Graham Concrete, LLC submitted 14 bids on Virginia DOT contracts in the data, from 28 JUL 2010 to 23 SEP 2026, and was the low bidder on 5 of them (36%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $746,741
- Latest bid
- 23 SEP 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2010 | 6 | 2 | 33% |
| 2011 | 1 | 0 | 0% |
| 2012 | 1 | 1 | 100% |
| 2013 | 1 | 1 | 100% |
| 2014 | 1 | 1 | 100% |
| 2015 | 2 | 0 | 0% |
| 2016 | 1 | 0 | 0% |
| 2026 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Fredericksburg | 4 | 3 | 75% |
| Northern Virginia | 3 | 0 | 0% |
| Richmond | 3 | 2 | 67% |
| Staunton | 2 | 0 | 0% |
| Bristol | 1 | 0 | 0% |
| Culpeper | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Temporary sign | 512SD20-0014 | SF | 7 | 4 (57%) | $16.00 | $20.00 |
| Regular seed | 603SD20-0003 | LB | 6 | 3 (50%) | $10.00 | $13.50 |
| Sign panel | 701SD20-0001 | SF | 5 | 3 (60%) | $35.00 | $34.00 |
| Flagger service | 512SD20-0027 | HR | 8 | 2 (25%) | $30.00 | $20.00 |
| Temp. silt fence type A | 303SD20-0034 | LF | 6 | 2 (33%) | $3.12 | $3.00 |
| Lime | 603SD20-0017 | TON | 6 | 2 (33%) | $650.00 | $200.00 |
| Demo. of pavement flexible | 508SD20-0004 | SY | 5 | 2 (40%) | $11.04 | $9.00 |
| Post installation inspection | 700 | LF | 5 | 2 (40%) | $23.50 | $7.75 |
| Group 2 channelizing devices | 512SD20-0024 | DAY | 8 | 1 (13%) | $1.75 | $1.00 |
| Hydr. cement conc. sidewalk 4" | 504SD20-0003 | SY | 8 | 1 (13%) | $52.05 | $55.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Richardson-Wayland Electrical Co. LLC | 2 | 2 of 2 |
| Portico Realty Services, LLC | 2 | 1 of 2 |
| A & M Concrete Corp. | 2 | 1 of 2 |
| Jireh Construction Company, Inc. | 2 | 0 of 2 |
| Arthur Construction Co., Inc. | 2 | 1 of 2 |
| Richardson-Wayland-Ferreira, LLC | 1 | 1 of 1 |
| F & B Contractors, LTD. | 1 | 0 of 1 |
| Lumin8 Transportation Technologies, LLC | 1 | 0 of 1 |
| J. Sanders Construction Co. | 1 | 0 of 1 |
| Burleigh Construction Co., Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | C0000124001C01B | Staunton | Smart scale - pedestrian improvements | 2 of 4 | $636,824 | +2.0% |
| 24 FEB 2016 | C00104688M01 | Northern Virginia | Construct sidewalks,crosswalks, & pedstrian actuated signals | 2 of 3 | $173,423 | +3.0% |
| 24 JUN 2015 | C00103486N01 | Richmond | Construct sidewalk and alternative path | 2 of 3 | $206,504 | +24% |
| 24 JUN 2015 | C00C0097736M01 | Northern Virginia | 0.0627 mi. grade, drain, asp. pave, sidewalk and planting | 3 of 3 | $204,956 | +20% |
| 24 SEP 2014 | C00100559M01 | Fredericksburg | Hsip-5a27(119)(nfo)0754-020-s28, m501 | 1 of 3 | $169,955 | Low, 1.0% under the second |
| 23 OCT 2013 | C000103053N01B | Richmond | Replace pipe culvert | 1 of 2 | $211,878 | Low, 39% under the second |
| 25 JUL 2012 | C00098919N01 | Richmond | Hsip-060-4(015)(nfo)0060-020-s23, n501 | 1 of 3 | $89,694 | Low, 0.0% under the second |
| 26 JAN 2011 | C00099028N01 | Staunton | Misc. concrete repair @ various locations | 2 of 3 | $137,575 | +4.0% |
| 27 OCT 2010 | C00081438N01 | Fredericksburg | 0.32 mi. grade, drain & incid. concrete | 1 of 3 | $154,154 | Low, 5.0% under the second |
| 27 OCT 2010 | C00089577F01 | Bristol | Improve vertical alignment at r/r crossing | 3 of 3 | $189,834 | +51% |
| 27 OCT 2010 | C00093106N01 | Culpeper | Traffic sign upgrades | 3 of 3 | $226,089 | +17% |
| 27 OCT 2010 | C00093119B01 | Northern Virginia | Districtwide deck sealing & crack sealing (14 structures) | 2 of 3 | $232,860 | +5.0% |
| 22 SEP 2010 | C00094317N01 | Fredericksburg | Pipe culvert replacement | 1 of 3 | $121,060 | Low, 6.0% under the second |
| 28 JUL 2010 | C00092875N01 | Fredericksburg | Connect i95 its devices to fiber optic cable | 3 of 3 | $181,138 | +449% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.