01) | SY | 300 | $7.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of August 14, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.