TxDOT contract A00206753 bid tabulation
Intersection Improvement, US 287 (OFF-RAMP TO US 287 BUS EB to US 287 BUS WB). Let by Texas DOT on August 7, 2025, Ellis, Dallas District. 5 bids received; low bid $1,120,429 by Big Creek Construction, LTD., +6.6% against the engineer's estimate of $1,051,195.
- Owner
- Texas DOT
- Letting
- 07 AUG 2025
- Pay items
- 45
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Big Creek Construction, LTD. | $1,120,429 | Low | +7.0% |
| 2 | Knife River Corporation - South | $1,229,091 | +10% | +17% |
| 3 | Grey Sky Construction LLC | $1,261,208 | +13% | +20% |
| 4 | Ed Bell Construction Company | $1,361,956 | +22% | +30% |
| 5 | Texas Materials Group, Inc. | $1,493,751 | +33% | +42% |
Engineer's estimate: $1,051,195.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Big Creek Construction, LTD. | 2. Knife River Corporation - South | 3. Grey Sky Construction LLC | 4. Ed Bell Construction Company | 5. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Remove (8"-14") TRT/untrt base & asphalt pavement (105-7059) | SY | 6,111 | $7.50 | $25.00 | $20.30 | $14.00 | $11.98 | $10.00 |
| 2 | Excavation (roadway) (110-7001) | CY | 514 | $25.00 | $35.00 | $60.00 | $20.00 | $42.76 | $115.00 |
| 3 | Backfill (type B) (134-7008) | LF | 4,450 | $3.00 | $5.00 | $5.35 | $10.00 | $8.61 | $2.35 |
| 4 | Blading (150-7003) | LF | 4,450 | $8.00 | $1.00 | $1.50 | $10.00 | $13.80 | $1.00 |
| 5 | Hydro mulch seed (permanent_rural_clay) (164-7018) | SY | 11,411 | $0.50 | $0.60 | $0.56 | $0.50 | $0.50 | $0.60 |
| 6 | Hydro mulch seed (temporary_warm_cool) (164-7023) | SY | 11,411 | $0.30 | $0.28 | $0.31 | $0.50 | $0.28 | $0.60 |
| 7 | Vegetative watering (168-7001) | TGL | 3,398 | $5.00 | $1.00 | $1.00 | $10.00 | $1.05 | $0.01 |
| 8 | FL BS (compacted in place)(type D GR 1-2) (6") (247-7056) | SY | 1,237 | $33.00 | $30.00 | $50.00 | $22.00 | $30.00 | $63.00 |
| 9 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 309 | $6.00 | $4.50 | $5.00 | $6.00 | $8.80 | $17.00 |
| 10 | SP mixes SP-B PG64-22 (344-7001) | TON | 1,098 | $140.00 | $135.00 | $156.95 | $150.00 | $180.00 | $245.00 |
| 11 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 1,815 | $150.00 | $145.00 | $169.75 | $170.00 | $190.00 | $180.00 |
| 12 | Tack coat (344-7077) | GAL | 1,728 | $2.00 | $4.00 | $3.00 | $6.00 | $7.70 | $5.00 |
| 13 | Planing asphalt concrete pavement(2") (354-7051) | SY | 14,267 | $2.25 | $2.75 | $4.30 | $4.50 | $2.55 | $5.00 |
| 14 | Mobilization (500-7001) | LS | 1 | $90,128 | $110,000 | $122,900 | $125,000 | $120,000 | $148,427 |
| 15 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $15,000 | $5,000.00 | $5,000.00 | $15,000 | $42,000 | $43,000 |
| 16 | Portable changeable message sign (503-7002) | EACH | 2 | $20,000 | $21,000 | $4,500.00 | $10,000 | $6,517.28 | $8,000.00 |
| 17 | TMA (stationary) (505-7001) | DAY | 36 | $278.00 | $275.00 | $450.00 | $250.00 | $1,686.83 | $1,152.00 |
| 18 | TMA (mobile operation) (505-7002) | HR | 24 | $90.00 | $100.00 | $110.00 | $55.00 | $168.43 | $1.00 |
| 19 | Rock filter dams (install) (type 2) (506-7002) | LF | 66 | $65.00 | $37.00 | $43.75 | $30.00 | $60.50 | $55.00 |
| 20 | Rock filter dams (remove) (506-7011) | LF | 66 | $15.00 | $22.00 | $25.00 | $15.00 | $33.00 | $22.00 |
| 21 | Construction exits (install) (type 1) (506-7020) | SY | 245 | $25.00 | $27.00 | $35.00 | $50.00 | $38.50 | $42.00 |
| 22 | Construction exits (remove) (506-7024) | SY | 245 | $8.50 | $6.00 | $10.00 | $20.00 | $11.00 | $16.00 |
| 23 | Temporary sediment control fence (install) (506-7039) | LF | 160 | $4.00 | $5.00 | $9.45 | $4.00 | $4.40 | $9.00 |
| 24 | Temporary sediment control fence (remove) (506-7041) | LF | 160 | $1.00 | $1.75 | $1.60 | $2.00 | $1.38 | $3.25 |
| 25 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 528 | $8.00 | $6.00 | $7.20 | $15.00 | $6.33 | $9.00 |
| 26 | Biodegradable erosion control logs (remove) (506-7046) | LF | 528 | $3.00 | $1.50 | $1.50 | $9.00 | $1.32 | $2.35 |
| 27 | Permanent CTB (single slope) (type 1) (42 ) (514-7001) | LF | 1,110 | $130.00 | $140.00 | $130.00 | $125.00 | $95.00 | $145.00 |
| 28 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 7,315 | $0.25 | $1.50 | $2.00 | $1.00 | $0.78 | $1.20 |
| 29 | Crash cushion attenuator (install)(R)(N)(TL3) (545-7010) | EACH | 1 | $30,000 | $22,400 | $45,000 | $21,000 | $35,000 | $28,000 |
| 30 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 3 | $800.00 | $850.00 | $1,000.00 | $1,500.00 | $863.50 | $950.00 |
| 31 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 4 | $900.00 | $1,000.00 | $1,225.00 | $1,500.00 | $1,160.50 | $1,100.00 |
| 32 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 1 | $650.00 | $650.00 | $750.00 | $1,150.00 | $660.00 | $655.00 |
| 33 | Remove SM RD SN sup&AM (644-7073) | EACH | 34 | $130.00 | $100.00 | $100.00 | $250.00 | $82.50 | $88.00 |
| 34 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BR) (658-7014) | EACH | 26 | $44.00 | $25.00 | $25.00 | $100.00 | $64.35 | $22.00 |
| 35 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 176 | $1.10 | $1.50 | $1.25 | $4.00 | $6.00 | $1.50 |
| 36 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 50 | $3.00 | $2.20 | $2.30 | $6.00 | $2.20 | $2.20 |
| 37 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 2,146 | $1.20 | $1.15 | $1.30 | $6.00 | $1.16 | $1.25 |
| 38 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 6 | $200.00 | $195.00 | $191.25 | $250.00 | $192.50 | $180.00 |
| 39 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 6 | $235.00 | $220.00 | $200.00 | $250.00 | $220.00 | $190.00 |
| 40 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 15 | $60.00 | $80.00 | $72.50 | $150.00 | $82.50 | $66.00 |
| 41 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 583 | $1.00 | $1.10 | $0.80 | $1.00 | $1.10 | $0.73 |
| 42 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 3,188 | $1.00 | $0.85 | $0.80 | $1.00 | $0.85 | $0.73 |
| 43 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 6,599 | $1.00 | $1.00 | $0.80 | $1.00 | $0.85 | $0.73 |
| 44 | Reflectorized pavement marker type I-C (672-7002) | EACH | 88 | $6.00 | $5.50 | $7.50 | $6.00 | $5.50 | $7.00 |
| 45 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 30 | $6.00 | $5.50 | $7.50 | $6.00 | $5.50 | $7.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.