TDOT contract CNZ086 bid tabulation

The resurfacing on s.r. 262 from s.r. 52 (l.m. 0.00) to wick lane (l.m. 2.99). Let by Tennessee DOT on March 21, 2025, Macon County. 2 bids received; low bid $1,446,642 by Vulcan Construction Materials, LLC.

Owner
Tennessee DOT
Letting
21 MAR 2025
Pay items
18
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Vulcan Construction Materials, LLC$1,446,642Low
2Rogers Group, Inc.$1,488,436+3.0%
TDOT contract CNZ086: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Vulcan Construction Materials, LLC2. Rogers Group, Inc.
1Brooming & degrassing shoulders (208-01.05)LM6$2,500.00$1,100.00
2Mineral aggregate, type A base, grading D (303-01)TON1,187$35.00$25.00
3Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON5,123$110.50$116.00
4Bituminous material for tack coat (TC) (403-01)TON34$965.00$900.00
5Acs mix(PG70-22) grading D (411-02.10)TON2,473$134.50$135.00
6Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04)LM4.80$990.00$1,800.00
7Cold planing bituminous pavement (415-01.01)TON7,208$31.00$31.50
8Traffic control (712-01)LS1$40,000$45,000
9Flexible drums (channelizing) (712-04.01)EACH50$40.00$4.00
10Signs (construction) (712-06)SF1,128$8.50$9.00
11Sign adjustments (713-20.30)EACH12$125.00$160.00
12Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH792$30.00$31.50
13Removal of snowplowable reflective marker (716-01.30)EACH792$12.00$12.50
14Plastic pavement marking (stop line) (716-02.05)LF121$25.00$26.25
15Plastic word pavement marking (stop ahead) (716-03.03)EACH2$700.00$725.00
16Painted pavement marking (6" line) (716-05.20)LM24$1,300.00$1,375.00
17Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM12$7,200.00$7,500.00
18Mobilization (717-01)LS1$22,000$38,000
TDOT contract CNZ086: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of March 21, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy