TxDOT contract A00130238 bid tabulation
Rehabilitate Existing Roadway, FM 667 (SH 34 to Navarro County Line). Let by Texas DOT on September 5, 2025, Ellis, Dallas District. 6 bids received; low bid $9,501,431 by Knife River Corporation - South, -15% against the engineer's estimate of $11,197,531.
- Owner
- Texas DOT
- Letting
- 05 SEP 2025
- Pay items
- 101
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Knife River Corporation - South | $9,501,431 | Low | -15% |
| 2 | Texas Materials Group, Inc. | $9,540,498 | 0.0% | -15% |
| 3 | A. L. Helmcamp, Inc. | $9,642,035 | +1.0% | -14% |
| 4 | Big Creek Construction, LTD. | $10,577,809 | +11% | -6.0% |
| 5 | Ed Bell Construction Company | $10,794,402 | +14% | -4.0% |
| 6 | Grey Sky Construction LLC | $11,739,147 | +24% | +5.0% |
Engineer's estimate: $11,197,531.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Knife River Corporation - South | 2. Texas Materials Group, Inc. | 3. A. L. Helmcamp, Inc. | 4. Big Creek Construction, LTD. | 5. Ed Bell Construction Company | 6. Grey Sky Construction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 319.37 | $1,100.00 | $720.00 | $305.00 | $371.00 | $2,000.00 | $750.00 | $3,000.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 733 | $22.00 | $26.00 | $62.00 | $15.00 | $30.00 | $15.00 | $20.00 |
| 3 | Remove (2"-8") TRT/untrt base & asphalt pavement (105-7053) | SY | 4,042 | $10.00 | $6.50 | $36.00 | $10.00 | $20.00 | $10.00 | $20.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 395 | $55.00 | $40.00 | $48.50 | $10.00 | $100.00 | $25.00 | $50.00 |
| 5 | Subgr widen (OC) (112-7001) | STA | 314.38 | $450.00 | $300.00 | $403.00 | $125.00 | $900.00 | $400.00 | $250.00 |
| 6 | Embankment (final)(OC)(type C) (132-7005) | CY | 15,241 | $30.00 | $31.00 | $7.00 | $20.00 | $34.00 | $15.00 | $30.00 |
| 7 | Backfill (type A or B) (134-7004) | STA | 328.95 | $210.00 | $220.00 | $198.00 | $125.00 | $250.00 | $250.00 | $250.00 |
| 8 | Blading (150-7001) | STA | 316 | $225.00 | $50.00 | $100.00 | $250.00 | $155.00 | $50.00 | $150.00 |
| 9 | Road grader work (ord comp) (152-7001) | STA | 314.38 | $200.00 | $50.00 | $127.00 | $175.00 | $125.00 | $350.00 | $150.00 |
| 10 | Block sodding (162-7002) | SY | 815 | $8.00 | $6.00 | $7.50 | $7.90 | $8.00 | $15.00 | $10.00 |
| 11 | Hydro mulch seed (permanent_rural_clay) (164-7018) | SY | 185,544 | $0.75 | $0.44 | $0.40 | $0.42 | $0.50 | $0.40 | $0.50 |
| 12 | Hydro mulch seed (temporary_warm_cool) (164-7023) | SY | 185,544 | $0.39 | $0.42 | $0.38 | $0.40 | $0.45 | $0.40 | $0.50 |
| 13 | Vegetative watering (168-7001) | TGL | 55,341 | $3.00 | $0.01 | $0.01 | $0.10 | $1.00 | $1.00 | $5.00 |
| 14 | FL BS (compacted in place)(type D GR 1-2) (10") (247-7102) | SY | 98,973 | $29.00 | $22.00 | $24.00 | $23.50 | $25.00 | $26.00 | $20.00 |
| 15 | FL BS (roadway del) (type D GR 1-2) (247-7209) | TON | 10,648 | $42.00 | $36.50 | $77.00 | $37.00 | $34.00 | $45.00 | $65.00 |
| 16 | Rework BS metal (type C)(10")(ord comp) (251-7053) | SY | 83,840 | $2.25 | $2.60 | $1.50 | $2.50 | $2.00 | $5.00 | $6.00 |
| 17 | Cement (275-7001) | TON | 544 | $240.00 | $230.00 | $259.00 | $240.00 | $240.00 | $225.00 | $300.00 |
| 18 | Cement TRT (existing material & new base)(6") (275-7006) | SY | 109,449 | $2.50 | $2.00 | $1.75 | $1.70 | $2.50 | $2.00 | $6.00 |
| 19 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 29,697 | $5.00 | $3.75 | $5.00 | $5.50 | $5.00 | $5.50 | $5.00 |
| 20 | Asphalt (CRS-2P) (316-7012) | GAL | 24,750 | $4.25 | $4.10 | $4.00 | $5.00 | $4.50 | $5.75 | $5.00 |
| 21 | Asphalt (AC-15P, AC-20-5TR or AC-20XP) (316-7071) | GAL | 20,792 | $4.75 | $4.10 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 22 | Aggregate (type-B, GR-3)(sac-B) (316-7171) | CY | 945 | $200.00 | $195.00 | $213.00 | $240.00 | $170.00 | $230.00 | $200.00 |
| 23 | SP mixes SP-C sac-B PG64-22 (344-7011) | TON | 11,145 | $135.00 | $125.00 | $139.00 | $158.00 | $119.00 | $145.00 | $141.00 |
| 24 | Tack coat (344-7077) | GAL | 383 | $3.50 | $8.00 | $3.50 | $5.00 | $10.00 | $1.50 | $6.00 |
| 25 | Planing asphalt concrete pavement(2") (354-7051) | SY | 87,301 | $2.00 | $1.85 | $1.75 | $2.00 | $2.00 | $3.00 | $3.00 |
| 26 | Riprap (mow strip)(4 in) (432-7013) | CY | 96 | $770.50 | $625.00 | $650.00 | $585.00 | $675.00 | $925.00 | $500.00 |
| 27 | Riprap (stone common)(dry)(18 in) (432-7033) | CY | 128 | $350.00 | $285.00 | $230.00 | $235.00 | $350.00 | $350.00 | $185.00 |
| 28 | Retrofit rail (type T131RC) (451-7049) | LF | 594 | $255.00 | $275.00 | $210.00 | $197.00 | $275.00 | $225.00 | $250.00 |
| 29 | Concrete box culvert (5 FT X 3 FT)(extend) (462-7062) | LF | 32 | $1,150.00 | $1,050.00 | $656.00 | $950.00 | $2,400.00 | $580.00 | $850.00 |
| 30 | Concrete box culvert (6 FT X 5 FT)(extend) (462-7068) | LF | 66 | $1,200.00 | $810.00 | $1,085.00 | $750.00 | $1,350.00 | $725.00 | $950.00 |
| 31 | Concrete box culvert (6 FT X 6 FT)(extend) (462-7069) | LF | 68 | $1,000.00 | $835.00 | $1,129.00 | $770.00 | $1,200.00 | $775.00 | $1,000.00 |
| 32 | RC pipe (CL III)(18 in) (464-7003) | LF | 1,248 | $85.00 | $62.00 | $63.00 | $58.00 | $80.00 | $75.00 | $85.00 |
| 33 | RC pipe (CL III)(24 in) (464-7005) | LF | 457 | $125.00 | $78.00 | $82.00 | $72.00 | $100.00 | $85.00 | $105.00 |
| 34 | RC pipe (CL III)(30 in) (464-7007) | LF | 104 | $160.00 | $112.00 | $113.00 | $104.00 | $125.00 | $130.00 | $150.00 |
| 35 | RC pipe (CL III)(36 in) (464-7009) | LF | 56 | $210.00 | $198.00 | $150.00 | $185.00 | $175.00 | $240.00 | $160.00 |
| 36 | RC pipe (CL III)(42 in) (464-7010) | LF | 60 | $275.00 | $220.00 | $200.00 | $204.00 | $215.00 | $250.00 | $250.00 |
| 37 | Headwall (CH - PW - 0) (diameter= 24 in) (466-7101) | EACH | 2 | $8,500.00 | $12,000 | $5,250.00 | $11,214 | $10,000 | $8,200.00 | $4,500.00 |
| 38 | Headwall (CH - PW - 0) (diameter= 30 in) (466-7103) | EACH | 2 | $10,000 | $12,500 | $8,750.00 | $11,750 | $12,000 | $9,500.00 | $6,500.00 |
| 39 | Headwall (CH - PW - 0) (diameter= 36 in) (466-7105) | EACH | 4 | $12,000 | $13,000 | $10,500 | $12,300 | $14,500 | $11,000 | $7,500.00 |
| 40 | Headwall (CH - PW - 0) (diameter= 42 in) (466-7106) | EACH | 2 | $13,000 | $15,000 | $12,250 | $13,930 | $15,000 | $12,000 | $12,500 |
| 41 | Headwall (CH - PW - S) (diameter= 24 in) (466-7116) | EACH | 2 | $8,750.00 | $11,500 | $5,300.00 | $10,995 | $12,000 | $5,200.00 | $4,500.00 |
| 42 | Wingwall (FW - 0) (HW=4 FT) (466-7146) | EACH | 1 | $17,000 | $12,000 | $9,500.00 | $11,113 | $15,000 | $7,800.00 | $15,000 |
| 43 | Wingwall (PW - 1) (HW=4 FT) (466-7174) | EACH | 1 | $17,000 | $14,500 | $9,000.00 | $13,850 | $17,000 | $17,200 | $16,500 |
| 44 | Wingwall (PW - 1) (HW=6 FT) (466-7176) | EACH | 2 | $20,000 | $19,000 | $33,000 | $17,775 | $28,000 | $27,500 | $20,000 |
| 45 | Wingwall (PW - 1) (HW=7 FT) (466-7177) | EACH | 2 | $25,000 | $19,000 | $35,000 | $17,800 | $30,000 | $27,500 | $25,000 |
| 46 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 2 | $1,100.00 | $1,425.00 | $990.00 | $1,102.00 | $2,150.00 | $700.00 | $1,000.00 |
| 47 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 96 | $1,300.00 | $1,525.00 | $1,180.00 | $1,430.00 | $1,700.00 | $850.00 | $1,000.00 |
| 48 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 38 | $1,750.00 | $1,950.00 | $1,540.00 | $1,837.50 | $2,750.00 | $1,750.00 | $2,000.00 |
| 49 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 8 | $3,200.00 | $4,800.00 | $2,860.00 | $4,456.20 | $5,000.00 | $3,500.00 | $3,000.00 |
| 50 | Set (type II) (42 in) (RCP) (6: 1) (P) (467-7380) | EACH | 2 | $8,000.00 | $6,800.00 | $4,780.00 | $6,350.40 | $10,000 | $8,400.00 | $4,000.00 |
| 51 | Removing structure (set) (496-7004) | EACH | 8 | $350.00 | $1,050.00 | $200.00 | $1,000.00 | $180.00 | $500.00 | $500.00 |
| 52 | Removing structure (wingwall) (496-7005) | EACH | 6 | $1,800.00 | $1,800.00 | $800.00 | $1,673.70 | $1,800.00 | $5,000.00 | $2,500.00 |
| 53 | Removing structure (pipe) (496-7007) | LF | 1,640 | $20.00 | $13.50 | $10.00 | $13.00 | $16.00 | $20.00 | $50.00 |
| 54 | Mobilization (500-7001) | LS | 1 | $1,017,957 | $945,000 | $939,000 | $850,000 | $1,000,000 | $1,000,000 | $1,000,000 |
| 55 | Barricades, signs and traffic handling (502-7001) | MO | 17 | $12,000 | $18,500 | $1,900.00 | $8,500.00 | $1,500.00 | $31,000 | $10,000 |
| 56 | Portable changeable message sign (503-7002) | EACH | 2 | $20,000 | $20,000 | $6,850.00 | $15,000 | $22,000 | $20,000 | $20,000 |
| 57 | TMA (stationary) (505-7001) | DAY | 284 | $400.00 | $20.00 | $98.00 | $250.00 | $200.00 | $150.00 | $250.00 |
| 58 | TMA (mobile operation) (505-7002) | HR | 176 | $50.00 | $25.00 | $12.20 | $75.00 | $200.00 | $95.00 | $55.00 |
| 59 | Rock filter dams (install) (type 2) (506-7002) | LF | 40 | $42.00 | $55.00 | $45.00 | $47.00 | $55.00 | $90.53 | $30.00 |
| 60 | Rock filter dams (install) (type 3) (506-7003) | LF | 120 | $85.00 | $100.00 | $69.00 | $72.00 | $85.00 | $101.18 | $50.00 |
| 61 | Rock filter dams (remove) (506-7011) | LF | 160 | $15.00 | $22.00 | $11.00 | $12.00 | $24.00 | $53.25 | $20.00 |
| 62 | Construction exits (install) (type 1) (506-7020) | SY | 247 | $30.00 | $36.00 | $35.00 | $37.00 | $40.00 | $34.08 | $50.00 |
| 63 | Construction exits (remove) (506-7024) | SY | 247 | $10.00 | $12.00 | $10.00 | $10.00 | $15.00 | $19.17 | $20.00 |
| 64 | Temporary sediment control fence (install) (506-7039) | LF | 7,409 | $4.00 | $6.00 | $4.00 | $4.20 | $4.50 | $3.20 | $4.00 |
| 65 | Temporary sediment control fence (remove) (506-7041) | LF | 7,409 | $1.25 | $1.25 | $0.40 | $0.42 | $1.40 | $1.60 | $2.00 |
| 66 | Driveways (concrete) (hes) (530-7007) | SY | 733 | $150.00 | $184.00 | $142.00 | $165.00 | $140.00 | $115.00 | $125.00 |
| 67 | Driveways (ACP) (530-7010) | SY | 4,042 | $70.00 | $65.00 | $80.95 | $98.00 | $35.00 | $60.00 | $45.00 |
| 68 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 58,839 | $0.25 | $0.28 | $0.25 | $0.38 | $0.25 | $0.15 | $0.50 |
| 69 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 29,321 | $0.25 | $0.28 | $0.50 | $0.50 | $0.25 | $0.18 | $0.50 |
| 70 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,000 | $32.00 | $25.00 | $22.50 | $22.00 | $30.00 | $23.96 | $25.00 |
| 71 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 8 | $3,000.00 | $2,850.00 | $1,850.00 | $1,654.00 | $2,000.00 | $3,059.77 | $1,850.00 |
| 72 | Guardrail end treatment (install) (544-7001) | EACH | 8 | $3,300.00 | $3,200.00 | $2,950.00 | $3,040.00 | $3,200.00 | $3,141.75 | $3,850.00 |
| 73 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 21 | $320.00 | $255.00 | $310.00 | $236.25 | $275.00 | $330.15 | $850.00 |
| 74 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 68 | $675.00 | $770.00 | $750.00 | $710.00 | $750.00 | $798.75 | $850.00 |
| 75 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 6 | $735.00 | $795.00 | $950.00 | $750.00 | $775.00 | $1,011.75 | $850.00 |
| 76 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 1 | $790.00 | $825.00 | $803.00 | $787.00 | $800.00 | $855.20 | $850.00 |
| 77 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $975.00 | $880.00 | $1,000.00 | $813.75 | $900.00 | $1,065.00 | $850.00 |
| 78 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $1,052.00 | $1,365.00 | $1,175.00 | $1,260.00 | $1,325.00 | $1,251.38 | $850.00 |
| 79 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 2 | $580.00 | $625.00 | $557.23 | $562.00 | $600.00 | $593.45 | $850.00 |
| 80 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 12 | $40.00 | $45.00 | $40.00 | $45.00 | $44.00 | $42.60 | $100.00 |
| 81 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 20 | $20.00 | $55.00 | $45.00 | $45.00 | $55.00 | $47.93 | $100.00 |
| 82 | Install delineator assembly (D-DW)SZ 1(WFLX)GNDHH (658-7139) | EACH | 24 | $45.00 | $142.00 | $130.00 | $131.25 | $140.00 | $138.45 | $100.00 |
| 83 | Install object marker assembly (OM-2Z)(WFLX)GNDHH(BI) (658-7253) | EACH | 37 | $63.00 | $147.00 | $135.00 | $137.00 | $140.00 | $143.78 | $100.00 |
| 84 | Install object marker assembly (OM-3L)(TWT)GNDHH (658-7271) | EACH | 4 | $5.00 | $395.00 | $350.00 | $367.50 | $375.00 | $372.75 | $100.00 |
| 85 | Install object marker assembly (OM-3R)(TWT)GNDHH (658-7279) | EACH | 4 | $5.00 | $395.00 | $350.00 | $367.50 | $375.00 | $372.75 | $100.00 |
| 86 | Install OM SM RD sign (1-OM-PW)Y (658-7317) | EACH | 71 | $5.00 | $11.00 | $15.00 | $10.50 | $11.00 | $15.98 | $100.00 |
| 87 | Install OM SM RD sign (1-OM-PW)R (658-7318) | EACH | 8 | $5.00 | $11.00 | $15.00 | $10.50 | $11.00 | $15.98 | $100.00 |
| 88 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 3,620 | $0.50 | $0.28 | $0.35 | $0.28 | $0.40 | $0.27 | $0.65 |
| 89 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 50,274 | $0.75 | $0.23 | $0.23 | $0.22 | $0.30 | $0.21 | $0.65 |
| 90 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 3,408 | $1.75 | $1.75 | $1.00 | $1.20 | $2.00 | $4.00 | $6.00 |
| 91 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 75 | $5.25 | $1.99 | $0.75 | $1.90 | $2.00 | $1.86 | $0.65 |
| 92 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 74 | $10.00 | $7.95 | $13.00 | $8.00 | $10.00 | $7.46 | $20.00 |
| 93 | Ref pavement marking type I(W)18"(yld tri)(100MIL) (666-7087) | EACH | 8 | $42.75 | $68.00 | $40.00 | $65.00 | $65.00 | $63.90 | $150.00 |
| 94 | Pavement sler 6" (666-7347) | LF | 1,190 | $0.75 | $0.28 | $0.25 | $0.30 | $0.30 | $0.27 | $0.75 |
| 95 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 64,803 | $1.25 | $0.57 | $0.53 | $0.56 | $0.60 | $0.53 | $0.65 |
| 96 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 3,620 | $0.86 | $0.63 | $0.56 | $0.65 | $0.60 | $0.59 | $0.65 |
| 97 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 50,274 | $1.75 | $0.57 | $0.53 | $0.56 | $0.60 | $0.53 | $0.65 |
| 98 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 809 | $8.75 | $4.26 | $3.80 | $4.25 | $4.00 | $3.99 | $6.00 |
| 99 | Eliminating existing PM & markers (4") (677-7001) | LF | 1,190 | $1.25 | $1.70 | $1.75 | $1.68 | $1.75 | $1.60 | $1.00 |
| 100 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,190 | $0.50 | $1.14 | $0.30 | $1.15 | $1.10 | $1.07 | $0.75 |
| 101 | Full - width mowing (730-7019) | CYC | 4 | $3,500.00 | $4,000.00 | $5,000.00 | $6,000.00 | $4,500.00 | $7,500.00 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.