TxDOT contract A00194321 bid tabulation

Reconstruct Existing Roadway, US 81 (Near Fruitland Road to Wise County Line). Let by Texas DOT on October 9, 2025, Montague, Wichita Falls District. 7 bids received; low bid $20,093,159 by Ed Bell Construction Company, -7.4% against the engineer's estimate of $21,707,026.

Owner
Texas DOT
Letting
09 OCT 2025
Pay items
57
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ed Bell Construction Company$20,093,159Low-7.0%
2Indus Road & Bridge, Inc.$20,559,782+2.0%-5.0%
3Mario Sinacola & Sons Excavating, Inc.$20,723,141+3.0%-5.0%
4Webber, LLC$20,899,111+4.0%-4.0%
5Grey Sky Construction LLC$21,675,093+8.0%0.0%
6Ragle Construction, Inc.$23,994,098+19%+11%
7A. L. Helmcamp, Inc.$28,485,271+42%+31%
TxDOT contract A00194321: bids by rank

Engineer's estimate: $21,707,026.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Ed Bell Construction Company2. Indus Road & Bridge, Inc.3. Mario Sinacola & Sons Excavating, Inc.4. Webber, LLC5. Grey Sky Construction LLC6. Ragle Construction, Inc.
1Removing concrete (pavement) (104-7001)SY71,090$10.00$12.50$11.00$15.00$13.00$10.00$13.40
2Removing concrete (mowstrip) (104-7005)LF350$17.00$21.00$15.00$15.00$13.40$50.00$11.00
3Remove (4") TRT/untrt base & asphalt pavement (105-7024)SY71,090$3.50$3.15$2.80$2.00$3.00$10.00$4.43
4Remove (0"-12") TRT/untrt base & asphalt pavement (105-7052)SY52,970$8.00$5.25$7.00$10.00$7.90$10.00$10.00
5Excavation (roadway) (110-7001)CY4,788$15.00$12.50$21.00$33.00$23.30$20.00$110.00
6Embankment (final)(OC)(type A) (132-7001)CY7,367$30.00$25.00$19.00$30.00$25.00$30.00$35.00
7Backfill (type A) (134-7001)STA266$245.00$800.00$335.00$500.00$156.40$350.00$118.00
8Broadcast seed (permanent_rural_sand) (164-7001)SY14,794$1.00$0.75$0.30$0.12$0.30$1.00$0.29
9Vegetative watering (168-7001)TGL2.30$165.00$600.00$30.00$500.00$90.70$100.00$1,000.00
10Cement (275-7001)TON1,371$280.00$225.00$235.00$210.00$231.90$300.00$335.00
11Cement TRT (existing material)(8") (275-7003)SY136,874$2.50$1.50$3.10$3.65$4.30$4.00$3.90
12Cem TRT(PLNT MX)(CL L)(tya)(GR1-2)(6") (276-7117)SY132,933$13.50$18.00$18.92$16.00$9.00$12.00$15.50
13Prime coat(MC-30 or AE-P) (310-7013)GAL33,198$7.00$4.00$4.20$3.90$4.00$5.00$3.70
14D-GR HMA type D PG64-22 (341-7043)TON7,151$125.50$115.00$150.00$107.00$101.00$125.00$113.00
15Planing asphalt concrete pavement (0" to 1.5") (354-7073)SY71,090$5.00$2.00$0.60$2.00$4.00$3.00$2.00
16Concrete pavement (CRCP) (12") (360-7006)SY123,564$93.25$92.00$85.00$87.00$87.00$90.00$105.00
17Concrete pavement(transition slab) (12") (360-7035)SY462$270.00$175.00$165.00$150.00$313.00$200.00$97.60
18Riprap (concrete)(4 in) (432-7001)CY17$710.00$1,000.00$607.88$850.00$577.00$550.00$834.35
19Mobilization (500-7001)LS1$1,976,174$1,800,000$2,000,000$2,070,000$2,089,911$2,000,000$2,400,000
20Barricades, signs and traffic handling (502-7001)MO18$7,000.00$11,000$18,500$40,000$103,844$12,500$56,250
21Portable changeable message sign (503-7002)EACH18$7,000.00$800.00$18,500$10,000$117.00$20,000$100.00
22TMA (stationary) (505-7001)DAY110$350.00$200.00$200.00$200.00$245.00$250.00$244.00
23TMA (mobile operation) (505-7003)DAY40$400.00$800.00$550.00$1,200.00$811.00$550.00$576.00
24Construction exits (install) (type 1) (506-7020)SY1,060$30.00$30.00$45.00$33.00$40.80$30.00$40.00
25Construction exits (remove) (506-7024)SY1,060$12.00$15.00$14.00$1.00$14.30$10.00$14.00
26Biodegradable erosion control logs (install) (8") (506-7043)LF360$12.00$12.00$9.00$3.45$8.20$12.00$8.00
27Biodegradable erosion control logs (remove) (506-7046)LF360$2.00$6.00$2.00$0.10$2.10$8.00$2.00
28Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005)LF6,480$65.00$25.00$50.00$45.00$25.00$85.00$24.00
29Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029)LF48,060$20.00$4.00$8.00$2.00$6.80$10.00$5.60
30Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053)LF6,480$20.00$12.50$6.00$5.00$10.60$20.00$13.50
31Mill rumble strips (concrete) (shoulder) (533-7003)LF45,080$3.00$0.67$0.75$0.42$0.80$1.00$0.42
32Metal W-beam guard fence (steel post) (540-7002)LF250$40.00$32.32$34.00$35.00$30.90$35.00$34.00
33Downstream anchor terminal section (540-7015)EACH1$1,650.00$1,751.93$1,900.00$1,500.00$1,686.19$1,850.00$1,500.00
34Remove metal beam guard fence (542-7001)LF250$6.00$2.93$3.50$3.00$2.80$3.00$5.00
35Remove downstream anchor terminal (542-7003)EACH1$300.00$292.88$320.00$500.00$280.00$500.00$300.00
36Guardrail end treatment (install) (544-7001)EACH1$3,250.00$3,694.49$3,900.00$4,000.00$3,532.00$3,850.00$3,500.00
37Guardrail end treatment (remove) (544-7003)EACH1$330.00$292.88$340.00$500.00$280.00$1,500.00$300.00
38Crash cushion attenuator (move & reset) (545-7002)EACH9$2,400.00$2,500.00$2,600.00$1,197.97$1,298.00$6,500.00$1,600.00
39Crash cushion attenuator (remove) (545-7004)EACH1$1,350.00$1,250.00$1,800.00$1,732.88$912.00$2,500.00$1,650.00
40Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH1$11,000$10,000$13,500$9,185.94$7,813.00$21,000$9,300.00
41In bridge MNT clearance sign assembly(type N) (644-7061)EACH4$3,100.00$3,828.68$4,000.00$3,500.00$3,660.00$5,000.00$3,500.00
42Remove BRDG MNT clearance sign assembly (644-7074)EACH4$1,300.00$569.78$600.00$3,500.00$545.00$2,500.00$500.00
43Work zone pavement marking removing (W)6"(solid) (662-7068)LF18,236$1.50$0.91$1.20$0.85$1.00$1.00$0.85
44Work zone pavement marking removing (Y)6"(solid) (662-7100)LF26,700$1.50$0.91$1.20$0.85$1.00$1.00$0.85
45Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF3,010$2.00$1.28$1.60$1.20$2.20$1.00$1.20
46Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF730$5.00$3.20$4.00$3.00$5.10$6.00$3.00
47Reflectorized pavement marking type II (W) (entr gore) (666-7195)EACH5$2,000.00$213.00$250.00$200.00$662.00$2,500.00$200.00
48Reflectorized pavement marking type II (W) (exit gore) (666-7196)EACH5$2,000.00$372.75$440.00$350.00$662.00$2,500.00$350.00
49Type I high perf PM (W)6"(broken)(100MIL) (666-7290)LF6,670$2.00$0.80$1.00$0.75$0.70$0.75$0.75
50Type I high perf PM (W)6"(solid)(100MIL) (666-7293)LF18,250$1.50$0.56$0.70$0.53$0.70$0.75$0.53
51Type I high perf PM (Y)6"(solid)(100MIL) (666-7305)LF26,660$1.50$0.56$0.70$0.53$0.70$0.75$0.53
52Reflectorized pavement marker type II-C-R (672-7006)EACH651$7.50$5.06$6.00$4.75$5.10$6.00$4.75
53Traffic button type W (672-7007)EACH1,440$6.00$1.97$2.40$1.85$5.10$6.00$1.85
54Traffic button type Y (672-7008)EACH1,440$4.50$1.97$2.40$1.85$5.10$6.00$1.85
55Pavement surface preparation for marking (6") (678-7002)LF79,980$0.40$0.16$0.20$0.15$0.05$0.75$0.15
56Pavement surface preparation for marking (entr gore) (678-7017)EACH5$150.00$159.75$200.00$150.00$204.00$1,500.00$150.00
57Pavement surface preparation for marking (exit gore) (678-7018)EACH5$150.00$186.38$220.00$175.00$204.00$1,500.00$175.00
TxDOT contract A00194321: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of October 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy