TDOT contract CNZ195 bid tabulation

The miscellaneous safety improvements on various local roads. Let by Tennessee DOT on June 27, 2025, Hawkins County. 3 bids received; low bid $328,947 by Superior Traffic Control, LLC.

Owner
Tennessee DOT
Letting
27 JUN 2025
Pay items
24
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Superior Traffic Control, LLC$328,947Low
2Lu, Inc.$339,737+3.0%
3Highway Markings, Inc.$393,992+20%
TDOT contract CNZ195: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Superior Traffic Control, LLC2. Lu, Inc.3. Highway Markings, Inc.
1Guardrail transition 27IN to 31IN (705-02.10)EACH3$150.00$180.00$300.00
2Earth pad for guard rail end treatment (705-04.10)EACH3$1,500.00$1,800.00$2,500.00
3W beam GR (type 2) MASH TL-3 (705-06.01)LF2,475$25.00$27.48$32.50
4GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH3$3,600.00$2,770.50$2,975.00
5Guardrail removed (706-01)LF50$3.00$1.00$1.50
6Traffic control (712-01)LS1$10,000$27,500$7,500.00
7Sign post delineation enhancement (713-02.21)LF876$5.07$3.90$8.00
8"U" section steel posts (713-11.01)LB2,600$4.22$2.89$5.45
9Perforated/knockout square tube post (713-11.02)LB5,217$5.07$3.59$5.95
10Flat sheet aluminum signs (0.080" thick) (713-13.02)SF583$11.11$12.22$18.25
11Flat sheet aluminum signs (0.100" thick) (713-13.03)SF1,098$11.28$12.96$19.00
12Remove sign, support & footing (713-15.36)EACH159$15.00$10.00$12.00
13Railroad advance warning sign and support (713-16.09)EACH2$300.00$264.38$500.00
14Remove and replace lens on snowplowable reflective marker (716-01.40)EACH371$5.75$5.81$10.00
15Plastic pavement marking(channelization striping) (716-02.04)SY69$24.00$24.24$25.00
16Plastic pavement marking (stop line) (716-02.05)LF431$10.00$10.10$11.50
17Plastic word pavement marking (RXR) (716-03.02)EACH2$450.00$454.50$500.00
18Plastic pavement marking (yield line) (716-04.12)SF60$15.00$15.15$15.00
19Spray thermo PVMT MRKNG (60 mil) (4IN line) (716-13.01)LM79$1,700.00$1,717.00$1,800.00
20Spray thermo PVMT MRKNG (60 mil) (4IN dotted line) (716-13.04)LF2,575$0.35$0.35$0.65
21Mobilization (717-01)LS1$11,500$12,000$25,000
22Saw cutting asphalt pavement (407-20.05)LF80$20.00$16.00$20.00
23Concrete median pavement (701-03)CY3$3,210.00$2,827.71$3,210.00
24Concrete curb (702-01)CY3$3,210.00$2,827.71$3,210.00
TDOT contract CNZ195: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy