TxDOT contract A00203532 bid tabulation

Construct Ramps, US 175 (Malloy Bridge Rd to Kaufman County Line). Let by Texas DOT on April 8, 2026, Dallas, Dallas District. 4 bids received; low bid $3,975,784 by Austin Bridge & Road Services, LP, +3.4% against the engineer's estimate of $3,844,434.

Owner
Texas DOT
Letting
08 APR 2026
Pay items
91
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Austin Bridge & Road Services, LP$3,975,784Low+3.0%
2Foutsco Paving Company, LLC$4,019,100+1.0%+5.0%
3Texas Materials Group, Inc.$4,214,086+6.0%+10%
4Ed Bell Construction Company$4,459,695+12%+16%
TxDOT contract A00203532: bids by rank

Engineer's estimate: $3,844,434.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Austin Bridge & Road Services, LP2. Foutsco Paving Company, LLC3. Texas Materials Group, Inc.4. Ed Bell Construction Company
1Preparing row (100-7002)STA130$1,777.00$540.00$500.00$1.00$850.00
2Removing concrete (pavement) (104-7001)SY2,751$15.00$12.32$24.00$18.00$21.00
3Remove (0"-8") TRT/untrt base & asphalt pavement (105-7048)SY2,751$15.00$4.63$7.00$7.98$7.35
4Remove (8"-22") TRT/untrt base & asphalt pavement (105-7122)SY3,180$24.00$12.21$18.00$11.98$8.40
5Excavation (roadway) (110-7001)CY2,748$20.00$16.41$23.00$50.00$21.00
6Subgr widen (OC) (112-7001)STA19.88$600.00$187.25$855.00$300.00$1,000.00
7Embankment (final)(DC)(type C) (132-7006)CY773$18.00$4.74$16.00$100.00$63.00
8Backfill (type A or B) (134-7004)STA181.64$250.00$175.75$175.00$400.00$300.00
9Road grader work (ord comp) (152-7001)STA19.88$175.00$161.41$100.00$200.00$1,000.00
10Compost manuf topsoil (4") (161-7002)SY12,007$3.00$1.63$2.00$0.96$1.50
11Block sodding (162-7002)SY12,007$7.00$6.33$4.00$3.82$5.25
12Drill seed (temporary_warm_cool) (164-7015)SY12,007$0.40$2.00$0.10$0.21$0.18
13Vegetative watering (168-7001)TGL3,572$5.00$0.01$0.10$1.00$1.00
14FL BS (compacted in place)(type D GR 1-2) (12") (247-7125)SY4,689$27.00$26.52$50.00$34.00$50.00
15Prime coat(MC-30 or AE-P) (310-7013)GAL1,409$6.00$5.23$0.10$4.00$5.50
16SP mixes SP-C sac-B PG64-22 (344-7011)TON6,874$115.00$180.35$170.00$155.00$156.00
17Tack coat (344-7077)GAL5,868$5.00$4.20$0.10$4.00$4.20
18Flexible pavement structure repair(8") (351-7007)SY8,946$90.00$75.79$80.00$90.00$80.00
19Planing asphalt concrete pavement(2") (354-7051)SY50,974$3.00$2.22$0.75$1.98$2.00
20Cem stabil BKFL (400-7010)CY1$1,000.00$1,000.00$1,200.00$850.00
21Trench excavation protection (402-7001)LF428$25.00$1.00$18.00$1.00$15.00
22Temporary special shoring (403-7001)SF199.50$28.00$51.02$55.00$50.00$150.00
23Drilled shaft (24 in) (416-7004)LF26$200.00$222.00$285.00$222.00$236.50
24Drilled shaft (36 in) (416-7006)LF100$225.00$398.32$250.00$393.00$525.00
25Drilled shaft (roadway illumination pole) (30 in) (416-7040)LF48$425.00$230.00$320.00$230.00$258.00
26Class K concrete (miscellaneous) (420-7148)CY33.40$2,000.00$2,015.31$975.00$1,975.00$2,500.00
27Riprap (concrete)(CL B) (432-7005)CY3$600.00$918.37$1,000.00$1,000.00$2,000.00
28Riprap (mow strip)(4 in) (432-7013)CY12$600.00$800.00$855.00$2,000.00$1,000.00
29Concrete box culvert (3 FT X 2 FT) (462-7001)LF4$1,250.00$1,200.00$1,250.00$900.00
30Concrete box culvert (4 FT X 2 FT) (462-7003)LF8$1,450.00$1,450.00$1,450.00$950.00
31RC pipe (CL III)(30 in) (464-7007)LF621$150.00$190.00$198.00$190.00$125.00
32Inl(CMP)(pazd-CZ)(FG)(4FTX4FT-4FTX4FT) (465-7165)EACH2$9,500.00$6,300.00$7,200.00$6,300.00$15,000
33Inl(CMP)(pazd-CZ)(FG)(5FTX5FT-4FTX4FT) (465-7167)EACH1$7,500.00$8,700.00$7,500.00$10,000
34Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348)EACH1$4,500.00$5,900.00$5,800.00$5,900.00$3,000.00
35Removing structure (inlet) (496-7002)EACH2$1,000.00$1,000.00$2,000.00$1,000.00
36Removing structure (headwall) (496-7006)EACH3$1,830.00$1,800.00$1,500.00$1,800.00$1,000.00
37Removing structure (pipe) (496-7007)LF527$10.00$10.00$30.00$10.00$25.00
38Removing structure (box culvert) (496-7008)LF12$30.00$300.00$30.00$400.00
39Mobilization (500-7001)LS1$408,155$437,336$300,000$420,000$448,000
40Barricades, signs and traffic handling (502-7001)MO9$10,000$34,213$55,000$40,000$52,500
41Portable changeable message sign (503-7002)EACH3$1,032.46$4,400.00$18,500$15,750
42TMA (stationary) (505-7001)DAY120$125.00$1.00$1.00$10.00$157.50
43TMA (mobile operation) (505-7003)DAY5$300.00$1.50$1.00$100.00$1,575.00
44Rock filter dams (install) (type 1) (506-7001)LF168$55.00$28.00$40.00$42.84$69.88
45Rock filter dams (remove) (506-7011)LF168$12.00$11.00$5.00$10.00$37.63
46Construction exits (install) (type 1) (506-7020)SY246$35.00$35.00$35.00$42.00$37.63
47Construction exits (remove) (506-7024)SY246$15.00$9.00$10.00$9.00$18.81
48Temporary sediment control fence (install) (506-7039)LF1,368$3.50$3.50$1.00$3.60$4.21
49Temporary sediment control fence (remove) (506-7041)LF1,368$1.00$1.00$0.50$0.79$1.88
50Biodegradable erosion control logs (install) (18") (506-7045)LF3,857$10.00$6.25$1.00$5.61$6.18
51Biodegradable erosion control logs (remove) (506-7046)LF3,857$3.00$1.25$0.50$0.79$2.96
52Mill rumble strips (asphalt) (shoulder) (533-7001)LF1,216$1.00$1.00$2.50$0.25$2.10
53Metal W-beam guard fence (steel post) (540-7002)LF125$25.00$30.00$55.00$50.00$32.25
54Downstream anchor terminal section (540-7015)EACH1$1,170.00$1,300.00$1,950.00$2,500.00$1,397.50
55Guardrail end treatment (install) (544-7001)EACH1$3,200.00$3,000.00$3,500.00$3,000.00$3,225.00
56Remove RD IL asm (trans-base) (610-7009)EACH10$800.00$672.00$785.00$672.00$913.75
57In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124)EACH6$5,800.00$4,065.00$5,750.00$4,065.00$4,730.00
58Conduit (PVC) (schedule 40) (2") (618-7030)LF1,818$21.00$15.25$17.00$15.25$16.13
59Conduit (PVC) (schedule 40) (2") (bore) (618-7031)LF330$35.00$36.05$48.00$36.05$35.48
60Electrical conductor (no.8) bare (620-7007)LF2,148$3.00$2.40$2.00$2.40$2.15
61Electrical conductor (no.8) insulated (620-7008)LF4,296$4.00$2.40$2.50$2.40$2.69
62Ground box type A (122311)W/apron (624-7002)EACH5$2,000.00$1,840.00$2,000.00$1,840.00$1,505.00
63Remove ground box (624-7013)EACH2$360.00$435.00$660.00$435.00$483.75
64Aluminum signs (type G) (636-7002)SF204$42.00$32.75$30.00$32.75$32.25
65Aluminum signs (type O) (636-7003)SF242.50$33.00$37.15$30.00$37.15$32.25
66Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH53$705.00$660.00$600.00$800.00$645.00
67Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH50$790.00$720.00$750.00$958.00$806.25
68Install small roadside sign support and assembly type 10BWG(2)SB(P-exal) (644-7020)EACH3$850.00$1,500.00$1,900.00$2,473.00$2,042.50
69Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH6$1,000.00$890.00$960.00$1,160.00$1,032.00
70Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH1$1,200.00$940.00$1,200.00$1,456.00$1,290.00
71Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034)EACH2$1,050.00$1,500.00$1,536.00$1,612.50
72Install small roadside sign support and assembly TYS80(2)SA(P-exal) (644-7049)EACH1$1,700.00$1,950.00$2,695.00$3,550.00$2,902.50
73In bridge MNT clearance sign assembly(type N) (644-7061)EACH3$3,118.00$3,200.00$3,118.00$3,440.00
74Install LRSS (struct steel) (647-7001)LB1,351$7.00$7.30$10.00$7.30$10.75
75Remove lrsa (647-7003)EACH3$880.00$888.00$1,150.00$888.00$1,236.25
76Install overhead sign support(40 FT cant)(span only) (650-7048)EACH1$29,000$27,680$20,000$27,680$40,000
77Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH3$55.00$25.00$60.00$50.00$26.88
78Install object marker assembly (OM-2Z)(WFLX)GNDLL (658-7248)EACH4$75.00$85.00$170.00$50.00$75.25
79Work zone pavement marking removing (W)8"(solid) (662-7072)LF348$1.50$2.50$1.50$8.15$8.76
80Work zone pavement marking removing (Y)6"(solid) (662-7100)LF700$1.00$1.25$1.30$8.15$8.76
81Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF1,198$2.50$1.30$0.79$1.50$1.61
82Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF222$4.00$4.00$3.05$7.25$7.79
83Pavement sler 6" (666-7347)LF494$2.00$0.18$1.00$1.08
84Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF4,522$1.00$0.70$0.54$1.00$1.08
85Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF19,657$1.50$0.65$0.53$0.95$1.02
86Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF17,929$1.00$0.65$0.53$0.95$1.02
87Reflectorized pavement marker type II-C-R (672-7006)EACH294$8.00$6.00$4.00$6.25$6.72
88Eliminating existing PM & markers (6") (677-7002)LF298$0.58$0.89$5.00$5.38
89Eliminating existing PM & markers (8") (677-7004)LF376$1.15$1.00$6.00$6.45
90Pavement surface preparation for marking (6") (678-7002)LF494$2.00$0.25$2.00$2.15
91Full - width mowing (730-7019)CYC2$2,500.00$5,000.00$2,500.00$6,000.00$5,000.00
TxDOT contract A00203532: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy