WisDOT contract 20250513011 bid tabulation
IH 94 East West, National Avenue; 70th Street to Miller Park Way (STH 059, Milwaukee County I 94, East West, National Avenue). Let by Wisconsin DOT on May 13, 2025, Milwaukee. 4 bids received; low bid $2,595,032 by Zignego Company, Inc..
- Owner
- Wisconsin DOT
- Letting
- 13 MAY 2025
- Pay items
- 253
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zignego Company, Inc. | $2,595,032 | Low |
| 2 | Lalonde Contractors Incorporated | $2,762,650 | +6.0% |
| 3 | Michels Road & Stone, Inc. | $2,772,567 | +7.0% |
| 4 | Zenith Tech., Inc. - Waukesha | $2,983,093 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zignego Company, Inc. | 2. Lalonde Contractors Incorporated | 3. Michels Road & Stone, Inc. | 4. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0220) | ID | 59 | $49.99 | $49.99 | $52.95 | $49.99 |
| 2 | Removing concrete pavement (204.0100) | SY | 1,010 | $11.02 | $11.63 | $11.00 | $30.95 |
| 3 | Removing asphaltic surface (204.0110) | SY | 44 | $30.00 | $16.98 | $28.00 | $19.08 |
| 4 | Removing curb & gutter (204.0150) | LF | 1,824 | $6.00 | $10.36 | $12.00 | $13.29 |
| 5 | Removing concrete sidewalk (204.0155) | SY | 1,242 | $8.00 | $12.49 | $9.00 | $17.76 |
| 6 | Removing concrete bases (204.0195) | EACH | 42 | $300.00 | $377.00 | $350.00 | $1,750.00 |
| 7 | Removing manholes (204.0210) | EACH | 1 | $1,000.00 | $400.00 | $400.00 | $1,200.00 |
| 8 | Removing catch basins (204.0215) | EACH | 11 | $750.00 | $250.00 | $250.00 | $900.00 |
| 9 | Removing storm sewer (size) 0001. 12-inch (204.0245) | LF | 65 | $50.00 | $15.00 | $15.00 | $22.00 |
| 10 | Removing (item description) 0001. removing village banners (204.9060.S) | EACH | 8 | $67.00 | $67.00 | $67.00 | $67.00 |
| 11 | Removing (item description) 1001. removing distribution center (204.9060.S) | EACH | 1 | $2,211.00 | $2,211.00 | $2,211.00 | $2,211.00 |
| 12 | Removing (item description) 1002. removing lighting units (204.9060.S) | EACH | 7 | $415.40 | $415.40 | $415.40 | $415.40 |
| 13 | Removing (item description) 3010. traffic signals STH 59 (W. greenfield ave) & 70TH ST (204.9060.S) | EACH | 1 | $5,527.50 | $5,527.50 | $5,527.50 | $5,527.50 |
| 14 | Removing (item description) 3020. traffic signals STH 59 (W. greenfield ave) & STH 59 (W. national ave) (204.9060.S) | EACH | 1 | $5,527.50 | $5,527.50 | $5,527.50 | $5,527.50 |
| 15 | Removing (item description) 3030. traffic signals STH 59 (W. national ave) & S. 48TH ST (204.9060.S) | EACH | 1 | $5,527.50 | $5,527.50 | $5,527.50 | $5,527.50 |
| 16 | Removing (item description) 3031. loop detector wire & lead-in cable STH 59 & S. 48TH ST (204.9060.S) | EACH | 1 | $1,380.20 | $1,380.20 | $1,380.20 | $1,380.20 |
| 17 | Removing (item description) 3040. removing traffic signals STH 59 & S. 47TH ST (204.9060.S) | EACH | 1 | $5,527.50 | $5,527.50 | $5,527.50 | $5,527.50 |
| 18 | Removing (item description) 3041. removing loop detector wire and lead-in cable STH 59 & 47TH ST (204.9060.S) | EACH | 1 | $1,380.20 | $1,380.20 | $1,380.20 | $1,380.20 |
| 19 | Removing (item description) 3050. removing traffic signals STH 59 & miller park way (204.9060.S) | EACH | 1 | $11,055 | $11,055 | $11,055 | $11,055 |
| 20 | Removing (item description) 3051. removing loop detector wire and lead-in cable STH 59 & miller park way (204.9060.S) | EACH | 1 | $1,658.25 | $1,658.25 | $1,658.25 | $1,658.25 |
| 21 | Excavation common (205.0100) | CY | 1,890 | $27.00 | $30.66 | $24.00 | $61.54 |
| 22 | Prepare foundation for concrete pavement (project) 1000. 2410-47- 70 (211.0201) | EACH | 1 | $1.00 | $1.00 | $1,000.00 | $1.00 |
| 23 | Prepare foundation for base aggregate (211.0500) | STA | 18 | $1.00 | $1.00 | $75.00 | $1.00 |
| 24 | Finishing roadway (project) 1000. 2410-47-70 (213.0100) | EACH | 1 | $1,000.00 | $2,856.00 | $3,500.00 | $2,123.61 |
| 25 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,480 | $27.00 | $25.01 | $24.00 | $39.12 |
| 26 | Concrete pavement 9-inch (415.0090) | SY | 2,264 | $80.00 | $82.52 | $75.00 | $74.91 |
| 27 | Drilled tie bars (416.0610) | EACH | 1,430 | $20.00 | $13.28 | $13.00 | $9.65 |
| 28 | Drilled dowel bars (416.0620) | EACH | 462 | $20.00 | $19.29 | $22.00 | $14.96 |
| 29 | Concrete pavement repair shes (416.1715) | SY | 300 | $105.00 | $221.72 | $134.00 | $198.20 |
| 30 | Concrete pavement replacement (416.1720) | SY | 26 | $100.00 | $165.37 | $115.00 | $164.71 |
| 31 | Concrete pavement replacement shes (416.1725) | SY | 1,015 | $105.00 | $189.25 | $137.00 | $203.49 |
| 32 | Cold patch (495.1000.S) | TON | 20 | $1.00 | $0.01 | $350.00 | $174.14 |
| 33 | Concrete collars for pipe (520.8000) | EACH | 2 | $1,000.00 | $800.00 | $800.00 | $900.00 |
| 34 | Concrete curb & gutter 19-inch (601.0319) | LF | 786 | $30.00 | $35.06 | $45.00 | $30.60 |
| 35 | Concrete curb & gutter 31-inch (601.0331) | LF | 1,840 | $29.00 | $43.08 | $42.00 | $50.48 |
| 36 | Concrete curb pedestrian (601.0600) | LF | 128 | $45.00 | $52.82 | $67.00 | $66.29 |
| 37 | Concrete sidewalk 5-inch (602.0410) | SF | 12,074 | $6.53 | $9.53 | $11.00 | $9.76 |
| 38 | Curb ramp detectable warning field yellow (602.0505) | SF | 276 | $45.00 | $41.15 | $52.00 | $35.63 |
| 39 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 29 | $55.00 | $63.08 | $78.00 | $52.17 |
| 40 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 121 | $150.00 | $85.00 | $85.00 | $208.00 |
| 41 | Reconstructing manholes (611.0420) | EACH | 3 | $1,500.00 | $2,200.00 | $2,200.00 | $4,402.00 |
| 42 | Manhole covers type J (611.0530) | EACH | 1 | $750.00 | $900.00 | $900.00 | $770.00 |
| 43 | Manhole covers type J-special (611.0535) | EACH | 6 | $750.00 | $950.00 | $950.00 | $787.00 |
| 44 | Inlet covers type H (611.0624) | EACH | 7 | $1,000.00 | $1,050.00 | $1,050.00 | $995.00 |
| 45 | Inlet covers type H-S (611.0639) | EACH | 3 | $1,000.00 | $1,050.00 | $1,050.00 | $995.00 |
| 46 | Inlet covers type S (611.0651) | EACH | 1 | $850.00 | $1,050.00 | $1,050.00 | $1,191.00 |
| 47 | Inlet covers type Z (611.0666) | EACH | 2 | $850.00 | $1,080.00 | $1,080.00 | $1,207.00 |
| 48 | Catch basins 3-FT diameter (611.1003) | EACH | 2 | $3,700.00 | $4,000.00 | $4,000.00 | $3,845.00 |
| 49 | Catch basins 5-FT diameter (611.1005) | EACH | 1 | $6,500.00 | $8,500.00 | $8,500.00 | $5,795.00 |
| 50 | Catch basins 2X3-FT (611.1230) | EACH | 9 | $3,700.00 | $4,200.00 | $4,200.00 | $3,858.00 |
| 51 | Manholes 3-FT diameter (611.2003) | EACH | 3 | $3,500.00 | $3,500.00 | $3,500.00 | $3,731.00 |
| 52 | Manholes 4-FT diameter (611.2004) | EACH | 2 | $4,750.00 | $4,200.00 | $4,200.00 | $4,550.00 |
| 53 | Adjusting catch basin covers (611.8105) | EACH | 1 | $1,000.00 | $1,500.00 | $1,500.00 | $2,021.00 |
| 54 | Adjusting manhole covers (611.8110) | EACH | 1 | $1,000.00 | $1,500.00 | $1,500.00 | $2,021.00 |
| 55 | Fence safety (616.0700.S) | LF | 477 | $3.65 | $3.65 | $4.00 | $11.00 |
| 56 | Mobilization (619.1000) | EACH | 1 | $246,000 | $131,121 | $161,184 | $96,445 |
| 57 | Concrete median sloped nose (620.0300) | SF | 414 | $18.00 | $14.32 | $18.00 | $20.48 |
| 58 | Water (624.0100) | MGAL | 149 | $1.00 | $52.40 | $45.00 | $1.33 |
| 59 | Topsoil (625.0100) | SY | 1,507 | $4.95 | $4.95 | $8.00 | $10.47 |
| 60 | Mulching (627.0200) | SY | 992 | $0.55 | $0.55 | $0.35 | $2.00 |
| 61 | Silt fence (628.1504) | LF | 516 | $2.05 | $2.05 | $3.00 | $4.00 |
| 62 | Silt fence maintenance (628.1520) | LF | 516 | $0.01 | $0.01 | $0.50 | $0.01 |
| 63 | Mobilizations erosion control (628.1905) | EACH | 3 | $100.00 | $100.00 | $250.00 | $650.00 |
| 64 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $100.00 | $100.00 | $300.00 | $1.00 |
| 65 | Inlet protection type B (628.7010) | EACH | 2 | $60.00 | $60.00 | $60.00 | $100.00 |
| 66 | Inlet protection type C (628.7015) | EACH | 51 | $65.00 | $65.00 | $60.00 | $100.00 |
| 67 | Inlet protection type D (628.7020) | EACH | 4 | $95.00 | $95.00 | $125.00 | $200.00 |
| 68 | Fertilizer type B (629.0210) | CWT | 1 | $90.00 | $90.00 | $150.00 | $250.00 |
| 69 | Seeding temporary (630.0200) | LB | 27 | $5.00 | $5.00 | $20.00 | $5.00 |
| 70 | Seed water (630.0500) | MGAL | 22 | $25.00 | $25.00 | $80.00 | $100.00 |
| 71 | Sod water (631.0300) | MGAL | 91 | $45.00 | $45.00 | $80.00 | $100.00 |
| 72 | Sod lawn (631.1000) | SY | 1,952 | $7.95 | $7.95 | $12.50 | $20.00 |
| 73 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 3 | $125.00 | $125.00 | $75.00 | $200.00 |
| 74 | Signs type II reflective H (637.2210) | SF | 481.50 | $22.00 | $22.00 | $19.95 | $30.00 |
| 75 | Signs type II reflective H folding (637.2215) | SF | 100.08 | $28.00 | $28.00 | $30.00 | $40.00 |
| 76 | Signs type II reflective F (637.2230) | SF | 34.25 | $25.00 | $25.00 | $21.50 | $35.00 |
| 77 | Moving signs type II (638.2102) | EACH | 10 | $110.00 | $110.00 | $75.00 | $100.00 |
| 78 | Removing signs type II (638.2602) | EACH | 96 | $30.00 | $30.00 | $35.00 | $50.00 |
| 79 | Removing small sign supports (638.3000) | EACH | 14 | $30.00 | $30.00 | $35.00 | $50.00 |
| 80 | Traffic control drums (643.0300) | DAY | 33,509 | $0.15 | $0.10 | $0.15 | $0.15 |
| 81 | Traffic control barricades type III (643.0420) | DAY | 1,886 | $0.60 | $0.55 | $0.60 | $0.60 |
| 82 | Traffic control flexible tubular marker posts (643.0500) | EACH | 15 | $35.00 | $32.00 | $35.00 | $35.00 |
| 83 | Traffic control flexible tubular marker bases (643.0600) | EACH | 15 | $12.50 | $5.00 | $12.50 | $12.50 |
| 84 | Traffic control warning lights type A (643.0705) | DAY | 3,772 | $0.14 | $0.10 | $0.14 | $0.14 |
| 85 | Traffic control warning lights type C (643.0715) | DAY | 4,866 | $0.15 | $0.10 | $0.15 | $0.15 |
| 86 | Connected arrow board (643.0810.S) | DAY | 176 | $13.50 | $35.00 | $13.50 | $13.50 |
| 87 | Traffic control signs (643.0900) | DAY | 8,643 | $0.20 | $0.45 | $0.20 | $0.20 |
| 88 | Traffic control covering signs type I (643.0910) | EACH | 2 | $300.00 | $225.00 | $300.00 | $300.00 |
| 89 | Traffic control signs fixed message (643.1000) | SF | 178 | $26.50 | $12.50 | $26.50 | $26.50 |
| 90 | Traffic control signs PCMS (643.1050) | DAY | 112 | $18.00 | $25.00 | $18.00 | $18.00 |
| 91 | Traffic control cones 42-inch (643.1070) | DAY | 540 | $0.15 | $0.10 | $0.15 | $0.15 |
| 92 | Connected work zone start and end location markers (643.1220.S) | DAY | 704 | $5.45 | $12.00 | $5.45 | $5.45 |
| 93 | Temporary marking line removable tape 4-inch (643.3150) | LF | 6,973 | $1.48 | $0.93 | $1.48 | $1.48 |
| 94 | Temporary marking line removable tape 6-inch (643.3180) | LF | 1,870 | $2.15 | $1.37 | $2.15 | $2.15 |
| 95 | Temporary marking line removable tape 8-inch (643.3250) | LF | 1,634 | $2.96 | $1.80 | $2.96 | $2.96 |
| 96 | Temporary marking arrow removable tape (643.3550) | EACH | 1 | $165.00 | $100.00 | $165.00 | $165.00 |
| 97 | Temporary marking word removable tape (643.3650) | EACH | 1 | $215.00 | $100.00 | $215.00 | $215.00 |
| 98 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 2,247 | $2.75 | $1.50 | $2.75 | $2.75 |
| 99 | Traffic control interim lane closure (643.4100) | EACH | 79 | $595.00 | $550.00 | $595.00 | $595.00 |
| 100 | Traffic control (643.5000) | EACH | 1 | $28,125 | $72,644 | $28,125 | $28,125 |
| 101 | Temporary pedestrian surface plate (644.1430) | SF | 360 | $6.50 | $8.00 | $6.50 | $1.00 |
| 102 | Temporary pedestrian curb ramp (644.1601) | DAY | 95 | $10.25 | $6.00 | $10.25 | $10.25 |
| 103 | Temporary pedestrian detectable warning field (644.1605) | SF | 163 | $3.25 | $4.00 | $3.25 | $3.25 |
| 104 | Temporary pedestrian barricade (644.1810) | LF | 1,755 | $4.00 | $3.50 | $4.00 | $4.00 |
| 105 | Temporary audible message devices (644.1900.S) | DAY | 1,023 | $3.10 | $3.00 | $3.10 | $3.10 |
| 106 | Marking line epoxy 4-inch (646.1020) | LF | 24,068 | $0.62 | $0.62 | $0.40 | $0.62 |
| 107 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 305 | $3.05 | $3.05 | $2.30 | $3.05 |
| 108 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 1,410 | $3.40 | $3.40 | $1.45 | $3.40 |
| 109 | Marking line epoxy 8-inch (646.3020) | LF | 3,206 | $1.23 | $1.23 | $1.05 | $1.23 |
| 110 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 602 | $5.55 | $5.55 | $2.95 | $5.55 |
| 111 | Marking arrow epoxy (646.5020) | EACH | 83 | $220.00 | $220.00 | $341.70 | $220.00 |
| 112 | Marking word epoxy (646.5120) | EACH | 23 | $240.00 | $240.00 | $392.70 | $240.00 |
| 113 | Marking symbol epoxy (646.5220) | EACH | 49 | $400.00 | $400.00 | $330.20 | $400.00 |
| 114 | Marking stop line epoxy 18-inch (646.6120) | LF | 940 | $13.00 | $13.00 | $14.55 | $13.00 |
| 115 | Marking yield line epoxy 18-inch (646.6220) | EACH | 30 | $65.00 | $65.00 | $34.20 | $65.00 |
| 116 | Marking diagonal epoxy 12-inch (646.7120) | LF | 363 | $9.50 | $9.50 | $13.95 | $9.50 |
| 117 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 484 | $10.50 | $10.50 | $13.50 | $10.50 |
| 118 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 5,198 | $15.00 | $15.00 | $21.25 | $15.00 |
| 119 | Marking curb epoxy (646.8120) | LF | 231 | $8.30 | $8.30 | $6.85 | $8.30 |
| 120 | Marking island nose epoxy (646.8220) | EACH | 7 | $275.00 | $275.00 | $269.50 | $275.00 |
| 121 | Marking removal line 4-inch (646.9000) | LF | 12,709 | $0.18 | $0.50 | $0.18 | $0.18 |
| 122 | Marking removal line 6-inch (646.9002) | LF | 5,099 | $0.23 | $0.50 | $0.23 | $0.23 |
| 123 | Marking removal line 8-inch (646.9100) | LF | 2,623 | $0.39 | $0.85 | $0.39 | $0.39 |
| 124 | Marking removal line wide (646.9200) | LF | 1,005 | $3.00 | $1.20 | $3.00 | $3.00 |
| 125 | Marking removal special marking (646.9300) | EACH | 45 | $75.00 | $65.00 | $75.00 | $75.00 |
| 126 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 2,500 | $8.25 | $8.25 | $8.25 | $8.25 |
| 127 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 2,031 | $9.86 | $9.86 | $9.86 | $9.86 |
| 128 | Conduit rigid nonmetallic schedule 80 2-inch (652.0325) | LF | 142 | $9.71 | $9.71 | $9.71 | $9.71 |
| 129 | Conduit special 2-inch (652.0605) | LF | 467 | $30.92 | $30.92 | $30.92 | $30.92 |
| 130 | Conduit special 3-inch (652.0615) | LF | 1,854 | $35.34 | $35.34 | $35.34 | $35.34 |
| 131 | Pull boxes steel 24X42-inch (653.0140) | EACH | 37 | $1,337.80 | $1,337.80 | $1,337.80 | $1,337.80 |
| 132 | Pull boxes steel 24X48-inch (653.0145) | EACH | 16 | $1,519.15 | $1,519.15 | $1,519.15 | $1,519.15 |
| 133 | Removing pull boxes (653.0905) | EACH | 40 | $160.75 | $160.75 | $160.75 | $160.75 |
| 134 | Concrete bases type 1 (654.0101) | EACH | 18 | $1,015.10 | $1,015.10 | $1,015.10 | $1,015.10 |
| 135 | Concrete bases type 2 (654.0102) | EACH | 5 | $1,291.60 | $1,291.60 | $1,291.60 | $1,291.60 |
| 136 | Concrete bases type 5 (654.0105) | EACH | 6 | $1,141.00 | $1,141.00 | $1,141.00 | $1,141.00 |
| 137 | Concrete bases type 10 (654.0110) | EACH | 7 | $6,581.00 | $6,581.00 | $6,581.00 | $6,581.00 |
| 138 | Concrete bases type 13 (654.0113) | EACH | 1 | $10,530 | $10,530 | $10,530 | $10,530 |
| 139 | Concrete bases type 10-special (654.0120) | EACH | 5 | $8,870.00 | $8,870.00 | $8,870.00 | $8,870.00 |
| 140 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 3 | $3,209.05 | $3,209.05 | $3,209.05 | $3,209.05 |
| 141 | Concrete control cabinet bases type L30 (654.0230) | EACH | 1 | $2,911.00 | $2,911.00 | $2,911.00 | $2,911.00 |
| 142 | Cable traffic signal 5-14 AWG (655.0230) | LF | 5,234 | $1.79 | $1.79 | $1.79 | $1.79 |
| 143 | Cable traffic signal 7-14 AWG (655.0240) | LF | 2,878 | $2.17 | $2.17 | $2.17 | $2.17 |
| 144 | Cable traffic signal 12-14 AWG (655.0260) | LF | 7,353 | $3.09 | $3.09 | $3.09 | $3.09 |
| 145 | Cable traffic signal 15-14 AWG (655.0270) | LF | 1,366 | $3.87 | $3.87 | $3.87 | $3.87 |
| 146 | Cable type UF 2-10 AWG grounded (655.0320) | LF | 2,631 | $2.34 | $2.34 | $2.34 | $2.34 |
| 147 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 8,227 | $1.24 | $1.24 | $1.24 | $1.24 |
| 148 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,205 | $1.10 | $1.10 | $1.10 | $1.10 |
| 149 | Electrical wire lighting 6 AWG (655.0625) | LF | 9,135 | $2.11 | $2.11 | $2.11 | $2.11 |
| 150 | Loop detector lead in cable (655.0700) | LF | 396 | $2.03 | $2.03 | $2.03 | $2.03 |
| 151 | Traffic signal evp detector cable (655.0900) | LF | 2,467 | $1.47 | $1.47 | $1.47 | $1.47 |
| 152 | Electrical service meter breaker pedestal (location) 1000. W national avenue (656.0201) | EACH | 1 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 |
| 153 | Electrical service meter breaker pedestal (location) 3030. STH 59 & S. 48TH ST (656.0201) | EACH | 1 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 |
| 154 | Electrical service meter breaker pedestal (location) 3040. STH 59 & S. 47TH ST (656.0201) | EACH | 1 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 |
| 155 | Electrical service meter breaker pedestal (location) 3050. STH 59 & miller park way (656.0201) | EACH | 1 | $1,450.00 | $1,450.00 | $1,450.00 | $1,450.00 |
| 156 | Pedestal bases (657.0100) | EACH | 23 | $239.25 | $239.25 | $239.25 | $239.25 |
| 157 | Poles type 3 (657.0310) | EACH | 6 | $3,678.75 | $3,678.75 | $3,678.75 | $3,678.75 |
| 158 | Poles type 5-aluminum (657.0322) | EACH | 6 | $1,913.75 | $1,913.75 | $1,913.75 | $1,913.75 |
| 159 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 1 | $240.00 | $240.00 | $240.00 | $240.00 |
| 160 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 13 | $560.80 | $560.80 | $560.80 | $560.80 |
| 161 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 2 | $604.50 | $604.50 | $604.50 | $604.50 |
| 162 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 7 | $501.75 | $501.75 | $501.75 | $501.75 |
| 163 | Luminaire arms single member 4- inch clamp 6-FT (657.0609) | EACH | 6 | $289.00 | $289.00 | $289.00 | $289.00 |
| 164 | Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615) | EACH | 8 | $294.00 | $294.00 | $294.00 | $294.00 |
| 165 | Traffic signal face 3S 12-inch (658.0173) | EACH | 69 | $823.50 | $823.50 | $823.50 | $823.50 |
| 166 | Traffic signal face 5S 12-inch (658.0175) | EACH | 2 | $1,415.50 | $1,415.50 | $1,415.50 | $1,415.50 |
| 167 | Pedestrian signal face 16-inch (658.0416) | EACH | 44 | $663.50 | $663.50 | $663.50 | $663.50 |
| 168 | Signal mounting hardware (location) 3010. STH 59 & S. 70TH ST (658.5070) | EACH | 1 | $3,305.00 | $3,305.00 | $3,305.00 | $3,305.00 |
| 169 | Signal mounting hardware (location) 3020. STH 59 (greenfield ave) & STH 59 (W. national ave) (658.5070) | EACH | 1 | $4,365.00 | $4,365.00 | $4,365.00 | $4,365.00 |
| 170 | Signal mounting hardware (location) 3030. STH 59 & S. 48TH ST (658.5070) | EACH | 1 | $4,890.00 | $4,890.00 | $4,890.00 | $4,890.00 |
| 171 | Signal mounting hardware (location) 3040. STH 59 & S. 47TH ST (658.5070) | EACH | 1 | $4,890.00 | $4,890.00 | $4,890.00 | $4,890.00 |
| 172 | Signal mounting hardware (location) 3050. STH 59 & miller park way (658.5070) | EACH | 1 | $11,114 | $11,114 | $11,114 | $11,114 |
| 173 | Luminaires utility LED C (659.1125) | EACH | 23 | $284.00 | $284.00 | $284.00 | $284.00 |
| 174 | Lighting control cabinets 240/480 30-inch (659.2230) | EACH | 1 | $12,080 | $12,080 | $12,080 | $12,080 |
| 175 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 132 | $8.50 | $8.50 | $8.50 | $8.50 |
| 176 | Temporary traffic signals for intersections (location) 3040. STH 59 & S. 47TH ST (661.0201) | EACH | 1 | $61,870 | $61,870 | $61,870 | $61,870 |
| 177 | Temporary traffic signals for intersections (location) 3050. STH 59 & miller park way (661.0201) | EACH | 1 | $82,937 | $82,937 | $82,937 | $82,937 |
| 178 | Generators (661.0300) | DAY | 4 | $185.00 | $185.00 | $185.00 | $185.00 |
| 179 | Field system integrator (670.0101) | EACH | 2 | $7,278.00 | $7,278.00 | $7,278.00 | $7,278.00 |
| 180 | ITS documentation (670.0201) | EACH | 2 | $5,073.00 | $5,073.00 | $5,073.00 | $5,073.00 |
| 181 | Remove cable (674.0300) | LF | 2,135 | $1.32 | $1.32 | $1.32 | $1.32 |
| 182 | Reinstall cable (674.0400) | LF | 485 | $2.38 | $2.38 | $2.38 | $2.38 |
| 183 | Install fiber optic cable outdoor plant 6-CT (678.0006) | LF | 2,715 | $2.61 | $2.61 | $2.61 | $2.61 |
| 184 | Fiber optic splice (678.0300) | EACH | 4 | $296.00 | $296.00 | $296.00 | $296.00 |
| 185 | Fiber optic termination (678.0400) | EACH | 12 | $227.00 | $227.00 | $227.00 | $227.00 |
| 186 | Communication system testing (678.0501) | EACH | 2 | $5,073.00 | $5,073.00 | $5,073.00 | $5,073.00 |
| 187 | Install cellular modems (678.0800) | EACH | 1 | $1,162.75 | $1,162.75 | $1,162.75 | $1,162.75 |
| 188 | Sawing asphalt (690.0150) | LF | 24 | $1.95 | $1.15 | $3.00 | $1.95 |
| 189 | Sawing concrete (690.0250) | LF | 5,605 | $1.95 | $2.15 | $3.00 | $1.95 |
| 190 | Incentive compressive strength concrete pavement (715.0720) | DOL | 701.10 | $1.00 | $1.00 | $1.00 | $1.00 |
| 191 | Special 0001. roadway embankment (SPV.0035) | CY | 101 | $1.00 | $26.36 | $52.00 | $115.66 |
| 192 | Special 0001. curb ramp grading, shaping, & finishing (SPV.0060) | EACH | 25 | $100.00 | $0.01 | $1,500.00 | $733.44 |
| 193 | Special 0002. utility line opening (SPV.0060) | EACH | 13 | $1.00 | $1,675.76 | $800.00 | $1,500.00 |
| 194 | Special 0003. field facilities office space (SPV.0060) | EACH | 1 | $1.00 | $18,712 | $10,000 | $17,814 |
| 195 | Special 0004. traffic control close- open freeway entrance ramp (SPV.0060) | EACH | 10 | $285.00 | $500.00 | $285.00 | $285.00 |
| 196 | Special 0005. survey project (SPV.0060) | EACH | 1 | $26,000 | $15,000 | $26,000 | $26,000 |
| 197 | Special 0006. round steel sign post system (SPV.0060) | EACH | 19 | $215.00 | $215.00 | $350.00 | $525.00 |
| 198 | Special 0007. street name sign mounting hardware on mast arm (SPV.0060) | EACH | 4 | $250.00 | $250.00 | $250.00 | $525.00 |
| 199 | Special 1000. temporary lighting system (SPV.0060) | EACH | 1 | $35,605 | $35,605 | $35,605 | $35,605 |
| 200 | Special 1001. maintenance of lighting systems (SPV.0060) | EACH | 1 | $14,070 | $14,070 | $14,070 | $14,070 |
| 201 | Special 2000. enter existing fiber optic splice enclosure (SPV.0060) | EACH | 2 | $1,319.75 | $1,319.75 | $1,319.75 | $1,319.75 |
| 202 | Special 2001. store cable (SPV.0060) | EACH | 1 | $652.75 | $652.75 | $652.75 | $652.75 |
| 203 | Special 2002. remove cellular modem (SPV.0060) | EACH | 1 | $831.00 | $831.00 | $831.00 | $831.00 |
| 204 | Special 3001. install poles type 9 (SPV.0060) | EACH | 2 | $1,530.20 | $1,530.20 | $1,530.20 | $1,530.20 |
| 205 | Special 3002. install poles type 9 special (SPV.0060) | EACH | 1 | $1,530.20 | $1,530.20 | $1,530.20 | $1,530.20 |
| 206 | Special 3003. install poles type 9- over height (SPV.0060) | EACH | 2 | $1,530.20 | $1,530.20 | $1,530.20 | $1,530.20 |
| 207 | Special 3004. install poles type 10 (SPV.0060) | EACH | 3 | $1,758.00 | $1,758.00 | $1,758.00 | $1,758.00 |
| 208 | Special 3005. install poles type 10 special (SPV.0060) | EACH | 4 | $1,758.00 | $1,758.00 | $1,758.00 | $1,758.00 |
| 209 | Special 3006. install monotube arms 15-FT (SPV.0060) | EACH | 2 | $2,411.00 | $2,411.00 | $2,411.00 | $2,411.00 |
| 210 | Special 3007. install monotube arms 20-FT (SPV.0060) | EACH | 2 | $2,548.35 | $2,548.35 | $2,548.35 | $2,548.35 |
| 211 | Special 3008. install monotube arms 25-FT (SPV.0060) | EACH | 1 | $2,689.05 | $2,689.05 | $2,689.05 | $2,689.05 |
| 212 | Special 3009. install monotube arms 30-FT (SPV.0060) | EACH | 2 | $2,880.00 | $2,880.00 | $2,880.00 | $2,880.00 |
| 213 | Special 3010. install monotube arms 40-FT-special (SPV.0060) | EACH | 3 | $3,104.45 | $3,104.45 | $3,104.45 | $3,104.45 |
| 214 | Special 3011. install monotube arms 45-FT-special (SPV.0060) | EACH | 2 | $3,241.80 | $3,241.80 | $3,241.80 | $3,241.80 |
| 215 | Special 3012. install luminaire arms steel 15-FT (SPV.0060) | EACH | 9 | $326.00 | $326.00 | $326.00 | $326.00 |
| 216 | Special 3013. TRNSPT & install state furn traffic signal cab STH 59 & S. 48TH ST (SPV.0060) | EACH | 1 | $3,701.50 | $3,701.50 | $3,701.50 | $3,701.50 |
| 217 | Special 3014. TRNSPT & install state furn traffic signal cab STH 59 & S. 47TH ST (SPV.0060) | EACH | 1 | $3,701.50 | $3,701.50 | $3,701.50 | $3,701.50 |
| 218 | Special 3015. TRNSPT & install state furn traffic signal cab STH 59 & miller park way (SPV.0060) | EACH | 1 | $5,711.50 | $5,711.50 | $5,711.50 | $5,711.50 |
| 219 | Special 3016. TRNSPT & install state furn evp heads & con light STH 59 & miller park way (SPV.0060) | EACH | 1 | $3,449.50 | $3,449.50 | $3,449.50 | $3,449.50 |
| 220 | Special 3018. TRNSPT traffic signals & inter lighting materials STH 59 & STH 59 (SPV.0060) | EACH | 1 | $402.00 | $402.00 | $402.00 | $402.00 |
| 221 | Special 3019. TRNSPT traffic signals & inter lighting materials STH 59 & S. 48TH ST (SPV.0060) | EACH | 1 | $402.00 | $402.00 | $402.00 | $402.00 |
| 222 | Special 3020. TRNSPT traffic signals & inter lighting materials STH 59 & S. 47TH ST (SPV.0060) | EACH | 1 | $402.00 | $402.00 | $402.00 | $402.00 |
| 223 | Special 3021.TRNSPT traffic signals & inter lighting materials STH 59 & miller park way (SPV.0060) | EACH | 1 | $402.00 | $402.00 | $402.00 | $402.00 |
| 224 | Special 3022. TRNSPT & install state furn accessible ped sig system STH 59 & S. 70TH ST (SPV.0060) | EACH | 1 | $4,335.50 | $4,335.50 | $4,335.50 | $4,335.50 |
| 225 | Special 3023. TRNSPT & install state furn accessible ped sig system, STH 59 & STH 59 (SPV.0060) | EACH | 1 | $4,335.50 | $4,335.50 | $4,335.50 | $4,335.50 |
| 226 | Special 3024. TRNSPT & install state furn accessible ped sig system STH 59 & S. 48TH ST (SPV.0060) | EACH | 1 | $4,335.50 | $4,335.50 | $4,335.50 | $4,335.50 |
| 227 | Special 3025. TRNSPT & install state furn accessible ped sig system STH 59 & S. 47TH ST (SPV.0060) | EACH | 1 | $4,335.50 | $4,335.50 | $4,335.50 | $4,335.50 |
| 228 | Special 3026. TRNSPT & install state furn accessible ped sig system STH 59 & miller park (SPV.0060) | EACH | 1 | $5,089.25 | $5,089.25 | $5,089.25 | $5,089.25 |
| 229 | Special 3027. TRNSPT & install state furn video detection system STH 59 & STH 59 (SPV.0060) | EACH | 1 | $4,302.00 | $4,302.00 | $4,302.00 | $4,302.00 |
| 230 | Special 3028. TRNSPT & install state furn video detection system STH 59 & S. 48TH ST (SPV.0060) | EACH | 1 | $4,302.00 | $4,302.00 | $4,302.00 | $4,302.00 |
| 231 | Special 3029. TRNSPT & install state furn video detection system STH 59 & S. 47TH ST (SPV.0060) | EACH | 1 | $4,302.00 | $4,302.00 | $4,302.00 | $4,302.00 |
| 232 | Special 3030. TRNSPT & install state furn video detection system STH 59 & miller park (SPV.0060) | EACH | 1 | $4,302.00 | $4,302.00 | $4,302.00 | $4,302.00 |
| 233 | Special 3031. temporary evp system STH 59 & miller park way (SPV.0060) | EACH | 1 | $6,262.75 | $6,262.75 | $6,262.75 | $6,262.75 |
| 234 | Special 3032. TRNSPT & install state furn radio STH 59 & S. 48TH ST (SPV.0060) | EACH | 1 | $2,063.50 | $2,063.50 | $2,063.50 | $2,063.50 |
| 235 | Special 3033. TRNSPT & install state furn radio STH 59 & 47TH (SPV.0060) | EACH | 1 | $2,063.50 | $2,063.50 | $2,063.50 | $2,063.50 |
| 236 | Special 3034. TRNSPT & install state furn radio STH 59 & miller park way (SPV.0060) | EACH | 1 | $2,063.50 | $2,063.50 | $2,063.50 | $2,063.50 |
| 237 | Special 3035. store existing communications cable STH 59 & miller park way (SPV.0060) | EACH | 1 | $602.75 | $602.75 | $602.75 | $602.75 |
| 238 | Special 3036. geometrically programmed louvers, STH 59 & STH 59 (SPV.0060) | EACH | 18 | $420.50 | $420.50 | $420.50 | $420.50 |
| 239 | Special 3037. TRNSPT & install state furn transformer base breakaway 11-1/2" bolt circle (SPV.0060) | EACH | 6 | $115.50 | $115.50 | $115.50 | $115.50 |
| 240 | Special 3038. concrete bases type 1 spread footing (SPV.0060) | EACH | 1 | $5,482.00 | $5,482.00 | $5,482.00 | $5,482.00 |
| 241 | Special 3039. traffic signal controller programming (SPV.0060) | EACH | 2 | $1,074.00 | $1,074.00 | $1,074.00 | $1,074.00 |
| 242 | Special 3040. install monotube arms 55-FT (SPV.0060) | EACH | 1 | $3,616.50 | $3,616.50 | $3,616.50 | $3,616.50 |
| 243 | Special 3042. TRNSPT & install state furn evp heads & con light STH 59 & S. 48TH ST (SPV.0060) | EACH | 1 | $3,449.50 | $3,449.50 | $3,449.50 | $3,449.50 |
| 244 | Special 3043. TRNSPT & install state furn evp heads & con light STH 59 & S. 47TH ST (SPV.0060) | EACH | 1 | $3,449.50 | $3,449.50 | $3,449.50 | $3,449.50 |
| 245 | Special 3044. install poles type 13 (SPV.0060) | EACH | 1 | $2,093.00 | $2,093.00 | $2,093.00 | $2,093.00 |
| 246 | Special 5001. water main protection (SPV.0060) | EACH | 4 | $1,500.00 | $150.00 | $150.00 | $1,200.00 |
| 247 | Special 5002. adjusting water valve boxes-milwaukee (SPV.0060) | EACH | 3 | $1,000.00 | $500.00 | $500.00 | $1,200.00 |
| 248 | Special 5003. adjusting water manholes (SPV.0060) | EACH | 1 | $2,000.00 | $1,500.00 | $1,500.00 | $2,071.00 |
| 249 | Special 5004. adjusting water valve boxes-village of west milwaukee (SPV.0060) | EACH | 4 | $500.00 | $500.00 | $500.00 | $1,200.00 |
| 250 | Special 5005. internal sanitary manhole seal (SPV.0060) | EACH | 1 | $1,500.00 | $1,000.00 | $1,000.00 | $1,214.00 |
| 251 | Special 8002. reconnect storm sewer (SPV.0060) | EACH | 8 | $1,750.00 | $500.00 | $500.00 | $1,780.00 |
| 252 | Special 0001. pavement cleanup project (SPV.0075) | HRS | 100 | $1.00 | $189.00 | $225.00 | $150.00 |
| 253 | Special 3001. adjust existing conduit (SPV.0090) | LF | 20 | $135.55 | $135.55 | $135.55 | $135.55 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way