TxDOT contract A00130692 bid tabulation
Surfacing/Roadway Restoration, FM 1485 (Old Houston Rd to Kidd Cemetery Rd). Let by Texas DOT on January 7, 2025, Montgomery, Houston District. 5 bids received; low bid $8,172,669 by Vulcan Materials Asphalt and Construction, LLC, -33% against the engineer's estimate of $12,136,141.
- Owner
- Texas DOT
- Letting
- 07 JAN 2025
- Pay items
- 82
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Vulcan Materials Asphalt and Construction, LLC | $8,172,669 | Low | -33% |
| 2 | Durwood Greene Construction Co. | $8,749,305 | +7.0% | -28% |
| 3 | Cornerstone Paving and Construction, L.L.C. | $9,194,576 | +13% | -24% |
| 4 | Larry Young Paving, Inc. | $9,798,851 | +20% | -19% |
| 5 | Texas Materials Group, Inc. | $14,321,138 | +75% | +18% |
Engineer's estimate: $12,136,141.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Vulcan Materials Asphalt and Construction, LLC | 2. Durwood Greene Construction Co. | 3. Cornerstone Paving and Construction, L.L.C. | 4. Larry Young Paving, Inc. | 5. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Backfill (type A or B) (134-7004) | STA | 382 | $250.00 | $155.23 | $150.00 | $338.00 | $240.00 | $525.00 |
| 2 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 13,431 | $135.00 | $129.88 | $140.00 | $130.00 | $140.00 | $207.00 |
| 3 | SP mixes SP-D sac-A PG70-22 (344-7052) | TON | 13,431 | $150.00 | $131.14 | $145.00 | $140.00 | $150.00 | $187.00 |
| 4 | Tack coat (344-7077) | GAL | 10,744 | $6.00 | $4.89 | $2.00 | $4.00 | $5.25 | $5.00 |
| 5 | Flexible pavement structure repair(10") (351-7009) | SY | 17,907 | $100.00 | $66.01 | $50.00 | $65.00 | $75.00 | $122.00 |
| 6 | Plane & text asphalt concrete pavement(3") (354-7020) | SY | 179,075 | $7.00 | $0.90 | $1.25 | $2.50 | $2.74 | $3.35 |
| 7 | Planing asphalt concrete pavement(2") (354-7051) | SY | 21,445 | $5.00 | $9.58 | $7.00 | $6.00 | $1.75 | $13.25 |
| 8 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 41 | $360.00 | $355.00 | $400.00 | $355.00 | $330.00 | $550.00 |
| 9 | Riprap (mow strip)(4 in) (432-7013) | CY | 194 | $450.00 | $676.00 | $750.00 | $485.00 | $710.00 | $750.00 |
| 10 | Adjusting manholes (479-7001) | EACH | 1 | $1,500.00 | $2,728.53 | $1,000.00 | $500.00 | $1,250.00 | $4,650.00 |
| 11 | Mobilization (500-7001) | LS | 1 | $1,103,286 | $338,527 | $260,000 | $800,000 | $1,000,000 | $700,000 |
| 12 | Barricades, signs and traffic handling (502-7001) | MO | 9 | $5,000.00 | $19,332 | $3,400.00 | $6,000.00 | $7,700.00 | $15,000 |
| 13 | Portable changeable message sign (503-7001) | DAY | 91 | $130.00 | $81.84 | $350.00 | $60.00 | $65.00 | $100.00 |
| 14 | TMA (stationary) (505-7001) | DAY | 32 | $223.00 | $296.33 | $300.00 | $45.00 | $280.00 | $500.00 |
| 15 | TMA (mobile operation) (505-7002) | HR | 59 | $80.00 | $32.21 | $50.00 | $125.00 | $140.00 | $150.00 |
| 16 | Intersections (ACP) (530-7002) | SY | 3,038 | $47.00 | $20.65 | $33.00 | $38.00 | $29.00 | $86.00 |
| 17 | Driveways (ACP) (530-7010) | SY | 18,409 | $56.00 | $18.22 | $32.00 | $33.00 | $28.00 | $57.00 |
| 18 | Turnouts (ACP) (530-7018) | SY | 1,431 | $124.00 | $18.21 | $150.00 | $46.90 | $25.00 | $225.00 |
| 19 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 29,167 | $1.40 | $0.09 | $0.28 | $0.10 | $0.25 | $0.62 |
| 20 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,550 | $30.00 | $23.44 | $30.00 | $23.50 | $31.00 | $36.00 |
| 21 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,000.00 | $1,635.00 | $2,700.00 | $1,635.00 | $2,200.00 | $3,000.00 |
| 22 | Short radius (28") (540-7013) | LF | 30 | $55.00 | $39.00 | $120.00 | $39.00 | $52.00 | $60.00 |
| 23 | TL-3 31" short radius (transition) (540-7035) | EACH | 6 | $1,119.00 | $5,798.25 | $6,100.00 | $5,798.00 | $7,700.00 | $9,000.00 |
| 24 | Terminal anchor section (540-7041) | EACH | 2 | $1,000.00 | $850.00 | $825.00 | $850.00 | $1,100.00 | $1,315.00 |
| 25 | Remove metal beam guard fence (542-7001) | LF | 1,975 | $5.00 | $2.35 | $2.50 | $2.35 | $3.25 | $3.60 |
| 26 | Guardrail end treatment (install) (544-7001) | EACH | 17 | $3,250.00 | $3,049.00 | $3,100.00 | $3,049.00 | $4,100.00 | $4,700.00 |
| 27 | Guardrail end treatment (remove) (544-7003) | EACH | 17 | $400.00 | $195.00 | $350.00 | $195.00 | $260.00 | $300.00 |
| 28 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 30 | $13.00 | $12.00 | $14.00 | $12.00 | $15.00 | $19.00 |
| 29 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 205 | $21.00 | $18.00 | $20.00 | $18.00 | $16.00 | $28.00 |
| 30 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 70 | $30.00 | $28.00 | $32.00 | $28.00 | $25.00 | $43.00 |
| 31 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 15 | $34.00 | $21.00 | $28.00 | $21.00 | $250.00 | $32.00 |
| 32 | Electrical conductor (no.8) bare (620-7007) | LF | 310 | $2.00 | $2.25 | $4.00 | $2.25 | $2.00 | $3.50 |
| 33 | Electrical conductor (no.4) insulated (620-7012) | LF | 25 | $3.00 | $3.60 | $3.75 | $3.60 | $3.25 | $5.50 |
| 34 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 380 | $3.00 | $3.95 | $4.50 | $3.95 | $3.25 | $6.10 |
| 35 | Ground box type D (162922)W/apron (624-7008) | EACH | 3 | $1,217.00 | $1,195.00 | $1,200.00 | $1,195.00 | $1,300.00 | $1,850.00 |
| 36 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 1 | $6,622.00 | $6,875.00 | $7,400.00 | $6,875.00 | $7,800.00 | $10,650 |
| 37 | Replace existing aluminum signs(type A) (636-7004) | SF | 55 | $46.00 | $22.00 | $27.00 | $22.00 | $33.00 | $35.00 |
| 38 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 46 | $864.00 | $495.00 | $540.00 | $495.00 | $660.00 | $766.00 |
| 39 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 27 | $955.00 | $540.00 | $590.00 | $540.00 | $720.00 | $835.00 |
| 40 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 1 | $1,123.00 | $895.00 | $980.00 | $895.00 | $1,200.00 | $1,385.00 |
| 41 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 4 | $1,100.00 | $794.00 | $870.00 | $794.00 | $1,100.00 | $1,225.00 |
| 42 | Install small roadside sign support and assembly TYS80(1)SA(U-2EXT) (644-7033) | EACH | 4 | $1,193.00 | $1,031.00 | $1,150.00 | $1,031.00 | $1,400.00 | $1,600.00 |
| 43 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 1 | $1,331.00 | $950.00 | $1,040.00 | $950.00 | $1,300.00 | $1,480.00 |
| 44 | Remove SM RD SN sup&AM (644-7073) | EACH | 79 | $46.00 | $25.00 | $80.00 | $75.00 | $100.00 | $116.00 |
| 45 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 32 | $53.00 | $25.00 | $32.00 | $25.00 | $33.00 | $39.00 |
| 46 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 222,353 | $0.70 | $0.41 | $0.42 | $0.41 | $0.50 | $0.63 |
| 47 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 3,955 | $1.00 | $1.00 | $1.10 | $1.00 | $1.25 | $1.55 |
| 48 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 312 | $4.00 | $5.00 | $6.00 | $5.00 | $6.75 | $7.75 |
| 49 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 93 | $100.00 | $115.00 | $120.00 | $115.00 | $150.00 | $178.00 |
| 50 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 27 | $130.00 | $125.00 | $130.00 | $125.00 | $170.00 | $195.00 |
| 51 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 1,592 | $1.50 | $1.50 | $1.75 | $1.50 | $2.00 | $2.30 |
| 52 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 104 | $9.00 | $8.55 | $10.00 | $8.55 | $11.00 | $13.25 |
| 53 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 31 | $200.00 | $175.00 | $185.00 | $175.00 | $230.00 | $270.00 |
| 54 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 9 | $225.00 | $190.00 | $200.00 | $190.00 | $250.00 | $300.00 |
| 55 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 74,671 | $0.80 | $1.35 | $1.50 | $1.35 | $1.75 | $2.10 |
| 56 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 42,055 | $1.00 | $1.00 | $1.50 | $1.00 | $1.25 | $1.50 |
| 57 | All-wther PM type I (Y)6"(broken)(100MIL) (666-7316) | LF | 7,508 | $1.50 | $1.00 | $1.50 | $1.00 | $1.25 | $1.50 |
| 58 | Reflectorized pavement marker type I-C (672-7002) | EACH | 85 | $1.00 | $8.00 | $8.50 | $8.00 | $11.00 | $12.00 |
| 59 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,566 | $9.00 | $5.00 | $5.50 | $5.00 | $6.75 | $7.75 |
| 60 | Pavement surface preparation for marking (6") (678-7002) | LF | 74,671 | $0.10 | $0.10 | $0.12 | $0.10 | $0.25 | $0.15 |
| 61 | Pavement surface preparation for marking (8") (678-7004) | LF | 1,592 | $1.00 | $0.20 | $0.22 | $0.20 | $0.25 | $0.30 |
| 62 | Pavement surface preparation for marking (24") (678-7008) | LF | 340 | $0.70 | $0.60 | $0.65 | $0.60 | $0.75 | $1.00 |
| 63 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 31 | $13.00 | $9.00 | $10.00 | $9.00 | $12.00 | $14.00 |
| 64 | Pavement surface preparation for marking (word) (678-7016) | EACH | 9 | $12.00 | $9.00 | $10.00 | $9.00 | $12.00 | $14.00 |
| 65 | Install highway traffic signal (system) (680-7003) | EACH | 1 | $36,847 | $26,500 | $29,000 | $26,500 | $45,000 | $41,000 |
| 66 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 6 | $266.00 | $295.00 | $320.00 | $295.00 | $240.00 | $450.00 |
| 67 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 1 | $273.00 | $295.00 | $320.00 | $295.00 | $260.00 | $450.00 |
| 68 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 6 | $284.00 | $295.00 | $320.00 | $295.00 | $240.00 | $450.00 |
| 69 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 1 | $272.00 | $295.00 | $320.00 | $295.00 | $250.00 | $450.00 |
| 70 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 6 | $284.00 | $295.00 | $320.00 | $295.00 | $240.00 | $450.00 |
| 71 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 2 | $272.00 | $295.00 | $320.00 | $295.00 | $250.00 | $450.00 |
| 72 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 6 | $188.00 | $160.00 | $180.00 | $160.00 | $160.00 | $250.00 |
| 73 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 1 | $219.00 | $225.00 | $250.00 | $225.00 | $230.00 | $350.00 |
| 74 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 920 | $3.00 | $3.50 | $4.00 | $3.50 | $2.75 | $5.50 |
| 75 | Ins traffic signal PL AM(S)1 arm(32') (686-7033) | EACH | 1 | $8,500.00 | $13,975 | $15,200 | $13,975 | $14,000 | $22,000 |
| 76 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 1 | $12,261 | $15,700 | $17,100 | $15,700 | $16,000 | $25,000 |
| 77 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 1 | $15,727 | $18,100 | $19,700 | $18,100 | $19,000 | $28,000 |
| 78 | Underseal course (3006-7001) | GAL | 35,815 | $6.00 | $5.28 | $9.50 | $6.90 | $5.00 | $14.80 |
| 79 | High friction surface treatment (3009-7001) | SY | 51,991 | $28.00 | $21.49 | $22.00 | $20.00 | $20.00 | $30.00 |
| 80 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $8,375.00 | $7,490.00 | $8,000.00 | $7,490.00 | $8,200.00 | $12,000 |
| 81 | RVDS (presence det)(install only) (6008-7004) | EACH | 3 | $672.00 | $500.00 | $600.00 | $500.00 | $980.00 | $770.00 |
| 82 | RVDS (advance det)(install only) (6008-7005) | EACH | 2 | $681.00 | $500.00 | $750.00 | $1,000.00 | $1,100.00 | $770.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 7, 2025. Compiled by Mirage Metrics.