WisDOT contract 20250114001 bid tabulation

1204-08-73. Let by Wisconsin DOT on January 14, 2025, Dane. 4 bids received; low bid $12,977,080 by Zenith Tech., Inc. - Waukesha.

Owner
Wisconsin DOT
Letting
14 JAN 2025
Pay items
340
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Zenith Tech., Inc. - Waukesha$12,977,080Low
2Hoffman Construction Company$13,160,185+1.0%
3Kraemer North America, LLC$14,649,734+13%
4Lunda Construction Company$15,037,314+16%
WisDOT contract 20250114001: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Zenith Tech., Inc. - Waukesha2. Hoffman Construction Company3. Kraemer North America, LLC4. Lunda Construction Company
1Grubbing (201.0205)STA19$178.53$178.53$178.53$178.53
2Removing small pipe culverts (203.0100)EACH1$500.55$650.00$500.55$500.55
3Removing structure (structure) 001. B-13-403 (203.0220)EACH1$150,000$150,000$75,000$75,000
4Removing structure (structure) 002. C-13-111 (203.0220)EACH1$100,000$100,000$50,000$80,000
5Removing structure (structure) 004. B-13-0573 (203.0220)EACH1$150,000$150,000$125,000$75,000
6Removing structure over waterway minimal debris (structure) 001. B- 13-52 (203.0260)EACH1$125,000$125,000$100,000$90,000
7Removing structure over waterway minimal debris (structure) 002. B- 13-0383 (203.0260)EACH1$125,000$125,000$100,000$90,000
8Debris containment (structure) 001. B-13-403 (203.0330)EACH1$1.00$1.00$7,500.00$500.00
9Debris containment (structure) 002. B-13-0573 (203.0330)EACH1$1.00$1.00$7,500.00$500.00
10Removing concrete pavement (204.0100)SY7,179$10.84$5.00$10.84$10.84
11Removing concrete pavement butt joints (204.0105)SY151$57.50$57.50$57.50$57.50
12Removing asphaltic surface milling (204.0120)SY6,482$2.00$2.00$2.00$2.00
13Removing asphaltic longitudinal notched wedge joint milling (204.0126.S)LF9,564$1.00$1.00$1.00$1.00
14Removing guardrail (204.0165)LF2,559$2.45$2.45$2.45$2.45
15Removing fence (204.0170)LF278$4.00$4.00$4.00$4.00
16Removing delineators and markers (204.0180)EACH5$30.00$30.00$30.00$30.00
17Removing surface drains (204.0190)EACH3$436.62$350.00$436.62$436.62
18Removing concrete bases (204.0195)EACH2$700.00$350.00$400.00$500.00
19Removing inlets (204.0220)EACH2$510.74$650.00$510.74$510.74
20Removing storm sewer (size) 001. 12-inch (204.0245)LF96$9.88$20.00$9.88$9.88
21Removing (item description) 001. apron endwalls (204.9060.S)EACH3$508.58$350.00$508.58$508.58
22Removing (item description) 002. removing pipe underdrain 6-inch (204.9090.S)LF25$9.89$20.00$9.89$9.89
23Excavation common (205.0100)CY46,617$11.62$13.00$11.62$11.62
24Excavation rock (205.0200)CY5,000$30.44$0.01$30.44$30.44
25Excavation marsh (205.0400)CY135$36.14$13.00$36.14$36.14
26Excavation for structures bridges (structure) 001. B-13-52 (206.1001)EACH1$60,000$45,000$30,000$45,822
27Excavation for structures bridges (structure) 002. B-13-0383 (206.1001)EACH1$60,000$45,000$30,000$45,822
28Excavation for structures bridges (structure) 003. B-13-403 (206.1001)EACH1$30,000$25,000$10,000$19,511
29Excavation for structures bridges (structure) 004. B-13-0573 (206.1001)EACH1$40,000$30,000$10,000$34,211
30Excavation for structures culverts (structure) 001. C-13-111 (206.2001)EACH1$30,000$40,000$17,431$17,431
31Cofferdams (structure) 001. B-13-52 (206.5001)EACH1$125,000$125,000$125,000$150,000
32Cofferdams (structure) 002. B-13- 0383 (206.5001)EACH1$125,000$125,000$125,000$150,000
33Cofferdams (structure) 003. C-13- 111 (206.5001)EACH1$60,000$60,000$250,000$1.00
34Borrow (208.0100)CY2,671$1.00$0.01$1.00$1.00
35Backfill structure type A (210.1500)TON3,322$30.55$30.00$30.55$30.55
36Finishing roadway (project) 001. 1204-08-73 (213.0100)EACH1$2,000.00$100.00$2,500.00$1,500.00
37Finishing roadway (project) 002. 1204-08-74 (213.0100)EACH1$2,000.00$99.99$2,500.00$1,500.00
38Base aggregate dense 3/4-inch (305.0110)TON1,871$36.29$31.02$36.29$36.29
39Base aggregate dense 1 1/4-inch (305.0120)TON34,962$13.12$15.20$13.12$13.12
40Base aggregate dense 3-inch (305.0130)TON4,747$11.38$20.40$11.38$11.38
41Select crushed material (312.0110)TON19,742$12.10$20.00$12.10$12.10
42Concrete base 9-inch (320.0155)SY9,559$57.69$57.69$57.69$57.69
43Concrete pavement 9-inch (415.0090)SY7,663$70.83$70.83$70.83$70.83
44Concrete pavement approach slab (415.0410)SY509$170.23$170.23$170.23$170.23
45Rout and seal (415.6000.S)LF3,043$4.75$6.79$6.79$6.79
46Drilled tie bars (416.0610)EACH4,036$9.80$9.80$9.80$9.80
47Drilled dowel bars (416.0620)EACH121$13.65$13.65$13.65$13.65
48Tack coat (455.0605)GAL3,791$0.01$0.01$0.01$0.01
49HMA pavement test strip volumetrics (460.0115.S)EACH1$1,000.00$1,000.00$1,000.00$1,000.00
50HMA pavement test strip density (460.0120.S)EACH1$1,000.00$1,000.00$1,000.00$1,000.00
51Incentive density HMA pavement (460.2000)DOL5,950$1.00$1.00$1.00$1.00
52Incentive density HMA pavement longitudinal joints (460.2007)DOL1,744$1.00$1.00$1.00$1.00
53HMA pavement 4 LT 58-28 S (460.5224)TON322$114.80$114.80$114.80$114.80
54HMA pavement 3 MT 58-28 S (460.6223)TON1,377$84.80$84.80$84.80$84.80
55HMA pavement 4 MT 58-28 S (460.6224)TON1,074$114.80$114.80$114.80$114.80
56HMA pavement 3 HT 58-28 H (460.7423)TON2,861$84.80$84.80$84.80$84.80
57HMA pavement 4 HT 58-28 H (460.7424)TON856$114.80$114.80$114.80$114.80
58HMA pavement 4 SMA 58-28 V (460.8624)TON2,793$143.50$143.50$143.50$143.50
59Material transfer vehicle (460.9000.S)EACH1$100.00$99.99$100.00$100.00
60Asphaltic flumes (465.0315)SY14$60.00$60.00$60.00$60.00
61Asphaltic rumble strips, shoulder divided roadway (465.0510)LF14,478$0.59$0.59$0.59$0.59
62Concrete masonry bridges (502.0100)CY1,024$1,350.00$1,350.00$1,800.00$950.00
63Concrete masonry seal (502.1100)CY100$340.00$340.00$600.00$700.00
64Expansion device (502.3101)LF73$280.00$280.00$500.00$350.00
65Protective surface treatment (502.3200)SY1,870$4.00$4.00$3.00$4.00
66Pigmented surface sealer reseal (502.3205)SY259$16.00$16.00$20.00$40.00
67Pigmented surface sealer (502.3210)SY428$12.00$12.00$15.00$5.00
68Protective surface treatment reseal (502.3215)SY1,402$10.00$10.00$6.00$30.00
69Adhesive anchors no. 4 bar (502.4204)EACH42$26.00$26.00$30.00$25.00
70Adhesive anchors no. 5 bar (502.4205)EACH92$30.00$30.00$40.00$25.00
71Adhesive anchors no. 6 bar (502.4206)EACH155$37.00$37.00$50.00$25.00
72Adhesive anchors no. 8 bar (502.4208)EACH16$55.00$55.00$55.00$25.00
73Adhesive anchors no. 9 bar (502.4209)EACH9$66.00$66.00$60.00$25.00
74Prestressed girder type I 54W-inch (503.0155)LF1,321$250.00$250.00$300.00$280.00
75Concrete masonry culverts (504.0100)CY300$900.00$900.00$1,000.00$1,100.00
76Bar steel reinforcement HS structures (505.0400)LB37,260$1.26$1.26$1.30$1.12
77Bar steel reinforcement HS coated structures (505.0600)LB189,500$1.36$1.36$1.45$1.25
78Structural steel carbon (506.0105)LB9,140$5.60$5.60$6.00$5.50
79Structural steel HS (506.0605)LB82,490$3.50$3.50$4.50$3.50
80Bearing pads elastomeric non- laminated (506.2605)EACH24$140.00$140.00$90.00$150.00
81Bearing pads elastomeric laminated (506.2610)EACH4$1,450.00$1,450.00$2,000.00$2,000.00
82Welded stud shear connectors 7/8X6-inch (506.3015)EACH2,844$6.50$6.50$6.00$6.00
83Steel diaphragms (structure) 001. B-13-403 (506.4000)EACH16$1,200.00$1,200.00$1,000.00$2,000.00
84Steel diaphragms (structure) 002. B-13-0573 (506.4000)EACH8$1,200.00$1,200.00$1,000.00$1,800.00
85Bearing assemblies fixed (structure) 001. B-13-0052 (506.5000)EACH2$1,600.00$1,600.00$2,500.00$2,000.00
86Bearing assemblies fixed (structure) 002. B-13-0383 (506.5000)EACH4$1,600.00$1,600.00$2,500.00$2,500.00
87Bearing assemblies expansion (structure) 001. B-13-0052 (506.6000)EACH6$2,050.00$2,050.00$2,500.00$3,000.00
88Preparation decks type 1 (509.0301)SY10$260.00$260.00$600.00$250.00
89Preparation decks type 2 (509.0302)SY10$300.00$300.00$700.00$250.00
90Sawing pavement deck preparation areas (509.0310.S)LF138$10.00$10.00$15.00$3.00
91Concrete surface repair (509.1500)SF12$290.00$290.00$250.00$300.00
92Concrete masonry deck repair (509.2100.S)CY1$4,000.00$4,000.01$2,000.00$3,500.00
93Polymer overlay (509.5100.S)SY1,810$41.67$41.67$36.46$36.46
94Removing polymer overlay (structure) 01. B-13-0052 (509.9015.S)SY930$12.41$12.41$12.41$12.41
95Removing polymer overlay (structure) 02. B-13-0383 (509.9015.S)SY880$12.83$12.83$12.83$12.83
96Temporary shoring (structure) 001. B13-0052 (511.1200)SF234$70.00$70.00$65.00$35.00
97Temporary shoring (structure) 002. B-13-0383 (511.1200)SF510$70.00$70.00$65.00$25.00
98Temporary shoring (structure) 003. B-13-403 (511.1200)SF273$45.00$45.00$25.00$0.01
99Temporary shoring (structure) 004. C-13-111 (511.1200)SF3,370$70.00$70.00$70.00$60.00
100Temporary shoring (structure) 005. B-13-0573 (511.1200)SF680$45.00$45.00$30.00$25.00
101Railing pipe (513.2001)LF35$250.00$250.00$300.00$300.00
102Rubberized membrane waterproofing (516.0500)SY100$60.00$60.00$10.00$25.00
103Sheet membrane waterproofing for buried structures 001. C-13-111 (516.0610.S)SY90$60.00$60.00$70.00$150.00
104Painting epoxy system (structure) 001. B-13-0052 (517.0601)EACH1$35,000$35,000$25,000$35,000
105Painting epoxy system (structure) 002. B-13-0383 (517.0601)EACH1$35,000$35,000$25,000$35,000
106Preparation and coating of top flanges (structure) 001. B-13-0052 (517.0901.S)EACH1$5,500.00$5,500.01$11,480$5,500.00
107Preparation and coating of top flanges (structure) 002. B-13-0383 (517.0901.S)EACH1$5,500.00$5,500.01$7,497.00$5,500.00
108Apron endwalls for culvert pipe 12- inch (520.1012)EACH2$430.62$500.00$430.62$430.62
109Concrete collars for pipe (520.8000)EACH3$537.25$1,000.00$537.25$537.25
110Culvert pipe reinforced concrete class III 24-inch (522.0124)LF84$125.89$100.00$125.89$125.89
111Culvert pipe reinforced concrete class III 48-inch (522.0148)LF4$682.84$500.00$682.84$682.84
112Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH4$1,461.24$1,200.00$1,461.24$1,461.24
113Apron endwalls for culvert pipe reinforced concrete 48-inch (522.1048)EACH1$4,375.70$2,200.00$4,375.70$4,375.70
114Concrete masonry ancillary structures type NS (531.1100)CY30$900.00$900.00$900.00$900.00
115Steel reinforcement HS ancillary structures type NS (531.1140)LB2,780$3.25$3.25$3.25$3.25
116Steel reinforcement HS coated ancillary structures type NS (531.1160)LB2,200$3.25$3.25$3.25$3.25
117Drilling shaft 24-inch (531.2024)LF30$75.00$75.00$75.00$75.00
118Drilling shaft 36-inch (531.2036)LF170$220.00$220.00$220.00$220.00
119Foundation two-shaft type FC-I (structure) 001. S-13-613 (531.6010)EACH1$24,000$24,000$24,000$24,000
120Foundation two-shaft type FC-I (structure) 002. S-13-614 (531.6010)EACH1$24,000$24,000$24,000$24,000
121Foundation two-shaft type FC-I (structure) 003. S-13-0616 (531.6010)EACH1$24,000$24,000$24,000$24,000
122Foundation two-shaft type FC-II (structure) 001. S-13-0617 (531.6020)EACH1$24,000$24,000$24,000$24,000
123Anchor assemblies poles on structures (531.8990)EACH2$1,000.00$1,000.00$1,200.00$250.00
124Truss cantilever 4-chord type I (structure) 001. S-13-613 (532.6010)EACH1$40,000$40,000$40,000$40,000
125Truss cantilever 4-chord type I (structure) 002. S-13-614 (532.6010)EACH1$39,000$39,000$39,000$39,000
126Truss cantilever 4-chord type I (structure) 003. S-13-615 (532.6010)EACH1$39,000$39,000$39,000$39,000
127Truss cantilever 4-chord type I (structure) 004. S-13-0616 (532.6010)EACH1$39,000$39,000$39,000$39,000
128Truss cantilever 4-chord type II (structure) 001. S-13-612 (532.6020)EACH1$47,000$47,000$47,000$47,000
129Truss cantilever 4-chord type II (structure) 002. S-13-0617 (532.6020)EACH1$46,000$46,000$46,000$46,000
130Pre-boring rock or consolidated materials (550.0020)LF30$1,420.00$1,420.00$1,339.97$1,400.00
131Piling steel HP 10-inch X 42 LB (550.1100)LF2,045$55.00$55.00$60.00$35.00
132Piling steel HP 14-inch X 73 LB (550.1140)LF1,980$72.00$72.00$75.00$55.00
133Concrete curb & gutter 18-inch type A (601.0405)LF244$30.53$30.53$30.53$30.53
134Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413)LF379$32.66$32.66$32.66$32.66
135Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555)LF335$30.22$30.22$30.22$30.22
136Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF169$49.62$49.62$49.62$49.62
137Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF82$75.46$75.46$75.46$75.46
138Concrete sidewalk 4-inch (602.0405)SF2,523$4.82$4.82$4.82$4.82
139Concrete surface drains (602.3010)CY9$753.21$753.21$753.21$753.21
140Concrete barrier temporary precast delivered (603.8000)LF10,187$10.00$10.00$13.58$10.00
141Concrete barrier temporary precast installed (603.8125)LF19,174$3.40$3.40$3.20$4.25
142Slope paving crushed aggregate (604.0500)SY495$35.00$35.00$35.00$35.00
143Slope paving repair crushed aggregate (604.9010.S)CY5$200.00$200.00$200.00$200.00
144Reseal crushed aggregate slope paving (604.9015.S)SY790$20.00$20.00$20.00$20.00
145Riprap medium (606.0200)CY338$80.02$100.00$80.02$80.02
146Riprap heavy (606.0300)CY800$110.00$100.00$100.00$80.00
147Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF31$104.08$100.00$104.08$104.08
148Storm sewer pipe class III-A 12- inch (608.3012)LF62$84.50$100.00$84.50$84.50
149Inlet covers type HM-GJ (611.0630)EACH1$1,076.41$700.00$1,076.41$1,076.41
150Inlet covers type V (611.0654)EACH3$959.06$900.00$959.06$959.06
151Inlet covers type Z (611.0666)EACH1$1,028.55$900.00$1,028.55$1,028.55
152Inlets 3-FT diameter (611.3003)EACH1$2,736.38$2,000.00$2,736.38$2,736.38
153Inlets 2X2-FT (611.3220)EACH2$2,458.67$2,000.00$2,458.67$2,458.67
154Inlets 2X3-FT (611.3230)EACH1$2,778.59$2,000.00$2,778.59$2,778.59
155Pipe underdrain unperforated 6- inch (612.0206)LF175$53.55$25.00$53.55$53.55
156Pipe underdrain wrapped 6-inch (612.0406)LF306$18.02$5.00$18.02$18.02
157Apron endwalls for underdrain reinforced concrete 6-inch (612.0806)EACH7$518.75$250.00$518.75$518.75
158Barrier system grading shaping finishing (614.0010)EACH2$1,503.20$1,000.00$1,503.20$1,503.20
159Anchor assemblies for steel plate beam guard (614.0150)EACH8$450.00$450.00$33.96$150.00
160Steel thrie beam bullnose terminal (614.0220)EACH2$14,500$14,500$14,500$14,500
161Steel thrie beam (614.0230)LF146$40.00$40.00$40.00$40.00
162Crash cushions temporary (614.0905)EACH9$4,125.00$4,125.00$4,125.00$4,125.00
163MGS guardrail 3 (614.2300)LF4,469$24.95$24.95$24.95$24.95
164MGS guardrail 3 L (614.2340)LF225$26.95$26.95$26.95$26.95
165MGS guardrail short radius (614.2350)LF111$36.00$36.00$36.00$36.00
166MGS thrie beam transition (614.2500)LF355$85.00$85.00$85.00$85.00
167MGS guardrail terminal eat (614.2610)EACH6$3,700.00$3,700.00$3,700.00$3,700.00
168MGS guardrail terminal type 2 (614.2620)EACH6$2,600.00$2,600.00$2,600.00$2,600.00
169MGS guardrail short radius terminal (614.2630)EACH2$2,400.00$2,400.00$2,400.00$2,400.00
170Fence woven wire (height) 001. 4- FT (616.0100)LF199$18.00$18.00$18.00$18.00
171Maintenance and repair of haul roads (project) 001. 1204-08-73 (618.0100)EACH1$2,000.00$100.00$1,000.00$1.00
172Maintenance and repair of haul roads (project) 002. 1204-08-74 (618.0100)EACH1$2,000.00$99.99$1,000.00$1.00
173Mobilization (619.1000)EACH1$960,000$961,715$1,464,000$3,541,255
174Concrete median sloped nose (620.0300)SF74$13.51$13.51$13.51$13.51
175Water (624.0100)MGAL638$0.01$0.01$0.01$0.01
176Salvaged topsoil (625.0500)SY70,241$1.08$2.00$1.08$1.08
177Silt fence (628.1504)LF15,046$1.85$1.85$1.85$1.85
178Silt fence maintenance (628.1520)LF15,046$0.01$0.01$0.01$0.01
179Mobilizations erosion control (628.1905)EACH24$100.00$100.00$100.00$100.00
180Mobilizations emergency erosion control (628.1910)EACH36$100.00$100.00$100.00$100.00
181Erosion mat class I type A (628.2002)SY55,762$1.00$1.00$1.00$1.00
182Erosion mat urban class I type B (628.2008)SY14,479$1.60$1.60$1.60$1.60
183Turbidity barriers (628.6005)SY622$45.00$45.00$45.00$45.00
184Inlet protection type A (628.7005)EACH7$125.00$125.00$125.00$125.00
185Inlet protection type C (628.7015)EACH1$70.00$70.00$70.00$70.00
186Inlet protection type D (628.7020)EACH6$125.00$125.00$125.00$125.00
187Temporary ditch checks (628.7504)LF849$7.50$7.50$7.50$7.50
188Culvert pipe checks (628.7555)EACH56$18.50$18.50$18.50$18.50
189Fertilizer type A (629.0205)CWT49$80.00$80.00$80.00$80.00
190Seeding mixture no. 30 (630.0130)LB1,220$8.95$8.95$8.95$8.95
191Seeding mixture no. 60 (630.0160)LB52$9.95$9.95$9.95$9.95
192Seeding temporary (630.0200)LB2,446$3.45$3.45$3.45$3.45
193Seeding nurse crop (630.0400)LB137$5.00$5.00$5.00$5.00
194Seed water (630.0500)MGAL1,973$1.00$1.00$1.00$1.00
195Shrubs (species, root, size) 001. prunus americana cont. 8X6-inch, 24-inch (632.0201)EACH81$70.00$70.00$70.00$70.00
196Shrubs (species, root, size) 002. viburnum trilobum cont. 9X6-inch, 24-inch (632.0201)EACH158$70.00$70.00$70.00$70.00
197Landscape planting surveillance and care cycles (632.9101)EACH18$750.00$750.00$750.00$750.00
198Delineator posts steel (633.0100)EACH21$35.00$35.00$35.00$35.00
199Delineator reflectors (633.0500)EACH21$8.00$8.00$8.00$8.00
200Markers culvert end (633.5200)EACH5$60.00$60.00$60.00$60.00
201Posts wood 4X6-inch X 12-FT (634.0612)EACH6$85.00$85.00$85.00$85.00
202Posts wood 4X6-inch X 16-FT (634.0616)EACH12$90.00$90.00$90.00$90.00
203Sign supports structural steel HS (635.0200)LB2,438$4.50$4.50$4.50$4.50
204Signs type I reflective SH (637.1220)SF906$26.00$26.00$26.00$26.00
205Signs type I reflective F (637.1230)SF311$26.00$26.00$26.00$26.00
206Signs type II reflective H (637.2210)SF105$20.00$20.00$20.00$20.00
207Signs type II reflective H folding (637.2215)SF25$28.00$28.00$28.00$28.00
208Signs type II reflective F (637.2230)SF36$25.00$25.00$25.00$25.00
209Moving signs type I (638.2101)EACH1$750.00$750.00$750.00$750.00
210Moving signs type II (638.2102)EACH56$200.00$200.00$200.00$200.00
211Removing signs type I (638.2601)EACH7$500.00$500.00$500.00$500.00
212Removing signs type II (638.2602)EACH4$45.00$45.00$45.00$45.00
213Removing small sign supports (638.3000)EACH5$45.00$45.00$45.00$45.00
214Removing structural steel sign supports (638.3100)EACH10$450.00$450.00$450.00$450.00
215Moving small sign supports (638.4000)EACH46$100.00$100.00$100.00$100.00
216Traffic control drums (643.0300)DAY124,944$0.15$0.15$0.15$0.15
217Traffic control barricades type II (643.0410)DAY1,750$0.25$0.25$0.25$0.25
218Traffic control barricades type III (643.0420)DAY12,963$0.42$0.42$0.42$0.42
219Traffic control warning lights type A (643.0705)DAY19,804$0.13$0.13$0.13$0.13
220Traffic control warning lights type C (643.0715)DAY21,324$0.13$0.13$0.13$0.13
221Traffic control arrow boards (643.0800)DAY572$12.50$12.50$12.50$12.50
222Traffic control signs (643.0900)DAY25,179$0.24$0.24$0.24$0.24
223Traffic control covering signs type I (643.0910)EACH10$175.00$175.00$175.00$175.00
224Traffic control covering signs type II (643.0920)EACH10$75.00$75.00$75.00$75.00
225Traffic control signs PCMS (643.1050)DAY1,204$13.75$13.75$13.75$13.75
226Truck or trailer mounted attenuator (643.1055.S)DAY62$500.00$500.00$500.00$500.00
227Basic traffic queue warning system (643.1205.S)DAY476$65.00$65.00$65.00$65.00
228Temporary marking line paint 6- inch (643.3165)LF2,082$0.35$0.35$0.35$0.35
229Temporary marking line epoxy 6- inch (643.3170)LF20,506$0.41$0.41$1.00$0.41
230Temporary marking line removable tape 6-inch (643.3180)LF36,609$2.15$2.15$2.15$2.15
231Temporary marking line epoxy 10- inch (643.3270)LF2,220$1.28$1.28$3.00$1.28
232Temporary marking line removable tape 10-inch (643.3280)LF1,244$4.50$4.50$4.50$4.50
233Temporary marking arrow removable tape (643.3550)EACH1$145.00$144.99$145.00$145.00
234Temporary marking removable mask out tape 6-inch (643.3960)LF3,584$3.50$3.50$3.50$3.50
235Traffic control interim lane closure (643.4100)EACH178$850.00$850.00$850.00$850.00
236Traffic control (643.5000)EACH1$108,550$108,550$108,550$108,550
237Geotextile type C (645.0105)SY670$2.00$2.00$0.68$3.00
238Geotextile type DF schedule A (645.0111)SY212$0.68$2.00$7.00$0.68
239Geotextile type HR (645.0120)SY2,081$6.00$5.80$1.44$5.00
240Geotextile type R (645.0130)SY73$0.95$4.00$0.95$0.95
241Geogrid type SR (645.0220)SY29,329$1.44$3.00$1.44$1.44
242Marking line epoxy 6-inch (646.2020)LF1,953$0.44$0.44$0.44$0.44
243Marking line grooved black epoxy 6-inch (646.2025)LF7,678$1.99$1.99$1.99$1.99
244Marking line grooved wet ref epoxy 6-inch (646.2040)LF84,533$1.22$1.22$1.22$1.22
245Marking line grooved permanent tape 6-inch (646.2050)LF8,143$7.00$7.00$7.00$7.00
246Marking line grooved black epoxy 10-inch (646.4025)LF2,613$3.65$3.65$3.65$3.65
247Marking line grooved wet ref epoxy 10-inch (646.4040)LF2,613$2.51$2.51$2.51$2.51
248Marking line grooved permanent tape 10-inch (646.4050)LF11,781$13.00$13.00$13.00$13.00
249Marking arrow epoxy (646.5020)EACH9$293.79$293.79$293.79$293.79
250Marking word epoxy (646.5120)EACH3$337.55$337.55$337.55$337.55
251Marking stop line epoxy 18-inch (646.6120)LF254$12.50$12.50$12.50$12.50
252Marking diagonal epoxy 12-inch (646.7120)LF1,139$12.00$12.00$12.00$12.00
253Marking chevron epoxy 24-inch (646.7220)LF422$20.26$20.26$20.26$20.26
254Marking curb epoxy (646.8120)LF87$5.90$5.90$5.90$5.90
255Marking island nose epoxy (646.8220)EACH3$231.62$231.62$231.62$231.62
256Marking removal line 4-inch (646.9000)LF2,088$1.00$1.00$1.00$1.00
257Construction staking storm sewer (650.4000)EACH5$150.00$150.00$150.00$150.00
258Construction staking subgrade (650.4500)LF16,707$0.01$0.01$0.01$0.01
259Construction staking base (650.5000)LF840$2.00$10.00$2.00$2.00
260Construction staking pipe culverts (650.6000)EACH13$150.00$150.00$150.00$150.00
261Construction staking structure layout (structure) 001. B-13-383 (650.6501)EACH1$3,000.00$3,000.00$3,000.00$3,000.00
262Construction staking structure layout (structure) 002. B-13-403 (650.6501)EACH1$3,000.00$3,000.00$3,000.00$3,000.00
263Construction staking structure layout (structure) 003. B-13-52 (650.6501)EACH1$3,000.00$3,000.00$3,000.00$3,000.00
264Construction staking structure layout (structure) 004. C-13-111 (650.6501)EACH1$3,000.00$3,000.00$3,000.00$3,000.00
265Construction staking structure layout (structure) 005. S-13-0612 (650.6501)EACH1$1,000.00$1,000.00$1,000.00$1,000.00
266Construction staking structure layout (structure) 006. S-13-0613 (650.6501)EACH1$1,000.00$1,000.00$1,000.00$1,000.00
267Construction staking structure layout (structure) 007. S-13-0614 (650.6501)EACH1$1,000.00$1,000.00$1,000.00$1,000.00
268Construction staking structure layout (structure) 008. S-13-0615 (650.6501)EACH1$1,000.00$1,000.00$1,000.00$1,000.00
269Construction staking structure layout (structure) 009. B-13-0573 (650.6501)EACH1$3,000.00$3,000.00$3,000.00$3,000.00
270Construction staking structure layout (structure) 010. S-13-0616 (650.6501)EACH1$1,000.00$1,000.00$1,000.00$1,000.00
271Construction staking structure layout (structure) 011. S-13-0617 (650.6501)EACH1$1,000.00$1,000.00$1,000.00$1,000.00
272Construction staking concrete pavement (650.7000)LF16,707$2.00$2.00$2.00$2.00
273Construction staking electrical installations (project) 001. 1204-08- 73 (650.8501)EACH1$1,250.00$1,250.00$1,250.00$1,250.00
274Construction staking sidewalk (project) 001. 1204-0-8-73 (650.9500)EACH1$2,000.00$2,000.00$2,000.00$2,000.00
275Construction staking supplemental control (project) 001. 1204-08-73 (650.9911)EACH1$10,000$10,000$10,000$10,000
276Construction staking supplemental control (project) 002. 1204-08-74 (650.9911)EACH1$7,000.00$7,000.01$7,000.00$7,000.00
277Construction staking slope stakes (650.9920)LF18,817$1.00$0.01$1.00$1.00
278Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF1,199$7.50$9.00$7.50$7.50
279Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF1,252$11.00$11.00$11.00$11.00
280Conduit loop detector (652.0800)LF1,140$7.50$7.00$7.50$7.50
281Pull boxes non-conductive 24X36- inch (653.0154)EACH3$1,750.00$1,700.00$1,750.00$1,750.00
282Pull boxes non-conductive 24X42- inch (653.0164)EACH13$1,825.00$1,800.00$1,825.00$1,825.00
283Junction boxes 18X12X6-inch (653.0222)EACH2$1,900.00$1,000.00$1,900.00$1,900.00
284Concrete bases type 1 (654.0101)EACH3$800.00$950.00$800.00$800.00
285Concrete bases type 5 (654.0105)EACH1$1,100.00$1,050.00$1,100.00$1,100.00
286Concrete bases type 10 (654.0110)EACH2$6,500.00$7,000.01$6,500.00$6,500.00
287Concrete bases type 10-special (654.0120)EACH1$7,500.00$7,750.01$7,500.00$7,500.00
288Concrete control cabinet bases type 9 special (654.0217)EACH1$1,800.00$2,000.00$1,800.00$1,800.00
289Cable traffic signal 5-14 AWG (655.0230)LF233$1.25$1.25$1.25$1.25
290Cable traffic signal 7-14 AWG (655.0240)LF1,317$1.50$1.50$1.50$1.50
291Cable traffic signal 12-14 AWG (655.0260)LF244$2.50$2.50$2.50$2.50
292Cable traffic signal 15-14 AWG (655.0270)LF146$3.00$4.00$3.00$3.00
293Cable type UF 2-8 AWG grounded (655.0325)LF768$2.50$4.00$2.50$2.50
294Electrical wire traffic signals 10 AWG (655.0515)LF1,052$1.10$1.20$1.10$1.10
295Electrical wire lighting 12 AWG (655.0610)LF480$1.00$1.10$1.00$1.00
296Loop detector lead in cable (655.0700)LF3,367$1.25$1.25$1.25$1.25
297Loop detector wire (655.0800)LF4,220$1.00$1.00$1.00$1.00
298Electrical service meter breaker pedestal (location) 001. ush 18/151 WB ramp & dairy ridge RD/CTH G (656.0201)EACH1$2,000.00$2,000.00$2,000.00$2,000.00
299Pedestal bases (657.0100)EACH3$250.00$260.00$250.00$250.00
300Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH1$600.00$740.00$600.00$600.00
301Poles type 5-aluminum (657.0322)EACH1$2,050.00$1,900.00$2,050.00$2,050.00
302Poles type 10 (657.0350)EACH2$9,027.00$9,000.01$9,027.00$9,027.00
303Poles type 10-special (657.0352)EACH1$10,727$11,500$10,727$10,727
304Traffic signal standards aluminum 15-FT (657.0425)EACH3$800.00$740.00$800.00$800.00
305Monotube arms 30-FT (657.0530)EACH2$4,892.00$4,400.01$4,892.00$4,892.00
306Monotube arms 45-FT-special (657.0546)EACH1$6,107.00$5,000.01$6,107.00$6,104.00
307Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610)EACH1$300.00$339.98$300.00$300.00
308Luminaire arms steel 6-FT (657.0806)EACH3$850.00$775.00$850.00$850.00
309Traffic signal face 3S 12-inch (658.0173)EACH11$800.00$700.00$800.00$800.00
310Traffic signal face 4S 12-inch (658.0174)EACH1$1,050.00$1,000.00$1,050.00$1,050.00
311Signal mounting hardware (location) 001. ush 18/151 WB ramps & dairy ridge RD/CTH G (658.5070)EACH1$3,400.00$3,500.00$3,400.00$3,400.00
312Luminaires utility LED B (659.1120)EACH4$235.00$220.00$235.00$235.00
313Sawing asphalt (690.0150)LF5,178$1.15$1.15$1.15$1.75
314Sawing concrete (690.0250)LF9,851$2.25$2.25$2.25$2.35
315Incentive strength concrete structures (715.0502)DOL9,804$1.00$1.00$1.00$1.00
316Incentive compressive strength concrete pavement (715.0720)DOL2,569$1.00$1.00$1.00$1.00
317Incentive iri ride (740.0440)DOL3,086$1.00$1.00$1.00$1.00
318Installing and maintaining bird deterrent system (station) 001. 462+50'EB' (999.2000.S)EACH1$1.00$1.00$6,000.00$1.00
319Installing and maintaining bird deterrent system (station) 002. 489+00'EB' (999.2000.S)EACH1$3,000.00$3,000.00$6,000.00$1.00
320Installing and maintaining bird deterrent system (station) 003. 489+00'WB' (999.2000.S)EACH1$3,000.00$3,000.00$6,000.00$1.00
321Installing and maintaining bird deterrent system (station) 004. 502+50'EB' (999.2000.S)EACH1$1.00$1.00$1,500.00$1.00
322Installing and maintaining bird deterrent system (station) 005. 529+00'EB' (999.2000.S)EACH1$4,500.00$4,500.01$6,000.00$1.00
323On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00$5.00
324On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS4,900$5.00$5.00$5.00$5.00
325Special 501. neat cement grout (SPV.0025)CF302$120.00$120.00$120.00$120.00
326Special 502. low-mobility grout (SPV.0025)CF33$150.00$150.00$150.00$150.00
327Special 101. digital speed reduction system (SPV.0045)DAY296$75.00$75.00$75.00$75.00
328Special 101. salvage and reinstall underdrain endwalls (SPV.0060)EACH14$514.53$350.00$514.53$514.53
329Special 102. temporary access for sugar river structure construction and demolition (SPV.0060)EACH1$40,000$40,000$513,502$130,000
330Special 103. field office special (SPV.0060)EACH1$25,000$40,000$80,237$145,576
331Special 501. embedded galvanic anodes (SPV.0060)EACH79$45.00$45.00$100.00$50.00
332Special 502. cleaning and painting bearings (SPV.0060)EACH12$800.00$800.00$800.00$800.00
333Special 503. temporary support B- 13-0052 (SPV.0060)EACH1$5,000.00$5,000.01$6,792.69$7,500.00
334Special 504. temporary support B- 13-0383 (SPV.0060)EACH1$5,000.00$5,000.01$6,792.69$7,500.00
335Special 505. trench drain and grate (SPV.0060)EACH1$12,000$15,000$12,000$8,500.00
336Special 101. salvage and reinstall cable guard (SPV.0090)LF4,772$4.00$4.00$4.00$4.00
337Special 350. transport and install state furnished cat-5E cable (SPV.0090)LF240$1.00$2.00$1.00$1.00
338Special 501. strip seal gland replacement (SPV.0090)LF130$140.00$140.00$300.00$150.00
339Special 502. grout drilling (SPV.0090)LF1,136$130.00$130.00$130.00$130.00
340Special 101. limestone screenings path (SPV.0195)TON4$415.27$250.00$415.27$415.27
WisDOT contract 20250114001: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy