WisDOT contract 20250211014 bid tabulation
C Greenfield, S 43rd St; W Cold Spring Rd to W Howard Ave (LOC STR, Milwaukee County C Greenfield, S 43rd Street). Let by Wisconsin DOT on February 11, 2025, Milwaukee. 4 bids received; low bid $2,591,224 by Lalonde Contractors Incorporated.
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 176
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lalonde Contractors Incorporated | $2,591,224 | Low |
| 2 | Zignego Company, Inc. | $2,704,886 | +4.0% |
| 3 | A.W. Oakes & Son, Inc. | $2,793,722 | +8.0% |
| 4 | Stark Pavement Corporation | $3,001,123 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lalonde Contractors Incorporated | 2. Zignego Company, Inc. | 3. A.W. Oakes & Son, Inc. | 4. Stark Pavement Corporation |
|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 6 | $199.00 | $199.00 | $250.00 | $199.00 |
| 2 | Grubbing (201.0220) | ID | 244 | $12.99 | $12.99 | $15.00 | $12.99 |
| 3 | Removing concrete pavement (204.0100) | SY | 16,749 | $5.02 | $10.01 | $11.00 | $0.81 |
| 4 | Removing curb & gutter (204.0150) | LF | 39 | $7.05 | $20.00 | $20.00 | $5.72 |
| 5 | Removing concrete sidewalk (204.0155) | SY | 440 | $10.80 | $10.00 | $10.00 | $7.56 |
| 6 | Removing fence (204.0170) | LF | 51 | $5.00 | $4.00 | $5.00 | $4.00 |
| 7 | Removing concrete bases (204.0195) | EACH | 7 | $298.47 | $500.00 | $450.00 | $505.00 |
| 8 | Removing manholes (204.0210) | EACH | 4 | $350.00 | $350.00 | $625.00 | $350.00 |
| 9 | Removing catch basins (204.0215) | EACH | 10 | $250.00 | $250.00 | $470.00 | $250.00 |
| 10 | Removing inlets (204.0220) | EACH | 1 | $350.00 | $350.00 | $470.00 | $350.00 |
| 11 | Removing storm sewer (size) 12- inch (204.0245) | LF | 95 | $8.00 | $8.00 | $13.00 | $8.00 |
| 12 | Removing storm sewer (size) 18- inch (204.0245) | LF | 94 | $10.00 | $10.00 | $13.00 | $10.00 |
| 13 | Removing storm sewer (size) 21- inch (204.0245) | LF | 432 | $12.00 | $12.00 | $13.00 | $12.00 |
| 14 | Removing (item description) wooden bollard (204.9060.S) | EACH | 12 | $81.00 | $50.00 | $25.00 | $151.50 |
| 15 | Excavation common (205.0100) | CY | 9,408 | $14.54 | $15.65 | $7.00 | $24.40 |
| 16 | Finishing roadway (project) 01. ID 2155-15-70 (213.0100) | EACH | 1 | $2,756.00 | $1,000.00 | $2,500.00 | $8,500.00 |
| 17 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 4,529 | $17.37 | $21.75 | $21.00 | $19.25 |
| 18 | Breaker run (311.0110) | TON | 5,355 | $17.34 | $14.50 | $0.01 | $16.51 |
| 19 | Concrete pavement 8-inch (415.0080) | SY | 13,498 | $51.29 | $52.39 | $52.00 | $61.35 |
| 20 | Concrete pavement joint filling (415.4100) | SY | 15,166 | $1.53 | $1.00 | $2.00 | $2.30 |
| 21 | Drilled tie bars (416.0610) | EACH | 59 | $16.22 | $20.00 | $15.00 | $20.00 |
| 22 | Drilled dowel bars (416.0620) | EACH | 120 | $20.38 | $20.00 | $30.00 | $25.00 |
| 23 | Asphaltic surface driveways and field entrances (465.0120) | TON | 76 | $317.50 | $317.50 | $350.00 | $50.70 |
| 24 | Concrete collars for pipe (520.8000) | EACH | 8 | $350.00 | $350.00 | $600.00 | $350.00 |
| 25 | Concrete curb & gutter 19-inch (601.0319) | LF | 220 | $43.22 | $47.80 | $40.00 | $32.00 |
| 26 | Concrete curb & gutter 31-inch (601.0331) | LF | 5,671 | $21.98 | $23.05 | $21.50 | $24.75 |
| 27 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 20 | $44.65 | $58.64 | $50.00 | $32.00 |
| 28 | Concrete curb pedestrian (601.0600) | LF | 51 | $49.55 | $26.03 | $75.00 | $85.00 |
| 29 | Concrete sidewalk 5-inch (602.0410) | SF | 24,749 | $6.40 | $5.01 | $6.25 | $8.15 |
| 30 | Curb ramp detectable warning field natural patina (602.0515) | SF | 200 | $40.67 | $37.38 | $45.00 | $48.00 |
| 31 | Concrete driveway 7-inch (602.0815) | SY | 1,404 | $70.67 | $69.60 | $65.00 | $76.00 |
| 32 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 98 | $88.00 | $88.00 | $120.00 | $88.00 |
| 33 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 89 | $96.00 | $96.00 | $120.00 | $96.00 |
| 34 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 8 | $102.00 | $102.00 | $175.00 | $102.00 |
| 35 | Storm sewer pipe reinforced concrete class III 21-inch (608.0321) | LF | 446 | $114.00 | $114.00 | $152.00 | $114.00 |
| 36 | Storm sewer pipe reinforced concrete class III 42-inch (608.0342) | LF | 8 | $243.00 | $243.00 | $250.00 | $243.00 |
| 37 | Manhole covers type Q (611.0555) | EACH | 3 | $1,147.00 | $1,147.00 | $1,220.00 | $1,147.00 |
| 38 | Inlet covers type W (611.0657) | EACH | 11 | $1,644.00 | $1,644.00 | $1,800.00 | $1,644.00 |
| 39 | Manholes 4-FT diameter (611.2004) | EACH | 3 | $3,574.00 | $3,574.00 | $4,000.00 | $3,574.00 |
| 40 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $6,344.00 | $6,344.00 | $6,900.00 | $6,344.00 |
| 41 | Manholes 6-FT diameter (611.2006) | EACH | 1 | $7,292.00 | $7,292.00 | $8,900.00 | $7,292.00 |
| 42 | Adjusting catch basin covers (611.8105) | EACH | 1 | $556.00 | $556.00 | $530.00 | $556.00 |
| 43 | Adjusting manhole covers (611.8110) | EACH | 14 | $715.00 | $715.00 | $530.00 | $715.00 |
| 44 | Adjusting inlet covers (611.8115) | EACH | 13 | $715.00 | $715.00 | $530.00 | $715.00 |
| 45 | Cover plates temporary (611.8120.S) | EACH | 26 | $230.00 | $230.00 | $145.00 | $230.00 |
| 46 | Maintenance and repair of haul roads (project) 01. ID 2155-15-70 (618.0100) | EACH | 1 | $1.00 | $1.00 | $0.01 | $7,500.00 |
| 47 | Mobilization (619.1000) | EACH | 1 | $53,187 | $72,000 | $210,000 | $201,255 |
| 48 | Concrete median sloped nose (620.0300) | SF | 214 | $16.87 | $18.06 | $15.00 | $15.00 |
| 49 | Water (624.0100) | MGAL | 46 | $0.01 | $50.00 | $25.00 | $36.14 |
| 50 | Topsoil (625.0100) | SY | 9,705 | $4.80 | $4.80 | $5.00 | $4.80 |
| 51 | Mulching (627.0200) | SY | 1,941 | $0.55 | $0.01 | $0.01 | $0.01 |
| 52 | Erosion bales (628.1104) | EACH | 25 | $12.00 | $0.01 | $0.01 | $0.01 |
| 53 | Silt fence (628.1504) | LF | 139 | $2.05 | $5.00 | $5.00 | $5.00 |
| 54 | Silt fence maintenance (628.1520) | LF | 139 | $0.01 | $0.01 | $0.01 | $0.01 |
| 55 | Mobilizations erosion control (628.1905) | EACH | 3 | $100.00 | $50.00 | $50.00 | $50.00 |
| 56 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $100.00 | $1.00 | $1.00 | $1.00 |
| 57 | Erosion mat urban class I type A (628.2006) | SY | 9,705 | $1.70 | $2.01 | $2.20 | $2.01 |
| 58 | Inlet protection type A (628.7005) | EACH | 33 | $95.00 | $50.00 | $55.00 | $50.00 |
| 59 | Inlet protection type B (628.7010) | EACH | 3 | $50.00 | $50.00 | $55.00 | $50.00 |
| 60 | Inlet protection type C (628.7015) | EACH | 35 | $55.00 | $71.00 | $72.00 | $71.00 |
| 61 | Inlet protection type D (628.7020) | EACH | 5 | $80.00 | $128.00 | $130.00 | $128.00 |
| 62 | Tracking pads (628.7560) | EACH | 2 | $1.00 | $1.00 | $0.01 | $505.00 |
| 63 | Fertilizer type B (629.0210) | CWT | 6.10 | $80.00 | $80.00 | $85.00 | $80.00 |
| 64 | Seeding mixture no. 40 (630.0140) | LB | 175 | $12.25 | $10.00 | $11.00 | $10.00 |
| 65 | Seeding temporary (630.0200) | LB | 52 | $3.25 | $3.00 | $5.00 | $3.00 |
| 66 | Seed water (630.0500) | MGAL | 261 | $12.00 | $10.00 | $12.00 | $10.00 |
| 67 | Signs type II reflective H (637.2210) | SF | 213.50 | $20.00 | $21.90 | $23.00 | $21.90 |
| 68 | Signs type II reflective H folding (637.2215) | SF | 20.72 | $29.00 | $24.00 | $25.00 | $24.00 |
| 69 | Signs type II reflective F (637.2230) | SF | 6 | $23.00 | $22.90 | $25.00 | $22.90 |
| 70 | Moving signs type II (638.2102) | EACH | 19 | $105.00 | $77.00 | $77.00 | $77.00 |
| 71 | Removing signs type II (638.2602) | EACH | 13 | $28.00 | $13.00 | $15.00 | $13.00 |
| 72 | Removing small sign supports (638.3000) | EACH | 9 | $28.00 | $9.00 | $10.00 | $9.00 |
| 73 | Moving small sign supports (638.4000) | EACH | 8 | $80.00 | $40.00 | $40.00 | $40.00 |
| 74 | Field office type C (642.5201) | EACH | 1 | $20,768 | $20,000 | $20,000 | $10,000 |
| 75 | Traffic control drums (643.0300) | DAY | 5,072 | $0.22 | $0.05 | $0.25 | $0.22 |
| 76 | Traffic control barricades type III (643.0420) | DAY | 1,893 | $0.65 | $0.70 | $0.75 | $0.65 |
| 77 | Traffic control flexible tubular marker posts (643.0500) | EACH | 30 | $14.00 | $35.00 | $15.00 | $14.00 |
| 78 | Traffic control flexible tubular marker bases (643.0600) | EACH | 30 | $14.00 | $2.00 | $15.00 | $14.00 |
| 79 | Traffic control warning lights type A (643.0705) | DAY | 3,786 | $0.11 | $0.10 | $0.20 | $0.11 |
| 80 | Traffic control warning lights type C (643.0715) | DAY | 954 | $0.25 | $0.15 | $0.25 | $0.25 |
| 81 | Traffic control arrow boards (643.0800) | DAY | 117 | $9.00 | $5.00 | $10.00 | $9.00 |
| 82 | Traffic control signs (643.0900) | DAY | 18,176 | $0.22 | $0.34 | $0.25 | $0.22 |
| 83 | Traffic control signs PCMS (643.1050) | DAY | 14 | $35.00 | $50.00 | $40.00 | $35.00 |
| 84 | Temporary marking line removable tape 6-inch (643.3180) | LF | 1,772 | $2.37 | $1.80 | $2.50 | $2.37 |
| 85 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 38 | $9.95 | $4.00 | $10.00 | $9.95 |
| 86 | Traffic control (643.5000) | EACH | 1 | $15,000 | $19,400 | $23,000 | $15,000 |
| 87 | Temporary pedestrian surface plate (644.1430) | SF | 1,277 | $2.00 | $5.00 | $2.00 | $2.00 |
| 88 | Temporary pedestrian curb ramp (644.1601) | DAY | 535 | $5.25 | $1.00 | $5.50 | $5.25 |
| 89 | Temporary pedestrian detectable warning field (644.1605) | SF | 98 | $10.50 | $50.00 | $11.00 | $10.50 |
| 90 | Temporary pedestrian barricade (644.1810) | LF | 1,077 | $8.50 | $2.50 | $9.00 | $8.50 |
| 91 | Geotextile type HR (645.0120) | SY | 50 | $8.28 | $10.00 | $1.00 | $5.05 |
| 92 | Marking line epoxy 4-inch (646.1020) | LF | 14,207 | $0.83 | $0.83 | $1.00 | $0.83 |
| 93 | Marking line epoxy 8-inch (646.3020) | LF | 828 | $1.65 | $1.65 | $1.75 | $1.65 |
| 94 | Marking arrow epoxy (646.5020) | EACH | 32 | $200.00 | $200.00 | $200.00 | $200.00 |
| 95 | Marking symbol epoxy (646.5220) | EACH | 19 | $220.00 | $220.00 | $225.00 | $220.00 |
| 96 | Marking stop line epoxy 18-inch (646.6120) | LF | 188 | $13.00 | $13.00 | $13.00 | $13.00 |
| 97 | Marking diagonal epoxy 12-inch (646.7120) | LF | 273 | $9.50 | $9.50 | $10.00 | $9.50 |
| 98 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 904 | $10.00 | $10.00 | $10.00 | $10.00 |
| 99 | Marking curb epoxy (646.8120) | LF | 40 | $8.25 | $8.25 | $8.50 | $8.25 |
| 100 | Marking island nose epoxy (646.8220) | EACH | 4 | $275.00 | $275.00 | $275.00 | $275.00 |
| 101 | Marking removal line water blasting 4-inch (646.9010) | LF | 1,754 | $0.60 | $1.00 | $1.00 | $0.60 |
| 102 | Marking removal line water blasting 8-inch (646.9110) | LF | 362 | $1.20 | $2.00 | $1.25 | $1.20 |
| 103 | Marking removal line water blasting wide (646.9210) | LF | 41 | $8.00 | $10.00 | $10.00 | $8.00 |
| 104 | Construction staking storm sewer (650.4000) | EACH | 15 | $120.00 | $120.00 | $140.00 | $115.00 |
| 105 | Construction staking subgrade (650.4500) | LF | 1,053 | $0.01 | $0.01 | $0.01 | $2.25 |
| 106 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 20 | $1.00 | $1.00 | $2.00 | $0.01 |
| 107 | Construction staking concrete pavement (650.7000) | LF | 2,703 | $1.80 | $1.80 | $0.01 | $1.75 |
| 108 | Construction staking electrical installations (project) 01. ID 2155- 15-70 (650.8501) | EACH | 1 | $1,600.00 | $1,600.00 | $3,000.00 | $1,500.00 |
| 109 | Construction staking curb ramps (650.9000) | EACH | 18 | $130.00 | $130.00 | $125.00 | $125.00 |
| 110 | Construction staking sidewalk (project) 01. ID 2155-15-70 (650.9500) | EACH | 1 | $3,200.00 | $3,200.00 | $3,000.00 | $1,500.00 |
| 111 | Construction staking supplemental control (project) 01. ID 2155-15-70 (650.9911) | EACH | 1 | $700.00 | $700.00 | $3,000.00 | $1,500.00 |
| 112 | Construction staking slope stakes (650.9920) | LF | 2,703 | $0.80 | $0.80 | $1.00 | $0.70 |
| 113 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 3,370 | $8.51 | $8.51 | $9.00 | $8.51 |
| 114 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 1,301 | $11.15 | $11.15 | $12.00 | $11.15 |
| 115 | Conduit rigid nonmetallic schedule 80 3-inch (652.0335) | LF | 156 | $12.75 | $12.75 | $13.00 | $12.75 |
| 116 | Pull boxes steel 24X42-inch (653.0140) | EACH | 8 | $1,313.40 | $1,313.40 | $1,320.00 | $1,313.40 |
| 117 | Removing pull boxes (653.0905) | EACH | 4 | $81.00 | $81.00 | $82.00 | $81.00 |
| 118 | Concrete bases type 1 (654.0101) | EACH | 6 | $1,058.00 | $1,058.00 | $1,060.00 | $1,058.00 |
| 119 | Concrete bases type 5 (654.0105) | EACH | 18 | $1,243.80 | $1,243.80 | $1,245.00 | $1,243.80 |
| 120 | Concrete bases type 10 (654.0110) | EACH | 2 | $6,278.00 | $6,278.00 | $6,280.00 | $6,278.00 |
| 121 | Concrete bases type 10-special (654.0120) | EACH | 2 | $9,025.00 | $9,025.00 | $9,050.00 | $9,025.00 |
| 122 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,840.00 | $2,840.00 | $2,850.00 | $2,840.00 |
| 123 | Cable traffic signal 5-14 AWG (655.0230) | LF | 762 | $1.61 | $1.61 | $2.00 | $1.61 |
| 124 | Cable traffic signal 7-14 AWG (655.0240) | LF | 231 | $2.29 | $2.29 | $2.50 | $2.29 |
| 125 | Cable traffic signal 9-14 AWG (655.0250) | LF | 221 | $2.79 | $2.79 | $3.00 | $2.79 |
| 126 | Cable traffic signal 12-14 AWG (655.0260) | LF | 1,109 | $3.44 | $3.44 | $3.50 | $3.44 |
| 127 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 565 | $2.39 | $2.39 | $2.50 | $2.39 |
| 128 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,334 | $1.32 | $1.32 | $1.50 | $1.32 |
| 129 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,388 | $0.80 | $0.80 | $1.00 | $0.80 |
| 130 | Electrical wire lighting 4 AWG (655.0630) | LF | 16,415 | $2.49 | $2.49 | $2.50 | $2.49 |
| 131 | Traffic signal evp detector cable (655.0900) | LF | 888 | $1.75 | $1.75 | $2.00 | $1.75 |
| 132 | Electrical service meter breaker pedestal (location) S 43RD ST & W cold spring RD (656.0201) | EACH | 1 | $1,460.00 | $1,460.00 | $1,500.00 | $1,460.00 |
| 133 | Traffic signal face 3S 12-inch (658.0173) | EACH | 20 | $911.00 | $911.00 | $920.00 | $911.00 |
| 134 | Pedestrian signal face 16-inch (658.0416) | EACH | 8 | $1,121.00 | $1,121.00 | $1,130.00 | $1,121.00 |
| 135 | Signal mounting hardware (location) S 43RD ST & W cold spring RD (658.5070) | EACH | 1 | $7,167.00 | $7,167.00 | $7,200.00 | $7,167.00 |
| 136 | Sawing asphalt (690.0150) | LF | 313 | $1.15 | $1.69 | $1.25 | $1.15 |
| 137 | Sawing concrete (690.0250) | LF | 555 | $2.25 | $2.50 | $2.50 | $2.25 |
| 138 | Incentive compressive strength concrete pavement (715.0720) | DOL | 4,056 | $1.00 | $1.00 | $1.00 | $1.00 |
| 139 | Incentive iri ride (740.0440) | DOL | 2,048 | $1.00 | $1.00 | $1.00 | $1.00 |
| 140 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,625 | $5.00 | $5.00 | $5.00 | $5.00 |
| 141 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,600 | $5.00 | $5.00 | $5.00 | $5.00 |
| 142 | Special 01. inlets 3X6-FT (SPV.0060) | EACH | 2 | $4,095.00 | $4,095.00 | $5,600.00 | $4,095.00 |
| 143 | Special 02. catch basins 2X2.5-FT (SPV.0060) | EACH | 7 | $2,565.00 | $2,565.00 | $3,200.00 | $2,565.00 |
| 144 | Special 03. adjust sanitary manhole with internal/external seal (SPV.0060) | EACH | 10 | $983.00 | $983.00 | $2,100.00 | $983.00 |
| 145 | Special 04. tree root cutting and removal (SPV.0060) | EACH | 30 | $101.70 | $449.00 | $250.00 | $449.00 |
| 146 | Special 05. reconnect storm sewer laterals (SPV.0060) | EACH | 10 | $256.00 | $256.00 | $700.00 | $256.00 |
| 147 | Special 06. fluid thermal backfill (SPV.0060) | EACH | 1 | $786.00 | $786.00 | $830.00 | $786.00 |
| 148 | Special 07. luminaire fixture A (SPV.0060) | EACH | 20 | $2,089.80 | $2,089.80 | $2,100.00 | $2,089.80 |
| 149 | Special 08. luminaire fixture B (SPV.0060) | EACH | 2 | $2,089.80 | $2,089.80 | $2,100.00 | $2,089.80 |
| 150 | Special 09. light pole (30-FT) black (SPV.0060) | EACH | 16 | $2,862.40 | $2,862.40 | $2,875.00 | $2,862.40 |
| 151 | Special 10. light pole (23-FT) black (SPV.0060) | EACH | 2 | $2,527.40 | $2,527.40 | $2,550.00 | $2,527.40 |
| 152 | Special 11. luminaire arm member 4 1/2-inch clamp (6-FT) black (SPV.0060) | EACH | 16 | $354.50 | $354.50 | $400.00 | $354.50 |
| 153 | Special 12. transformer bases breakaway 11 1/2 inch bolt circle black (SPV.0060) | EACH | 18 | $673.00 | $673.00 | $700.00 | $673.00 |
| 154 | Special 13. pull boxes 13-inch X 24- inch X 12-inch (SPV.0060) | EACH | 9 | $927.00 | $927.00 | $950.00 | $927.00 |
| 155 | Special 14. lighting cabinet modifications (SPV.0060) | EACH | 1 | $4,732.00 | $4,732.00 | $4,800.00 | $4,732.00 |
| 156 | Special 15. adjusting water valve boxes (SPV.0060) | EACH | 43 | $338.76 | $500.00 | $170.00 | $550.00 |
| 157 | Special 16. adjusting water manhole (SPV.0060) | EACH | 1 | $762.00 | $762.00 | $530.00 | $762.00 |
| 158 | Special 17. round steel post sign system (SPV.0060) | EACH | 29 | $215.00 | $320.00 | $325.00 | $320.00 |
| 159 | Special 19. utility line opening (SPV.0060) | EACH | 15 | $328.00 | $1.00 | $800.00 | $1,212.00 |
| 160 | Special 20. pedestal bases black (SPV.0060) | EACH | 6 | $305.00 | $305.00 | $325.00 | $305.00 |
| 161 | Special 21. poles type 10 black (SPV.0060) | EACH | 2 | $8,675.90 | $8,675.90 | $8,700.00 | $8,675.90 |
| 162 | Special 22. poles type 10-special black (SPV.0060) | EACH | 2 | $10,363 | $10,363 | $10,400 | $10,363 |
| 163 | Special 23. traffic signal standards aluminum 13-FT (SPV.0060) | EACH | 4 | $702.50 | $702.50 | $720.00 | $702.50 |
| 164 | Special 24. traffic signal standards aluminum 10-FT (SPV.0060) | EACH | 2 | $605.50 | $605.50 | $620.00 | $605.50 |
| 165 | Special 25. monotube arms 30-FT black (SPV.0060) | EACH | 2 | $6,454.00 | $6,454.00 | $6,500.00 | $6,454.00 |
| 166 | Special 26. monotube arms 35-FT- special black (SPV.0060) | EACH | 1 | $6,543.50 | $6,543.50 | $6,700.00 | $6,543.50 |
| 167 | Special 27. monotube arms 40-FT- special black (SPV.0060) | EACH | 1 | $6,781.00 | $6,781.00 | $6,800.00 | $6,781.00 |
| 168 | Special 28. luminaire arms steel 10-FT black (SPV.0060) | EACH | 4 | $1,210.00 | $1,210.00 | $1,250.00 | $1,210.00 |
| 169 | Special 29. emergency vehicle preemption system, S 43RD ST & W cold spring RD (SPV.0060) | EACH | 1 | $11,666 | $11,666 | $12,000 | $11,666 |
| 170 | Special 30. traffic signal cabinet and controller, S 43RD ST & W cold spring RD (SPV.0060) | EACH | 1 | $25,854 | $25,854 | $26,000 | $25,854 |
| 171 | Special 31. vehicle video detection system, S 43RD ST & W cold spring RD (SPV.0060) | EACH | 1 | $28,725 | $28,725 | $29,000 | $28,725 |
| 172 | Special 32. APS push button system & buttons, S 43RD ST & W cold spring RD (SPV.0060) | EACH | 1 | $10,854 | $10,854 | $11,000 | $10,854 |
| 173 | Special 33. pull boxes 17-inch X 30-inch X 24-inch (SPV.0060) | EACH | 5 | $1,244.00 | $1,244.00 | $1,250.00 | $1,244.00 |
| 174 | Special 34. section corner monuments (SPV.0060) | EACH | 1 | $1,572.00 | $1,000.00 | $500.00 | $1,500.00 |
| 175 | Special 01. timber fence (SPV.0090) | LF | 70 | $80.00 | $64.00 | $65.00 | $64.00 |
| 176 | Special 02. staked wattles (SPV.0090) | LF | 915 | $6.95 | $8.00 | $10.00 | $8.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.