TxDOT contract A00211316 bid tabulation
Bridge Maintenance, US 67 (At Bosque River to .). Let by Texas DOT on April 7, 2026, Erath, Fort Worth District. 6 bids received; low bid $2,983,533 by Blacksmith Ventures LLC, -29% against the engineer's estimate of $4,188,151.
- Owner
- Texas DOT
- Letting
- 07 APR 2026
- Pay items
- 58
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Blacksmith Ventures LLC | $2,983,533 | Low | -29% |
| 2 | Gibson & Associates, Inc. | $3,280,280 | +10% | -22% |
| 3 | The Truesdell Corporation | $3,333,333 | +12% | -20% |
| 4 | Structural Integrity Group LLC | $3,672,303 | +23% | -12% |
| 5 | Ragle Construction, Inc. | $3,749,569 | +26% | -10% |
| 6 | Built Right Construction of Oklahoma, LLC | $4,246,103 | +42% | +1.0% |
Engineer's estimate: $4,188,151.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Blacksmith Ventures LLC | 2. Gibson & Associates, Inc. | 3. The Truesdell Corporation | 4. Structural Integrity Group LLC | 5. Ragle Construction, Inc. | 6. Built Right Construction of Oklahoma, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 1.30 | $20,000 | $15,000 | $5,500.00 | $5,000.00 | $2,500.00 | $40,000 | $4,600.00 |
| 2 | Remove (0"-4") TRT/untrt base & asphalt pavement (105-7001) | SY | 3,325 | $8.71 | $6.58 | $6.50 | $7.50 | $7.50 | $6.25 | |
| 3 | Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002) | SY | 7,430 | $10.00 | $8.71 | $6.58 | $6.50 | $10.00 | $5.15 | $6.50 |
| 4 | Backfill (type A) (134-7001) | STA | 5 | $243.00 | $200.00 | $1,100.00 | $1,000.00 | $750.00 | $550.00 | $675.00 |
| 5 | Soil ret BLKT(chan_permanent_4 PSF) (169-7032) | SY | 81 | $2.00 | $2.00 | $11.00 | $10.00 | $10.00 | $7.25 | $20.00 |
| 6 | SP mixes SP-C sac-B PG70-28 (344-7025) | TON | 419 | $250.00 | $350.00 | $391.33 | $290.00 | $300.00 | $350.00 | $400.00 |
| 7 | Tack coat (344-7077) | GAL | 1,613 | $3.85 | $8.00 | $1.65 | $11.00 | $6.50 | $7.00 | $2.00 |
| 8 | Flowable backfill (401-7001) | CY | 17 | $2,250.00 | $1,000.00 | $880.00 | $800.00 | $360.00 | $440.00 | $500.00 |
| 9 | Class C concrete (crashwall) (420-7050) | CY | 128.20 | $500.00 | $1,265.00 | $880.00 | $1,590.00 | $995.00 | $1,100.00 | |
| 10 | Silicone resin paint finish (427-7004) | SF | 3,250 | $12.10 | $6.60 | $15.00 | $6.00 | $6.00 | $7.00 | |
| 11 | Penetrating concrete surface treatment (428-7001) | SY | 1,425 | $13.00 | $9.90 | $27.50 | $15.00 | $25.00 | $12.00 | $30.00 |
| 12 | Concrete structure repair(clean & coat WTH epoxy) (429-7001) | SF | 70.70 | $75.00 | $66.00 | $60.00 | $110.00 | $200.00 | $250.00 | |
| 13 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 6,450 | $100.00 | $55.00 | $5.00 | $45.00 | $30.00 | $20.00 | $225.00 |
| 14 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 857.70 | $200.00 | $91.00 | $170.50 | $155.00 | $468.00 | $150.00 | $225.00 |
| 15 | Concrete structure repair (standard) (429-7009) | SF | 19.70 | $200.00 | $75.00 | $170.50 | $155.00 | $468.00 | $250.00 | $225.00 |
| 16 | Concrete structure repair (pan girder hole repair) (429-7010) | EACH | 100 | $197.00 | $1.00 | $55.00 | $50.00 | $100.00 | $130.00 | $225.00 |
| 17 | Riprap (stone protection)(18 in) (432-7043) | CY | 228 | $150.00 | $162.00 | $206.80 | $188.00 | $225.00 | $200.00 | $200.00 |
| 18 | Riprap (stone protection)(24 in) (432-7045) | CY | 145 | $160.00 | $162.00 | $206.80 | $188.00 | $258.00 | $190.00 | $200.00 |
| 19 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 75 | $42.00 | $33.00 | $60.00 | $68.00 | $18.00 | $50.00 | |
| 20 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 152 | $43.00 | $42.00 | $40.70 | $63.00 | $86.00 | $23.00 | $55.00 |
| 21 | Resizing and sealing joints (438-7009) | LF | 298 | $46.71 | $60.00 | $81.40 | $110.00 | $110.00 | $64.00 | $70.00 |
| 22 | Clean and seal JNTS (pan girders) (CL3) (438-7011) | LF | 503 | $60.00 | $42.00 | $33.00 | $60.00 | $64.00 | $30.00 | $65.00 |
| 23 | Clean and seal JNTS (pan girders) (CL7) (438-7012) | LF | 284 | $42.00 | $42.00 | $40.70 | $60.00 | $117.00 | $37.00 | $65.00 |
| 24 | Polyester polymer concrete overlay (2") (439-7017) | SY | 2,116 | $151.00 | $220.00 | $255.00 | $255.00 | $235.00 | $170.00 | |
| 25 | Polyester polymer concrete overlay (1") (439-7021) | SY | 5,435 | $200.00 | $151.00 | $115.00 | $150.00 | $121.00 | $120.00 | $90.00 |
| 26 | Header type expansion joint (454-7009) | CF | 15.40 | $490.62 | $400.00 | $1,100.00 | $3,000.00 | $200.00 | $380.00 | $500.00 |
| 27 | Gabion mattresses (galvanized)(12 in) (459-7007) | SY | 73 | $90.00 | $369.17 | $170.50 | $155.00 | $240.00 | $145.00 | $325.00 |
| 28 | Gabions (3' X 3')(galvanized) (459-7010) | CY | 15 | $400.00 | $617.47 | $385.00 | $350.00 | $585.00 | $490.00 | $400.00 |
| 29 | Clean existing culverts (480-7002) | CY | 675 | $19.25 | $88.00 | $80.00 | $135.00 | $20.00 | $200.00 | |
| 30 | Mobilization (500-7001) | LS | 1 | $350,000 | $340,000 | $459,000 | $330,486 | $350,000 | $370,000 | $200,000 |
| 31 | Barricades, signs and traffic handling (502-7001) | MO | 10 | $4,000.00 | $3,000.00 | $20,250 | $1,700.00 | $14,400 | $35,000 | $3,000.00 |
| 32 | Portable changeable message sign (503-7002) | EACH | 4 | $8,000.00 | $15,000 | $12,000 | $5,000.00 | $2,500.00 | $15,000 | $6,000.00 |
| 33 | Rock filter dams (install) (type 2) (506-7002) | LF | 216.80 | $20.00 | $49.50 | $45.00 | $45.00 | $45.00 | $10.00 | |
| 34 | Rock filter dams (remove) (506-7011) | LF | 216.80 | $1.00 | $16.50 | $15.00 | $20.00 | $20.00 | $5.00 | |
| 35 | Temporary sediment control fence (install) (506-7039) | LF | 2,984.10 | $4.11 | $3.00 | $5.50 | $5.00 | $5.00 | $5.00 | $3.00 |
| 36 | Temporary sediment control fence (remove) (506-7041) | LF | 2,984.10 | $1.10 | $0.10 | $1.10 | $1.00 | $0.50 | $0.50 | $1.00 |
| 37 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 2,119 | $50.00 | $35.00 | $48.40 | $39.00 | $48.50 | $35.00 | $88.00 |
| 38 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 80 | $120.00 | $27.50 | $48.40 | $38.00 | $48.50 | $35.00 | $90.00 |
| 39 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 2,119 | $20.00 | $1.00 | $11.00 | $11.00 | $5.25 | $60.00 | $25.00 |
| 40 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 80 | $20.00 | $1.00 | $11.00 | $11.00 | $5.25 | $60.00 | $30.00 |
| 41 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 2,119 | $15.00 | $0.25 | $24.20 | $34.00 | $23.00 | $5.00 | $25.00 |
| 42 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 80 | $30.00 | $0.25 | $24.20 | $34.00 | $23.00 | $5.00 | $25.00 |
| 43 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 2,838 | $1.50 | $1.75 | $1.93 | $1.60 | $1.75 | $1.50 | $1.80 |
| 44 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 2,838 | $1.45 | $1.75 | $1.93 | $1.60 | $1.75 | $1.50 | $1.80 |
| 45 | Pavement sler 6" (666-7347) | LF | 5,966 | $0.28 | $0.40 | $0.44 | $0.25 | $0.40 | $0.20 | $0.25 |
| 46 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 750 | $0.59 | $2.00 | $2.20 | $0.75 | $2.00 | $0.70 | $0.85 |
| 47 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 2,998 | $0.47 | $1.20 | $1.32 | $0.75 | $1.20 | $0.59 | $0.75 |
| 48 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 5,996 | $0.46 | $1.20 | $1.32 | $0.75 | $1.20 | $0.59 | $0.75 |
| 49 | Eliminating existing PM & markers (6") (677-7002) | LF | 11,352 | $0.64 | $0.85 | $0.94 | $0.60 | $0.85 | $0.55 | $0.65 |
| 50 | Spot tree trimming / brush removal (752-7002) | LF | 512 | $30.00 | $15.75 | $16.50 | $15.00 | $7.50 | $35.00 | $20.00 |
| 51 | Tree trimming / brush removal(channels) (752-7003) | ACRE | 0.30 | $15,000 | $11,000 | $10,000 | $1,640.00 | $19,250 | $2,500.00 | |
| 52 | Drain inlet cleaning (764-7001) | EACH | 20 | $65.00 | $20.00 | $350.00 | $270.00 | $150.00 | $250.00 | $200.00 |
| 53 | CNC crack repair (discrete)(inject) (780-7002) | LF | 28 | $75.00 | $110.00 | $100.00 | $70.00 | $125.00 | $125.00 | |
| 54 | Concrete CRCK repair(discrete)(rout and seal) (780-7003) | LF | 607 | $120.00 | $75.00 | $36.30 | $33.00 | $45.00 | $35.00 | $25.00 |
| 55 | Steel bridge zone painting ref STR #1 (4010-7002) | EACH | 1 | $120,000 | $115,000 | $179,680 | $120,000 | $163,345 | $375,000 | $185,000 |
| 56 | Steel bridge zone painting ref STR #2 (4010-7003) | EACH | 1 | $85,000 | $85,085 | $75,000 | $77,350 | $219,000 | $90,000 | |
| 57 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 2 | $500.00 | $1,100.00 | $1,000.00 | $2,000.00 | $1,150.00 | $1,000.00 | |
| 58 | Remove & replace delineator/object mark (7034-7001) | EACH | 2 | $100.00 | $150.00 | $200.00 | $225.00 | $195.00 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 7, 2026. Compiled by Mirage Metrics.