TxDOT contract A00196689 bid tabulation

Remove/Replace Bridge Rail, Various (DISTRICTWIDE to .). Let by Texas DOT on March 4, 2025, Webb, Laredo District. 6 bids received; low bid $3,111,940 by Delgado'S Contractors, LLC, +1.0% against the engineer's estimate of $3,082,512.

Owner
Texas DOT
Letting
04 MAR 2025
Pay items
48
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Delgado'S Contractors, LLC$3,111,940Low+1.0%
2Icos Management, LLC$3,147,250+1.0%+2.0%
33LW Civil LLC$3,298,802+6.0%+7.0%
4Relmco, Inc.$3,323,094+7.0%+8.0%
5STX Civil$4,074,753+31%+32%
6Built Right Construction of Oklahoma, LLC$5,423,560+74%+76%
TxDOT contract A00196689: bids by rank

Engineer's estimate: $3,082,512.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Delgado'S Contractors, LLC2. Icos Management, LLC3. 3LW Civil LLC4. Relmco, Inc.5. STX Civil6. Built Right Construction of Oklahoma, LLC
1Removing concrete (mowstrip) (104-7005)LF3,020$15.00$6.00$15.00$17.24$25.00$22.00$50.00
2Embankment (final)(OC)(type A) (132-7001)CY72$100.00$100.00$120.00$331.97$200.00$75.00$300.00
3Backfill (type B) (134-7002)STA125$300.00$125.00$80.00$373.52$1,500.00$263.00$500.00
4Spec excavation work (backhoe) (158-7001)HR28$125.00$125.00$500.00$78.31$100.00$196.00$200.00
5Riprap (concrete)(4 in) (432-7001)CY72$500.00$625.00$800.00$699.74$525.00$714.00$1,700.00
6Riprap (mow strip)(4 in) (432-7013)CY466$600.00$625.00$700.00$798.19$525.00$777.00$1,300.00
7Retrofit rail (type T402) (451-7012)LF3,062$220.00$180.00$260.00$166.81$150.00$281.00$350.00
8Retrofit rail (type T631) (451-7020)LF3,950$100.00$115.00$160.00$98.95$104.50$139.00$225.00
9Retrofit rail (add HSS) (451-7052)LF170$100.00$125.00$500.00$159.77$187.00$139.00$300.00
10Clean existing culverts (480-7001)EACH9$2,500.00$4,000.00$7,000.00$16,663$3,500.00$4,500.00$5,000.00
11Mobilization (500-7001)LS1$227,076$155,000$47,000$311,944$300,000$336,000$500,000
12Barricades, signs and traffic handling (502-7001)MO20$5,000.00$5,000.00$1.00$2,101.67$6,500.00$5,500.00$2,500.00
13Portable changeable message sign (503-7002)EACH2$10,000$9,500.00$10,000$8,453.19$17,500$12,500$20,000
14TMA (stationary) (505-7001)DAY388$150.00$300.00$1.00$183.50$250.00$260.00$325.00
15Rock filter dams (install) (type 3) (506-7003)LF273$50.00$75.00$10.00$46.80$50.00$110.00$125.00
16Rock filter dams (remove) (506-7011)LF273$15.00$7.00$5.00$21.60$25.00$25.00$35.00
17Construction exits (install) (type 1) (506-7020)SY156$15.00$35.00$20.00$33.60$30.00$45.00$55.00
18Construction exits (remove) (506-7024)SY156$10.00$7.00$5.00$18.00$15.00$20.00$25.00
19Backhoe work (erosion & sediment control) (506-7030)HR4$100.00$150.00$600.00$97.88$100.00$116.00$200.00
20Temporary sediment control fence (install) (506-7039)LF160$3.00$7.00$5.00$5.70$6.00$8.00$7.00
21Temporary sediment control fence (remove) (506-7041)LF160$1.00$1.00$2.00$2.40$4.00$2.00$5.00
22One-way traffic control (flagger cont) (510-7001)HR848$100.00$75.00$1.00$113.72$100.00$132.00$35.00
23One-way traffic control (port traffic signal) (510-7003)MO6$5,000.00$6,000.00$10,000$4,200.00$5,500.00$7,630.00$6,000.00
24PTB (fur&inst)(SSCB or CSB)(type 1)or(steel) (512-7085)LF1,170$60.00$90.00$90.00$38.26$60.00$75.00$105.00
25PTB (move)(SSCB or CSB)(type 1)or(steel) (512-7086)LF5,670$15.00$12.00$25.00$8.62$30.00$25.00$25.00
26PTB (remove)(SSCB or CSB)(type 1)or(steel) (512-7088)LF1,170$20.00$17.00$25.00$25.46$30.00$30.00$40.00
27Metal W-beam guard fence (timber post) (540-7001)LF9,975$28.00$27.50$19.00$28.64$30.80$33.00$33.00
28Metal beam guard fence trans (thrie-beam) (540-7005)EACH12$2,500.00$2,500.00$3,800.00$3,242.16$2,420.00$3,200.00$5,500.00
29Transition adjustment (540-7012)EACH1$500.00$1,250.00$5,000.00$2,184.65$1,210.00$128.00$1,500.00
30Remove metal beam guard fence (542-7001)LF7,625$3.00$2.50$2.00$9.18$2.75$4.00$5.00
31Remove terminal anchor section (542-7002)EACH4$200.00$250.00$500.00$1,143.94$275.00$422.00$300.00
32RM metal beam guard fence trans (thrie-beam) (542-7004)EACH12$250.00$325.00$500.00$762.63$275.00$469.00$300.00
33RM metal beam guard fence trans (T101) (542-7005)EACH33$200.00$250.00$500.00$1,109.28$275.00$426.00$300.00
34Guardrail end treatment (install) (544-7001)EACH47$3,000.00$3,150.00$3,500.00$3,791.80$3,520.00$3,500.00$4,500.00
35Guardrail end treatment (remove) (544-7003)EACH43$200.00$250.00$500.00$744.89$275.00$523.00$300.00
36Crash cushion attenuator (move & reset) (545-7002)EACH42$1,500.00$2,000.00$2,000.00$1,089.47$800.00$2,272.00$3,500.00
37Crash cushion attenuator (remove) (545-7004)EACH6$1,000.00$2,000.00$2,000.00$1,162.63$600.00$1,136.00$1,500.00
38Crash cushion attenuator (install)(S)(N)(TL3) (545-7014)EACH6$15,000$9,000.00$10,000$8,417.94$9,000.00$11,135$13,000
39Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH267$50.00$40.00$40.00$60.41$40.70$45.00$65.00
40Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059)EACH56$100.00$100.00$100.00$71.98$40.70$127.00$25.00
41Work zone pavement marking removing (W)6"(solid) (662-7068)LF16,920$2.00$3.00$0.50$1.80$1.65$2.00$3.50
42Work zone pavement marking removing (W)24"(solid) (662-7077)LF288$10.00$20.00$0.50$24.00$22.00$28.00$25.00
43Work zone pavement marking removing (Y)6"(solid) (662-7100)LF32,080$2.00$3.00$0.50$1.10$1.21$2.00$3.25
44Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH1,692$2.00$2.00$0.50$4.66$5.00$3.00$0.50
45Work zone pavement marking SHT terminal (tab)type Y (662-7113)EACH3,208$2.00$2.00$0.50$4.63$5.00$3.00$0.50
46Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF8,020$1.00$3.00$0.50$3.00$3.30$4.00$3.25
47Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF32,080$1.50$3.00$0.50$1.28$1.41$2.00$3.25
48Reflectorized pavement marker type II-A-A (672-7004)EACH802$8.00$11.00$10.00$20.00$22.00$28.00$20.00
TxDOT contract A00196689: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of March 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy