Northwest Cascade, Inc.: WSDOT bid record
Northwest Cascade, Inc. submitted 19 bids on Washington State DOT contracts in the data, from 18 DEC 2002 to 29 MAR 2023, and was the low bidder on 2 of them (11%). When it was not low, its total sat a median +25% above the low bid.
- Owner
- Washington State DOT
- Low bid volume
- $804,612
- Latest bid
- 29 MAR 2023
- Data through
- 07 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2002 | 1 | 0 | 0% |
| 2008 | 1 | 0 | 0% |
| 2009 | 3 | 0 | 0% |
| 2010 | 1 | 0 | 0% |
| 2011 | 2 | 0 | 0% |
| 2014 | 1 | 0 | 0% |
| 2016 | 1 | 0 | 0% |
| 2019 | 1 | 0 | 0% |
| 2020 | 2 | 1 | 50% |
| 2021 | 1 | 0 | 0% |
| 2022 | 1 | 1 | 100% |
| 2023 | 4 | 0 | 0% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| OR region | 7 | 0 | 0% |
| NWR region | 4 | 1 | 25% |
| SCR region | 2 | 0 | 0% |
| SWR region | 2 | 0 | 0% |
| NCR region | 2 | 0 | 0% |
| ER region | 1 | 0 | 0% |
| Region 9 | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Inlet protection | EACH | 9 | 3 (33%) | $134.00 | $95.00 | |
| Crushed surfacing base course | TON | 8 | 3 (38%) | $52.00 | $26.44 | |
| High visibility fence | LF | 8 | 2 (25%) | $3.75 | $3.09 | |
| Roadway excavation including haul | CY | 9 | 1 (11%) | $50.00 | $20.00 | |
| Paint line | LF | 5 | 1 (20%) | $1.15 | $0.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Hi Tech Rockfall Construction, | 6 | 4 of 6 |
| Ais Construction Company | 6 | 3 of 6 |
| Janod Inc. | 4 | 2 of 4 |
| Rognlin'S, Inc. | 4 | 2 of 4 |
| Scarsella Bros., Inc. | 4 | 4 of 4 |
| Active Construction, Inc. | 4 | 3 of 4 |
| Thompson Bros. Excavating, Inc | 3 | 2 of 3 |
| Granite Northwest, Inc. DBA | 3 | 1 of 3 |
| Granite Construction Company | 3 | 2 of 3 |
| Skycorp, LTD | 3 | 2 of 3 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 29 MAR 2023 | 009941 | OR region | Sr 166 bay st./bethel ave./maple ave. intersection - roundabout | 6 of 6 | $1,899,639 | +31% |
| 25 JAN 2023 | 009926 | OR region | Sr 109 w of hoquiam stabilize slope | 5 of 8 | $507,109 | +63% |
| 19 JAN 2023 | 009911 | OR region | Sr 167 sr 167 completion demo 9 | 6 of 7 | $381,487 | +91% |
| 11 JAN 2023 | 009908 | NWR region | Sr 202 evans crk vic to se fish hatchery rd vic stormwater retrofit | 4 of 5 | $387,387 | +37% |
| 13 APR 2022 | 009785 | Region 9 | Sr163 tahlequah ferry terminal facility ada compliance improvements | 1 of 2 | $462,794 | Low, 30% under the second |
| 03 MAR 2021 | 009654 | NWR region | I-90 coal mine wall vic to soderman cr vic stormwater retrofit | 4 of 5 | $499,966 | +37% |
| 15 APR 2020 | 009537 | NWR region | Sr 509 sr 516 vic to s 204th demo 1 | 1 of 4 | $341,818 | Low, 1.0% under the second |
| 08 APR 2020 | 009535 | OR region | Us 12 anderson rd safety improvement | 5 of 5 | $1,294,294 | +17% |
| 27 FEB 2019 | 000000 | OR region | Sr 509 sr 167 completion demo #2 | 2 of 4 | $125,512 | +46% |
| 16 MAR 2016 | 008853 | OR region | Sr 121 blooms ditch remove fish barriers 14c515 | 7 of 10 | $1,659,804 | +19% |
| 05 MAR 2014 | 008584 | NWR region | Sr 18 taylor creek scour protection 13a028 | 5 of 6 | $288,368 | +107% |
| 10 MAR 2011 | 008093 | ER region | Sr 20 & sr 25 unstable slopes - rock slope scaling | 3 of 6 | $355,446 | +22% |
| 09 MAR 2011 | 008094 | SWR region | Sr 4 4 miles east of cathlamet rock scaling | 2 of 5 | $148,829 | +2.0% |
| 16 DEC 2010 | 008056 | NCR region | Sr 150 3 miles e of manson slope stabilization | 6 of 6 | $1,581,210 | +15% |
| 26 FEB 2009 | 007675 | NCR region | Us 2 east of orondo slope stabilization | 5 of 5 | $1,555,333 | +42% |
| 07 JAN 2009 | 007655 | SWR region | Avery road southbound off ramp turn pocket | 3 of 10 | $167,234 | +25% |
| 07 JAN 2009 | 007652 | SCR region | Us 12 west side white pass - stabilize slopes | 4 of 5 | $955,593 | +23% |
| 12 MAR 2008 | 007500 | SCR region | Us 12 rimrock lake vicinity - stabilize slopes | 2 of 5 | $759,677 | +20% |
| 18 DEC 2002 | 006466 | OR region | Winnifred street bridge repair | 5 of 7 | $791,873 | +15% |
How this record was read
WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.
- Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.