WisDOT contract 20260113021 bid tabulation

Pleasant Prairie - Caledonia; STH 11 to STH 20 (STH 031, Racine County Pleasant Prairie - Caledonia). Let by Wisconsin DOT on January 13, 2026, Racine. 4 bids received; low bid $23,333,442 by A.W. Oakes & Son, Inc..

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
367
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1A.W. Oakes & Son, Inc.$23,333,442Low
2Lalonde Contractors Incorporated$24,657,076+6.0%
3Zignego Company, Inc.$25,395,556+9.0%
4Hoffman Construction Company$26,316,229+13%
WisDOT contract 20260113021: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. A.W. Oakes & Son, Inc.2. Lalonde Contractors Incorporated3. Zignego Company, Inc.4. Hoffman Construction Company
1CPM progress schedule (108.4400)EACH1$18,000$16,956$5,000.00$100.00
2Clearing (201.0105)STA41$400.00$375.00$375.00$375.00
3Clearing (201.0120)ID44$50.00$50.00$50.00$50.00
4Grubbing (201.0205)STA39$200.00$200.00$200.00$200.00
5Grubbing (201.0220)ID50$50.00$25.00$25.00$25.00
6Removing concrete pavement (204.0100)SY73,200$6.60$6.25$8.76$10.00
7Removing concrete surface partial depth (204.0109.S)SF5,400$2.60$2.60$2.39$2.50
8Removing asphaltic surface (204.0110)SY183$10.00$6.27$30.00$4.00
9Removing curb (204.0130)LF290$10.00$5.84$20.00$6.00
10Removing curb & gutter (204.0150)LF16,650$6.60$6.04$10.00$6.00
11Removing concrete sidewalk (204.0155)SY2,040$10.00$10.14$10.00$6.00
12Removing concrete bases (204.0195)EACH76$200.00$342.46$500.00$400.00
13Removing manholes (204.0210)EACH23$525.00$848.00$848.00$325.00
14Removing inlets (204.0220)EACH131$420.00$700.00$700.00$325.00
15Removing storm sewer (size) 012. 12-inch (204.0245)LF3,915$14.00$14.00$14.00$10.00
16Removing storm sewer (size) 015. 15-inch (204.0245)LF1,464$14.00$14.00$14.00$10.00
17Removing storm sewer (size) 018. 18-inch (204.0245)LF570$14.00$14.00$14.00$10.00
18Removing storm sewer (size) 021. 21-inch (204.0245)LF500$21.00$14.00$14.00$10.00
19Removing storm sewer (size) 024. 24-inch (204.0245)LF1,114$23.00$14.00$14.00$10.00
20Removing storm sewer (size) 027. 27-inch (204.0245)LF73$25.00$14.00$14.00$10.00
21Removing storm sewer (size) 030. 30-inch (204.0245)LF34$26.00$14.00$14.00$10.00
22Removing storm sewer (size) 036. 36-inch (204.0245)LF1,138$32.00$14.00$14.00$20.00
23Removing storm sewer (size) 042. 42-inch (204.0245)LF510$32.00$14.00$14.00$20.00
24Removing storm sewer (size) 048. 48-inch (204.0245)LF545$40.00$14.00$14.00$20.00
25Removing ancillary structure (structure) 001. S-51-209 (204.0246)EACH1$4,500.00$10,000$10,000$4,900.00
26Abandoning manholes (204.0250)EACH6$525.00$1,025.00$1,025.00$1,100.00
27Abandoning inlets (204.0260)EACH3$430.00$625.00$625.00$1,100.00
28Sealing pipes (204.0280)EACH11$450.00$298.00$298.00$1,100.00
29Removing (item description) 001. removing inlet and manhole covers (204.9060.S)EACH71$30.00$160.00$160.00$275.00
30Removing (item description) 200. removing traffic signals STH 31 & STH 11 (204.9060.S)EACH1$2,700.00$2,658.62$2,658.62$2,658.62
31Removing (item description) 201. removing traffic signals STH 31 & timber DR (204.9060.S)EACH1$6,800.00$6,783.01$6,783.01$6,783.01
32Removing (item description) 202. removing traffic signals STH 31 & regency west DR (204.9060.S)EACH1$6,800.00$6,783.01$6,783.01$6,783.01
33Removing (item description) 203. removing traffic signals STH 31 & high ridge ent (204.9060.S)EACH1$5,800.00$5,751.91$5,751.91$5,751.91
34Removing (item description) 204. removing traffic signals STH 31 & 21ST ST (204.9060.S)EACH1$6,800.00$6,783.01$6,783.01$6,783.01
35Removing (item description) 205. removing traffic signals STH 31 & 16TH ST (204.9060.S)EACH1$5,800.00$5,751.91$5,751.91$5,751.91
36Removing (item description) 206. removing traffic signals STH 31 & wright ave (204.9060.S)EACH1$8,000.00$7,814.10$7,814.10$7,814.10
37Removing (item description) 207. removing traffic signals STH 31 & STH 20 (204.9060.S)EACH1$1,800.00$1,799.37$1,799.37$1,799.37
38Removing (item description) 208. removing loop detector wire & lead-in cable STH 31 & STH 11 (204.9060.S)EACH1$900.00$894.63$894.63$894.63
39Removing (item description) 209. removing loop detector wire & lead-in cable STH 31 & timber DR (204.9060.S)EACH1$1,100.00$1,066.48$1,066.48$1,066.48
40Removing (item description) 210. removing loop detector wire & lead-in cable STH 31 & regency west DR (204.9060.S)EACH1$1,100.00$1,066.48$1,066.48$1,066.48
41Removing (item description) 211. removing loop detector wire & lead-in cable STH 31 & high ridge ent (204.9060.S)EACH1$1,100.00$1,066.48$1,066.48$1,066.48
42Removing (item description) 212. removing loop detector wire & lead-in cable STH 31 & 21ST ST (204.9060.S)EACH1$1,100.00$1,066.48$1,066.48$1,066.48
43Removing (item description) 213. removing loop detector wire & lead-in cable STH 31 & 16TH ST (204.9060.S)EACH1$1,100.00$1,066.48$1,066.48$1,066.48
44Removing (item description) 214. removing loop detector wire & lead-in cable STH 31 & STH 20 (204.9060.S)EACH1$900.00$894.63$894.63$894.63
45Removing (item description) 215. removing communication vaults (204.9060.S)EACH6$400.00$399.30$399.30$399.30
46Removing (item description) 001. removing underdrain (204.9090.S)LF720$3.00$15.00$15.00$1.50
47Excavation common (205.0100)CY121,441$15.00$20.97$25.25$25.00
48Excavation, hauling, and disposal of petroleum contaminated soil (205.0501.S)TON813$58.00$62.96$75.00$55.00
49Finishing roadway (project) 001. 2390-12-70 (213.0100)EACH1$10,000$5,050.00$1,000.00$100.00
50Base aggregate dense 1 1/4-inch (305.0120)TON57,108$16.60$23.56$17.54$0.01
51Base aggregate open-graded (310.0110)TON1,513$33.00$31.00$31.00$35.18
52Breaker run (311.0110)TON847$16.60$29.89$50.00$30.00
53Pit run (313.0110)TON106,374$16.60$20.88$20.50$20.00
54Removing pavement for base patching (390.0100)CY42$175.00$77.33$170.00$200.00
55Base patching asphaltic (390.0201)TON13$531.00$531.00$531.00$531.00
56Base patching concrete hes (390.0305)CY11$1,100.00$381.32$500.00$915.87
57Concrete pavement 6-inch (415.0060)SY14$200.00$111.59$150.00$62.55
58Concrete pavement 8 1/2-inch (415.0085)SY65,160$62.50$62.19$66.71$64.45
59Concrete pavement 9-inch (415.0090)SY67$200.00$106.32$100.00$75.66
60Concrete pavement gaps (415.0210)EACH11$2,500.00$1,175.33$1,000.00$854.76
61Concrete pavement hes 8 1/2-inch (415.1085)SY18,590$68.00$76.63$69.11$84.32
62Drilled tie bars (416.0610)EACH116$15.00$13.93$30.00$9.67
63Drilled dowel bars (416.0620)EACH652$30.00$18.11$30.00$13.73
64Tack coat (455.0605)GAL2,047.50$1.80$1.80$1.80$1.80
65Asphaltic surface (465.0105)TON159$242.00$242.00$242.00$242.00
66Asphaltic surface driveways and field entrances (465.0120)TON135$250.00$250.00$250.00$250.00
67Asphaltic surface temporary (465.0125)TON8,280$86.00$85.85$85.85$85.85
68Asphaltic curb (465.0310)LF7,430$7.00$7.00$7.00$7.00
69Cold patch (495.1000.S)TON15$1,000.00$452.00$500.00$600.00
70Concrete collars for pipe (520.8000)EACH5$550.00$750.00$750.00$1,100.00
71Concrete curb & gutter 18-inch type A (601.0405)LF10,872$25.50$30.24$22.00$14.52
72Concrete curb & gutter 30-inch type A (601.0409)LF7,008$30.00$35.55$28.50$21.64
73Concrete curb & gutter integral 30- inch type D (601.0452)LF15,182$13.50$21.16$23.50$11.61
74Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF16$50.00$61.88$100.00$85.20
75Concrete curb pedestrian (601.0600)LF639$60.00$55.52$60.00$59.19
76Concrete sidewalk 5-inch (602.0410)SF92,700$6.50$7.56$7.00$5.45
77Curb ramp detectable warning field yellow (602.0505)SF733$45.00$43.98$35.00$51.46
78Curb ramp detectable warning field radial yellow (602.0605)SF522$65.00$58.39$75.00$68.71
79Concrete driveway 6-inch (602.0810)SY140$75.00$79.25$100.00$61.95
80Concrete driveway 8-inch (602.0820)SY265$80.00$87.88$100.00$79.62
81Concrete driveway hes 8-inch (602.0870)SY124$85.00$101.36$150.00$83.14
82Concrete barrier temporary precast delivered (603.8000)LF27$100.00$35.00$100.00$50.00
83Concrete barrier temporary precast installed (603.8125)LF27$100.00$13.11$100.00$50.00
84Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF5,018$92.00$87.00$87.00$62.00
85Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF1,137$93.00$116.00$116.00$64.00
86Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF3,377$118.00$130.00$130.00$80.00
87Storm sewer pipe reinforced concrete class III 30-inch (608.0330)LF47$147.00$232.00$232.00$114.00
88Storm sewer pipe reinforced concrete class III 36-inch (608.0336)LF1,206$152.00$185.00$185.00$140.00
89Storm sewer pipe reinforced concrete class III 42-inch (608.0342)LF198$197.00$205.00$205.00$180.00
90Storm sewer pipe reinforced concrete class III 48-inch (608.0348)LF976$240.00$268.00$268.00$236.00
91Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF1,238$85.00$84.00$84.00$62.00
92Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF582$93.00$107.00$107.00$66.00
93Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF675$110.00$107.00$107.00$86.00
94Storm sewer pipe reinforced concrete class IV 30-inch (608.0430)LF286$126.00$138.00$138.00$126.00
95Reconstructing manholes (611.0420)EACH1$3,000.00$1,062.00$1,062.00$1,100.00
96Manhole covers type J (611.0530)EACH10$600.00$707.00$707.00$700.00
97Manhole covers type J-special (611.0535)EACH62$600.00$707.00$707.00$700.00
98Inlet covers type H (611.0624)EACH172$825.00$945.00$945.00$1,000.00
99Inlet covers type HM (611.0627)EACH2$825.00$945.00$945.00$1,000.00
100Inlet covers type MS (611.0642)EACH1$630.00$644.00$644.00$750.00
101Inlet covers type S (611.0651)EACH71$1,020.00$1,083.00$1,083.00$1,200.00
102Inlet covers type Z (611.0666)EACH138$775.00$894.00$894.00$950.00
103Manholes 3-FT diameter (611.2003)EACH2$2,600.00$2,230.00$2,230.00$1,800.00
104Manholes 4-FT diameter (611.2004)EACH32$2,900.00$3,701.00$3,701.00$2,550.00
105Manholes 5-FT diameter (611.2005)EACH20$3,700.00$3,838.00$3,838.00$4,500.00
106Manholes 6-FT diameter (611.2006)EACH5$6,500.00$6,339.00$6,339.00$7,000.00
107Manholes 7-FT diameter (611.2007)EACH10$10,300$10,198$10,198$11,000
108Manholes 8-FT diameter (611.2008)EACH3$15,000$14,932$14,932$15,500
109Inlets 3-FT diameter (611.3003)EACH122$2,200.00$1,718.00$1,718.00$1,800.00
110Inlets 4-FT diameter (611.3004)EACH59$2,550.00$2,041.00$2,041.00$2,600.00
111Inlets 2X3-FT (611.3230)EACH129$2,300.00$1,733.00$1,733.00$1,900.00
112Inlets median 2 grate (611.3902)EACH1$5,200.00$4,953.00$4,953.00$4,100.00
113Adjusting manhole covers (611.8110)EACH11$505.00$531.00$531.00$2,300.00
114Adjusting inlet covers (611.8115)EACH20$505.00$531.00$531.00$2,300.00
115Cover plates temporary (611.8120.S)EACH210$100.00$253.00$253.00$200.00
116Salvaged inlet covers (611.9710)EACH3$200.00$266.00$266.00$155.00
117Drain slotted vane (611.9900.S)EACH4$17,500$25,871$25,871$20,000
118Pipe underdrain 6-inch (612.0106)LF24,397$8.50$14.00$14.00$8.00
119Pipe underdrain unperforated 6- inch (612.0206)LF2,304$8.50$27.00$27.00$8.00
120Fence safety (616.0700.S)LF390$6.50$3.50$3.50$6.50
121Maintenance and repair of haul roads (project) 001. 2390-12-70 (618.0100)EACH1$0.01$1.00$1.00$100.00
122Mobilization (619.1000)EACH1$1,636,000$874,209$1,021,000$4,230,967
123Concrete median sloped nose (620.0300)SF1,140$16.00$18.48$10.00$12.19
124Water (624.0100)MGAL1,900$20.00$26.10$50.00$0.01
125Topsoil (625.0100)SY25,630$6.00$4.95$4.95$10.00
126Mulching (627.0200)SY16,140$0.35$0.35$0.35$0.32
127Silt fence (628.1504)LF3,160$2.50$1.95$1.95$2.17
128Silt fence maintenance (628.1520)LF1,610$0.10$0.01$0.01$0.10
129Mobilizations erosion control (628.1905)EACH18$200.00$100.00$100.00$200.00
130Mobilizations emergency erosion control (628.1910)EACH16$150.00$100.00$100.00$150.00
131Erosion mat class I type A (628.2002)SY16,140$1.10$1.05$1.05$1.05
132Soil stabilizer type B (628.6510)ACRE1.24$1,000.00$2,300.00$2,300.00$900.00
133Inlet protection type A (628.7005)EACH314$85.00$95.00$95.00$81.00
134Inlet protection type B (628.7010)EACH72$60.00$55.00$55.00$58.50
135Inlet protection type C (628.7015)EACH289$50.00$58.00$58.00$40.00
136Inlet protection type D (628.7020)EACH8$80.00$95.00$95.00$79.50
137Tracking pads (628.7560)EACH20$100.00$0.01$1,000.00$500.00
138Fertilizer type B (629.0210)CWT11.60$81.00$85.00$85.00$81.00
139Seeding mixture no. 30 (630.0130)LB272$10.00$8.50$8.50$9.15
140Seeding mixture no. 40 (630.0140)LB455$10.50$12.00$12.00$9.90
141Seeding temporary (630.0200)LB1,158$3.50$2.50$2.50$3.40
142Seed water (630.0500)MGAL361$20.00$10.00$10.00$18.00
143Sod water (631.0300)MGAL213$45.00$40.00$40.00$45.00
144Sod lawn (631.1000)SY9,490$8.00$7.95$7.95$7.90
145Markers permanent flexible (633.5350)EACH12$80.00$80.00$80.00$75.10
146Posts wood 4X6-inch X 18-FT (634.0618)EACH235$100.00$120.00$120.00$95.00
147Signs type II reflective H (637.2210)SF1,884.51$21.00$21.00$21.00$20.60
148Signs type II reflective H folding (637.2215)SF343.16$28.00$25.00$25.00$27.40
149Signs type II reflective F (637.2230)SF236$23.00$24.00$24.00$22.30
150Moving signs type II (638.2102)EACH2$110.00$110.00$110.00$105.00
151Removing signs type II (638.2602)EACH306$30.00$25.00$25.00$25.00
152Removing small sign supports (638.3000)EACH185$30.00$25.00$25.00$25.00
153Traffic control drums (643.0300)DAY313,015$0.25$0.20$0.20$0.20
154Traffic control barricades type III (643.0420)DAY54,185$0.50$0.45$0.45$0.45
155Traffic control flexible tubular marker posts (643.0500)EACH2,270$25.00$20.00$20.00$20.00
156Traffic control flexible tubular marker bases (643.0600)EACH2,270$10.00$10.00$10.00$10.00
157Traffic control warning lights type A (643.0705)DAY108,370$0.15$0.10$0.10$0.10
158Traffic control warning lights type C (643.0715)DAY19,959$0.15$0.10$0.10$0.10
159Traffic control connected arrow boards (643.0810)DAY1,093$20.00$15.00$15.00$15.00
160Traffic control signs (643.0900)DAY107,787$0.25$0.20$0.20$0.20
161Traffic control covering signs type II (643.0920)EACH8$50.00$50.00$50.00$50.00
162Traffic control signs fixed message (643.1000)SF120$20.00$20.00$20.00$20.00
163Traffic control signs PCMS (643.1050)DAY350$40.00$40.00$40.00$40.00
164Traffic control cones 42-inch (643.1070)DAY747$1.00$0.75$0.75$0.75
165Traffic control connected work zone start and end location markers (643.1220)DAY1,040$2.50$2.50$2.50$2.50
166Temporary marking line paint 6- inch (643.3165)LF39,235$0.75$0.70$0.70$0.70
167Temporary marking line epoxy 6- inch (643.3170)LF955$0.50$2.95$2.95$1.25
168Temporary marking line removable tape 6-inch (643.3180)LF59,645$1.60$1.50$1.50$1.50
169Temporary marking line paint 10- inch (643.3265)LF5,870$1.20$1.15$1.15$1.15
170Temporary marking line epoxy 10- inch (643.3270)LF1,465$1.60$4.90$4.90$3.00
171Temporary marking line removable tape 10-inch (643.3280)LF15,500$3.30$3.00$3.00$3.00
172Temporary marking crosswalk paint 6-inch (643.3305)LF1,155$0.80$0.70$0.70$0.70
173Temporary marking crosswalk removable tape 6-inch (643.3350)LF1,920$1.60$1.50$1.50$1.50
174Temporary marking arrow paint (643.3505)EACH42$30.00$30.00$30.00$30.00
175Temporary marking arrow removable tape (643.3550)EACH50$50.00$50.00$50.00$50.00
176Temporary marking word paint (643.3605)EACH18$40.00$40.00$40.00$40.00
177Temporary marking word removable tape (643.3650)EACH24$50.00$50.00$50.00$50.00
178Temporary marking stop line paint 18-inch (643.3805)LF735$2.25$2.25$2.25$2.25
179Temporary marking stop line removable tape 18-inch (643.3850)LF965$5.00$5.00$5.00$5.00
180Traffic control interim lane closure (643.4100)EACH52$450.00$400.00$400.00$400.00
181Traffic control (643.5000)EACH1$165,000$140,000$140,000$140,000
182Temporary pedestrian surface matting (644.1440)SF1,565$10.00$10.00$10.00$10.00
183Temporary pedestrian curb ramp (644.1601)DAY55$50.00$50.00$50.00$50.00
184Temporary pedestrian detectable warning field (644.1605)SF395$15.00$15.00$15.00$15.00
185Temporary pedestrian barricade (644.1810)LF5,685$5.00$5.00$5.00$5.00
186Temporary audible message devices (644.1900.S)DAY2,958$2.00$2.00$2.00$2.00
187Geotextile type DF schedule A (645.0111)SY4,264$2.00$1.00$1.00$4.00
188Geogrid type SR (645.0220)SY22,490$4.00$1.83$4.00$2.00
189Marking line epoxy 4-inch (646.1020)LF3,229$0.40$0.85$0.85$0.85
190Marking line grooved black epoxy 6-inch (646.2025)LF8,644$1.00$1.66$1.66$1.66
191Marking line grooved wet ref epoxy 6-inch (646.2040)LF27,200$1.40$1.95$1.95$1.95
192Marking line epoxy 8-inch (646.3020)LF1,925$1.00$1.75$1.75$1.75
193Marking line grooved wet ref epoxy 10-inch (646.4040)LF9,037$3.00$3.15$3.15$3.15
194Marking arrow epoxy (646.5020)EACH116$400.00$235.00$235.00$235.00
195Marking word epoxy (646.5120)EACH37$425.00$260.00$260.00$260.00
196Marking stop line epoxy 18-inch (646.6120)LF1,534$17.00$13.00$13.00$13.00
197Marking yield line epoxy 18-inch (646.6220)EACH35$41.00$50.00$50.00$50.00
198Cold weather marking epoxy 4-inch (646.6464)LF3,229$1.00$0.90$0.90$0.90
199Cold weather marking epoxy 6-inch (646.6466)LF27,200$0.75$1.35$1.35$1.35
200Cold weather marking epoxy 8-inch (646.6468)LF1,925$1.70$1.75$1.75$1.75
201Cold weather marking epoxy 10- inch (646.6470)LF13,919$1.60$2.20$2.20$2.20
202Marking diagonal epoxy 12-inch (646.7120)LF76$16.50$10.00$10.00$10.00
203Marking crosswalk epoxy transverse line 6-inch (646.7420)LF6,212$15.00$11.00$11.00$11.00
204Marking curb epoxy (646.8120)LF1,171$10.00$8.00$8.00$8.00
205Marking island nose epoxy (646.8220)EACH37$350.00$300.00$300.00$300.00
206Marking removal line 4-inch (646.9000)LF4,470$0.45$0.42$0.42$0.42
207Marking removal line water blasting 4-inch (646.9010)LF1,360$0.45$0.42$0.42$0.42
208Marking removal line 8-inch (646.9100)LF3,520$0.60$0.52$0.52$0.52
209Marking removal line water blasting 8-inch (646.9110)LF1,310$0.60$0.52$0.52$0.52
210Marking removal line wide (646.9200)LF60$1.00$1.00$1.00$1.00
211Marking removal line water blasting wide (646.9210)LF35$1.00$1.00$1.00$1.00
212Marking removal special marking (646.9300)EACH14$75.00$75.00$75.00$75.00
213Marking removal special marking water blasting (646.9310)EACH14$75.00$75.00$75.00$75.00
214Construction staking storm sewer (650.4000)EACH441$100.00$125.00$125.00$125.00
215Construction staking subgrade (650.4500)LF16,054$0.01$0.01$0.01$1.20
216Construction staking curb gutter and curb & gutter (650.5500)LF854$4.00$1.50$1.50$1.50
217Construction staking concrete pavement (650.7000)LF16,054$2.00$2.25$0.01$0.22
218Construction staking electrical installations (project) 001. 2390-12- 70 (650.8501)EACH1$35,000$3,000.00$6,500.00$3,000.00
219Construction staking curb ramps (650.9000)EACH93$150.00$150.00$150.00$150.00
220Construction staking sidewalk (project) 001. 2390-12-70 (650.9500)EACH1$15,000$2,500.00$2,500.00$2,500.00
221Construction staking supplemental control (project) 001. 2390-12-70 (650.9911)EACH1$15,000$3,500.00$3,500.00$3,500.00
222Construction staking slope stakes (650.9920)LF16,054$2.00$0.60$0.60$0.60
223Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF5,766$9.00$8.38$8.38$8.38
224Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF2,916$11.00$10.82$10.82$10.82
225Conduit special 2-inch (652.0605)LF843$20.00$19.48$19.48$19.48
226Conduit special 3-inch (652.0615)LF4,858$26.00$25.52$25.52$25.52
227Install conduit into existing item (652.0700.S)EACH4$400.00$391.55$391.55$391.55
228Conduit loop detector (652.0800)LF11,389$7.00$6.72$6.72$6.72
229Pull boxes steel 24X36-inch (653.0135)EACH35$1,250.00$1,222.17$1,222.17$1,222.17
230Pull boxes steel 24X42-inch (653.0140)EACH87$1,300.00$1,280.33$1,280.33$1,280.33
231Adjusting pull boxes (653.0900)EACH1$1,000.00$951.44$951.44$951.44
232Removing pull boxes (653.0905)EACH102$130.00$127.27$127.27$127.27
233Concrete bases type 1 (654.0101)EACH62$1,000.00$975.10$975.10$975.10
234Concrete bases type 2 (654.0102)EACH13$1,300.00$1,219.15$1,219.15$1,219.15
235Concrete bases type 5 (654.0105)EACH1$1,200.00$1,171.34$1,171.34$1,171.34
236Concrete bases type 10 (654.0110)EACH6$6,200.00$6,142.21$6,142.21$6,142.21
237Concrete bases type 10-special (654.0120)EACH18$8,000.00$7,976.52$7,976.52$7,976.52
238Concrete control cabinet bases type 9 special (654.0217)EACH6$2,500.00$2,461.40$2,461.40$2,461.40
239Cable traffic signal 5-14 AWG (655.0230)LF4,625$1.80$1.79$1.79$1.79
240Cable traffic signal 7-14 AWG (655.0240)LF12,092$2.30$2.29$2.29$2.29
241Cable traffic signal 12-14 AWG (655.0260)LF11,505$3.60$3.57$3.57$3.57
242Cable traffic signal 15-14 AWG (655.0270)LF5,376$4.50$4.41$4.41$4.41
243Cable type UF 2-12 AWG grounded (655.0305)LF1,655$1.30$1.23$1.23$1.23
244Cable type UF 2-10 AWG grounded (655.0320)LF4,748$2.80$2.78$2.78$2.78
245Electrical wire traffic signals 10 AWG (655.0515)LF14,142$1.70$1.66$1.66$1.66
246Electrical wire lighting 12 AWG (655.0610)LF12,963$1.00$0.91$0.91$0.91
247Loop detector lead in cable (655.0700)LF43,239$1.80$1.75$1.75$1.75
248Loop detector wire (655.0800)LF30,453$1.10$1.09$1.09$1.09
249Traffic signal evp detector cable (655.0900)LF6,432$1.60$1.55$1.55$1.55
250Electrical service meter breaker pedestal (location) 201. STH 31 & timber DR / regency mall south driveway (656.0201)EACH1$1,400.00$1,338.91$1,338.91$1,338.91
251Electrical service meter breaker pedestal (location) 202. STH 31 & regency mall north driveway (656.0201)EACH1$1,400.00$1,338.91$1,338.91$1,338.91
252Electrical service meter breaker pedestal (location) 203. STH 31 & high ridge / regency point (656.0201)EACH1$1,400.00$1,338.91$1,338.91$1,338.91
253Electrical service meter breaker pedestal (location) 204. STH 31 & 21ST ST (656.0201)EACH1$1,400.00$1,338.91$1,338.91$1,338.91
254Electrical service meter breaker pedestal (location) 205. STH 31 & 16TH ST (656.0201)EACH1$1,400.00$1,338.91$1,338.91$1,338.91
255Electrical service meter breaker pedestal (location) 206. STH 31 & wright ave (656.0201)EACH1$1,400.00$1,338.91$1,338.91$1,338.91
256Pedestal bases (657.0100)EACH62$450.00$420.49$420.49$420.49
257Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH14$750.00$724.86$724.86$724.86
258Poles type 3 (657.0310)EACH12$3,400.00$3,394.87$3,394.87$3,394.87
259Traffic signal standards aluminum 13-FT (657.0420)EACH1$950.00$908.06$908.06$908.06
260Traffic signal standards aluminum 15-FT (657.0425)EACH37$1,000.00$962.98$962.98$962.98
261Traffic signal standards aluminum 10-FT (657.0430)EACH24$900.00$854.32$854.32$854.32
262Luminaire arms single member 4- inch clamp 6-FT (657.0609)EACH24$350.00$346.52$346.52$346.52
263Traffic signal face 3S 12-inch (658.0173)EACH80$850.00$845.57$845.57$845.57
264Traffic signal face 4S 12-inch (658.0174)EACH58$1,200.00$1,171.60$1,171.60$1,171.60
265Traffic signal face 5S 12-inch (658.0175)EACH6$1,250.00$1,180.95$1,180.95$1,180.95
266Pedestrian signal face 16-inch (658.0416)EACH48$550.00$541.12$541.12$541.12
267Signal mounting hardware (location) 201. STH 31 & timber DR / regency mall south driveway (658.5070)EACH1$5,300.00$5,210.83$5,210.83$5,210.83
268Signal mounting hardware (location) 202. STH 31 & regency mall north driveway (658.5070)EACH1$5,300.00$5,210.83$5,210.83$5,210.83
269Signal mounting hardware (location) 203. STH 31 & high ridge / regency point (658.5070)EACH1$5,600.00$5,549.71$5,549.71$5,549.71
270Signal mounting hardware (location) 204. STH 31 & 21ST ST (658.5070)EACH1$6,000.00$5,903.79$5,903.79$5,903.79
271Signal mounting hardware (location) 205. STH 31 & 16TH ST (658.5070)EACH1$5,500.00$5,449.21$5,449.21$5,449.21
272Signal mounting hardware (location) 206. STH 31 & wright ave (658.5070)EACH1$5,600.00$5,549.71$5,549.71$5,549.71
273Luminaires utility LED C (659.1125)EACH36$550.00$534.73$534.73$534.73
274Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH167$15.00$12.03$12.03$12.03
275Temporary traffic signals for intersections (location) 200. STH 31 & STH 11 (661.0201)EACH1$65,000$64,562$64,562$64,562
276Temporary traffic signals for intersections (location) 201. STH 31 & timber DR / regency mall south driveway (661.0201)EACH1$55,000$54,771$54,771$54,771
277Temporary traffic signals for intersections (location) 202. STH 31 & regency mall north driveway (661.0201)EACH1$55,000$54,442$54,442$54,442
278Temporary traffic signals for intersections (location) 203. STH 31 & high ridge / regency point (661.0201)EACH1$55,000$54,634$54,634$54,634
279Temporary traffic signals for intersections (location) 204. STH 31 & 21ST ST (661.0201)EACH1$62,000$61,474$61,474$61,474
280Temporary traffic signals for intersections (location) 205. STH 31 & 16TH ST (661.0201)EACH1$62,000$60,924$60,924$60,924
281Temporary traffic signals for intersections (location) 206. STH 31 & wright ave (661.0201)EACH1$57,000$56,886$56,886$56,886
282Temporary traffic signals for intersections (location) 207. STH 31 & STH 20 (661.0201)EACH1$65,000$62,138$62,138$62,138
283Generators (661.0300)DAY6$400.00$374.03$374.03$374.03
284Field system integrator (670.0101)EACH1$40,000$38,823$38,823$38,823
285ITS documentation (670.0201)EACH1$5,800.00$5,781.02$5,781.02$5,781.02
286Conduit HDPE 2-duct 2-inch (671.0122)LF7,417$14.00$13.16$13.16$13.16
287Conduit HDPE directional bore 2- duct 2-inch (671.0222)LF233$30.00$29.60$29.60$29.60
288Communication vault type 1 (673.0105)EACH7$2,500.00$2,468.32$2,468.32$2,468.32
289Remove cable (674.0300)LF8,910$0.75$0.61$0.61$0.61
290Install camera assembly (677.0200)EACH8$1,200.00$1,140.07$1,140.07$1,140.07
291Install fiber optic cable outdoor plant 36-CT (678.0036)LF9,660$2.00$1.86$1.86$1.86
292Fiber optic splice enclosure (678.0200)EACH7$2,100.00$2,018.20$2,018.20$2,018.20
293Fiber optic splice (678.0300)EACH100$300.00$271.52$271.52$271.52
294Communication system testing (678.0501)EACH1$5,800.00$5,781.02$5,781.02$5,781.02
295Install ethernet switches (678.0600)EACH6$1,300.00$1,293.68$1,293.68$1,293.68
296Sawing asphalt (690.0150)LF6,050$1.50$1.30$1.35$1.35
297Sawing concrete (690.0250)LF10,630$2.00$2.75$2.10$2.10
298Incentive flexural strength concrete pavement (715.0715)DOL25,144$1.00$1.00$1.00$1.00
299Incentive iri ride (740.0440)DOL18,240$1.00$1.00$1.00$1.00
300On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS6,300$5.00$5.00$5.00$5.00
301On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS17,280$5.00$5.00$5.00$5.00
302Special 001. backfill slurry (SPV.0035)CY50$90.00$88.00$88.00$250.00
303Special 001. utility line opening (ulo) (SPV.0060)EACH25$750.00$1,453.03$1,000.00$500.00
304Special 002. field facilities office space (SPV.0060)EACH1$40,000$62,380$150,000$100,000
305Special 030. inlets 6-FT diameter (SPV.0060)EACH3$6,100.00$3,984.00$3,984.00$5,400.00
306Special 031. inlets 7-FT diameter (SPV.0060)EACH1$12,500$13,574$13,574$12,100
307Special 032. temporary inlet (SPV.0060)EACH44$1,800.00$2,301.00$2,301.00$1,100.00
308Special 033. temporary manholes (SPV.0060)EACH11$2,000.00$3,883.00$3,883.00$2,100.00
309Special 034. reconnect private storm sewer laterals (SPV.0060)EACH28$1,200.00$1,812.00$1,812.00$1,100.00
310Special 100. adjusting sanitary manholes (SPV.0060)EACH15$1,600.00$816.00$816.00$3,200.00
311Special 101. reconstructing sanitary manholes (SPV.0060)EACH7$3,700.00$1,383.00$1,383.00$3,800.00
312Special 200. install poles type 9 special (SPV.0060)EACH12$1,200.00$1,179.25$1,179.25$1,179.25
313Special 201. install poles type 10 (SPV.0060)EACH6$1,500.00$1,437.03$1,437.03$1,437.03
314Special 202. install poles type 10 special (SPV.0060)EACH6$1,600.00$1,551.11$1,551.11$1,551.11
315Special 203. install monotube arms 20-FT (SPV.0060)EACH1$1,500.00$1,465.19$1,465.19$1,465.19
316Special 204. install monotube arms 25-FT (SPV.0060)EACH2$1,500.00$1,465.19$1,465.19$1,465.19
317Special 205. install monotube arms 30-FT (SPV.0060)EACH3$1,500.00$1,465.19$1,465.19$1,465.19
318Special 206. install monotube arms 35-FT special (SPV.0060)EACH4$1,500.00$1,465.19$1,465.19$1,465.19
319Special 207. install monotube arms 40-FT special (SPV.0060)EACH11$1,800.00$1,765.93$1,765.93$1,765.93
320Special 208. install monotube arms 45-FT special (SPV.0060)EACH3$1,800.00$1,765.93$1,765.93$1,765.93
321Special 209. install luminaire arms steel 15-FT (SPV.0060)EACH12$350.00$332.70$332.70$332.70
322Special 210. TRNSPT traffic signal & inter lighting materials STH 31 & timber DR (SPV.0060)EACH1$1,100.00$1,081.64$1,081.64$1,081.64
323Special 211. TRNSPT traffic signal & inter lighting materials STH 31 & regency west DR (SPV.0060)EACH1$1,100.00$1,081.64$1,081.64$1,081.64
324Special 212. TRNSPT traffic signal & inter lighting materials STH 31 & high ridge ent (SPV.0060)EACH1$1,100.00$1,081.64$1,081.64$1,081.64
325Special 213. TRNSPT traffic signal & inter lighting materials STH 31 & 21ST ST (SPV.0060)EACH1$1,100.00$1,081.64$1,081.64$1,081.64
326Special 214. TRNSPT traffic signal & inter lighting materials STH 31 & 16TH ST (SPV.0060)EACH1$1,100.00$1,081.64$1,081.64$1,081.64
327Special 215. TRNSPT traffic signal & inter lighting materials STH 31 & wright ave (SPV.0060)EACH1$1,100.00$1,081.64$1,081.64$1,081.64
328Special 216. TRNSPT and install state furn sig cabinet STH 31 & timber DR (SPV.0060)EACH1$7,200.00$7,158.86$7,158.86$7,158.86
329Special 217. TRNSPT and install state furn sig cabinet STH 31 & regency west DR (SPV.0060)EACH1$7,000.00$6,835.04$6,835.04$6,835.04
330Special 218. TRNSPT and install state furn sig cabinet STH 31 & high ridge ent (SPV.0060)EACH1$6,600.00$6,511.21$6,511.21$6,511.21
331Special 219. TRNSPT and install state furn sig cabinet STH 31 & 21ST ST (SPV.0060)EACH1$7,700.00$7,654.53$7,654.53$7,654.53
332Special 220. TRNSPT and install state furn sig cabinet STH 31 & 16TH ST (SPV.0060)EACH1$7,000.00$6,987.01$6,987.01$6,987.01
333Special 221. TRNSPT and install state furn sig cabinet STH 31 & wright ave (SPV.0060)EACH1$6,300.00$6,231.42$6,231.42$6,231.42
334Special 222. TRNSPT & install state furn evp detect heads STH 31 & timber DR (SPV.0060)EACH1$3,000.00$2,811.82$2,811.82$2,811.82
335Special 223. TRNSPT & install state furn evp detect heads STH 31 & regency west DR (SPV.0060)EACH1$3,000.00$2,796.66$2,796.66$2,796.66
336Special 224. TRNSPT & install state furn evp detect heads STH 31 & high ridge ent (SPV.0060)EACH1$3,000.00$2,796.66$2,796.66$2,796.66
337Special 225. TRNSPT & install state furn evp detect heads STH 31 & 21ST ST (SPV.0060)EACH1$3,000.00$2,796.66$2,796.66$2,796.66
338Special 226. TRNSPT & install state furn evp detect heads STH 31 & 16TH ST (SPV.0060)EACH1$3,000.00$2,796.66$2,796.66$2,796.66
339Special 227. TRNSPT & install state furn evp detect heads STH 31 & wright ave (SPV.0060)EACH1$3,000.00$2,796.66$2,796.66$2,796.66
340Special 228. TRNSPT & install state furn video detect system STH 31 & wright ave (SPV.0060)EACH1$2,200.00$2,109.26$2,109.26$2,109.26
341Special 229. temporary infrared evp system STH 31 & timber DR (SPV.0060)EACH1$7,100.00$7,039.97$7,039.97$7,039.97
342Special 230. temporary infrared evp system STH 31 & regency west DR (SPV.0060)EACH1$7,100.00$7,039.97$7,039.97$7,039.97
343Special 231. temporary infrared evp system STH 31 & high ridge ent (SPV.0060)EACH1$7,100.00$7,039.97$7,039.97$7,039.97
344Special 232. temporary infrared evp system STH 31 & 21ST ST (SPV.0060)EACH1$7,100.00$7,039.97$7,039.97$7,039.97
345Special 233. temporary infrared evp system STH 31 & 16TH ST (SPV.0060)EACH1$7,100.00$7,039.97$7,039.97$7,039.97
346Special 234. temporary infrared evp system STH 31 & wright ave (SPV.0060)EACH1$7,100.00$7,039.97$7,039.97$7,039.97
347Special 235. removing concrete monotube traffic signal bases (SPV.0060)EACH4$2,000.00$1,909.45$1,909.45$1,909.45
348Special 236. install fiber optic communications in cabinet STH 31 & timber DR (SPV.0060)EACH1$550.00$540.82$540.82$540.82
349Special 237. install fiber optic communications in cabinet STH 31 & regency west DR (SPV.0060)EACH1$550.00$540.82$540.82$540.82
350Special 238. install fiber optic communications in cabinet STH 31 & high ridge ent (SPV.0060)EACH1$550.00$540.82$540.82$540.82
351Special 239. install fiber optic communications in cabinet STH 31 & 21ST ST (SPV.0060)EACH1$550.00$540.82$540.82$540.82
352Special 240. install fiber optic communications in cabinet STH 31 & 16TH ST (SPV.0060)EACH1$550.00$540.82$540.82$540.82
353Special 241. install fiber optic communications in cabinet STH 31 & wright ave (SPV.0060)EACH1$550.00$540.82$540.82$540.82
354Special 242. TRNSPT and install state furn audible ped system STH 31 & STH 11 (SPV.0060)EACH1$2,800.00$2,774.87$2,774.87$2,774.87
355Special 243. TRNSPT and install state furn audible ped system STH 31 & timber DR (SPV.0060)EACH1$3,500.00$3,462.27$3,462.27$3,462.27
356Special 244. TRNSPT and install state furn audible ped system STH 31 & regency west DR (SPV.0060)EACH1$3,500.00$3,462.27$3,462.27$3,462.27
357Special 245. TRNSPT and install state furn audible ped system STH 31 & high ridge ent (SPV.0060)EACH1$3,500.00$3,462.27$3,462.27$3,462.27
358Special 246. TRNSPT and install state furn audible ped system STH 31 & 21ST ST (SPV.0060)EACH1$3,500.00$3,462.27$3,462.27$3,462.27
359Special 247. TRNSPT and install state furn audible ped system STH 31 & 16TH ST (SPV.0060)EACH1$3,500.00$3,462.27$3,462.27$3,462.27
360Special 248. TRNSPT and install state furn audible ped system STH 31 & wright ave (SPV.0060)EACH1$3,500.00$3,462.27$3,462.27$3,462.27
361Special 249. TRNSPT and install state furn audible ped system STH 31 & STH 20 (SPV.0060)EACH1$3,000.00$2,774.87$2,774.87$2,774.87
362Special 250. remove, salvage, & reinstall traffic sig and lighting equip STH 31 & STH 11 (SPV.0060)EACH1$3,000.00$2,748.30$2,748.30$2,748.30
363Special 251. maintain existing traffic signal interconnect system (SPV.0060)EACH1$1,600.00$15,448$15,448$15,448
364Special 252. temporary infrared evp system STH 31 & STH 11 (SPV.0060)EACH1$5,500.00$5,387.18$5,387.18$5,387.18
365Special 253. temporary infrared evp system STH 31 & STH 20 (SPV.0060)EACH1$5,500.00$5,387.18$5,387.18$5,387.18
366Special 030. temporary storm sewer connection (SPV.0090)LF1,373$50.00$90.00$90.00$50.00
367Special 200. fiber optic warning tape (SPV.0090)LF8,468$0.60$0.55$0.55$0.55
WisDOT contract 20260113021: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy