WisDOT contract 20250114001 bid tabulation
1204-08-73. Let by Wisconsin DOT on January 14, 2025, Dane. 4 bids received; low bid $12,977,080 by Zenith Tech., Inc. - Waukesha.
- Owner
- Wisconsin DOT
- Letting
- 14 JAN 2025
- Pay items
- 340
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zenith Tech., Inc. - Waukesha | $12,977,080 | Low |
| 2 | Hoffman Construction Company | $13,160,185 | +1.0% |
| 3 | Kraemer North America, LLC | $14,649,734 | +13% |
| 4 | Lunda Construction Company | $15,037,314 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zenith Tech., Inc. - Waukesha | 2. Hoffman Construction Company | 3. Kraemer North America, LLC | 4. Lunda Construction Company |
|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 19 | $178.53 | $178.53 | $178.53 | $178.53 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 1 | $500.55 | $650.00 | $500.55 | $500.55 |
| 3 | Removing structure (structure) 001. B-13-403 (203.0220) | EACH | 1 | $150,000 | $150,000 | $75,000 | $75,000 |
| 4 | Removing structure (structure) 002. C-13-111 (203.0220) | EACH | 1 | $100,000 | $100,000 | $50,000 | $80,000 |
| 5 | Removing structure (structure) 004. B-13-0573 (203.0220) | EACH | 1 | $150,000 | $150,000 | $125,000 | $75,000 |
| 6 | Removing structure over waterway minimal debris (structure) 001. B- 13-52 (203.0260) | EACH | 1 | $125,000 | $125,000 | $100,000 | $90,000 |
| 7 | Removing structure over waterway minimal debris (structure) 002. B- 13-0383 (203.0260) | EACH | 1 | $125,000 | $125,000 | $100,000 | $90,000 |
| 8 | Debris containment (structure) 001. B-13-403 (203.0330) | EACH | 1 | $1.00 | $1.00 | $7,500.00 | $500.00 |
| 9 | Debris containment (structure) 002. B-13-0573 (203.0330) | EACH | 1 | $1.00 | $1.00 | $7,500.00 | $500.00 |
| 10 | Removing concrete pavement (204.0100) | SY | 7,179 | $10.84 | $5.00 | $10.84 | $10.84 |
| 11 | Removing concrete pavement butt joints (204.0105) | SY | 151 | $57.50 | $57.50 | $57.50 | $57.50 |
| 12 | Removing asphaltic surface milling (204.0120) | SY | 6,482 | $2.00 | $2.00 | $2.00 | $2.00 |
| 13 | Removing asphaltic longitudinal notched wedge joint milling (204.0126.S) | LF | 9,564 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | Removing guardrail (204.0165) | LF | 2,559 | $2.45 | $2.45 | $2.45 | $2.45 |
| 15 | Removing fence (204.0170) | LF | 278 | $4.00 | $4.00 | $4.00 | $4.00 |
| 16 | Removing delineators and markers (204.0180) | EACH | 5 | $30.00 | $30.00 | $30.00 | $30.00 |
| 17 | Removing surface drains (204.0190) | EACH | 3 | $436.62 | $350.00 | $436.62 | $436.62 |
| 18 | Removing concrete bases (204.0195) | EACH | 2 | $700.00 | $350.00 | $400.00 | $500.00 |
| 19 | Removing inlets (204.0220) | EACH | 2 | $510.74 | $650.00 | $510.74 | $510.74 |
| 20 | Removing storm sewer (size) 001. 12-inch (204.0245) | LF | 96 | $9.88 | $20.00 | $9.88 | $9.88 |
| 21 | Removing (item description) 001. apron endwalls (204.9060.S) | EACH | 3 | $508.58 | $350.00 | $508.58 | $508.58 |
| 22 | Removing (item description) 002. removing pipe underdrain 6-inch (204.9090.S) | LF | 25 | $9.89 | $20.00 | $9.89 | $9.89 |
| 23 | Excavation common (205.0100) | CY | 46,617 | $11.62 | $13.00 | $11.62 | $11.62 |
| 24 | Excavation rock (205.0200) | CY | 5,000 | $30.44 | $0.01 | $30.44 | $30.44 |
| 25 | Excavation marsh (205.0400) | CY | 135 | $36.14 | $13.00 | $36.14 | $36.14 |
| 26 | Excavation for structures bridges (structure) 001. B-13-52 (206.1001) | EACH | 1 | $60,000 | $45,000 | $30,000 | $45,822 |
| 27 | Excavation for structures bridges (structure) 002. B-13-0383 (206.1001) | EACH | 1 | $60,000 | $45,000 | $30,000 | $45,822 |
| 28 | Excavation for structures bridges (structure) 003. B-13-403 (206.1001) | EACH | 1 | $30,000 | $25,000 | $10,000 | $19,511 |
| 29 | Excavation for structures bridges (structure) 004. B-13-0573 (206.1001) | EACH | 1 | $40,000 | $30,000 | $10,000 | $34,211 |
| 30 | Excavation for structures culverts (structure) 001. C-13-111 (206.2001) | EACH | 1 | $30,000 | $40,000 | $17,431 | $17,431 |
| 31 | Cofferdams (structure) 001. B-13-52 (206.5001) | EACH | 1 | $125,000 | $125,000 | $125,000 | $150,000 |
| 32 | Cofferdams (structure) 002. B-13- 0383 (206.5001) | EACH | 1 | $125,000 | $125,000 | $125,000 | $150,000 |
| 33 | Cofferdams (structure) 003. C-13- 111 (206.5001) | EACH | 1 | $60,000 | $60,000 | $250,000 | $1.00 |
| 34 | Borrow (208.0100) | CY | 2,671 | $1.00 | $0.01 | $1.00 | $1.00 |
| 35 | Backfill structure type A (210.1500) | TON | 3,322 | $30.55 | $30.00 | $30.55 | $30.55 |
| 36 | Finishing roadway (project) 001. 1204-08-73 (213.0100) | EACH | 1 | $2,000.00 | $100.00 | $2,500.00 | $1,500.00 |
| 37 | Finishing roadway (project) 002. 1204-08-74 (213.0100) | EACH | 1 | $2,000.00 | $99.99 | $2,500.00 | $1,500.00 |
| 38 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,871 | $36.29 | $31.02 | $36.29 | $36.29 |
| 39 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 34,962 | $13.12 | $15.20 | $13.12 | $13.12 |
| 40 | Base aggregate dense 3-inch (305.0130) | TON | 4,747 | $11.38 | $20.40 | $11.38 | $11.38 |
| 41 | Select crushed material (312.0110) | TON | 19,742 | $12.10 | $20.00 | $12.10 | $12.10 |
| 42 | Concrete base 9-inch (320.0155) | SY | 9,559 | $57.69 | $57.69 | $57.69 | $57.69 |
| 43 | Concrete pavement 9-inch (415.0090) | SY | 7,663 | $70.83 | $70.83 | $70.83 | $70.83 |
| 44 | Concrete pavement approach slab (415.0410) | SY | 509 | $170.23 | $170.23 | $170.23 | $170.23 |
| 45 | Rout and seal (415.6000.S) | LF | 3,043 | $4.75 | $6.79 | $6.79 | $6.79 |
| 46 | Drilled tie bars (416.0610) | EACH | 4,036 | $9.80 | $9.80 | $9.80 | $9.80 |
| 47 | Drilled dowel bars (416.0620) | EACH | 121 | $13.65 | $13.65 | $13.65 | $13.65 |
| 48 | Tack coat (455.0605) | GAL | 3,791 | $0.01 | $0.01 | $0.01 | $0.01 |
| 49 | HMA pavement test strip volumetrics (460.0115.S) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 50 | HMA pavement test strip density (460.0120.S) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 51 | Incentive density HMA pavement (460.2000) | DOL | 5,950 | $1.00 | $1.00 | $1.00 | $1.00 |
| 52 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 1,744 | $1.00 | $1.00 | $1.00 | $1.00 |
| 53 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 322 | $114.80 | $114.80 | $114.80 | $114.80 |
| 54 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 1,377 | $84.80 | $84.80 | $84.80 | $84.80 |
| 55 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 1,074 | $114.80 | $114.80 | $114.80 | $114.80 |
| 56 | HMA pavement 3 HT 58-28 H (460.7423) | TON | 2,861 | $84.80 | $84.80 | $84.80 | $84.80 |
| 57 | HMA pavement 4 HT 58-28 H (460.7424) | TON | 856 | $114.80 | $114.80 | $114.80 | $114.80 |
| 58 | HMA pavement 4 SMA 58-28 V (460.8624) | TON | 2,793 | $143.50 | $143.50 | $143.50 | $143.50 |
| 59 | Material transfer vehicle (460.9000.S) | EACH | 1 | $100.00 | $99.99 | $100.00 | $100.00 |
| 60 | Asphaltic flumes (465.0315) | SY | 14 | $60.00 | $60.00 | $60.00 | $60.00 |
| 61 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 14,478 | $0.59 | $0.59 | $0.59 | $0.59 |
| 62 | Concrete masonry bridges (502.0100) | CY | 1,024 | $1,350.00 | $1,350.00 | $1,800.00 | $950.00 |
| 63 | Concrete masonry seal (502.1100) | CY | 100 | $340.00 | $340.00 | $600.00 | $700.00 |
| 64 | Expansion device (502.3101) | LF | 73 | $280.00 | $280.00 | $500.00 | $350.00 |
| 65 | Protective surface treatment (502.3200) | SY | 1,870 | $4.00 | $4.00 | $3.00 | $4.00 |
| 66 | Pigmented surface sealer reseal (502.3205) | SY | 259 | $16.00 | $16.00 | $20.00 | $40.00 |
| 67 | Pigmented surface sealer (502.3210) | SY | 428 | $12.00 | $12.00 | $15.00 | $5.00 |
| 68 | Protective surface treatment reseal (502.3215) | SY | 1,402 | $10.00 | $10.00 | $6.00 | $30.00 |
| 69 | Adhesive anchors no. 4 bar (502.4204) | EACH | 42 | $26.00 | $26.00 | $30.00 | $25.00 |
| 70 | Adhesive anchors no. 5 bar (502.4205) | EACH | 92 | $30.00 | $30.00 | $40.00 | $25.00 |
| 71 | Adhesive anchors no. 6 bar (502.4206) | EACH | 155 | $37.00 | $37.00 | $50.00 | $25.00 |
| 72 | Adhesive anchors no. 8 bar (502.4208) | EACH | 16 | $55.00 | $55.00 | $55.00 | $25.00 |
| 73 | Adhesive anchors no. 9 bar (502.4209) | EACH | 9 | $66.00 | $66.00 | $60.00 | $25.00 |
| 74 | Prestressed girder type I 54W-inch (503.0155) | LF | 1,321 | $250.00 | $250.00 | $300.00 | $280.00 |
| 75 | Concrete masonry culverts (504.0100) | CY | 300 | $900.00 | $900.00 | $1,000.00 | $1,100.00 |
| 76 | Bar steel reinforcement HS structures (505.0400) | LB | 37,260 | $1.26 | $1.26 | $1.30 | $1.12 |
| 77 | Bar steel reinforcement HS coated structures (505.0600) | LB | 189,500 | $1.36 | $1.36 | $1.45 | $1.25 |
| 78 | Structural steel carbon (506.0105) | LB | 9,140 | $5.60 | $5.60 | $6.00 | $5.50 |
| 79 | Structural steel HS (506.0605) | LB | 82,490 | $3.50 | $3.50 | $4.50 | $3.50 |
| 80 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 24 | $140.00 | $140.00 | $90.00 | $150.00 |
| 81 | Bearing pads elastomeric laminated (506.2610) | EACH | 4 | $1,450.00 | $1,450.00 | $2,000.00 | $2,000.00 |
| 82 | Welded stud shear connectors 7/8X6-inch (506.3015) | EACH | 2,844 | $6.50 | $6.50 | $6.00 | $6.00 |
| 83 | Steel diaphragms (structure) 001. B-13-403 (506.4000) | EACH | 16 | $1,200.00 | $1,200.00 | $1,000.00 | $2,000.00 |
| 84 | Steel diaphragms (structure) 002. B-13-0573 (506.4000) | EACH | 8 | $1,200.00 | $1,200.00 | $1,000.00 | $1,800.00 |
| 85 | Bearing assemblies fixed (structure) 001. B-13-0052 (506.5000) | EACH | 2 | $1,600.00 | $1,600.00 | $2,500.00 | $2,000.00 |
| 86 | Bearing assemblies fixed (structure) 002. B-13-0383 (506.5000) | EACH | 4 | $1,600.00 | $1,600.00 | $2,500.00 | $2,500.00 |
| 87 | Bearing assemblies expansion (structure) 001. B-13-0052 (506.6000) | EACH | 6 | $2,050.00 | $2,050.00 | $2,500.00 | $3,000.00 |
| 88 | Preparation decks type 1 (509.0301) | SY | 10 | $260.00 | $260.00 | $600.00 | $250.00 |
| 89 | Preparation decks type 2 (509.0302) | SY | 10 | $300.00 | $300.00 | $700.00 | $250.00 |
| 90 | Sawing pavement deck preparation areas (509.0310.S) | LF | 138 | $10.00 | $10.00 | $15.00 | $3.00 |
| 91 | Concrete surface repair (509.1500) | SF | 12 | $290.00 | $290.00 | $250.00 | $300.00 |
| 92 | Concrete masonry deck repair (509.2100.S) | CY | 1 | $4,000.00 | $4,000.01 | $2,000.00 | $3,500.00 |
| 93 | Polymer overlay (509.5100.S) | SY | 1,810 | $41.67 | $41.67 | $36.46 | $36.46 |
| 94 | Removing polymer overlay (structure) 01. B-13-0052 (509.9015.S) | SY | 930 | $12.41 | $12.41 | $12.41 | $12.41 |
| 95 | Removing polymer overlay (structure) 02. B-13-0383 (509.9015.S) | SY | 880 | $12.83 | $12.83 | $12.83 | $12.83 |
| 96 | Temporary shoring (structure) 001. B13-0052 (511.1200) | SF | 234 | $70.00 | $70.00 | $65.00 | $35.00 |
| 97 | Temporary shoring (structure) 002. B-13-0383 (511.1200) | SF | 510 | $70.00 | $70.00 | $65.00 | $25.00 |
| 98 | Temporary shoring (structure) 003. B-13-403 (511.1200) | SF | 273 | $45.00 | $45.00 | $25.00 | $0.01 |
| 99 | Temporary shoring (structure) 004. C-13-111 (511.1200) | SF | 3,370 | $70.00 | $70.00 | $70.00 | $60.00 |
| 100 | Temporary shoring (structure) 005. B-13-0573 (511.1200) | SF | 680 | $45.00 | $45.00 | $30.00 | $25.00 |
| 101 | Railing pipe (513.2001) | LF | 35 | $250.00 | $250.00 | $300.00 | $300.00 |
| 102 | Rubberized membrane waterproofing (516.0500) | SY | 100 | $60.00 | $60.00 | $10.00 | $25.00 |
| 103 | Sheet membrane waterproofing for buried structures 001. C-13-111 (516.0610.S) | SY | 90 | $60.00 | $60.00 | $70.00 | $150.00 |
| 104 | Painting epoxy system (structure) 001. B-13-0052 (517.0601) | EACH | 1 | $35,000 | $35,000 | $25,000 | $35,000 |
| 105 | Painting epoxy system (structure) 002. B-13-0383 (517.0601) | EACH | 1 | $35,000 | $35,000 | $25,000 | $35,000 |
| 106 | Preparation and coating of top flanges (structure) 001. B-13-0052 (517.0901.S) | EACH | 1 | $5,500.00 | $5,500.01 | $11,480 | $5,500.00 |
| 107 | Preparation and coating of top flanges (structure) 002. B-13-0383 (517.0901.S) | EACH | 1 | $5,500.00 | $5,500.01 | $7,497.00 | $5,500.00 |
| 108 | Apron endwalls for culvert pipe 12- inch (520.1012) | EACH | 2 | $430.62 | $500.00 | $430.62 | $430.62 |
| 109 | Concrete collars for pipe (520.8000) | EACH | 3 | $537.25 | $1,000.00 | $537.25 | $537.25 |
| 110 | Culvert pipe reinforced concrete class III 24-inch (522.0124) | LF | 84 | $125.89 | $100.00 | $125.89 | $125.89 |
| 111 | Culvert pipe reinforced concrete class III 48-inch (522.0148) | LF | 4 | $682.84 | $500.00 | $682.84 | $682.84 |
| 112 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 4 | $1,461.24 | $1,200.00 | $1,461.24 | $1,461.24 |
| 113 | Apron endwalls for culvert pipe reinforced concrete 48-inch (522.1048) | EACH | 1 | $4,375.70 | $2,200.00 | $4,375.70 | $4,375.70 |
| 114 | Concrete masonry ancillary structures type NS (531.1100) | CY | 30 | $900.00 | $900.00 | $900.00 | $900.00 |
| 115 | Steel reinforcement HS ancillary structures type NS (531.1140) | LB | 2,780 | $3.25 | $3.25 | $3.25 | $3.25 |
| 116 | Steel reinforcement HS coated ancillary structures type NS (531.1160) | LB | 2,200 | $3.25 | $3.25 | $3.25 | $3.25 |
| 117 | Drilling shaft 24-inch (531.2024) | LF | 30 | $75.00 | $75.00 | $75.00 | $75.00 |
| 118 | Drilling shaft 36-inch (531.2036) | LF | 170 | $220.00 | $220.00 | $220.00 | $220.00 |
| 119 | Foundation two-shaft type FC-I (structure) 001. S-13-613 (531.6010) | EACH | 1 | $24,000 | $24,000 | $24,000 | $24,000 |
| 120 | Foundation two-shaft type FC-I (structure) 002. S-13-614 (531.6010) | EACH | 1 | $24,000 | $24,000 | $24,000 | $24,000 |
| 121 | Foundation two-shaft type FC-I (structure) 003. S-13-0616 (531.6010) | EACH | 1 | $24,000 | $24,000 | $24,000 | $24,000 |
| 122 | Foundation two-shaft type FC-II (structure) 001. S-13-0617 (531.6020) | EACH | 1 | $24,000 | $24,000 | $24,000 | $24,000 |
| 123 | Anchor assemblies poles on structures (531.8990) | EACH | 2 | $1,000.00 | $1,000.00 | $1,200.00 | $250.00 |
| 124 | Truss cantilever 4-chord type I (structure) 001. S-13-613 (532.6010) | EACH | 1 | $40,000 | $40,000 | $40,000 | $40,000 |
| 125 | Truss cantilever 4-chord type I (structure) 002. S-13-614 (532.6010) | EACH | 1 | $39,000 | $39,000 | $39,000 | $39,000 |
| 126 | Truss cantilever 4-chord type I (structure) 003. S-13-615 (532.6010) | EACH | 1 | $39,000 | $39,000 | $39,000 | $39,000 |
| 127 | Truss cantilever 4-chord type I (structure) 004. S-13-0616 (532.6010) | EACH | 1 | $39,000 | $39,000 | $39,000 | $39,000 |
| 128 | Truss cantilever 4-chord type II (structure) 001. S-13-612 (532.6020) | EACH | 1 | $47,000 | $47,000 | $47,000 | $47,000 |
| 129 | Truss cantilever 4-chord type II (structure) 002. S-13-0617 (532.6020) | EACH | 1 | $46,000 | $46,000 | $46,000 | $46,000 |
| 130 | Pre-boring rock or consolidated materials (550.0020) | LF | 30 | $1,420.00 | $1,420.00 | $1,339.97 | $1,400.00 |
| 131 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 2,045 | $55.00 | $55.00 | $60.00 | $35.00 |
| 132 | Piling steel HP 14-inch X 73 LB (550.1140) | LF | 1,980 | $72.00 | $72.00 | $75.00 | $55.00 |
| 133 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 244 | $30.53 | $30.53 | $30.53 | $30.53 |
| 134 | Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413) | LF | 379 | $32.66 | $32.66 | $32.66 | $32.66 |
| 135 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 335 | $30.22 | $30.22 | $30.22 | $30.22 |
| 136 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 169 | $49.62 | $49.62 | $49.62 | $49.62 |
| 137 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 82 | $75.46 | $75.46 | $75.46 | $75.46 |
| 138 | Concrete sidewalk 4-inch (602.0405) | SF | 2,523 | $4.82 | $4.82 | $4.82 | $4.82 |
| 139 | Concrete surface drains (602.3010) | CY | 9 | $753.21 | $753.21 | $753.21 | $753.21 |
| 140 | Concrete barrier temporary precast delivered (603.8000) | LF | 10,187 | $10.00 | $10.00 | $13.58 | $10.00 |
| 141 | Concrete barrier temporary precast installed (603.8125) | LF | 19,174 | $3.40 | $3.40 | $3.20 | $4.25 |
| 142 | Slope paving crushed aggregate (604.0500) | SY | 495 | $35.00 | $35.00 | $35.00 | $35.00 |
| 143 | Slope paving repair crushed aggregate (604.9010.S) | CY | 5 | $200.00 | $200.00 | $200.00 | $200.00 |
| 144 | Reseal crushed aggregate slope paving (604.9015.S) | SY | 790 | $20.00 | $20.00 | $20.00 | $20.00 |
| 145 | Riprap medium (606.0200) | CY | 338 | $80.02 | $100.00 | $80.02 | $80.02 |
| 146 | Riprap heavy (606.0300) | CY | 800 | $110.00 | $100.00 | $100.00 | $80.00 |
| 147 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 31 | $104.08 | $100.00 | $104.08 | $104.08 |
| 148 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 62 | $84.50 | $100.00 | $84.50 | $84.50 |
| 149 | Inlet covers type HM-GJ (611.0630) | EACH | 1 | $1,076.41 | $700.00 | $1,076.41 | $1,076.41 |
| 150 | Inlet covers type V (611.0654) | EACH | 3 | $959.06 | $900.00 | $959.06 | $959.06 |
| 151 | Inlet covers type Z (611.0666) | EACH | 1 | $1,028.55 | $900.00 | $1,028.55 | $1,028.55 |
| 152 | Inlets 3-FT diameter (611.3003) | EACH | 1 | $2,736.38 | $2,000.00 | $2,736.38 | $2,736.38 |
| 153 | Inlets 2X2-FT (611.3220) | EACH | 2 | $2,458.67 | $2,000.00 | $2,458.67 | $2,458.67 |
| 154 | Inlets 2X3-FT (611.3230) | EACH | 1 | $2,778.59 | $2,000.00 | $2,778.59 | $2,778.59 |
| 155 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 175 | $53.55 | $25.00 | $53.55 | $53.55 |
| 156 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 306 | $18.02 | $5.00 | $18.02 | $18.02 |
| 157 | Apron endwalls for underdrain reinforced concrete 6-inch (612.0806) | EACH | 7 | $518.75 | $250.00 | $518.75 | $518.75 |
| 158 | Barrier system grading shaping finishing (614.0010) | EACH | 2 | $1,503.20 | $1,000.00 | $1,503.20 | $1,503.20 |
| 159 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 8 | $450.00 | $450.00 | $33.96 | $150.00 |
| 160 | Steel thrie beam bullnose terminal (614.0220) | EACH | 2 | $14,500 | $14,500 | $14,500 | $14,500 |
| 161 | Steel thrie beam (614.0230) | LF | 146 | $40.00 | $40.00 | $40.00 | $40.00 |
| 162 | Crash cushions temporary (614.0905) | EACH | 9 | $4,125.00 | $4,125.00 | $4,125.00 | $4,125.00 |
| 163 | MGS guardrail 3 (614.2300) | LF | 4,469 | $24.95 | $24.95 | $24.95 | $24.95 |
| 164 | MGS guardrail 3 L (614.2340) | LF | 225 | $26.95 | $26.95 | $26.95 | $26.95 |
| 165 | MGS guardrail short radius (614.2350) | LF | 111 | $36.00 | $36.00 | $36.00 | $36.00 |
| 166 | MGS thrie beam transition (614.2500) | LF | 355 | $85.00 | $85.00 | $85.00 | $85.00 |
| 167 | MGS guardrail terminal eat (614.2610) | EACH | 6 | $3,700.00 | $3,700.00 | $3,700.00 | $3,700.00 |
| 168 | MGS guardrail terminal type 2 (614.2620) | EACH | 6 | $2,600.00 | $2,600.00 | $2,600.00 | $2,600.00 |
| 169 | MGS guardrail short radius terminal (614.2630) | EACH | 2 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 |
| 170 | Fence woven wire (height) 001. 4- FT (616.0100) | LF | 199 | $18.00 | $18.00 | $18.00 | $18.00 |
| 171 | Maintenance and repair of haul roads (project) 001. 1204-08-73 (618.0100) | EACH | 1 | $2,000.00 | $100.00 | $1,000.00 | $1.00 |
| 172 | Maintenance and repair of haul roads (project) 002. 1204-08-74 (618.0100) | EACH | 1 | $2,000.00 | $99.99 | $1,000.00 | $1.00 |
| 173 | Mobilization (619.1000) | EACH | 1 | $960,000 | $961,715 | $1,464,000 | $3,541,255 |
| 174 | Concrete median sloped nose (620.0300) | SF | 74 | $13.51 | $13.51 | $13.51 | $13.51 |
| 175 | Water (624.0100) | MGAL | 638 | $0.01 | $0.01 | $0.01 | $0.01 |
| 176 | Salvaged topsoil (625.0500) | SY | 70,241 | $1.08 | $2.00 | $1.08 | $1.08 |
| 177 | Silt fence (628.1504) | LF | 15,046 | $1.85 | $1.85 | $1.85 | $1.85 |
| 178 | Silt fence maintenance (628.1520) | LF | 15,046 | $0.01 | $0.01 | $0.01 | $0.01 |
| 179 | Mobilizations erosion control (628.1905) | EACH | 24 | $100.00 | $100.00 | $100.00 | $100.00 |
| 180 | Mobilizations emergency erosion control (628.1910) | EACH | 36 | $100.00 | $100.00 | $100.00 | $100.00 |
| 181 | Erosion mat class I type A (628.2002) | SY | 55,762 | $1.00 | $1.00 | $1.00 | $1.00 |
| 182 | Erosion mat urban class I type B (628.2008) | SY | 14,479 | $1.60 | $1.60 | $1.60 | $1.60 |
| 183 | Turbidity barriers (628.6005) | SY | 622 | $45.00 | $45.00 | $45.00 | $45.00 |
| 184 | Inlet protection type A (628.7005) | EACH | 7 | $125.00 | $125.00 | $125.00 | $125.00 |
| 185 | Inlet protection type C (628.7015) | EACH | 1 | $70.00 | $70.00 | $70.00 | $70.00 |
| 186 | Inlet protection type D (628.7020) | EACH | 6 | $125.00 | $125.00 | $125.00 | $125.00 |
| 187 | Temporary ditch checks (628.7504) | LF | 849 | $7.50 | $7.50 | $7.50 | $7.50 |
| 188 | Culvert pipe checks (628.7555) | EACH | 56 | $18.50 | $18.50 | $18.50 | $18.50 |
| 189 | Fertilizer type A (629.0205) | CWT | 49 | $80.00 | $80.00 | $80.00 | $80.00 |
| 190 | Seeding mixture no. 30 (630.0130) | LB | 1,220 | $8.95 | $8.95 | $8.95 | $8.95 |
| 191 | Seeding mixture no. 60 (630.0160) | LB | 52 | $9.95 | $9.95 | $9.95 | $9.95 |
| 192 | Seeding temporary (630.0200) | LB | 2,446 | $3.45 | $3.45 | $3.45 | $3.45 |
| 193 | Seeding nurse crop (630.0400) | LB | 137 | $5.00 | $5.00 | $5.00 | $5.00 |
| 194 | Seed water (630.0500) | MGAL | 1,973 | $1.00 | $1.00 | $1.00 | $1.00 |
| 195 | Shrubs (species, root, size) 001. prunus americana cont. 8X6-inch, 24-inch (632.0201) | EACH | 81 | $70.00 | $70.00 | $70.00 | $70.00 |
| 196 | Shrubs (species, root, size) 002. viburnum trilobum cont. 9X6-inch, 24-inch (632.0201) | EACH | 158 | $70.00 | $70.00 | $70.00 | $70.00 |
| 197 | Landscape planting surveillance and care cycles (632.9101) | EACH | 18 | $750.00 | $750.00 | $750.00 | $750.00 |
| 198 | Delineator posts steel (633.0100) | EACH | 21 | $35.00 | $35.00 | $35.00 | $35.00 |
| 199 | Delineator reflectors (633.0500) | EACH | 21 | $8.00 | $8.00 | $8.00 | $8.00 |
| 200 | Markers culvert end (633.5200) | EACH | 5 | $60.00 | $60.00 | $60.00 | $60.00 |
| 201 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 6 | $85.00 | $85.00 | $85.00 | $85.00 |
| 202 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 12 | $90.00 | $90.00 | $90.00 | $90.00 |
| 203 | Sign supports structural steel HS (635.0200) | LB | 2,438 | $4.50 | $4.50 | $4.50 | $4.50 |
| 204 | Signs type I reflective SH (637.1220) | SF | 906 | $26.00 | $26.00 | $26.00 | $26.00 |
| 205 | Signs type I reflective F (637.1230) | SF | 311 | $26.00 | $26.00 | $26.00 | $26.00 |
| 206 | Signs type II reflective H (637.2210) | SF | 105 | $20.00 | $20.00 | $20.00 | $20.00 |
| 207 | Signs type II reflective H folding (637.2215) | SF | 25 | $28.00 | $28.00 | $28.00 | $28.00 |
| 208 | Signs type II reflective F (637.2230) | SF | 36 | $25.00 | $25.00 | $25.00 | $25.00 |
| 209 | Moving signs type I (638.2101) | EACH | 1 | $750.00 | $750.00 | $750.00 | $750.00 |
| 210 | Moving signs type II (638.2102) | EACH | 56 | $200.00 | $200.00 | $200.00 | $200.00 |
| 211 | Removing signs type I (638.2601) | EACH | 7 | $500.00 | $500.00 | $500.00 | $500.00 |
| 212 | Removing signs type II (638.2602) | EACH | 4 | $45.00 | $45.00 | $45.00 | $45.00 |
| 213 | Removing small sign supports (638.3000) | EACH | 5 | $45.00 | $45.00 | $45.00 | $45.00 |
| 214 | Removing structural steel sign supports (638.3100) | EACH | 10 | $450.00 | $450.00 | $450.00 | $450.00 |
| 215 | Moving small sign supports (638.4000) | EACH | 46 | $100.00 | $100.00 | $100.00 | $100.00 |
| 216 | Traffic control drums (643.0300) | DAY | 124,944 | $0.15 | $0.15 | $0.15 | $0.15 |
| 217 | Traffic control barricades type II (643.0410) | DAY | 1,750 | $0.25 | $0.25 | $0.25 | $0.25 |
| 218 | Traffic control barricades type III (643.0420) | DAY | 12,963 | $0.42 | $0.42 | $0.42 | $0.42 |
| 219 | Traffic control warning lights type A (643.0705) | DAY | 19,804 | $0.13 | $0.13 | $0.13 | $0.13 |
| 220 | Traffic control warning lights type C (643.0715) | DAY | 21,324 | $0.13 | $0.13 | $0.13 | $0.13 |
| 221 | Traffic control arrow boards (643.0800) | DAY | 572 | $12.50 | $12.50 | $12.50 | $12.50 |
| 222 | Traffic control signs (643.0900) | DAY | 25,179 | $0.24 | $0.24 | $0.24 | $0.24 |
| 223 | Traffic control covering signs type I (643.0910) | EACH | 10 | $175.00 | $175.00 | $175.00 | $175.00 |
| 224 | Traffic control covering signs type II (643.0920) | EACH | 10 | $75.00 | $75.00 | $75.00 | $75.00 |
| 225 | Traffic control signs PCMS (643.1050) | DAY | 1,204 | $13.75 | $13.75 | $13.75 | $13.75 |
| 226 | Truck or trailer mounted attenuator (643.1055.S) | DAY | 62 | $500.00 | $500.00 | $500.00 | $500.00 |
| 227 | Basic traffic queue warning system (643.1205.S) | DAY | 476 | $65.00 | $65.00 | $65.00 | $65.00 |
| 228 | Temporary marking line paint 6- inch (643.3165) | LF | 2,082 | $0.35 | $0.35 | $0.35 | $0.35 |
| 229 | Temporary marking line epoxy 6- inch (643.3170) | LF | 20,506 | $0.41 | $0.41 | $1.00 | $0.41 |
| 230 | Temporary marking line removable tape 6-inch (643.3180) | LF | 36,609 | $2.15 | $2.15 | $2.15 | $2.15 |
| 231 | Temporary marking line epoxy 10- inch (643.3270) | LF | 2,220 | $1.28 | $1.28 | $3.00 | $1.28 |
| 232 | Temporary marking line removable tape 10-inch (643.3280) | LF | 1,244 | $4.50 | $4.50 | $4.50 | $4.50 |
| 233 | Temporary marking arrow removable tape (643.3550) | EACH | 1 | $145.00 | $144.99 | $145.00 | $145.00 |
| 234 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 3,584 | $3.50 | $3.50 | $3.50 | $3.50 |
| 235 | Traffic control interim lane closure (643.4100) | EACH | 178 | $850.00 | $850.00 | $850.00 | $850.00 |
| 236 | Traffic control (643.5000) | EACH | 1 | $108,550 | $108,550 | $108,550 | $108,550 |
| 237 | Geotextile type C (645.0105) | SY | 670 | $2.00 | $2.00 | $0.68 | $3.00 |
| 238 | Geotextile type DF schedule A (645.0111) | SY | 212 | $0.68 | $2.00 | $7.00 | $0.68 |
| 239 | Geotextile type HR (645.0120) | SY | 2,081 | $6.00 | $5.80 | $1.44 | $5.00 |
| 240 | Geotextile type R (645.0130) | SY | 73 | $0.95 | $4.00 | $0.95 | $0.95 |
| 241 | Geogrid type SR (645.0220) | SY | 29,329 | $1.44 | $3.00 | $1.44 | $1.44 |
| 242 | Marking line epoxy 6-inch (646.2020) | LF | 1,953 | $0.44 | $0.44 | $0.44 | $0.44 |
| 243 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 7,678 | $1.99 | $1.99 | $1.99 | $1.99 |
| 244 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 84,533 | $1.22 | $1.22 | $1.22 | $1.22 |
| 245 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 8,143 | $7.00 | $7.00 | $7.00 | $7.00 |
| 246 | Marking line grooved black epoxy 10-inch (646.4025) | LF | 2,613 | $3.65 | $3.65 | $3.65 | $3.65 |
| 247 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 2,613 | $2.51 | $2.51 | $2.51 | $2.51 |
| 248 | Marking line grooved permanent tape 10-inch (646.4050) | LF | 11,781 | $13.00 | $13.00 | $13.00 | $13.00 |
| 249 | Marking arrow epoxy (646.5020) | EACH | 9 | $293.79 | $293.79 | $293.79 | $293.79 |
| 250 | Marking word epoxy (646.5120) | EACH | 3 | $337.55 | $337.55 | $337.55 | $337.55 |
| 251 | Marking stop line epoxy 18-inch (646.6120) | LF | 254 | $12.50 | $12.50 | $12.50 | $12.50 |
| 252 | Marking diagonal epoxy 12-inch (646.7120) | LF | 1,139 | $12.00 | $12.00 | $12.00 | $12.00 |
| 253 | Marking chevron epoxy 24-inch (646.7220) | LF | 422 | $20.26 | $20.26 | $20.26 | $20.26 |
| 254 | Marking curb epoxy (646.8120) | LF | 87 | $5.90 | $5.90 | $5.90 | $5.90 |
| 255 | Marking island nose epoxy (646.8220) | EACH | 3 | $231.62 | $231.62 | $231.62 | $231.62 |
| 256 | Marking removal line 4-inch (646.9000) | LF | 2,088 | $1.00 | $1.00 | $1.00 | $1.00 |
| 257 | Construction staking storm sewer (650.4000) | EACH | 5 | $150.00 | $150.00 | $150.00 | $150.00 |
| 258 | Construction staking subgrade (650.4500) | LF | 16,707 | $0.01 | $0.01 | $0.01 | $0.01 |
| 259 | Construction staking base (650.5000) | LF | 840 | $2.00 | $10.00 | $2.00 | $2.00 |
| 260 | Construction staking pipe culverts (650.6000) | EACH | 13 | $150.00 | $150.00 | $150.00 | $150.00 |
| 261 | Construction staking structure layout (structure) 001. B-13-383 (650.6501) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 262 | Construction staking structure layout (structure) 002. B-13-403 (650.6501) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 263 | Construction staking structure layout (structure) 003. B-13-52 (650.6501) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 264 | Construction staking structure layout (structure) 004. C-13-111 (650.6501) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 265 | Construction staking structure layout (structure) 005. S-13-0612 (650.6501) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 266 | Construction staking structure layout (structure) 006. S-13-0613 (650.6501) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 267 | Construction staking structure layout (structure) 007. S-13-0614 (650.6501) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 268 | Construction staking structure layout (structure) 008. S-13-0615 (650.6501) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 269 | Construction staking structure layout (structure) 009. B-13-0573 (650.6501) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 270 | Construction staking structure layout (structure) 010. S-13-0616 (650.6501) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 271 | Construction staking structure layout (structure) 011. S-13-0617 (650.6501) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 272 | Construction staking concrete pavement (650.7000) | LF | 16,707 | $2.00 | $2.00 | $2.00 | $2.00 |
| 273 | Construction staking electrical installations (project) 001. 1204-08- 73 (650.8501) | EACH | 1 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 |
| 274 | Construction staking sidewalk (project) 001. 1204-0-8-73 (650.9500) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 275 | Construction staking supplemental control (project) 001. 1204-08-73 (650.9911) | EACH | 1 | $10,000 | $10,000 | $10,000 | $10,000 |
| 276 | Construction staking supplemental control (project) 002. 1204-08-74 (650.9911) | EACH | 1 | $7,000.00 | $7,000.01 | $7,000.00 | $7,000.00 |
| 277 | Construction staking slope stakes (650.9920) | LF | 18,817 | $1.00 | $0.01 | $1.00 | $1.00 |
| 278 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 1,199 | $7.50 | $9.00 | $7.50 | $7.50 |
| 279 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 1,252 | $11.00 | $11.00 | $11.00 | $11.00 |
| 280 | Conduit loop detector (652.0800) | LF | 1,140 | $7.50 | $7.00 | $7.50 | $7.50 |
| 281 | Pull boxes non-conductive 24X36- inch (653.0154) | EACH | 3 | $1,750.00 | $1,700.00 | $1,750.00 | $1,750.00 |
| 282 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 13 | $1,825.00 | $1,800.00 | $1,825.00 | $1,825.00 |
| 283 | Junction boxes 18X12X6-inch (653.0222) | EACH | 2 | $1,900.00 | $1,000.00 | $1,900.00 | $1,900.00 |
| 284 | Concrete bases type 1 (654.0101) | EACH | 3 | $800.00 | $950.00 | $800.00 | $800.00 |
| 285 | Concrete bases type 5 (654.0105) | EACH | 1 | $1,100.00 | $1,050.00 | $1,100.00 | $1,100.00 |
| 286 | Concrete bases type 10 (654.0110) | EACH | 2 | $6,500.00 | $7,000.01 | $6,500.00 | $6,500.00 |
| 287 | Concrete bases type 10-special (654.0120) | EACH | 1 | $7,500.00 | $7,750.01 | $7,500.00 | $7,500.00 |
| 288 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $1,800.00 | $2,000.00 | $1,800.00 | $1,800.00 |
| 289 | Cable traffic signal 5-14 AWG (655.0230) | LF | 233 | $1.25 | $1.25 | $1.25 | $1.25 |
| 290 | Cable traffic signal 7-14 AWG (655.0240) | LF | 1,317 | $1.50 | $1.50 | $1.50 | $1.50 |
| 291 | Cable traffic signal 12-14 AWG (655.0260) | LF | 244 | $2.50 | $2.50 | $2.50 | $2.50 |
| 292 | Cable traffic signal 15-14 AWG (655.0270) | LF | 146 | $3.00 | $4.00 | $3.00 | $3.00 |
| 293 | Cable type UF 2-8 AWG grounded (655.0325) | LF | 768 | $2.50 | $4.00 | $2.50 | $2.50 |
| 294 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,052 | $1.10 | $1.20 | $1.10 | $1.10 |
| 295 | Electrical wire lighting 12 AWG (655.0610) | LF | 480 | $1.00 | $1.10 | $1.00 | $1.00 |
| 296 | Loop detector lead in cable (655.0700) | LF | 3,367 | $1.25 | $1.25 | $1.25 | $1.25 |
| 297 | Loop detector wire (655.0800) | LF | 4,220 | $1.00 | $1.00 | $1.00 | $1.00 |
| 298 | Electrical service meter breaker pedestal (location) 001. ush 18/151 WB ramp & dairy ridge RD/CTH G (656.0201) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 299 | Pedestal bases (657.0100) | EACH | 3 | $250.00 | $260.00 | $250.00 | $250.00 |
| 300 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 1 | $600.00 | $740.00 | $600.00 | $600.00 |
| 301 | Poles type 5-aluminum (657.0322) | EACH | 1 | $2,050.00 | $1,900.00 | $2,050.00 | $2,050.00 |
| 302 | Poles type 10 (657.0350) | EACH | 2 | $9,027.00 | $9,000.01 | $9,027.00 | $9,027.00 |
| 303 | Poles type 10-special (657.0352) | EACH | 1 | $10,727 | $11,500 | $10,727 | $10,727 |
| 304 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 3 | $800.00 | $740.00 | $800.00 | $800.00 |
| 305 | Monotube arms 30-FT (657.0530) | EACH | 2 | $4,892.00 | $4,400.01 | $4,892.00 | $4,892.00 |
| 306 | Monotube arms 45-FT-special (657.0546) | EACH | 1 | $6,107.00 | $5,000.01 | $6,107.00 | $6,104.00 |
| 307 | Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610) | EACH | 1 | $300.00 | $339.98 | $300.00 | $300.00 |
| 308 | Luminaire arms steel 6-FT (657.0806) | EACH | 3 | $850.00 | $775.00 | $850.00 | $850.00 |
| 309 | Traffic signal face 3S 12-inch (658.0173) | EACH | 11 | $800.00 | $700.00 | $800.00 | $800.00 |
| 310 | Traffic signal face 4S 12-inch (658.0174) | EACH | 1 | $1,050.00 | $1,000.00 | $1,050.00 | $1,050.00 |
| 311 | Signal mounting hardware (location) 001. ush 18/151 WB ramps & dairy ridge RD/CTH G (658.5070) | EACH | 1 | $3,400.00 | $3,500.00 | $3,400.00 | $3,400.00 |
| 312 | Luminaires utility LED B (659.1120) | EACH | 4 | $235.00 | $220.00 | $235.00 | $235.00 |
| 313 | Sawing asphalt (690.0150) | LF | 5,178 | $1.15 | $1.15 | $1.15 | $1.75 |
| 314 | Sawing concrete (690.0250) | LF | 9,851 | $2.25 | $2.25 | $2.25 | $2.35 |
| 315 | Incentive strength concrete structures (715.0502) | DOL | 9,804 | $1.00 | $1.00 | $1.00 | $1.00 |
| 316 | Incentive compressive strength concrete pavement (715.0720) | DOL | 2,569 | $1.00 | $1.00 | $1.00 | $1.00 |
| 317 | Incentive iri ride (740.0440) | DOL | 3,086 | $1.00 | $1.00 | $1.00 | $1.00 |
| 318 | Installing and maintaining bird deterrent system (station) 001. 462+50'EB' (999.2000.S) | EACH | 1 | $1.00 | $1.00 | $6,000.00 | $1.00 |
| 319 | Installing and maintaining bird deterrent system (station) 002. 489+00'EB' (999.2000.S) | EACH | 1 | $3,000.00 | $3,000.00 | $6,000.00 | $1.00 |
| 320 | Installing and maintaining bird deterrent system (station) 003. 489+00'WB' (999.2000.S) | EACH | 1 | $3,000.00 | $3,000.00 | $6,000.00 | $1.00 |
| 321 | Installing and maintaining bird deterrent system (station) 004. 502+50'EB' (999.2000.S) | EACH | 1 | $1.00 | $1.00 | $1,500.00 | $1.00 |
| 322 | Installing and maintaining bird deterrent system (station) 005. 529+00'EB' (999.2000.S) | EACH | 1 | $4,500.00 | $4,500.01 | $6,000.00 | $1.00 |
| 323 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 |
| 324 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 4,900 | $5.00 | $5.00 | $5.00 | $5.00 |
| 325 | Special 501. neat cement grout (SPV.0025) | CF | 302 | $120.00 | $120.00 | $120.00 | $120.00 |
| 326 | Special 502. low-mobility grout (SPV.0025) | CF | 33 | $150.00 | $150.00 | $150.00 | $150.00 |
| 327 | Special 101. digital speed reduction system (SPV.0045) | DAY | 296 | $75.00 | $75.00 | $75.00 | $75.00 |
| 328 | Special 101. salvage and reinstall underdrain endwalls (SPV.0060) | EACH | 14 | $514.53 | $350.00 | $514.53 | $514.53 |
| 329 | Special 102. temporary access for sugar river structure construction and demolition (SPV.0060) | EACH | 1 | $40,000 | $40,000 | $513,502 | $130,000 |
| 330 | Special 103. field office special (SPV.0060) | EACH | 1 | $25,000 | $40,000 | $80,237 | $145,576 |
| 331 | Special 501. embedded galvanic anodes (SPV.0060) | EACH | 79 | $45.00 | $45.00 | $100.00 | $50.00 |
| 332 | Special 502. cleaning and painting bearings (SPV.0060) | EACH | 12 | $800.00 | $800.00 | $800.00 | $800.00 |
| 333 | Special 503. temporary support B- 13-0052 (SPV.0060) | EACH | 1 | $5,000.00 | $5,000.01 | $6,792.69 | $7,500.00 |
| 334 | Special 504. temporary support B- 13-0383 (SPV.0060) | EACH | 1 | $5,000.00 | $5,000.01 | $6,792.69 | $7,500.00 |
| 335 | Special 505. trench drain and grate (SPV.0060) | EACH | 1 | $12,000 | $15,000 | $12,000 | $8,500.00 |
| 336 | Special 101. salvage and reinstall cable guard (SPV.0090) | LF | 4,772 | $4.00 | $4.00 | $4.00 | $4.00 |
| 337 | Special 350. transport and install state furnished cat-5E cable (SPV.0090) | LF | 240 | $1.00 | $2.00 | $1.00 | $1.00 |
| 338 | Special 501. strip seal gland replacement (SPV.0090) | LF | 130 | $140.00 | $140.00 | $300.00 | $150.00 |
| 339 | Special 502. grout drilling (SPV.0090) | LF | 1,136 | $130.00 | $130.00 | $130.00 | $130.00 |
| 340 | Special 101. limestone screenings path (SPV.0195) | TON | 4 | $415.27 | $250.00 | $415.27 | $415.27 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.