TDOT contract CNZ001 bid tabulation

The microsurfacing on s.r. 438 from east of toms creek ford road (l.m. 14.66) to s.r. 13 (l.m. 20.26). Let by Tennessee DOT on February 7, 2025, Perry County. 2 bids received; low bid $961,641 by Asphalt Paving Systems, Inc..

Owner
Tennessee DOT
Letting
07 FEB 2025
Pay items
17
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Asphalt Paving Systems, Inc.$961,641Low
2Wiregrass Construction Company, Inc$1,111,148+16%
TDOT contract CNZ001: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Asphalt Paving Systems, Inc.2. Wiregrass Construction Company, Inc
1Brooming & degrassing shoulders (208-01.05)LM11.20$1,000.00$2,467.59
2Mineral aggregate, type A base, grading D (303-01)TON1,482$44.21$59.23
3Bituminous material (BSC) (405-01.01)TON107$1,147.00$794.34
4Mineral aggregate (BSC) (405-01.02)TON858$67.00$104.95
5Emulsified asphalt for micro-surfacing (414-03.01)TON158$1,182.87$966.41
6Aggregate for micro surfacing (414-03.02)TON1,313$98.70$156.43
7Tangent energy absorbing term MASH TL-3 (705-06.20)EACH2$4,000.00$4,185.04
8Guardrail removed (706-01)LF100$5.26$5.51
9Traffic control (712-01)LS1$50,000$28,871
10Flexible drums (channelizing) (712-04.01)EACH45$1.05$1.10
11Signs (construction) (712-06)SF748$7.53$7.87
12Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH370$30.53$44.05
13Plastic pavement marking (stop line) (716-02.05)LF59$14.74$22.03
14Painted pavement marking (6" line) (716-05.20)LM21$1,157.89$1,651.99
15Removal of pavement marking (line) (716-08.01)LF110,696$0.36$0.34
16Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM21$7,052.63$8,259.95
17Mobilization (717-01)LS1$99,578$155,491
TDOT contract CNZ001: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy