| 1 | Grubbing (201.0205) | STA | 58 | $849.59 | $880.00 |
| 2 | Grubbing (201.0220) | ID | 5 | $45.00 | $55.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 18 | $1,115.00 | $1,226.19 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 142 | $0.01 | $0.01 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 18,710 | $1.60 | $3.30 |
| 6 | Removing curb & gutter (204.0150) | LF | 1,785 | $4.99 | $17.56 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 675 | $4.89 | $14.20 |
| 8 | Removing guardrail (204.0165) | LF | 215 | $3.50 | $3.85 |
| 9 | Removing masonry (204.0185) | CY | 1 | $217.70 | $175.96 |
| 10 | Removing concrete bases (204.0195) | EACH | 8 | $283.84 | $194.09 |
| 11 | Removing manholes (204.0210) | EACH | 2 | $605.00 | $665.33 |
| 12 | Removing catch basins (204.0215) | EACH | 1 | $925.00 | $1,017.24 |
| 13 | Removing inlets (204.0220) | EACH | 10 | $915.00 | $1,006.24 |
| 14 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 752 | $40.00 | $44.00 |
| 15 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 220 | $40.00 | $44.00 |
| 16 | Removing storm sewer (size) 03. 60-inch (204.0245) | LF | 72 | $40.00 | $44.00 |
| 17 | Removing storm sewer (size) 04. 48X104-inch (204.0245) | LF | 52 | $40.00 | $44.00 |
| 18 | Excavation common (205.0100) | CY | 41,931 | $14.50 | $15.83 |
| 19 | Finishing roadway (project) 01. 3751-03-70 (213.0100) | EACH | 1 | $500.00 | $1,750.00 |
| 20 | Base aggregate dense 3/4-inch (305.0110) | TON | 798 | $25.57 | $28.04 |
| 21 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 21,738 | $14.78 | $19.93 |
| 22 | Base aggregate open-graded (310.0110) | TON | 74 | $39.43 | $55.73 |
| 23 | Select crushed material (312.0110) | TON | 9,835 | $25.84 | $19.00 |
| 24 | Pulverize and relay (325.0100) | SY | 18,710 | $3.66 | $2.75 |
| 25 | QMP base aggregate dense 1 1/4- inch compaction (371.2000.S) | EACH | 8 | $1,897.58 | $1,099.00 |
| 26 | HMA cold weather paving (450.4000) | TON | 96 | $12.00 | $13.18 |
| 27 | Tack coat (455.0605) | GAL | 5,270 | $2.00 | $2.20 |
| 28 | Incentive density HMA pavement (460.2000) | DOL | 6,400 | $1.00 | $1.00 |
| 29 | HMA pavement 3 MT 58-28 H (460.6423) | TON | 6,095 | $82.00 | $90.09 |
| 30 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 3,900 | $84.00 | $92.38 |
| 31 | Asphaltic surface (465.0105) | TON | 1,880 | $85.00 | $93.39 |
| 32 | Asphaltic surface driveways and field entrances (465.0120) | TON | 244 | $125.00 | $137.34 |
| 33 | Asphaltic surface temporary (465.0125) | TON | 99 | $170.00 | $186.78 |
| 34 | Asphaltic rumble strips, shoulder sinusoidal (465.0525) | LF | 3,540 | $0.81 | $1.10 |
| 35 | Asphaltic rumble strips, edge line (465.0540) | LF | 1,150 | $0.81 | $1.10 |
| 36 | Asphaltic rumble strips, centerline sinusoidal (465.0565) | LF | 3,705 | $0.81 | $1.10 |
| 37 | Concrete collars for pipe (520.8000) | EACH | 2 | $830.00 | $912.77 |
| 38 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 6 | $375.00 | $412.40 |
| 39 | Apron endwalls for culvert pipe steel 15-inch (521.1015) | EACH | 14 | $400.00 | $439.89 |
| 40 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 2 | $430.00 | $472.88 |
| 41 | Culvert pipe corrugated steel 12- inch (521.3112) | LF | 121 | $75.00 | $82.48 |
| 42 | Culvert pipe corrugated steel 15- inch (521.3115) | LF | 203 | $65.00 | $71.48 |
| 43 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 25 | $95.00 | $104.47 |
| 44 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 69 | $115.00 | $126.47 |
| 45 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 10 | $1,470.00 | $1,616.59 |
| 46 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 3 | $1,520.00 | $1,671.57 |
| 47 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 6 | $1,585.00 | $1,743.06 |
| 48 | Apron endwalls for culvert pipe reinforced concrete 21-inch (522.1021) | EACH | 1 | $1,645.00 | $1,809.04 |
| 49 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 2 | $1,715.00 | $1,886.02 |
| 50 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 1 | $1,910.00 | $2,100.46 |
| 51 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 2 | $2,125.00 | $2,336.91 |
| 52 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 48X76-inch (522.2648) | EACH | 2 | $4,090.00 | $4,497.86 |
| 53 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 3,675 | $23.00 | $27.00 |
| 54 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 6,260 | $25.00 | $25.00 |
| 55 | Concrete curb pedestrian (601.0600) | LF | 26 | $45.00 | $104.47 |
| 56 | Concrete sidewalk 5-inch (602.0410) | SF | 9,540 | $10.00 | $8.50 |
| 57 | Curb ramp detectable warning field yellow (602.0505) | SF | 205 | $45.00 | $55.00 |
| 58 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 90 | $55.00 | $93.00 |
| 59 | Concrete driveway 6-inch (602.0810) | SY | 737 | $75.00 | $80.28 |
| 60 | Concrete surface drains (602.3010) | CY | 6 | $950.00 | $1,649.58 |
| 61 | Riprap medium (606.0200) | CY | 86 | $175.00 | $192.27 |
| 62 | Riprap heavy (606.0300) | CY | 39 | $175.00 | $192.27 |
| 63 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 620 | $75.00 | $82.40 |
| 64 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 1,926 | $75.00 | $82.40 |
| 65 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 582 | $90.00 | $98.88 |
| 66 | Storm sewer pipe reinforced concrete class III 21-inch (608.0321) | LF | 84 | $90.00 | $98.88 |
| 67 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 147 | $105.00 | $115.60 |
| 68 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 306 | $75.00 | $82.40 |
| 69 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 127 | $85.00 | $93.40 |
| 70 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 655 | $80.00 | $88.00 |
| 71 | Storm sewer pipe reinforced concrete class IV 21-inch (608.0421) | LF | 98 | $80.00 | $88.00 |
| 72 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 51 | $145.00 | $159.31 |
| 73 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 75 | $150.00 | $165.00 |
| 74 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (608.2424) | LF | 67 | $230.00 | $252.70 |
| 75 | Reconstructing inlets (611.0430) | EACH | 3 | $1,165.00 | $1,280.00 |
| 76 | Manhole covers type J (611.0530) | EACH | 23 | $620.00 | $681.00 |
| 77 | Inlet covers type B (611.0606) | EACH | 3 | $905.00 | $994.32 |
| 78 | Inlet covers type BW (611.0610) | EACH | 2 | $885.00 | $972.35 |
| 79 | Inlet covers type H (611.0624) | EACH | 31 | $865.00 | $950.37 |
| 80 | Inlet covers type HM (611.0627) | EACH | 22 | $865.00 | $950.37 |
| 81 | Catch basins 4-FT diameter (611.1004) | EACH | 21 | $2,505.00 | $2,754.80 |
| 82 | Catch basins 5-FT diameter (611.1005) | EACH | 2 | $4,095.00 | $4,503.35 |
| 83 | Catch basins 2X3-FT (611.1230) | EACH | 35 | $2,040.00 | $2,243.43 |
| 84 | Manholes 4-FT diameter (611.2004) | EACH | 9 | $2,800.00 | $3,079.22 |
| 85 | Manholes 5-FT diameter (611.2005) | EACH | 11 | $3,885.00 | $4,272.41 |
| 86 | Pipe underdrain 6-inch (612.0106) | LF | 2,500 | $15.00 | $16.50 |
| 87 | Pipe underdrain unperforated 4- inch (612.0204) | LF | 100 | $65.00 | $71.50 |
| 88 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 275 | $18.70 | $24.17 |
| 89 | Insulation board polystyrene (inch) 01. 4-inch (612.0902.S) | SY | 20 | $45.00 | $49.50 |
| 90 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 190 | $15.00 | $16.50 |
| 91 | MGS guardrail 3 (614.2300) | LF | 287.50 | $38.00 | $41.79 |
| 92 | MGS guardrail terminal eat (614.2610) | EACH | 2 | $3,850.00 | $4,234.00 |
| 93 | Mobilization (619.1000) | EACH | 1 | $297,560 | $143,534 |
| 94 | Water (624.0100) | MGAL | 567 | $7.92 | $28.10 |
| 95 | Topsoil (625.0100) | SY | 5,445 | $1.64 | $5.24 |
| 96 | Salvaged topsoil (625.0500) | SY | 25,395 | $0.66 | $3.65 |
| 97 | Mulching (627.0200) | SY | 32,730 | $0.25 | $0.27 |
| 98 | Erosion bales (628.1104) | EACH | 200 | $16.75 | $18.42 |
| 99 | Silt fence (628.1504) | LF | 7,125 | $1.85 | $2.03 |
| 100 | Silt fence maintenance (628.1520) | LF | 3,580 | $0.25 | $0.27 |
| 101 | Silt fence heavy duty (628.1530.S) | LF | 195 | $15.40 | $16.94 |
| 102 | Silt fence heavy duty maintenance (628.1535.S) | LF | 100 | $5.75 | $6.32 |
| 103 | Mobilizations erosion control (628.1905) | EACH | 8 | $50.00 | $55.00 |
| 104 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $50.00 | $55.00 |
| 105 | Erosion mat class I type B (628.2004) | SY | 5,195 | $1.68 | $1.85 |
| 106 | Erosion mat urban class I type B (628.2008) | SY | 11,150 | $1.68 | $1.85 |
| 107 | Soil stabilizer type B (628.6510) | ACRE | 2 | $550.00 | $604.85 |
| 108 | Inlet protection type A (628.7005) | EACH | 72 | $70.00 | $76.98 |
| 109 | Inlet protection type B (628.7010) | EACH | 5 | $60.00 | $65.98 |
| 110 | Inlet protection type C (628.7015) | EACH | 64 | $60.00 | $66.00 |
| 111 | Inlet protection type D (628.7020) | EACH | 9 | $120.00 | $131.97 |
| 112 | Temporary ditch checks (628.7504) | LF | 770 | $6.75 | $7.42 |
| 113 | Culvert pipe checks (628.7555) | EACH | 52 | $34.00 | $38.00 |
| 114 | Tracking pads (628.7560) | EACH | 6 | $500.00 | $2,593.00 |
| 115 | Rock bags (628.7570) | EACH | 160 | $18.00 | $19.80 |
| 116 | Fertilizer type B (629.0210) | CWT | 26.40 | $175.00 | $192.45 |
| 117 | Seeding mixture no. 30 (630.0130) | LB | 1,423 | $9.50 | $10.71 |
| 118 | Seeding mixture no. 70A (630.0171) | LB | 33 | $150.00 | $165.00 |
| 119 | Seeding temporary (630.0200) | LB | 436 | $4.00 | $4.40 |
| 120 | Seeding borrow pit (630.0300) | LB | 235 | $4.00 | $4.40 |
| 121 | Seed water (630.0500) | MGAL | 1,072 | $12.50 | $13.75 |
| 122 | Sod water (631.0300) | MGAL | 150 | $30.00 | $33.00 |
| 123 | Sod lawn (631.1000) | SY | 6,320 | $7.15 | $7.86 |
| 124 | Markers culvert end (633.5200) | EACH | 27 | $65.00 | $71.48 |
| 125 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 4 | $165.00 | $182.00 |
| 126 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 17 | $165.00 | $182.00 |
| 127 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 27 | $165.00 | $182.00 |
| 128 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 3 | $165.00 | $182.00 |
| 129 | Signs type II reflective H (637.2210) | SF | 300.28 | $22.00 | $26.48 |
| 130 | Signs type II reflective SH (637.2220) | SF | 2.25 | $22.00 | $24.20 |
| 131 | Signs type II reflective F (637.2230) | SF | 174.75 | $22.00 | $24.20 |
| 132 | Moving signs type II (638.2102) | EACH | 15 | $115.00 | $126.47 |
| 133 | Removing signs type II (638.2602) | EACH | 50 | $35.00 | $38.49 |
| 134 | Removing small sign supports (638.3000) | EACH | 34 | $35.00 | $39.00 |
| 135 | Field office type C (642.5201) | EACH | 1 | $31,697 | $17,580 |
| 136 | Traffic control drums (643.0300) | DAY | 8,025 | $0.35 | $0.38 |
| 137 | Traffic control barricades type III (643.0420) | DAY | 2,189 | $1.00 | $1.10 |
| 138 | Traffic control warning lights type A (643.0705) | DAY | 4,208 | $0.10 | $0.11 |
| 139 | Traffic control warning lights type C (643.0715) | DAY | 2,111 | $0.10 | $0.11 |
| 140 | Traffic control signs (643.0900) | DAY | 36,075 | $0.25 | $0.27 |
| 141 | Traffic control signs fixed message (643.1000) | SF | 66 | $20.00 | $22.00 |
| 142 | Traffic control signs PCMS (643.1050) | DAY | 42 | $65.00 | $71.42 |
| 143 | Traffic control cones 42-inch (643.1070) | DAY | 240 | $2.00 | $2.20 |
| 144 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 147 | $20.00 | $21.97 |
| 145 | Temporary marking line paint 4- inch (643.3105) | LF | 2,450 | $1.95 | $2.14 |
| 146 | Temporary marking line removable tape 4-inch (643.3150) | LF | 16,670 | $1.00 | $1.10 |
| 147 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 74 | $2.95 | $3.24 |
| 148 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 575 | $1.10 | $1.21 |
| 149 | Temporary marking stop line paint 18-inch (643.3805) | LF | 70 | $9.05 | $9.94 |
| 150 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 180 | $5.00 | $5.49 |
| 151 | Traffic control (643.5000) | EACH | 1 | $25,000 | $27,468 |
| 152 | Temporary pedestrian surface matting (644.1440) | SF | 250 | $9.00 | $9.89 |
| 153 | Temporary pedestrian curb ramp (644.1601) | DAY | 80 | $20.00 | $21.97 |
| 154 | Temporary pedestrian detectable warning field (644.1605) | SF | 60 | $10.00 | $11.00 |
| 155 | Temporary pedestrian barricade (644.1810) | LF | 354 | $5.00 | $5.50 |
| 156 | Temporary audible message devices (644.1900.S) | DAY | 410 | $2.50 | $2.75 |
| 157 | Geotextile type DF schedule A (645.0111) | SY | 1,480 | $1.00 | $1.10 |
| 158 | Geotextile type HR (645.0120) | SY | 495 | $5.00 | $5.50 |
| 159 | Geogrid type SR (645.0220) | SY | 11,301 | $2.24 | $4.06 |
| 160 | Marking line epoxy 6-inch (646.2020) | LF | 32,087 | $0.54 | $0.93 |
| 161 | Marking line epoxy 10-inch (646.4020) | LF | 901 | $1.19 | $1.59 |
| 162 | Marking arrow epoxy (646.5020) | EACH | 18 | $416.89 | $385.00 |
| 163 | Marking word epoxy (646.5120) | EACH | 3 | $422.06 | $494.41 |
| 164 | Marking stop line epoxy 18-inch (646.6120) | LF | 210 | $17.50 | $17.58 |
| 165 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 795 | $16.58 | $12.09 |
| 166 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 30 | $28.70 | $27.47 |
| 167 | Marking removal line water blasting 4-inch (646.9010) | LF | 577 | $5.00 | $11.00 |
| 168 | Locating no-passing zones (648.0100) | MI | 1.56 | $568.44 | $1,099.72 |
| 169 | Construction staking storm sewer (650.4000) | EACH | 111 | $135.00 | $148.32 |
| 170 | Construction staking subgrade (650.4500) | LF | 8,215 | $0.01 | $0.01 |
| 171 | Construction staking base (650.5000) | LF | 8,215 | $0.01 | $0.01 |
| 172 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 9,935 | $1.60 | $1.76 |
| 173 | Construction staking pipe culverts (650.6000) | EACH | 12 | $135.00 | $148.32 |
| 174 | Construction staking structure layout (structure) 01. modular wall (650.6501) | EACH | 1 | $2,500.00 | $2,750.00 |
| 175 | Construction staking curb ramps (650.9000) | EACH | 20 | $150.00 | $165.00 |
| 176 | Construction staking sidewalk (project) 01. 3751-03-70 (650.9500) | EACH | 1 | $5,000.00 | $5,500.00 |
| 177 | Construction staking supplemental control (project) 01. 3751-03-70 (650.9911) | EACH | 1 | $3,000.00 | $3,296.00 |
| 178 | Construction staking slope stakes (650.9920) | LF | 8,215 | $0.70 | $0.77 |
| 179 | Concrete bases type 1 (654.0101) | EACH | 2 | $1,514.00 | $1,664.00 |
| 180 | Sawing asphalt (690.0150) | LF | 1,110 | $1.75 | $2.14 |
| 181 | Sawing concrete (690.0250) | LF | 235 | $2.80 | $3.02 |
| 182 | Incentive iri ride (740.0440) | DOL | 6,256 | $1.00 | $1.00 |
| 183 | Crack and damage survey (999.1501.S) | EACH | 1 | $1,200.00 | $1,318.44 |
| 184 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 |
| 185 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 4,800 | $5.00 | $5.00 |
| 186 | Special 02. temporary mailbox station (SPV.0060) | EACH | 3 | $795.00 | $1,650.00 |
| 187 | Special 03. remove, salvage, and reinstall flashing stop sign (SPV.0060) | EACH | 2 | $1,675.00 | $1,840.00 |
| 188 | Special 04. bend 45-degree HE-IV 48X76-inch (SPV.0060) | EACH | 5 | $10,545 | $11,596 |
| 189 | Special 05. abandon 60-inch CMP and fill with grout (SPV.0060) | EACH | 1 | $45,075 | $49,524 |
| 190 | Special 06. adjust sanitary manhole (SPV.0060) | EACH | 10 | $1,355.00 | $1,489.00 |
| 191 | Special 07. reconstruct sanitary manhole (SPV.0060) | EACH | 10 | $1,840.00 | $2,025.00 |
| 192 | Special 08. reconstruct sanitary manhole with new casting (SPV.0060) | EACH | 1 | $2,770.00 | $3,046.00 |
| 193 | Special 09. rectangular rapid flashing beacon (SPV.0060) | EACH | 1 | $13,003 | $14,300 |
| 194 | Special 10. dewatering (SPV.0060) | EACH | 3 | $2,003.84 | $0.01 |
| 195 | Special 01. storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 48X76 (SPV.0090) | LF | 275 | $450.00 | $494.41 |
| 196 | Special 02. fence split rail three rail (SPV.0090) | LF | 1,810 | $16.00 | $17.60 |
| 197 | Special 01. wall modular block gravity landscape (SPV.0165) | SF | 680 | $115.00 | $126.47 |
| 198 | Special 01. excavation, hauling, dewatering, and disposal of petroleum contaminated soil (SPV.0195) | TON | 480 | $52.50 | $61.32 |