TxDOT contract A00194680 bid tabulation
Widen Road - Add Shoulders, SH 240 (FM 1813 to FM 369). Let by Texas DOT on May 1, 2025, Wichita, Wichita Falls District. 4 bids received; low bid $5,650,321 by Zack Burkett Co., -22% against the engineer's estimate of $7,266,665.
- Owner
- Texas DOT
- Letting
- 01 MAY 2025
- Pay items
- 99
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Zack Burkett Co. | $5,650,321 | Low | -22% |
| 2 | A. L. Helmcamp, Inc. | $6,842,387 | +21% | -6.0% |
| 3 | Overland Corporation | $6,999,556 | +24% | -4.0% |
| 4 | Duininck, Inc. | $8,140,861 | +44% | +12% |
Engineer's estimate: $7,266,665.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Zack Burkett Co. | 2. A. L. Helmcamp, Inc. | 3. Overland Corporation | 4. Duininck, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Excavation (roadway) (110-7001) | CY | 3,200 | $35.00 | $5.00 | $36.00 | $70.00 | $45.00 |
| 2 | Excavation (channel) (110-7002) | CY | 198 | $50.00 | $30.00 | $56.00 | $43.00 | $56.00 |
| 3 | Embankment (final)(OC)(type B) (132-7003) | CY | 8,200 | $50.00 | $17.58 | $46.00 | $30.00 | $45.00 |
| 4 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 105,220 | $0.45 | $0.13 | $0.12 | $0.11 | $0.12 |
| 5 | Broadcast seed (temporary_warm) (164-7005) | SY | 52,610 | $0.50 | $0.16 | $0.08 | $0.14 | $0.16 |
| 6 | Broadcast seed (temporary_cool) (164-7006) | SY | 52,610 | $0.50 | $0.17 | $0.12 | $0.15 | $0.17 |
| 7 | Vegetative watering (168-7001) | TGL | 894 | $75.00 | $20.00 | $10.00 | $50.00 | $29.00 |
| 8 | Cement (275-7001) | TON | 733 | $280.00 | $300.00 | $275.00 | $352.00 | $280.00 |
| 9 | Cement TRT (existing material)(8") (275-7003) | SY | 50,466 | $5.00 | $3.75 | $4.00 | $4.10 | $5.60 |
| 10 | Prime coat (MC-30) (310-7004) | GAL | 11,802 | $7.00 | $4.42 | $8.00 | $5.00 | $5.30 |
| 11 | Emuls asphalt (erosion control)(SS-1) (314-7008) | GAL | 8,810 | $4.25 | $3.00 | $4.70 | $3.50 | $4.30 |
| 12 | D-GR HMA type-B PG64-22 (341-7001) | TON | 12,979 | $100.00 | $97.45 | $119.00 | $102.00 | $137.50 |
| 13 | D-GR HMA type-B PG64-22 (level-UP) (341-7004) | TON | 384 | $200.00 | $130.00 | $175.00 | $250.00 | $270.00 |
| 14 | SP mixes SP-C sac-B PG70-28 (344-7025) | TON | 13,949 | $140.00 | $110.35 | $122.00 | $120.00 | $145.00 |
| 15 | Flexible pavement structure repair(6") (351-7005) | SY | 3,600 | $60.00 | $47.65 | $70.00 | $65.00 | $80.50 |
| 16 | Flexible pavement structure repair(8") (351-7007) | SY | 1,706 | $90.00 | $66.55 | $85.00 | $90.00 | $100.00 |
| 17 | Plane & text asphalt concrete pavement(0" to 2") (354-7002) | SY | 1,746 | $5.00 | $3.00 | $3.50 | $5.00 | $12.00 |
| 18 | Cut & restoring pavement (400-7006) | SY | 24 | $120.00 | $51.75 | $115.00 | $56.00 | $225.00 |
| 19 | Cem stabil BKFL (400-7010) | CY | 10 | $250.00 | $230.00 | $210.00 | $205.00 | $225.00 |
| 20 | Trench excavation protection (402-7001) | LF | 398 | $30.00 | $11.50 | $11.00 | $11.00 | $11.00 |
| 21 | Temporary special shoring (403-7001) | SF | 735 | $60.00 | $51.75 | $47.00 | $46.00 | $50.50 |
| 22 | Class A concrete (plug) (420-7009) | EACH | 2 | $5,000.00 | $1,725.00 | $1,600.00 | $1,525.00 | $1,700.00 |
| 23 | Class C concrete (miscellaneous) (420-7067) | CY | 4 | $3,000.00 | $1,150.00 | $1,100.00 | $1,020.00 | $1,100.00 |
| 24 | Riprap (concrete)(5 in) (432-7002) | CY | 17.30 | $850.00 | $747.50 | $680.00 | $660.00 | $725.00 |
| 25 | Riprap (mow strip)(4 in) (432-7013) | CY | 34 | $550.00 | $747.50 | $680.00 | $1,500.00 | $725.00 |
| 26 | Riprap (stone protection)(18 in) (432-7043) | CY | 152 | $440.00 | $287.50 | $260.00 | $255.00 | $280.00 |
| 27 | CMP (gal steel 18 in) (460-7003) | LF | 78 | $132.00 | $86.25 | $78.00 | $76.00 | $84.00 |
| 28 | CMP (gal steel 24 in) (460-7005) | LF | 110 | $105.00 | $97.75 | $90.00 | $87.00 | $95.00 |
| 29 | CMP (gal steel 36 in) (460-7009) | LF | 26 | $250.00 | $138.00 | $125.00 | $125.00 | $135.00 |
| 30 | Concrete box culvert (9 FT X 4 FT) (462-7026) | LF | 17 | $1,200.00 | $1,352.40 | $1,250.00 | $1,200.00 | $1,300.00 |
| 31 | Concrete box culvert (3 FT X 2 FT)(extend) (462-7056) | LF | 15 | $950.00 | $671.60 | $610.00 | $600.00 | $655.00 |
| 32 | Concrete box culvert (5 FT X 2 FT)(extend) (462-7061) | LF | 14 | $1,100.00 | $899.30 | $1,000.00 | $800.00 | $1,000.00 |
| 33 | Concrete box culvert (5 FT X 3 FT)(extend) (462-7062) | LF | 16 | $2,200.00 | $1,085.60 | $990.00 | $975.00 | $1,100.00 |
| 34 | Concrete box culvert (6 FT X 3 FT)(extend) (462-7066) | LF | 26 | $1,100.00 | $1,113.20 | $1,100.00 | $1,000.00 | $1,400.00 |
| 35 | Concrete box culvert (10 FT X 7 FT)(extend) (462-7090) | LF | 21 | $600.00 | $1,725.00 | $1,600.00 | $1,600.00 | $1,700.00 |
| 36 | Concrete box culvert (2.5 FT X 2 FT) (extend) (462-7125) | LF | 18 | $950.00 | $747.50 | $680.00 | $700.00 | $725.00 |
| 37 | Concrete box culvert (3 FT X 1.5 FT) (extend) (462-7126) | LF | 12 | $950.00 | $747.50 | $680.00 | $700.00 | $725.00 |
| 38 | RC pipe (CL III)(18 in) (464-7003) | LF | 96 | $70.00 | $94.30 | $86.00 | $85.00 | $91.50 |
| 39 | RC pipe (CL III)(24 in) (464-7005) | LF | 140 | $90.00 | $135.70 | $124.00 | $120.00 | $130.00 |
| 40 | Headwall (CH - PW - 0) (diameter= 24 in) (466-7101) | EACH | 2 | $8,000.00 | $13,340 | $12,000 | $25,000 | $13,000 |
| 41 | Wingwall (FW - 0) (HW=3 FT) (466-7145) | EACH | 2 | $10,000 | $6,210.00 | $5,700.00 | $6,000.00 | $6,000.00 |
| 42 | Wingwall (FW - 0) (HW=4 FT) (466-7146) | EACH | 1 | $10,500 | $11,040 | $10,000 | $10,000 | $10,500 |
| 43 | Wingwall (FW - S) (HW=3 FT) (466-7159) | EACH | 4 | $9,060.00 | $7,705.00 | $7,000.00 | $7,000.00 | $7,500.00 |
| 44 | Wingwall (PW - 2) (HW=3 FT) (466-7187) | EACH | 2 | $12,500 | $6,900.00 | $6,400.00 | $6,100.00 | $6,700.00 |
| 45 | Wingwall (PW - 2) (HW=4 FT) (466-7188) | EACH | 7 | $14,500 | $8,970.00 | $8,200.00 | $8,000.00 | $8,700.00 |
| 46 | Wingwall (PW - 2) (HW=8 FT) (466-7192) | EACH | 2 | $35,000 | $32,660 | $30,000 | $30,000 | $32,000 |
| 47 | Wingwall (PW - 2) (HW=9 FT) (466-7193) | EACH | 2 | $37,500 | $42,550 | $39,000 | $40,000 | $41,500 |
| 48 | Set (type I)(S= 3 FT)(HW= 2 FT)(6:1)(C) (467-7038) | EACH | 2 | $10,250 | $8,797.50 | $8,000.00 | $8,000.00 | $8,600.00 |
| 49 | Set (type I)(S= 3 FT)(HW= 2 FT)(6:1)(P) (467-7039) | EACH | 4 | $9,925.00 | $4,197.50 | $3,900.00 | $3,800.00 | $4,100.00 |
| 50 | Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307) | EACH | 2 | $5,000.00 | $1,495.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 51 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 4 | $2,100.00 | $1,495.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 52 | Set (type II) (24 in) (CMP) (6: 1) (P) (467-7324) | EACH | 10 | $2,700.00 | $1,874.50 | $1,700.00 | $1,700.00 | $1,800.00 |
| 53 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 6 | $2,625.00 | $1,794.00 | $1,700.00 | $1,600.00 | $1,700.00 |
| 54 | Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368) | EACH | 2 | $3,000.00 | $5,600.50 | $5,200.00 | $5,000.00 | $5,400.00 |
| 55 | Thermoplastic pipe (PP) (36") (468-7004) | LF | 420 | $115.00 | $143.75 | $130.00 | $127.00 | $140.00 |
| 56 | Clean existing culverts (480-7001) | EACH | 14 | $2,250.00 | $4,025.00 | $3,700.00 | $3,500.00 | $3,900.00 |
| 57 | Removing structure (set) (496-7004) | EACH | 1 | $1,000.00 | $575.00 | $520.00 | $550.00 | $560.00 |
| 58 | Removing structure (wingwall) (496-7005) | EACH | 26 | $2,000.00 | $575.00 | $520.00 | $550.00 | $560.00 |
| 59 | Removing structure (headwall) (496-7006) | EACH | 5 | $1,550.00 | $575.00 | $520.00 | $550.00 | $560.00 |
| 60 | Removing structure (pipe) (496-7007) | LF | 681 | $30.00 | $13.80 | $13.00 | $15.00 | $13.50 |
| 61 | Removing structure (box culvert) (496-7008) | LF | 22 | $160.00 | $74.75 | $68.00 | $66.00 | $72.50 |
| 62 | Mobilization (500-7001) | LS | 1 | $651,442 | $441,025 | $523,000 | $690,000 | $800,000 |
| 63 | Barricades, signs and traffic handling (502-7001) | MO | 14 | $7,200.00 | $1,676.00 | $14,000 | $20,000 | $25,000 |
| 64 | TMA (stationary) (505-7001) | DAY | 194 | $150.00 | $200.00 | $200.00 | $125.00 | $280.00 |
| 65 | TMA (mobile operation) (505-7003) | DAY | 8 | $200.00 | $0.01 | $300.00 | $1,000.00 | $1,000.00 |
| 66 | Rock filter dams (install) (type 2) (506-7002) | LF | 30 | $70.00 | $50.00 | $75.00 | $200.00 | $67.00 |
| 67 | Rock filter dams (remove) (506-7011) | LF | 30 | $20.00 | $10.00 | $35.00 | $150.00 | $17.00 |
| 68 | Temporary sediment control fence (install) (506-7039) | LF | 520 | $3.00 | $5.06 | $4.50 | $4.40 | $4.90 |
| 69 | Temporary sediment control fence (remove) (506-7041) | LF | 520 | $1.00 | $1.15 | $2.20 | $1.00 | $1.10 |
| 70 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 1,220 | $5.00 | $3.22 | $5.00 | $2.80 | $3.15 |
| 71 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,220 | $1.00 | $1.15 | $2.00 | $1.00 | $1.10 |
| 72 | Driveways (ACP) (530-7010) | SY | 1,939 | $60.00 | $33.00 | $75.00 | $59.00 | $85.50 |
| 73 | Driveways (base) (530-7015) | SY | 930 | $35.00 | $33.00 | $38.00 | $59.00 | $47.50 |
| 74 | Turnouts (ACP) (530-7018) | SY | 673 | $65.00 | $33.00 | $75.00 | $140.00 | $66.50 |
| 75 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 63,134 | $0.40 | $0.28 | $0.26 | $0.25 | $0.08 |
| 76 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 31,567 | $0.40 | $0.28 | $0.26 | $0.25 | $0.10 |
| 77 | Metal W-beam guard fence (timber post) (540-7001) | LF | 400 | $25.00 | $36.80 | $28.00 | $33.00 | $29.00 |
| 78 | Transition adjustment (540-7012) | EACH | 4 | $550.00 | $287.50 | $850.00 | $255.00 | $895.00 |
| 79 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 118 | $100.00 | $115.00 | $86.00 | $102.00 | $91.50 |
| 80 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,400.00 | $4,600.00 | $3,300.00 | $4,060.00 | $3,500.00 |
| 81 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 6 | $325.00 | $460.00 | $230.00 | $406.00 | $245.00 |
| 82 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 1 | $900.00 | $1,150.00 | $710.00 | $1,050.00 | $755.00 |
| 83 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 15 | $800.00 | $1,437.50 | $900.00 | $1,300.00 | $950.00 |
| 84 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 2 | $945.00 | $1,840.00 | $1,200.00 | $1,650.00 | $1,200.00 |
| 85 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 46 | $475.00 | $805.00 | $500.00 | $710.00 | $525.00 |
| 86 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 11 | $400.00 | $920.00 | $600.00 | $850.00 | $615.00 |
| 87 | Remove SM RD SN sup&AM (644-7073) | EACH | 91 | $130.00 | $143.75 | $110.00 | $130.00 | $110.00 |
| 88 | Install delineator assembly (D-SW)SZ 1(BRF)GF1 (BI) (658-7016) | EACH | 16 | $55.00 | $28.75 | $38.00 | $26.00 | $40.50 |
| 89 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 37 | $90.00 | $143.75 | $95.00 | $130.00 | $100.00 |
| 90 | Install object marker assembly (OM-2Z)(WFLX)SRF (658-7060) | EACH | 37 | $85.00 | $143.75 | $95.00 | $130.00 | $100.00 |
| 91 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 1,688 | $2.00 | $1.20 | $1.00 | $2.00 | $1.65 |
| 92 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 64,205 | $0.72 | $0.75 | $0.66 | $0.70 | $0.73 |
| 93 | Type I high perf PM (Y)6"(broken)(100MIL) (666-7302) | LF | 6,094 | $0.72 | $0.75 | $0.70 | $0.70 | $0.73 |
| 94 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 24,642 | $0.72 | $0.75 | $0.70 | $0.70 | $0.73 |
| 95 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 120 | $0.72 | $16.10 | $15.00 | $15.00 | $15.50 |
| 96 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 695 | $4.00 | $5.75 | $4.50 | $5.00 | $5.60 |
| 97 | Tree removal (4" - 12" diameter) (752-7005) | EACH | 5 | $500.00 | $1,000.00 | $900.00 | $1,000.00 | $840.00 |
| 98 | Tree removal (12" - 18" diameter) (752-7006) | EACH | 4 | $1,000.00 | $1,000.00 | $1,100.00 | $1,350.00 | $1,400.00 |
| 99 | Bonding course (3007-7001) | GAL | 7,576 | $6.00 | $4.69 | $4.00 | $4.25 | $4.45 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 1, 2025. Compiled by Mirage Metrics.