WisDOT contract 20250513011 bid tabulation

IH 94 East West, National Avenue; 70th Street to Miller Park Way (STH 059, Milwaukee County I 94, East West, National Avenue). Let by Wisconsin DOT on May 13, 2025, Milwaukee. 4 bids received; low bid $2,595,032 by Zignego Company, Inc..

Owner
Wisconsin DOT
Letting
13 MAY 2025
Pay items
253
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Zignego Company, Inc.$2,595,032Low
2Lalonde Contractors Incorporated$2,762,650+6.0%
3Michels Road & Stone, Inc.$2,772,567+7.0%
4Zenith Tech., Inc. - Waukesha$2,983,093+15%
WisDOT contract 20250513011: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Zignego Company, Inc.2. Lalonde Contractors Incorporated3. Michels Road & Stone, Inc.4. Zenith Tech., Inc. - Waukesha
1Grubbing (201.0220)ID59$49.99$49.99$52.95$49.99
2Removing concrete pavement (204.0100)SY1,010$11.02$11.63$11.00$30.95
3Removing asphaltic surface (204.0110)SY44$30.00$16.98$28.00$19.08
4Removing curb & gutter (204.0150)LF1,824$6.00$10.36$12.00$13.29
5Removing concrete sidewalk (204.0155)SY1,242$8.00$12.49$9.00$17.76
6Removing concrete bases (204.0195)EACH42$300.00$377.00$350.00$1,750.00
7Removing manholes (204.0210)EACH1$1,000.00$400.00$400.00$1,200.00
8Removing catch basins (204.0215)EACH11$750.00$250.00$250.00$900.00
9Removing storm sewer (size) 0001. 12-inch (204.0245)LF65$50.00$15.00$15.00$22.00
10Removing (item description) 0001. removing village banners (204.9060.S)EACH8$67.00$67.00$67.00$67.00
11Removing (item description) 1001. removing distribution center (204.9060.S)EACH1$2,211.00$2,211.00$2,211.00$2,211.00
12Removing (item description) 1002. removing lighting units (204.9060.S)EACH7$415.40$415.40$415.40$415.40
13Removing (item description) 3010. traffic signals STH 59 (W. greenfield ave) & 70TH ST (204.9060.S)EACH1$5,527.50$5,527.50$5,527.50$5,527.50
14Removing (item description) 3020. traffic signals STH 59 (W. greenfield ave) & STH 59 (W. national ave) (204.9060.S)EACH1$5,527.50$5,527.50$5,527.50$5,527.50
15Removing (item description) 3030. traffic signals STH 59 (W. national ave) & S. 48TH ST (204.9060.S)EACH1$5,527.50$5,527.50$5,527.50$5,527.50
16Removing (item description) 3031. loop detector wire & lead-in cable STH 59 & S. 48TH ST (204.9060.S)EACH1$1,380.20$1,380.20$1,380.20$1,380.20
17Removing (item description) 3040. removing traffic signals STH 59 & S. 47TH ST (204.9060.S)EACH1$5,527.50$5,527.50$5,527.50$5,527.50
18Removing (item description) 3041. removing loop detector wire and lead-in cable STH 59 & 47TH ST (204.9060.S)EACH1$1,380.20$1,380.20$1,380.20$1,380.20
19Removing (item description) 3050. removing traffic signals STH 59 & miller park way (204.9060.S)EACH1$11,055$11,055$11,055$11,055
20Removing (item description) 3051. removing loop detector wire and lead-in cable STH 59 & miller park way (204.9060.S)EACH1$1,658.25$1,658.25$1,658.25$1,658.25
21Excavation common (205.0100)CY1,890$27.00$30.66$24.00$61.54
22Prepare foundation for concrete pavement (project) 1000. 2410-47- 70 (211.0201)EACH1$1.00$1.00$1,000.00$1.00
23Prepare foundation for base aggregate (211.0500)STA18$1.00$1.00$75.00$1.00
24Finishing roadway (project) 1000. 2410-47-70 (213.0100)EACH1$1,000.00$2,856.00$3,500.00$2,123.61
25Base aggregate dense 1 1/4-inch (305.0120)TON1,480$27.00$25.01$24.00$39.12
26Concrete pavement 9-inch (415.0090)SY2,264$80.00$82.52$75.00$74.91
27Drilled tie bars (416.0610)EACH1,430$20.00$13.28$13.00$9.65
28Drilled dowel bars (416.0620)EACH462$20.00$19.29$22.00$14.96
29Concrete pavement repair shes (416.1715)SY300$105.00$221.72$134.00$198.20
30Concrete pavement replacement (416.1720)SY26$100.00$165.37$115.00$164.71
31Concrete pavement replacement shes (416.1725)SY1,015$105.00$189.25$137.00$203.49
32Cold patch (495.1000.S)TON20$1.00$0.01$350.00$174.14
33Concrete collars for pipe (520.8000)EACH2$1,000.00$800.00$800.00$900.00
34Concrete curb & gutter 19-inch (601.0319)LF786$30.00$35.06$45.00$30.60
35Concrete curb & gutter 31-inch (601.0331)LF1,840$29.00$43.08$42.00$50.48
36Concrete curb pedestrian (601.0600)LF128$45.00$52.82$67.00$66.29
37Concrete sidewalk 5-inch (602.0410)SF12,074$6.53$9.53$11.00$9.76
38Curb ramp detectable warning field yellow (602.0505)SF276$45.00$41.15$52.00$35.63
39Curb ramp detectable warning field radial yellow (602.0605)SF29$55.00$63.08$78.00$52.17
40Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF121$150.00$85.00$85.00$208.00
41Reconstructing manholes (611.0420)EACH3$1,500.00$2,200.00$2,200.00$4,402.00
42Manhole covers type J (611.0530)EACH1$750.00$900.00$900.00$770.00
43Manhole covers type J-special (611.0535)EACH6$750.00$950.00$950.00$787.00
44Inlet covers type H (611.0624)EACH7$1,000.00$1,050.00$1,050.00$995.00
45Inlet covers type H-S (611.0639)EACH3$1,000.00$1,050.00$1,050.00$995.00
46Inlet covers type S (611.0651)EACH1$850.00$1,050.00$1,050.00$1,191.00
47Inlet covers type Z (611.0666)EACH2$850.00$1,080.00$1,080.00$1,207.00
48Catch basins 3-FT diameter (611.1003)EACH2$3,700.00$4,000.00$4,000.00$3,845.00
49Catch basins 5-FT diameter (611.1005)EACH1$6,500.00$8,500.00$8,500.00$5,795.00
50Catch basins 2X3-FT (611.1230)EACH9$3,700.00$4,200.00$4,200.00$3,858.00
51Manholes 3-FT diameter (611.2003)EACH3$3,500.00$3,500.00$3,500.00$3,731.00
52Manholes 4-FT diameter (611.2004)EACH2$4,750.00$4,200.00$4,200.00$4,550.00
53Adjusting catch basin covers (611.8105)EACH1$1,000.00$1,500.00$1,500.00$2,021.00
54Adjusting manhole covers (611.8110)EACH1$1,000.00$1,500.00$1,500.00$2,021.00
55Fence safety (616.0700.S)LF477$3.65$3.65$4.00$11.00
56Mobilization (619.1000)EACH1$246,000$131,121$161,184$96,445
57Concrete median sloped nose (620.0300)SF414$18.00$14.32$18.00$20.48
58Water (624.0100)MGAL149$1.00$52.40$45.00$1.33
59Topsoil (625.0100)SY1,507$4.95$4.95$8.00$10.47
60Mulching (627.0200)SY992$0.55$0.55$0.35$2.00
61Silt fence (628.1504)LF516$2.05$2.05$3.00$4.00
62Silt fence maintenance (628.1520)LF516$0.01$0.01$0.50$0.01
63Mobilizations erosion control (628.1905)EACH3$100.00$100.00$250.00$650.00
64Mobilizations emergency erosion control (628.1910)EACH5$100.00$100.00$300.00$1.00
65Inlet protection type B (628.7010)EACH2$60.00$60.00$60.00$100.00
66Inlet protection type C (628.7015)EACH51$65.00$65.00$60.00$100.00
67Inlet protection type D (628.7020)EACH4$95.00$95.00$125.00$200.00
68Fertilizer type B (629.0210)CWT1$90.00$90.00$150.00$250.00
69Seeding temporary (630.0200)LB27$5.00$5.00$20.00$5.00
70Seed water (630.0500)MGAL22$25.00$25.00$80.00$100.00
71Sod water (631.0300)MGAL91$45.00$45.00$80.00$100.00
72Sod lawn (631.1000)SY1,952$7.95$7.95$12.50$20.00
73Posts wood 4X6-inch X 14-FT (634.0614)EACH3$125.00$125.00$75.00$200.00
74Signs type II reflective H (637.2210)SF481.50$22.00$22.00$19.95$30.00
75Signs type II reflective H folding (637.2215)SF100.08$28.00$28.00$30.00$40.00
76Signs type II reflective F (637.2230)SF34.25$25.00$25.00$21.50$35.00
77Moving signs type II (638.2102)EACH10$110.00$110.00$75.00$100.00
78Removing signs type II (638.2602)EACH96$30.00$30.00$35.00$50.00
79Removing small sign supports (638.3000)EACH14$30.00$30.00$35.00$50.00
80Traffic control drums (643.0300)DAY33,509$0.15$0.10$0.15$0.15
81Traffic control barricades type III (643.0420)DAY1,886$0.60$0.55$0.60$0.60
82Traffic control flexible tubular marker posts (643.0500)EACH15$35.00$32.00$35.00$35.00
83Traffic control flexible tubular marker bases (643.0600)EACH15$12.50$5.00$12.50$12.50
84Traffic control warning lights type A (643.0705)DAY3,772$0.14$0.10$0.14$0.14
85Traffic control warning lights type C (643.0715)DAY4,866$0.15$0.10$0.15$0.15
86Connected arrow board (643.0810.S)DAY176$13.50$35.00$13.50$13.50
87Traffic control signs (643.0900)DAY8,643$0.20$0.45$0.20$0.20
88Traffic control covering signs type I (643.0910)EACH2$300.00$225.00$300.00$300.00
89Traffic control signs fixed message (643.1000)SF178$26.50$12.50$26.50$26.50
90Traffic control signs PCMS (643.1050)DAY112$18.00$25.00$18.00$18.00
91Traffic control cones 42-inch (643.1070)DAY540$0.15$0.10$0.15$0.15
92Connected work zone start and end location markers (643.1220.S)DAY704$5.45$12.00$5.45$5.45
93Temporary marking line removable tape 4-inch (643.3150)LF6,973$1.48$0.93$1.48$1.48
94Temporary marking line removable tape 6-inch (643.3180)LF1,870$2.15$1.37$2.15$2.15
95Temporary marking line removable tape 8-inch (643.3250)LF1,634$2.96$1.80$2.96$2.96
96Temporary marking arrow removable tape (643.3550)EACH1$165.00$100.00$165.00$165.00
97Temporary marking word removable tape (643.3650)EACH1$215.00$100.00$215.00$215.00
98Temporary marking removable mask out tape 6-inch (643.3960)LF2,247$2.75$1.50$2.75$2.75
99Traffic control interim lane closure (643.4100)EACH79$595.00$550.00$595.00$595.00
100Traffic control (643.5000)EACH1$28,125$72,644$28,125$28,125
101Temporary pedestrian surface plate (644.1430)SF360$6.50$8.00$6.50$1.00
102Temporary pedestrian curb ramp (644.1601)DAY95$10.25$6.00$10.25$10.25
103Temporary pedestrian detectable warning field (644.1605)SF163$3.25$4.00$3.25$3.25
104Temporary pedestrian barricade (644.1810)LF1,755$4.00$3.50$4.00$4.00
105Temporary audible message devices (644.1900.S)DAY1,023$3.10$3.00$3.10$3.10
106Marking line epoxy 4-inch (646.1020)LF24,068$0.62$0.62$0.40$0.62
107Marking line grooved black epoxy 6-inch (646.2025)LF305$3.05$3.05$2.30$3.05
108Marking line grooved wet ref epoxy 6-inch (646.2040)LF1,410$3.40$3.40$1.45$3.40
109Marking line epoxy 8-inch (646.3020)LF3,206$1.23$1.23$1.05$1.23
110Marking line grooved wet ref epoxy 10-inch (646.4040)LF602$5.55$5.55$2.95$5.55
111Marking arrow epoxy (646.5020)EACH83$220.00$220.00$341.70$220.00
112Marking word epoxy (646.5120)EACH23$240.00$240.00$392.70$240.00
113Marking symbol epoxy (646.5220)EACH49$400.00$400.00$330.20$400.00
114Marking stop line epoxy 18-inch (646.6120)LF940$13.00$13.00$14.55$13.00
115Marking yield line epoxy 18-inch (646.6220)EACH30$65.00$65.00$34.20$65.00
116Marking diagonal epoxy 12-inch (646.7120)LF363$9.50$9.50$13.95$9.50
117Marking crosswalk epoxy transverse line 6-inch (646.7420)LF484$10.50$10.50$13.50$10.50
118Marking crosswalk epoxy block style 24-inch (646.7520)LF5,198$15.00$15.00$21.25$15.00
119Marking curb epoxy (646.8120)LF231$8.30$8.30$6.85$8.30
120Marking island nose epoxy (646.8220)EACH7$275.00$275.00$269.50$275.00
121Marking removal line 4-inch (646.9000)LF12,709$0.18$0.50$0.18$0.18
122Marking removal line 6-inch (646.9002)LF5,099$0.23$0.50$0.23$0.23
123Marking removal line 8-inch (646.9100)LF2,623$0.39$0.85$0.39$0.39
124Marking removal line wide (646.9200)LF1,005$3.00$1.20$3.00$3.00
125Marking removal special marking (646.9300)EACH45$75.00$65.00$75.00$75.00
126Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF2,500$8.25$8.25$8.25$8.25
127Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF2,031$9.86$9.86$9.86$9.86
128Conduit rigid nonmetallic schedule 80 2-inch (652.0325)LF142$9.71$9.71$9.71$9.71
129Conduit special 2-inch (652.0605)LF467$30.92$30.92$30.92$30.92
130Conduit special 3-inch (652.0615)LF1,854$35.34$35.34$35.34$35.34
131Pull boxes steel 24X42-inch (653.0140)EACH37$1,337.80$1,337.80$1,337.80$1,337.80
132Pull boxes steel 24X48-inch (653.0145)EACH16$1,519.15$1,519.15$1,519.15$1,519.15
133Removing pull boxes (653.0905)EACH40$160.75$160.75$160.75$160.75
134Concrete bases type 1 (654.0101)EACH18$1,015.10$1,015.10$1,015.10$1,015.10
135Concrete bases type 2 (654.0102)EACH5$1,291.60$1,291.60$1,291.60$1,291.60
136Concrete bases type 5 (654.0105)EACH6$1,141.00$1,141.00$1,141.00$1,141.00
137Concrete bases type 10 (654.0110)EACH7$6,581.00$6,581.00$6,581.00$6,581.00
138Concrete bases type 13 (654.0113)EACH1$10,530$10,530$10,530$10,530
139Concrete bases type 10-special (654.0120)EACH5$8,870.00$8,870.00$8,870.00$8,870.00
140Concrete control cabinet bases type 9 special (654.0217)EACH3$3,209.05$3,209.05$3,209.05$3,209.05
141Concrete control cabinet bases type L30 (654.0230)EACH1$2,911.00$2,911.00$2,911.00$2,911.00
142Cable traffic signal 5-14 AWG (655.0230)LF5,234$1.79$1.79$1.79$1.79
143Cable traffic signal 7-14 AWG (655.0240)LF2,878$2.17$2.17$2.17$2.17
144Cable traffic signal 12-14 AWG (655.0260)LF7,353$3.09$3.09$3.09$3.09
145Cable traffic signal 15-14 AWG (655.0270)LF1,366$3.87$3.87$3.87$3.87
146Cable type UF 2-10 AWG grounded (655.0320)LF2,631$2.34$2.34$2.34$2.34
147Electrical wire traffic signals 10 AWG (655.0515)LF8,227$1.24$1.24$1.24$1.24
148Electrical wire lighting 12 AWG (655.0610)LF2,205$1.10$1.10$1.10$1.10
149Electrical wire lighting 6 AWG (655.0625)LF9,135$2.11$2.11$2.11$2.11
150Loop detector lead in cable (655.0700)LF396$2.03$2.03$2.03$2.03
151Traffic signal evp detector cable (655.0900)LF2,467$1.47$1.47$1.47$1.47
152Electrical service meter breaker pedestal (location) 1000. W national avenue (656.0201)EACH1$1,450.00$1,450.00$1,450.00$1,450.00
153Electrical service meter breaker pedestal (location) 3030. STH 59 & S. 48TH ST (656.0201)EACH1$1,450.00$1,450.00$1,450.00$1,450.00
154Electrical service meter breaker pedestal (location) 3040. STH 59 & S. 47TH ST (656.0201)EACH1$1,450.00$1,450.00$1,450.00$1,450.00
155Electrical service meter breaker pedestal (location) 3050. STH 59 & miller park way (656.0201)EACH1$1,450.00$1,450.00$1,450.00$1,450.00
156Pedestal bases (657.0100)EACH23$239.25$239.25$239.25$239.25
157Poles type 3 (657.0310)EACH6$3,678.75$3,678.75$3,678.75$3,678.75
158Poles type 5-aluminum (657.0322)EACH6$1,913.75$1,913.75$1,913.75$1,913.75
159Traffic signal standards aluminum 3.5-FT (657.0405)EACH1$240.00$240.00$240.00$240.00
160Traffic signal standards aluminum 13-FT (657.0420)EACH13$560.80$560.80$560.80$560.80
161Traffic signal standards aluminum 15-FT (657.0425)EACH2$604.50$604.50$604.50$604.50
162Traffic signal standards aluminum 10-FT (657.0430)EACH7$501.75$501.75$501.75$501.75
163Luminaire arms single member 4- inch clamp 6-FT (657.0609)EACH6$289.00$289.00$289.00$289.00
164Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615)EACH8$294.00$294.00$294.00$294.00
165Traffic signal face 3S 12-inch (658.0173)EACH69$823.50$823.50$823.50$823.50
166Traffic signal face 5S 12-inch (658.0175)EACH2$1,415.50$1,415.50$1,415.50$1,415.50
167Pedestrian signal face 16-inch (658.0416)EACH44$663.50$663.50$663.50$663.50
168Signal mounting hardware (location) 3010. STH 59 & S. 70TH ST (658.5070)EACH1$3,305.00$3,305.00$3,305.00$3,305.00
169Signal mounting hardware (location) 3020. STH 59 (greenfield ave) & STH 59 (W. national ave) (658.5070)EACH1$4,365.00$4,365.00$4,365.00$4,365.00
170Signal mounting hardware (location) 3030. STH 59 & S. 48TH ST (658.5070)EACH1$4,890.00$4,890.00$4,890.00$4,890.00
171Signal mounting hardware (location) 3040. STH 59 & S. 47TH ST (658.5070)EACH1$4,890.00$4,890.00$4,890.00$4,890.00
172Signal mounting hardware (location) 3050. STH 59 & miller park way (658.5070)EACH1$11,114$11,114$11,114$11,114
173Luminaires utility LED C (659.1125)EACH23$284.00$284.00$284.00$284.00
174Lighting control cabinets 240/480 30-inch (659.2230)EACH1$12,080$12,080$12,080$12,080
175Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH132$8.50$8.50$8.50$8.50
176Temporary traffic signals for intersections (location) 3040. STH 59 & S. 47TH ST (661.0201)EACH1$61,870$61,870$61,870$61,870
177Temporary traffic signals for intersections (location) 3050. STH 59 & miller park way (661.0201)EACH1$82,937$82,937$82,937$82,937
178Generators (661.0300)DAY4$185.00$185.00$185.00$185.00
179Field system integrator (670.0101)EACH2$7,278.00$7,278.00$7,278.00$7,278.00
180ITS documentation (670.0201)EACH2$5,073.00$5,073.00$5,073.00$5,073.00
181Remove cable (674.0300)LF2,135$1.32$1.32$1.32$1.32
182Reinstall cable (674.0400)LF485$2.38$2.38$2.38$2.38
183Install fiber optic cable outdoor plant 6-CT (678.0006)LF2,715$2.61$2.61$2.61$2.61
184Fiber optic splice (678.0300)EACH4$296.00$296.00$296.00$296.00
185Fiber optic termination (678.0400)EACH12$227.00$227.00$227.00$227.00
186Communication system testing (678.0501)EACH2$5,073.00$5,073.00$5,073.00$5,073.00
187Install cellular modems (678.0800)EACH1$1,162.75$1,162.75$1,162.75$1,162.75
188Sawing asphalt (690.0150)LF24$1.95$1.15$3.00$1.95
189Sawing concrete (690.0250)LF5,605$1.95$2.15$3.00$1.95
190Incentive compressive strength concrete pavement (715.0720)DOL701.10$1.00$1.00$1.00$1.00
191Special 0001. roadway embankment (SPV.0035)CY101$1.00$26.36$52.00$115.66
192Special 0001. curb ramp grading, shaping, & finishing (SPV.0060)EACH25$100.00$0.01$1,500.00$733.44
193Special 0002. utility line opening (SPV.0060)EACH13$1.00$1,675.76$800.00$1,500.00
194Special 0003. field facilities office space (SPV.0060)EACH1$1.00$18,712$10,000$17,814
195Special 0004. traffic control close- open freeway entrance ramp (SPV.0060)EACH10$285.00$500.00$285.00$285.00
196Special 0005. survey project (SPV.0060)EACH1$26,000$15,000$26,000$26,000
197Special 0006. round steel sign post system (SPV.0060)EACH19$215.00$215.00$350.00$525.00
198Special 0007. street name sign mounting hardware on mast arm (SPV.0060)EACH4$250.00$250.00$250.00$525.00
199Special 1000. temporary lighting system (SPV.0060)EACH1$35,605$35,605$35,605$35,605
200Special 1001. maintenance of lighting systems (SPV.0060)EACH1$14,070$14,070$14,070$14,070
201Special 2000. enter existing fiber optic splice enclosure (SPV.0060)EACH2$1,319.75$1,319.75$1,319.75$1,319.75
202Special 2001. store cable (SPV.0060)EACH1$652.75$652.75$652.75$652.75
203Special 2002. remove cellular modem (SPV.0060)EACH1$831.00$831.00$831.00$831.00
204Special 3001. install poles type 9 (SPV.0060)EACH2$1,530.20$1,530.20$1,530.20$1,530.20
205Special 3002. install poles type 9 special (SPV.0060)EACH1$1,530.20$1,530.20$1,530.20$1,530.20
206Special 3003. install poles type 9- over height (SPV.0060)EACH2$1,530.20$1,530.20$1,530.20$1,530.20
207Special 3004. install poles type 10 (SPV.0060)EACH3$1,758.00$1,758.00$1,758.00$1,758.00
208Special 3005. install poles type 10 special (SPV.0060)EACH4$1,758.00$1,758.00$1,758.00$1,758.00
209Special 3006. install monotube arms 15-FT (SPV.0060)EACH2$2,411.00$2,411.00$2,411.00$2,411.00
210Special 3007. install monotube arms 20-FT (SPV.0060)EACH2$2,548.35$2,548.35$2,548.35$2,548.35
211Special 3008. install monotube arms 25-FT (SPV.0060)EACH1$2,689.05$2,689.05$2,689.05$2,689.05
212Special 3009. install monotube arms 30-FT (SPV.0060)EACH2$2,880.00$2,880.00$2,880.00$2,880.00
213Special 3010. install monotube arms 40-FT-special (SPV.0060)EACH3$3,104.45$3,104.45$3,104.45$3,104.45
214Special 3011. install monotube arms 45-FT-special (SPV.0060)EACH2$3,241.80$3,241.80$3,241.80$3,241.80
215Special 3012. install luminaire arms steel 15-FT (SPV.0060)EACH9$326.00$326.00$326.00$326.00
216Special 3013. TRNSPT & install state furn traffic signal cab STH 59 & S. 48TH ST (SPV.0060)EACH1$3,701.50$3,701.50$3,701.50$3,701.50
217Special 3014. TRNSPT & install state furn traffic signal cab STH 59 & S. 47TH ST (SPV.0060)EACH1$3,701.50$3,701.50$3,701.50$3,701.50
218Special 3015. TRNSPT & install state furn traffic signal cab STH 59 & miller park way (SPV.0060)EACH1$5,711.50$5,711.50$5,711.50$5,711.50
219Special 3016. TRNSPT & install state furn evp heads & con light STH 59 & miller park way (SPV.0060)EACH1$3,449.50$3,449.50$3,449.50$3,449.50
220Special 3018. TRNSPT traffic signals & inter lighting materials STH 59 & STH 59 (SPV.0060)EACH1$402.00$402.00$402.00$402.00
221Special 3019. TRNSPT traffic signals & inter lighting materials STH 59 & S. 48TH ST (SPV.0060)EACH1$402.00$402.00$402.00$402.00
222Special 3020. TRNSPT traffic signals & inter lighting materials STH 59 & S. 47TH ST (SPV.0060)EACH1$402.00$402.00$402.00$402.00
223Special 3021.TRNSPT traffic signals & inter lighting materials STH 59 & miller park way (SPV.0060)EACH1$402.00$402.00$402.00$402.00
224Special 3022. TRNSPT & install state furn accessible ped sig system STH 59 & S. 70TH ST (SPV.0060)EACH1$4,335.50$4,335.50$4,335.50$4,335.50
225Special 3023. TRNSPT & install state furn accessible ped sig system, STH 59 & STH 59 (SPV.0060)EACH1$4,335.50$4,335.50$4,335.50$4,335.50
226Special 3024. TRNSPT & install state furn accessible ped sig system STH 59 & S. 48TH ST (SPV.0060)EACH1$4,335.50$4,335.50$4,335.50$4,335.50
227Special 3025. TRNSPT & install state furn accessible ped sig system STH 59 & S. 47TH ST (SPV.0060)EACH1$4,335.50$4,335.50$4,335.50$4,335.50
228Special 3026. TRNSPT & install state furn accessible ped sig system STH 59 & miller park (SPV.0060)EACH1$5,089.25$5,089.25$5,089.25$5,089.25
229Special 3027. TRNSPT & install state furn video detection system STH 59 & STH 59 (SPV.0060)EACH1$4,302.00$4,302.00$4,302.00$4,302.00
230Special 3028. TRNSPT & install state furn video detection system STH 59 & S. 48TH ST (SPV.0060)EACH1$4,302.00$4,302.00$4,302.00$4,302.00
231Special 3029. TRNSPT & install state furn video detection system STH 59 & S. 47TH ST (SPV.0060)EACH1$4,302.00$4,302.00$4,302.00$4,302.00
232Special 3030. TRNSPT & install state furn video detection system STH 59 & miller park (SPV.0060)EACH1$4,302.00$4,302.00$4,302.00$4,302.00
233Special 3031. temporary evp system STH 59 & miller park way (SPV.0060)EACH1$6,262.75$6,262.75$6,262.75$6,262.75
234Special 3032. TRNSPT & install state furn radio STH 59 & S. 48TH ST (SPV.0060)EACH1$2,063.50$2,063.50$2,063.50$2,063.50
235Special 3033. TRNSPT & install state furn radio STH 59 & 47TH (SPV.0060)EACH1$2,063.50$2,063.50$2,063.50$2,063.50
236Special 3034. TRNSPT & install state furn radio STH 59 & miller park way (SPV.0060)EACH1$2,063.50$2,063.50$2,063.50$2,063.50
237Special 3035. store existing communications cable STH 59 & miller park way (SPV.0060)EACH1$602.75$602.75$602.75$602.75
238Special 3036. geometrically programmed louvers, STH 59 & STH 59 (SPV.0060)EACH18$420.50$420.50$420.50$420.50
239Special 3037. TRNSPT & install state furn transformer base breakaway 11-1/2" bolt circle (SPV.0060)EACH6$115.50$115.50$115.50$115.50
240Special 3038. concrete bases type 1 spread footing (SPV.0060)EACH1$5,482.00$5,482.00$5,482.00$5,482.00
241Special 3039. traffic signal controller programming (SPV.0060)EACH2$1,074.00$1,074.00$1,074.00$1,074.00
242Special 3040. install monotube arms 55-FT (SPV.0060)EACH1$3,616.50$3,616.50$3,616.50$3,616.50
243Special 3042. TRNSPT & install state furn evp heads & con light STH 59 & S. 48TH ST (SPV.0060)EACH1$3,449.50$3,449.50$3,449.50$3,449.50
244Special 3043. TRNSPT & install state furn evp heads & con light STH 59 & S. 47TH ST (SPV.0060)EACH1$3,449.50$3,449.50$3,449.50$3,449.50
245Special 3044. install poles type 13 (SPV.0060)EACH1$2,093.00$2,093.00$2,093.00$2,093.00
246Special 5001. water main protection (SPV.0060)EACH4$1,500.00$150.00$150.00$1,200.00
247Special 5002. adjusting water valve boxes-milwaukee (SPV.0060)EACH3$1,000.00$500.00$500.00$1,200.00
248Special 5003. adjusting water manholes (SPV.0060)EACH1$2,000.00$1,500.00$1,500.00$2,071.00
249Special 5004. adjusting water valve boxes-village of west milwaukee (SPV.0060)EACH4$500.00$500.00$500.00$1,200.00
250Special 5005. internal sanitary manhole seal (SPV.0060)EACH1$1,500.00$1,000.00$1,000.00$1,214.00
251Special 8002. reconnect storm sewer (SPV.0060)EACH8$1,750.00$500.00$500.00$1,780.00
252Special 0001. pavement cleanup project (SPV.0075)HRS100$1.00$189.00$225.00$150.00
253Special 3001. adjust existing conduit (SPV.0090)LF20$135.55$135.55$135.55$135.55
WisDOT contract 20250513011: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy