TxDOT contract A00212610 bid tabulation
Bridge Maintenance, Various (EL PASO COUNTYWIDE to .). Let by Texas DOT on March 5, 2025, El Paso, El Paso District. 7 bids received; low bid $2,373,713 by International Eagle Enterprises, Inc., -8.6% against the engineer's estimate of $2,596,796.
- Owner
- Texas DOT
- Letting
- 05 MAR 2025
- Pay items
- 51
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | International Eagle Enterprises, Inc. | $2,373,713 | Low | -9.0% |
| 2 | B & MS Construction, Inc. | $2,514,323 | +6.0% | -3.0% |
| 3 | The Truesdell Corporation | $2,568,568 | +8.0% | -1.0% |
| 4 | Synergy Project Contractors, Inc. | $2,734,891 | +15% | +5.0% |
| 5 | Dan Williams Company | $2,799,816 | +18% | +8.0% |
| 6 | Horizone Construction I, LTD | $3,044,126 | +28% | +17% |
| 7 | Built Right Construction of Oklahoma, LLC | $3,468,010 | +46% | +34% |
Engineer's estimate: $2,596,796.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. International Eagle Enterprises, Inc. | 2. B & MS Construction, Inc. | 3. The Truesdell Corporation | 4. Synergy Project Contractors, Inc. | 5. Dan Williams Company | 6. Horizone Construction I, LTD |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (curb) (104-7016) | LF | 200 | $30.00 | $12.00 | $60.00 | $16.00 | $15.96 | $12.00 | $22.00 |
| 2 | Flowable backfill (401-7001) | CY | 138 | $325.00 | $220.00 | $365.00 | $600.00 | $342.00 | $550.00 | $665.00 |
| 3 | Retaining wall (concrete block) (423-7013) | SF | 20 | $80.00 | $250.00 | $75.00 | $400.00 | $85.50 | $250.00 | $115.00 |
| 4 | Concrete paint finish (427-7002) | SF | 762 | $25.00 | $5.00 | $2.50 | $21.00 | $3.42 | $15.00 | $2.00 |
| 5 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 243 | $240.00 | $300.00 | $250.00 | $290.00 | $222.30 | $350.00 | $292.00 |
| 6 | Concrete structure repair (standard) (429-7009) | SF | 263 | $346.00 | $300.00 | $240.00 | $375.00 | $171.00 | $300.00 | $292.00 |
| 7 | Riprap (concrete)(5 in) (432-7002) | CY | 23 | $620.00 | $650.00 | $600.00 | $1,250.00 | $855.00 | $950.00 | $775.00 |
| 8 | Riprap (mow strip)(4 in) (432-7013) | CY | 9 | $560.00 | $650.00 | $590.00 | $1,650.00 | $684.00 | $1,200.00 | $755.00 |
| 9 | Riprap (stone protection)(12 in) (432-7041) | CY | 106 | $325.00 | $280.00 | $220.00 | $190.00 | $376.20 | $200.00 | $305.00 |
| 10 | Cleaning and sealing existing joints (438-7001) | LF | 1,007 | $45.00 | $35.00 | $30.00 | $58.00 | $37.62 | $45.00 | $70.00 |
| 11 | Multi-layer polymer overlay (439-7014) | SY | 5,377 | $45.00 | $45.00 | $45.00 | $35.00 | $51.30 | $52.00 | $65.00 |
| 12 | Polyester polymer concrete overlay (1") (439-7021) | SY | 3,083 | $145.00 | $180.00 | $67.00 | $175.00 | $222.30 | $175.00 | $170.00 |
| 13 | Miscellaneous non-bridge (nbis) (442-7017) | LB | 112 | $50.00 | $150.00 | $45.00 | $32.00 | $17.10 | $35.00 | $50.00 |
| 14 | Milling concrete slab (1/4IN) (483-7001) | SY | 331 | $22.00 | $125.00 | $75.00 | $16.00 | $34.20 | $25.00 | $350.00 |
| 15 | Shot blasting (483-7016) | SY | 8,460 | $8.50 | $3.00 | $24.00 | $3.50 | $34.20 | $3.25 | $30.00 |
| 16 | Mobilization (500-7001) | LS | 1 | $236,072 | $200,000 | $75,000 | $602,552 | $149,600 | $275,000 | $150,000 |
| 17 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $15,000 | $15,000 | $5,500.00 | $7,000.00 | $6,840.00 | $65,000 | $15,000 |
| 18 | Portable changeable message sign (503-7001) | DAY | 127 | $300.00 | $150.00 | $200.00 | $130.00 | $91.20 | $130.00 | $150.00 |
| 19 | TMA (stationary) (505-7001) | DAY | 203 | $240.00 | $150.00 | $295.00 | $575.00 | $285.00 | $190.00 | $285.00 |
| 20 | TMA (mobile operation) (505-7003) | DAY | 2 | $800.00 | $1,000.00 | $300.00 | $1,600.00 | $456.00 | $650.00 | $900.00 |
| 21 | Temporary sediment control fence (install) (506-7039) | LF | 410 | $24.00 | $10.00 | $3.00 | $19.00 | $3.42 | $5.65 | $6.00 |
| 22 | Temporary sediment control fence (remove) (506-7041) | LF | 410 | $15.00 | $1.00 | $2.00 | $10.00 | $10.26 | $4.25 | $2.00 |
| 23 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 1,214 | $16.00 | $10.00 | $15.00 | $16.00 | $17.10 | $10.65 | $9.00 |
| 24 | Biodegradable erosion control logs (remove) (506-7046) | LF | 994 | $6.00 | $1.00 | $7.00 | $10.00 | $11.40 | $4.40 | $3.00 |
| 25 | Concrete curb (slotted) (529-7013) | LF | 147 | $55.00 | $120.00 | $65.00 | $48.00 | $34.20 | $35.00 | $33.00 |
| 26 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 135 | $5.00 | $25.00 | $15.00 | $10.00 | $2.28 | $2.20 | $4.50 |
| 27 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 54 | $5.00 | $25.00 | $20.00 | $10.00 | $2.28 | $2.20 | $3.00 |
| 28 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 156 | $2.50 | $4.00 | $12.00 | $3.00 | $2.28 | $2.00 | $3.50 |
| 29 | Reflectorized pavement marking type II (W) 6" (DOT) (666-7173) | LF | 156 | $3.00 | $2.00 | $8.00 | $2.00 | $1.14 | $1.00 | $2.00 |
| 30 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 1,648 | $0.45 | $1.50 | $10.00 | $0.75 | $0.74 | $0.65 | $1.50 |
| 31 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 1,628 | $0.45 | $1.50 | $12.00 | $0.75 | $0.74 | $0.65 | $1.50 |
| 32 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 1,354 | $3.00 | $2.25 | $6.00 | $1.50 | $1.60 | $1.40 | $3.25 |
| 33 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 1,334 | $3.00 | $2.25 | $7.00 | $1.50 | $1.60 | $1.40 | $3.25 |
| 34 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 294 | $3.00 | $3.00 | $8.00 | $1.50 | $1.43 | $1.25 | $3.00 |
| 35 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 294 | $3.00 | $3.00 | $8.00 | $1.50 | $1.43 | $1.25 | $3.00 |
| 36 | Prefabricated PM type B (W)(6")(broken)contrast (668-7012) | LF | 500 | $2.60 | $25.00 | $17.00 | $16.00 | $17.10 | $15.00 | $22.00 |
| 37 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 76 | $25.00 | $12.00 | $35.00 | $7.00 | $7.41 | $6.50 | $9.00 |
| 38 | Pothole repair(standard)(0"-5" deep) (700-7001) | SY | 5 | $300.00 | $4,000.00 | $950.00 | $1,500.00 | $570.00 | $1,200.00 | $500.00 |
| 39 | JT / CRCK rout / seal(rubber - asphalt) (712-7004) | LF | 136 | $35.00 | $50.00 | $45.00 | $85.00 | $85.50 | $50.00 | $770.00 |
| 40 | Driftwood removal area (1) (735-7062) | LS | 2 | $10,000 | $500.00 | $32,500 | $1,500.00 | $6,840.00 | $50,000 | $10,000 |
| 41 | Ditch cleaning and reshaping (foot) (760-7001) | LF | 20 | $100.00 | $100.00 | $45.00 | $320.00 | $22.80 | $100.00 | $20.00 |
| 42 | Concrete CRCK repair(discrete)(rout and seal) (780-7003) | LF | 151 | $150.00 | $25.00 | $52.00 | $85.00 | $199.50 | $125.00 | $140.00 |
| 43 | Rep steel bridge MBR (anchor bolt nuts) (784-7021) | EACH | 11 | $1,500.00 | $1,000.00 | $450.00 | $900.00 | $199.50 | $275.00 | $375.00 |
| 44 | Bridge joint repair (header) (785-7002) | LF | 84 | $275.00 | $450.00 | $300.00 | $130.00 | $307.80 | $250.00 | $270.00 |
| 45 | Bridge joint repair (armor) (785-7004) | LF | 12 | $1,200.00 | $900.00 | $650.00 | $620.00 | $399.00 | $1,000.00 | $470.00 |
| 46 | Bridge joint repair (full depth) (785-7007) | LF | 75 | $1,500.00 | $1,000.00 | $600.00 | $700.00 | $513.00 | $750.00 | $500.00 |
| 47 | Bridge joint repair (partial depth) (785-7008) | LF | 650 | $505.00 | $400.00 | $580.00 | $220.00 | $342.00 | $325.00 | $300.00 |
| 48 | Bridge joint replacement (SEJ) (785-7011) | LF | 326 | $1,070.00 | $650.00 | $1,300.00 | $675.00 | $969.00 | $910.00 | $1,200.00 |
| 49 | Concrete beam repair (788-7001) | EACH | 31 | $3,500.00 | $5,000.00 | $9,000.00 | $1,550.00 | $6,840.00 | $2,500.00 | $7,000.00 |
| 50 | Bird deterrent (5008-7001) | LF | 84 | $70.00 | $25.00 | $65.00 | $85.00 | $17.10 | $50.00 | $200.00 |
| 51 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 7 | $2,000.00 | $1,200.00 | $1,650.00 | $1,850.00 | $1,539.00 | $600.00 | $1,700.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way