| 1 | Excavation (roadway) (110-7001) | CY | 8,639 | $22.00 | $15.00 | $16.50 | $20.00 | $17.00 |
| 2 | Subgr widen (OC) (112-7001) | STA | 130.14 | $555.00 | $122.50 | $976.81 | $832.50 | $250.00 |
| 3 | Embankment (final)(OC)(type C) (132-7005) | CY | 2,559 | $26.00 | $13.50 | $14.30 | $52.50 | $25.00 |
| 4 | Backfill (type A) (134-7001) | STA | 18.01 | $260.00 | $265.00 | $120.93 | $465.00 | $650.00 |
| 5 | Blading (150-7002) | HR | 20 | $150.00 | $130.00 | $99.00 | $110.00 | $200.00 |
| 6 | Broadcast seed (temporary_warm) (164-7005) | SY | 25 | $1.00 | $5.25 | $50.00 | $10.00 | $4.00 |
| 7 | Broadcast seed (temporary_cool) (164-7006) | SY | 25 | $1.00 | $5.25 | $50.00 | $10.00 | $4.00 |
| 8 | Drill seed (permanent_rural_clay) (164-7010) | SY | 43,380 | $0.25 | $0.25 | $0.52 | $0.24 | $0.50 |
| 9 | Drill seed (temporary_warm) (164-7013) | SY | 10,845 | $0.25 | $0.20 | $0.49 | $0.18 | $0.50 |
| 10 | Drill seed (temporary_cool) (164-7014) | SY | 10,845 | $0.25 | $0.25 | $0.49 | $0.22 | $0.50 |
| 11 | Vegetative watering (168-7001) | TGL | 365.35 | $50.00 | $48.00 | $23.10 | $100.00 | $35.00 |
| 12 | FL BS (compacted in place)(tye GR1-2)(final pos) (247-7193) | CY | 10,085 | $89.00 | $114.00 | $112.03 | $152.00 | $125.00 |
| 13 | Cement (275-7001) | TON | 701 | $300.00 | $205.00 | $220.00 | $200.00 | $200.00 |
| 14 | Cement TRT (existing material)(8") (275-7003) | SY | 34,593 | $3.50 | $2.00 | $2.20 | $5.05 | $2.50 |
| 15 | Asphalt (RC-250) (316-7016) | GAL | 5,183 | $5.00 | $4.70 | $4.95 | $4.00 | $6.00 |
| 16 | Aggregate (type-E, GR-5)(sac-B) (316-7194) | CY | 185 | $130.00 | $183.00 | $111.25 | $135.00 | $350.00 |
| 17 | Aggregate (type-PE, GR-3)(sac-B) (316-7229) | CY | 339 | $140.00 | $189.00 | $135.36 | $175.00 | $275.00 |
| 18 | Aggregate (type-PE, GR-4)(sac-B) (316-7232) | CY | 526 | $150.00 | $189.00 | $135.92 | $160.00 | $175.00 |
| 19 | Asphalt (AC 20-5TR or AC-20XP or CRS-2P) (316-7264) | GAL | 34,765 | $5.50 | $4.20 | $4.07 | $3.60 | $4.30 |
| 20 | D-GR HMA type D sac-B PG70-22 (341-7050) | TON | 3,621 | $125.00 | $160.00 | $122.10 | $145.00 | $175.00 |
| 21 | Tack coat (341-7082) | GAL | 3,181 | $5.10 | $4.00 | $3.30 | $3.50 | $4.00 |
| 22 | Flexible pavement structure repair(8") (351-7007) | SY | 500 | $80.00 | $92.00 | $81.31 | $70.50 | $115.00 |
| 23 | Cut & restoring pavement (400-7006) | SY | 74 | $230.00 | $142.00 | $250.00 | $300.00 | $125.00 |
| 24 | Cem stabil BKFL (400-7010) | CY | 18 | $210.00 | $200.00 | $135.00 | $130.00 | $400.00 |
| 25 | Trench excavation protection (402-7001) | LF | 50 | $25.00 | $29.00 | $42.00 | $125.00 | $50.00 |
| 26 | Concrete box culvert (3 FT X 3 FT) (462-7002) | LF | 252 | $510.00 | $313.00 | $325.00 | $680.00 | $575.00 |
| 27 | Wingwall (PW - 1) (HW=4 FT) (466-7174) | EACH | 2 | $15,000 | $26,900 | $17,500 | $26,100 | $20,000 |
| 28 | Removing structure (small) (496-7036) | EACH | 1 | $3,500.00 | $4,800.00 | $22,000 | $4,000.00 | $15,000 |
| 29 | Mobilization (500-7001) | LS | 1 | $288,000 | $175,000 | $288,855 | $151,000 | $385,000 |
| 30 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $3,500.00 | $2,112.00 | $6,661.30 | $1,200.00 | $30,000 |
| 31 | Portable changeable message sign (503-7002) | EACH | 2 | $11,000 | $8,500.00 | $7,609.26 | $10,500 | $10,000 |
| 32 | TMA (stationary) (505-7001) | DAY | 20 | $500.00 | $225.00 | $507.28 | $50.00 | $300.00 |
| 33 | TMA (mobile operation) (505-7003) | DAY | 20 | $500.00 | $355.00 | $1,014.57 | $175.00 | $700.00 |
| 34 | Rock filter dams (install) (type 1) (506-7001) | LF | 50 | $50.00 | $52.65 | $92.00 | $50.00 | $85.00 |
| 35 | Rock filter dams (remove) (506-7011) | LF | 50 | $20.00 | $10.50 | $28.00 | $10.00 | $40.00 |
| 36 | Sandbags for erosion control (506-7035) | EACH | 100 | $2.00 | $14.75 | $10.00 | $14.00 | $30.00 |
| 37 | Temporary sediment control fence (install) (506-7039) | LF | 470 | $4.50 | $3.80 | $9.00 | $3.60 | $8.00 |
| 38 | Temporary sediment control fence (remove) (506-7041) | LF | 470 | $1.50 | $1.25 | $3.00 | $1.20 | $1.25 |
| 39 | Driveways (surface treat) (530-7016) | SY | 271 | $47.00 | $34.00 | $30.80 | $25.00 | $55.00 |
| 40 | Turnouts (surface treat) (530-7019) | SY | 124 | $47.00 | $36.00 | $30.80 | $32.00 | $85.00 |
| 41 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 1 | $500.00 | $790.00 | $500.00 | $500.00 | $550.00 |
| 42 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 1 | $310.00 | $395.00 | $150.00 | $150.00 | $175.00 |
| 43 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 2 | $750.00 | $1,000.00 | $700.00 | $700.00 | $750.00 |
| 44 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 1 | $775.00 | $1,105.00 | $800.00 | $800.00 | $900.00 |
| 45 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 1 | $850.00 | $1,240.00 | $850.00 | $850.00 | $950.00 |
| 46 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 4 | $950.00 | $1,530.00 | $975.00 | $975.00 | $1,000.00 |
| 47 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 1 | $1,150.00 | $1,895.00 | $1,200.00 | $1,200.00 | $1,300.00 |
| 48 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 18 | $500.00 | $500.00 | $500.00 | $500.00 | $550.00 |
| 49 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 1 | $550.00 | $737.00 | $625.00 | $625.00 | $700.00 |
| 50 | Remove SM RD SN sup&AM (644-7073) | EACH | 28 | $100.00 | $89.50 | $100.00 | $100.00 | $125.00 |
| 51 | Install object marker assembly (OM-2Y)(WC)GND(BI) (658-7057) | EACH | 6 | $80.00 | $142.00 | $75.00 | $75.00 | $90.00 |
| 52 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 85,288 | $0.60 | $0.55 | $0.52 | $0.32 | $0.55 |
| 53 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 300 | $0.80 | $1.05 | $1.00 | $0.49 | $1.00 |
| 54 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 6,820 | $0.60 | $0.75 | $0.72 | $0.32 | $0.75 |
| 55 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 12,812 | $0.60 | $0.70 | $0.64 | $0.32 | $0.75 |
| 56 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 16 | $2.00 | $2.05 | $1.63 | $1.00 | $0.75 |
| 57 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 2,686 | $2.00 | $2.15 | $1.63 | $1.00 | $0.75 |
| 58 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 150 | $1.50 | $5.25 | $5.00 | $1.88 | $5.50 |
| 59 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 29,630 | $1.25 | $1.15 | $1.10 | $0.98 | $1.25 |
| 60 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 6,406 | $1.25 | $1.85 | $1.75 | $0.98 | $2.00 |
| 61 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 3,410 | $1.25 | $2.10 | $2.00 | $0.98 | $2.50 |
| 62 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 15 | $17.00 | $26.30 | $25.00 | $30.00 | $30.00 |
| 63 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 1 | $300.00 | $210.50 | $200.00 | $235.00 | $225.00 |
| 64 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 1 | $300.00 | $316.00 | $300.00 | $245.00 | $350.00 |
| 65 | Prefabricated PM type C (Y)(24")(solid) (668-7127) | LF | 407 | $17.00 | $16.85 | $16.00 | $17.00 | $20.00 |
| 66 | Reflectorized pavement marker type I-C (672-7002) | EACH | 8 | $5.50 | $15.80 | $15.00 | $6.46 | $20.00 |
| 67 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 406 | $5.50 | $10.50 | $10.00 | $6.46 | $15.00 |