WisDOT contract 20250311013 bid tabulation
C Oak Creek W Rawson Avenue; S 13th Street to S Howell Avenue (CTH BB, Milwaukee County C Oak Creek W Rawson Avenue). Let by Wisconsin DOT on March 11, 2025, Milwaukee. 5 bids received; low bid $8,145,685 by A.W. Oakes & Son, Inc..
- Owner
- Wisconsin DOT
- Letting
- 11 MAR 2025
- Pay items
- 215
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A.W. Oakes & Son, Inc. | $8,145,685 | Low |
| 2 | Michels Road & Stone, Inc. | $8,181,159 | 0.0% |
| 3 | Stark Pavement Corporation | $8,369,668 | +3.0% |
| 4 | Zignego Company, Inc. | $8,429,729 | +3.0% |
| 5 | Lalonde Contractors Incorporated | $8,720,149 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A.W. Oakes & Son, Inc. | 2. Michels Road & Stone, Inc. | 3. Stark Pavement Corporation | 4. Zignego Company, Inc. | 5. Lalonde Contractors Incorporated |
|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0220) | ID | 60 | $35.00 | $54.89 | $54.89 | $20.00 | $30.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 48,250 | $11.00 | $3.00 | $3.00 | $3.00 | $5.04 |
| 3 | Removing curb & gutter (204.0150) | LF | 2,450 | $5.50 | $2.00 | $2.00 | $2.00 | $6.32 |
| 4 | Removing concrete sidewalk (204.0155) | SY | 50 | $10.19 | $8.00 | $8.00 | $8.00 | $10.94 |
| 5 | Removing concrete bases (204.0195) | EACH | 47 | $350.00 | $220.00 | $220.00 | $220.00 | $313.99 |
| 6 | Removing manholes (204.0210) | EACH | 16 | $430.00 | $380.00 | $380.00 | $380.00 | $1,161.00 |
| 7 | Removing inlets (204.0220) | EACH | 49 | $360.00 | $234.00 | $234.00 | $234.00 | $594.00 |
| 8 | Removing storm sewer (size) 12. 12 inch (204.0245) | LF | 2,600 | $13.00 | $15.00 | $15.00 | $15.00 | $24.00 |
| 9 | Removing storm sewer (size) 18. 18-inch (204.0245) | LF | 220 | $15.00 | $16.00 | $16.00 | $16.00 | $22.00 |
| 10 | Removing storm sewer (size) 24. 24-inch (204.0245) | LF | 80 | $16.00 | $16.00 | $16.00 | $16.00 | $22.00 |
| 11 | Removing (item description) 01. traffic signal equipment at CTH V & CTH BB (204.9060.S) | EACH | 1 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 12 | Removing (item description) 02. traffic signal equipment at S 10TH ST & CTH BB (204.9060.S) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 13 | Removing (item description) 03. traffic signal equipment at S 6TH ST & CTH BB (204.9060.S) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 14 | Excavation common (205.0100) | CY | 48,600 | $14.05 | $17.00 | $17.00 | $17.00 | $0.01 |
| 15 | Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S) | TON | 1,100 | $36.69 | $41.00 | $41.00 | $41.00 | $48.54 |
| 16 | Excavation for structures culverts (structure) 01. B-40-389 (206.2001) | EACH | 1 | $2,500.00 | $7,969.00 | $2,500.00 | $7,969.00 | $7,969.00 |
| 17 | Finishing roadway (project) 01. 2050-08-71 (213.0100) | EACH | 1 | $3,000.00 | $7,500.00 | $10,000 | $1,000.00 | $3,408.00 |
| 18 | Base aggregate dense 3/4-inch (305.0110) | TON | 80 | $46.79 | $47.00 | $47.00 | $47.00 | $0.01 |
| 19 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 28,560 | $0.01 | $11.00 | $11.00 | $11.00 | $0.01 |
| 20 | Base aggregate dense 3-inch (305.0130) | TON | 8,000 | $0.01 | $11.00 | $11.00 | $11.00 | $0.01 |
| 21 | Concrete pavement 10-inch (415.0100) | SY | 53,000 | $58.80 | $54.01 | $58.70 | $59.13 | $0.01 |
| 22 | Concrete pavement gaps (415.0210) | EACH | 5 | $1,000.00 | $800.00 | $1,500.00 | $1,000.00 | $1,133.00 |
| 23 | Drilled tie bars (416.0610) | EACH | 100 | $15.00 | $14.78 | $15.00 | $20.00 | $12.72 |
| 24 | Drilled dowel bars (416.0620) | EACH | 150 | $30.00 | $17.69 | $25.00 | $20.00 | $16.61 |
| 25 | Tack coat (455.0605) | GAL | 460 | $3.00 | $3.00 | $3.00 | $3.25 | $3.00 |
| 26 | Incentive density HMA pavement (460.2000) | DOL | 70 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 27 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 150 | $131.00 | $131.00 | $120.00 | $140.00 | $131.00 |
| 28 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 60 | $131.00 | $131.00 | $120.00 | $270.00 | $131.00 |
| 29 | Asphaltic surface driveways and field entrances (465.0120) | TON | 170 | $131.00 | $131.00 | $120.00 | $150.00 | $131.00 |
| 30 | Asphaltic surface temporary (465.0125) | TON | 670 | $72.00 | $72.00 | $71.50 | $89.00 | $72.00 |
| 31 | Cold patch (495.1000.S) | TON | 5 | $600.00 | $300.00 | $750.00 | $500.00 | $0.01 |
| 32 | Adhesive anchors no. 5 bar (502.4205) | EACH | 50 | $25.00 | $26.00 | $25.00 | $26.00 | $26.00 |
| 33 | Concrete masonry culverts (504.0100) | CY | 2 | $9,000.00 | $984.00 | $9,000.00 | $984.00 | $984.00 |
| 34 | Bar steel reinforcement HS structures (505.0400) | LB | 190 | $15.00 | $2.45 | $15.00 | $2.45 | $2.45 |
| 35 | Concrete surface repair (509.1500) | SF | 20 | $175.00 | $105.00 | $175.00 | $105.00 | $105.00 |
| 36 | Apron endwalls for culvert pipe 12- inch (520.1012) | EACH | 1 | $1,050.00 | $1,225.00 | $1,225.00 | $1,225.00 | $1,313.00 |
| 37 | Concrete collars for pipe (520.8000) | EACH | 5 | $380.00 | $816.00 | $816.00 | $816.00 | $802.00 |
| 38 | Concrete curb & gutter 19-inch (601.0319) | LF | 1,200 | $26.25 | $23.75 | $17.75 | $22.00 | $24.87 |
| 39 | Concrete curb & gutter 31-inch (601.0331) | LF | 21,730 | $22.00 | $24.50 | $19.75 | $22.00 | $0.01 |
| 40 | Concrete curb pedestrian (601.0600) | LF | 1,100 | $33.00 | $35.25 | $28.00 | $40.00 | $45.48 |
| 41 | Concrete sidewalk 5-inch (602.0410) | SF | 76,500 | $6.25 | $5.00 | $5.60 | $6.01 | $7.08 |
| 42 | Concrete sidewalk 7-inch (602.0420) | SF | 6,000 | $7.00 | $6.00 | $7.05 | $7.00 | $8.66 |
| 43 | Curb ramp detectable warning field natural patina (602.0515) | SF | 270 | $43.00 | $32.75 | $45.00 | $40.00 | $40.69 |
| 44 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 200 | $65.00 | $37.25 | $55.00 | $55.00 | $56.03 |
| 45 | Concrete driveway 7-inch (602.0815) | SY | 550 | $62.00 | $73.70 | $64.00 | $70.00 | $75.16 |
| 46 | Concrete driveway hes 7-inch (602.0865) | SY | 150 | $67.00 | $76.60 | $85.00 | $77.00 | $77.58 |
| 47 | Riprap medium (606.0200) | CY | 26 | $210.00 | $109.00 | $109.00 | $109.00 | $95.00 |
| 48 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 430 | $86.00 | $80.00 | $80.00 | $80.00 | $90.00 |
| 49 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 640 | $88.00 | $84.00 | $84.00 | $84.00 | $92.00 |
| 50 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 210 | $137.00 | $110.00 | $110.00 | $110.00 | $141.00 |
| 51 | Storm sewer pipe reinforced concrete class V 12-inch (608.0512) | LF | 1,880 | $86.00 | $86.00 | $86.00 | $86.00 | $94.00 |
| 52 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 35 | $80.00 | $193.00 | $193.00 | $193.00 | $165.00 |
| 53 | Reconstructing manholes (611.0420) | EACH | 7 | $1,300.00 | $1,800.00 | $1,800.00 | $1,800.00 | $1,138.00 |
| 54 | Reconstructing inlets (611.0430) | EACH | 3 | $700.00 | $1,800.00 | $1,800.00 | $1,800.00 | $1,333.00 |
| 55 | Inlet covers type C (611.0612) | EACH | 13 | $630.00 | $1,170.00 | $1,170.00 | $1,170.00 | $898.00 |
| 56 | Catch basins 4-FT diameter (611.1004) | EACH | 69 | $3,130.00 | $3,094.00 | $3,094.00 | $3,094.00 | $2,960.00 |
| 57 | Manholes 4-FT diameter (611.2004) | EACH | 11 | $2,895.00 | $3,603.00 | $3,603.00 | $3,603.00 | $4,130.00 |
| 58 | Manholes 5-FT diameter (611.2005) | EACH | 4 | $5,000.00 | $5,731.00 | $5,731.00 | $5,731.00 | $5,742.00 |
| 59 | Inlets 2X2.5-FT (611.3225) | EACH | 9 | $2,525.00 | $2,229.00 | $2,229.00 | $2,229.00 | $2,368.00 |
| 60 | Adjusting manhole covers (611.8110) | EACH | 16 | $520.00 | $833.00 | $833.00 | $833.00 | $651.00 |
| 61 | Adjusting inlet covers (611.8115) | EACH | 6 | $520.00 | $864.00 | $864.00 | $864.00 | $651.00 |
| 62 | Cover plates temporary (611.8120.S) | EACH | 10 | $170.00 | $95.00 | $95.00 | $95.00 | $148.67 |
| 63 | Fence chain link 6-FT (616.0206) | LF | 360 | $33.55 | $33.55 | $33.55 | $33.55 | $33.55 |
| 64 | Mobilization (619.1000) | EACH | 1 | $375,000 | $422,201 | $490,000 | $470,000 | $5,357,954 |
| 65 | Concrete median sloped nose (620.0300) | SF | 1,500 | $15.00 | $18.00 | $16.00 | $16.00 | $16.31 |
| 66 | Water (624.0100) | MGAL | 50 | $64.00 | $155.00 | $155.00 | $155.00 | $34.71 |
| 67 | Topsoil (625.0100) | SY | 13,000 | $6.90 | $7.00 | $7.30 | $7.00 | $4.80 |
| 68 | Silt fence (628.1504) | LF | 1,000 | $2.12 | $2.00 | $2.12 | $1.95 | $1.95 |
| 69 | Silt fence maintenance (628.1520) | LF | 1,000 | $0.01 | $0.05 | $0.01 | $0.01 | $0.01 |
| 70 | Mobilizations erosion control (628.1905) | EACH | 4 | $50.00 | $50.00 | $50.00 | $100.00 | $100.00 |
| 71 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $20.00 | $50.00 | $20.00 | $100.00 | $100.00 |
| 72 | Erosion mat urban class I type B (628.2008) | SY | 12,000 | $1.99 | $1.85 | $1.99 | $1.75 | $1.75 |
| 73 | Soil stabilizer type B (628.6510) | ACRE | 3.60 | $10.00 | $850.00 | $10.00 | $775.00 | $775.00 |
| 74 | Inlet protection type A (628.7005) | EACH | 5 | $50.00 | $125.00 | $50.00 | $90.00 | $90.00 |
| 75 | Inlet protection type B (628.7010) | EACH | 70 | $50.00 | $60.00 | $50.00 | $50.00 | $50.00 |
| 76 | Inlet protection type C (628.7015) | EACH | 5 | $70.00 | $60.00 | $70.00 | $52.00 | $52.00 |
| 77 | Inlet protection type D (628.7020) | EACH | 15 | $125.00 | $115.00 | $125.00 | $80.00 | $80.00 |
| 78 | Temporary ditch checks (628.7504) | LF | 5 | $10.00 | $20.00 | $10.00 | $5.95 | $5.95 |
| 79 | Culvert pipe checks (628.7555) | EACH | 5 | $23.00 | $45.00 | $23.00 | $18.00 | $18.00 |
| 80 | Rock bags (628.7570) | EACH | 60 | $13.00 | $12.00 | $13.00 | $12.00 | $12.00 |
| 81 | Fertilizer type B (629.0210) | CWT | 7 | $80.00 | $100.00 | $80.00 | $80.00 | $80.00 |
| 82 | Seeding mixture no. 30 (630.0130) | LB | 250 | $9.00 | $9.85 | $9.00 | $8.25 | $8.25 |
| 83 | Seeding temporary (630.0200) | LB | 10 | $3.00 | $9.85 | $3.00 | $3.35 | $3.35 |
| 84 | Seed water (630.0500) | MGAL | 300 | $10.00 | $17.50 | $10.00 | $12.00 | $12.00 |
| 85 | Sod water (631.0300) | MGAL | 50 | $25.00 | $40.00 | $25.00 | $40.00 | $40.00 |
| 86 | Sod lawn (631.1000) | SY | 1,600 | $6.30 | $10.00 | $6.30 | $6.75 | $6.75 |
| 87 | Posts tubular steel 2X2-inch X 11- FT (634.0811) | EACH | 63 | $200.00 | $215.00 | $200.00 | $165.00 | $165.00 |
| 88 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 38 | $200.00 | $215.00 | $200.00 | $175.00 | $175.00 |
| 89 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 8 | $200.00 | $215.00 | $200.00 | $185.00 | $185.00 |
| 90 | Signs type II reflective H (637.2210) | SF | 820.21 | $22.00 | $19.10 | $21.90 | $20.00 | $20.00 |
| 91 | Signs type II reflective H folding (637.2215) | SF | 103.60 | $30.00 | $28.10 | $29.90 | $26.00 | $26.00 |
| 92 | Signs type II reflective F (637.2230) | SF | 95 | $24.00 | $19.10 | $23.90 | $22.00 | $22.00 |
| 93 | Signs type II reflective F folding (637.2235) | SF | 27 | $31.00 | $28.10 | $30.90 | $35.00 | $35.00 |
| 94 | Removing signs type II (638.2602) | EACH | 116 | $15.00 | $35.00 | $15.00 | $28.00 | $28.00 |
| 95 | Removing small sign supports (638.3000) | EACH | 60 | $18.00 | $35.00 | $18.00 | $28.00 | $28.00 |
| 96 | Traffic control drums (643.0300) | DAY | 185,000 | $0.15 | $0.10 | $0.10 | $0.08 | $0.10 |
| 97 | Traffic control barricades type III (643.0420) | DAY | 30,000 | $0.60 | $0.55 | $0.55 | $0.25 | $0.55 |
| 98 | Traffic control flexible tubular marker posts (643.0500) | EACH | 1,200 | $28.00 | $28.00 | $28.00 | $20.00 | $28.00 |
| 99 | Traffic control flexible tubular marker bases (643.0600) | EACH | 1,200 | $2.00 | $2.00 | $2.00 | $8.00 | $2.00 |
| 100 | Traffic control warning lights type A (643.0705) | DAY | 60,000 | $0.15 | $0.10 | $0.10 | $0.05 | $0.10 |
| 101 | Traffic control warning lights type C (643.0715) | DAY | 30,000 | $0.15 | $0.10 | $0.10 | $0.07 | $0.10 |
| 102 | Traffic control arrow boards (643.0800) | DAY | 1,500 | $10.00 | $8.00 | $8.00 | $10.00 | $8.00 |
| 103 | Traffic control signs (643.0900) | DAY | 56,000 | $0.40 | $0.35 | $0.35 | $0.15 | $0.35 |
| 104 | Traffic control covering signs type II (643.0920) | EACH | 10 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 105 | Traffic control signs PCMS (643.1050) | DAY | 150 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 106 | Temporary marking line removable tape 6-inch (643.3180) | LF | 50,000 | $1.10 | $1.05 | $1.05 | $1.25 | $1.05 |
| 107 | Temporary marking line removable tape 10-inch (643.3280) | LF | 6,000 | $1.50 | $1.50 | $1.50 | $3.00 | $1.50 |
| 108 | Temporary marking arrow removable tape (643.3550) | EACH | 35 | $65.00 | $65.00 | $65.00 | $50.00 | $65.00 |
| 109 | Temporary marking word removable tape (643.3650) | EACH | 10 | $75.00 | $75.00 | $75.00 | $50.00 | $75.00 |
| 110 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 300 | $3.50 | $3.50 | $3.50 | $5.00 | $3.50 |
| 111 | Temporary marking diagonal removable tape 12-inch (643.3950) | LF | 200 | $3.00 | $3.00 | $3.00 | $4.00 | $3.00 |
| 112 | Traffic control (643.5000) | EACH | 1 | $55,000 | $54,331 | $54,331 | $15,000 | $54,331 |
| 113 | Temporary pedestrian surface matting (644.1440) | SF | 50 | $12.00 | $12.00 | $12.00 | $20.00 | $12.00 |
| 114 | Temporary pedestrian curb ramp (644.1601) | DAY | 120 | $6.00 | $6.00 | $6.00 | $10.00 | $6.00 |
| 115 | Temporary pedestrian detectable warning field (644.1605) | SF | 50 | $6.00 | $6.00 | $6.00 | $100.00 | $6.00 |
| 116 | Temporary pedestrian barricade (644.1810) | LF | 200 | $6.00 | $6.00 | $6.00 | $5.00 | $6.00 |
| 117 | Geotextile type HR (645.0120) | SY | 89 | $8.00 | $2.00 | $2.00 | $2.00 | $4.50 |
| 118 | Geotextile type R (645.0130) | SY | 70 | $3.00 | $2.00 | $2.00 | $2.00 | $4.44 |
| 119 | Geogrid type SR (645.0220) | SY | 6,000 | $1.64 | $2.00 | $2.00 | $2.00 | $1.81 |
| 120 | Marking line epoxy 6-inch (646.2020) | LF | 21,000 | $0.65 | $0.65 | $0.66 | $0.65 | $0.65 |
| 121 | Marking line epoxy 10-inch (646.4020) | LF | 8,000 | $1.10 | $1.10 | $1.12 | $1.10 | $1.10 |
| 122 | Marking arrow epoxy (646.5020) | EACH | 60 | $225.00 | $225.00 | $227.25 | $225.00 | $225.00 |
| 123 | Marking word epoxy (646.5120) | EACH | 28 | $250.00 | $250.00 | $252.50 | $250.00 | $250.00 |
| 124 | Marking stop line epoxy 18-inch (646.6120) | LF | 1,000 | $13.00 | $13.00 | $13.13 | $13.00 | $13.00 |
| 125 | Marking yield line epoxy 18-inch (646.6220) | EACH | 14 | $65.00 | $65.00 | $65.65 | $65.00 | $65.00 |
| 126 | Cold weather marking epoxy 6-inch (646.6466) | LF | 7,000 | $0.65 | $0.65 | $0.66 | $0.65 | $0.65 |
| 127 | Cold weather marking epoxy 10- inch (646.6470) | LF | 7,500 | $1.10 | $1.10 | $1.12 | $1.10 | $1.10 |
| 128 | Marking diagonal epoxy 12-inch (646.7120) | LF | 3,000 | $9.50 | $9.50 | $9.60 | $9.50 | $9.50 |
| 129 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 3,500 | $9.00 | $9.00 | $9.09 | $9.00 | $9.00 |
| 130 | Marking removal line 4-inch (646.9000) | LF | 900 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 131 | Marking removal line 8-inch (646.9100) | LF | 900 | $1.50 | $1.50 | $1.50 | $1.00 | $1.50 |
| 132 | Marking removal line wide (646.9200) | LF | 600 | $2.00 | $2.00 | $2.00 | $1.50 | $2.00 |
| 133 | Marking removal special marking (646.9300) | EACH | 15 | $175.00 | $175.00 | $175.00 | $50.00 | $175.00 |
| 134 | Construction staking storm sewer (650.4000) | EACH | 94 | $100.00 | $115.00 | $90.00 | $115.00 | $93.00 |
| 135 | Construction staking subgrade (650.4500) | LF | 10,500 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 136 | Construction staking base (650.5000) | LF | 140 | $0.01 | $0.01 | $0.65 | $0.01 | $0.01 |
| 137 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 360 | $1.00 | $1.25 | $0.85 | $1.25 | $5.00 |
| 138 | Construction staking concrete pavement (650.7000) | LF | 10,500 | $1.50 | $2.30 | $1.15 | $2.30 | $1.33 |
| 139 | Construction staking electrical installations (project) 01. 2050-08- 71 (650.8501) | EACH | 1 | $7,500.00 | $4,500.00 | $2,400.00 | $4,500.00 | $3,815.00 |
| 140 | Construction staking curb ramps (650.9000) | EACH | 26 | $100.00 | $125.00 | $115.00 | $125.00 | $160.00 |
| 141 | Construction staking sidewalk (project) 01. 2050-08-71 (650.9500) | EACH | 1 | $5,000.00 | $5,000.00 | $4,500.00 | $5,000.00 | $14,030 |
| 142 | Construction staking supplemental control (project) 01. 2050-08-71 (650.9911) | EACH | 2 | $1,500.00 | $2,500.00 | $800.00 | $2,500.00 | $2,260.00 |
| 143 | Construction staking slope stakes (650.9920) | LF | 10,500 | $1.00 | $0.70 | $0.78 | $0.70 | $0.85 |
| 144 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 12,058 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 145 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 1,500 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 146 | Install conduit into existing item (652.0700.S) | EACH | 15 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 147 | Conduit loop detector (652.0800) | LF | 3,000 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 148 | Pull boxes steel 24X36-inch (653.0135) | EACH | 8 | $850.00 | $850.00 | $850.00 | $850.00 | $850.00 |
| 149 | Pull boxes steel 24X42-inch (653.0140) | EACH | 9 | $950.00 | $950.00 | $950.00 | $950.00 | $950.00 |
| 150 | Adjusting pull boxes (653.0900) | EACH | 8 | $350.00 | $350.00 | $350.00 | $350.00 | $350.00 |
| 151 | Removing pull boxes (653.0905) | EACH | 16 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 152 | Concrete bases type 1 (654.0101) | EACH | 17 | $700.00 | $700.00 | $700.00 | $700.00 | $700.00 |
| 153 | Concrete bases type 2 (654.0102) | EACH | 2 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 154 | Concrete bases type 5 (654.0105) | EACH | 38 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 |
| 155 | Cable traffic signal 3-14 AWG (655.0210) | LF | 3,700 | $1.00 | $0.95 | $0.95 | $0.95 | $0.95 |
| 156 | Cable traffic signal 5-14 AWG (655.0230) | LF | 2,300 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 |
| 157 | Cable traffic signal 7-14 AWG (655.0240) | LF | 3,600 | $1.50 | $1.45 | $1.45 | $1.45 | $1.45 |
| 158 | Cable traffic signal 12-14 AWG (655.0260) | LF | 4,200 | $2.15 | $2.15 | $2.15 | $2.15 | $2.15 |
| 159 | Cable traffic signal 19-14 AWG (655.0280) | LF | 200 | $3.25 | $3.20 | $3.20 | $3.20 | $3.20 |
| 160 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 1,500 | $1.40 | $1.35 | $1.35 | $1.35 | $1.35 |
| 161 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 3,700 | $1.00 | $0.90 | $0.90 | $0.90 | $0.90 |
| 162 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,000 | $1.00 | $0.80 | $0.80 | $0.80 | $0.80 |
| 163 | Loop detector lead in cable (655.0700) | LF | 11,000 | $1.30 | $1.30 | $1.30 | $1.30 | $1.30 |
| 164 | Loop detector wire (655.0800) | LF | 9,000 | $1.00 | $0.80 | $0.80 | $0.80 | $0.80 |
| 165 | Traffic signal evp detector cable (655.0900) | LF | 3,000 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 166 | Pedestal bases (657.0100) | EACH | 17 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 167 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 2 | $600.00 | $600.00 | $600.00 | $600.00 | $600.00 |
| 168 | Poles type 4 (657.0315) | EACH | 2 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 169 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 2 | $340.00 | $340.00 | $340.00 | $340.00 | $340.00 |
| 170 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 5 | $705.00 | $705.00 | $705.00 | $705.00 | $705.00 |
| 171 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 10 | $610.00 | $610.00 | $610.00 | $610.00 | $610.00 |
| 172 | Luminaire arms single member 4- inch clamp 8-FT (657.0614) | EACH | 2 | $300.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 173 | Traffic signal face 3S 12-inch (658.0173) | EACH | 20 | $690.00 | $690.00 | $690.00 | $690.00 | $690.00 |
| 174 | Traffic signal face 4S 12-inch (658.0174) | EACH | 11 | $900.00 | $898.00 | $898.00 | $898.00 | $898.00 |
| 175 | Pedestrian signal face 16-inch (658.0416) | EACH | 24 | $510.00 | $510.00 | $510.00 | $510.00 | $510.00 |
| 176 | Signal mounting hardware (location) 01. CTH V & CTH BB (658.5070) | EACH | 1 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 |
| 177 | Signal mounting hardware (location) 02. S 10TH ST & CTH BB (658.5070) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 178 | Signal mounting hardware (location) 03. S. 6TH ST & CTH BB (658.5070) | EACH | 1 | $3,400.00 | $3,400.00 | $3,400.00 | $3,400.00 | $3,400.00 |
| 179 | Luminaires utility LED C (659.1125) | EACH | 2 | $210.00 | $210.00 | $210.00 | $210.00 | $210.00 |
| 180 | Temporary traffic signals for intersections (location) 01. S 6TH ST & CTH BB (661.0201) | EACH | 1 | $35,000 | $35,000 | $35,000 | $35,000 | $35,000 |
| 181 | Communication vault type round (673.0110) | EACH | 12 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 182 | Remove cable (674.0300) | LF | 2,500 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 183 | Fiber optic splice enclosure (678.0200) | EACH | 4 | $1,700.00 | $1,660.00 | $1,660.00 | $1,660.00 | $1,660.00 |
| 184 | Fiber optic splice (678.0300) | EACH | 16 | $330.00 | $330.00 | $330.00 | $330.00 | $330.00 |
| 185 | Fiber optic termination (678.0400) | EACH | 12 | $330.00 | $330.00 | $330.00 | $330.00 | $330.00 |
| 186 | Sawing asphalt (690.0150) | LF | 700 | $1.10 | $1.75 | $1.10 | $1.69 | $1.10 |
| 187 | Sawing concrete (690.0250) | LF | 3,365 | $2.15 | $2.35 | $2.15 | $2.25 | $2.15 |
| 188 | Incentive strength concrete structures (715.0502) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 189 | Incentive flexural strength concrete pavement (715.0715) | DOL | 5,300 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 190 | Incentive iri ride (740.0440) | DOL | 5,300 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 191 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 3,000 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 192 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 7,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 193 | Special 01. backfill slurry (SPV.0035) | CY | 250 | $79.00 | $90.00 | $90.00 | $90.00 | $112.00 |
| 194 | Special 01. inlet covers type 57 (SPV.0060) | EACH | 86 | $775.00 | $1,375.00 | $1,375.00 | $1,375.00 | $848.00 |
| 195 | Special 02. adjusting water valve boxes (SPV.0060) | EACH | 12 | $280.00 | $500.00 | $500.00 | $500.00 | $393.00 |
| 196 | Special 03. watermain protection (SPV.0060) | EACH | 4 | $100.00 | $184.00 | $184.00 | $184.00 | $53.00 |
| 197 | Special 04. cleaning drainage structures and pipes (SPV.0060) | EACH | 20 | $160.00 | $500.00 | $500.00 | $500.00 | $487.00 |
| 198 | Special 05. utility line opening (ulo) (SPV.0060) | EACH | 8 | $940.00 | $1,500.00 | $1,500.00 | $1,000.00 | $1,725.76 |
| 199 | Special 06. field facilities office space (SPV.0060) | EACH | 1 | $20,000 | $48,488 | $28,000 | $25,000 | $23,140 |
| 200 | Special 08. temporary mailboxes (SPV.0060) | EACH | 70 | $30.00 | $500.00 | $30.00 | $60.00 | $60.00 |
| 201 | Special 10. section corner monuments (SPV.0060) | EACH | 1 | $500.00 | $300.00 | $1,500.00 | $1,000.00 | $1,500.00 |
| 202 | Special 11. internal/external sanitary manhole seal (SPV.0060) | EACH | 9 | $685.00 | $573.00 | $573.00 | $573.00 | $805.00 |
| 203 | Special 14. construction dewatering (SPV.0060) | EACH | 2 | $500.00 | $3,365.00 | $500.00 | $3,365.00 | $3,365.00 |
| 204 | Special 15. property monument setting (SPV.0060) | EACH | 12 | $1,000.00 | $800.00 | $1,350.00 | $500.00 | $500.00 |
| 205 | Special 30. cabinet modification (SPV.0060) | EACH | 3 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 206 | Special 31. accessible pedestrian push button system, 8 buttons (SPV.0060) | EACH | 3 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 |
| 207 | Special 32. adjusting communication vault (SPV.0060) | EACH | 1 | $550.00 | $550.00 | $550.00 | $550.00 | $550.00 |
| 208 | Special 33. adjusting communication vault round (SPV.0060) | EACH | 2 | $550.00 | $550.00 | $550.00 | $550.00 | $550.00 |
| 209 | Special 34. install communications conduit into pumping station (SPV.0060) | EACH | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 210 | Special 40. strapping B-40-389 (SPV.0060) | EACH | 4 | $2,600.00 | $1,325.00 | $2,600.00 | $1,325.00 | $1,325.00 |
| 211 | Special 41. temporary water diversion culvert B-40-389 (SPV.0060) | EACH | 1 | $4,000.00 | $9,145.00 | $4,000.00 | $9,145.00 | $9,145.00 |
| 212 | Special 30. pull and coil existing fiber optic cable (SPV.0090) | LF | 550 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 213 | Special 31. furnish and install 12 SM fiber optic communications cable (SPV.0090) | LF | 3,000 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 |
| 214 | Special 32. tracer wire, 10 AWG (SPV.0090) | LF | 2,500 | $1.00 | $0.80 | $0.80 | $0.80 | $0.80 |
| 215 | Special 33. remove and reinstall video detection cable (SPV.0090) | LF | 1,500 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.