WisDOT contract 20260310016 bid tabulation
2410-15-70. Let by Wisconsin DOT on March 10, 2026, Milwaukee. 5 bids received; low bid $22,328,024 by Hoffman Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 10 MAR 2026
- Pay items
- 353
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Hoffman Construction Company | $22,328,024 | Low |
| 2 | Vinton Construction Company | $23,000,387 | +3.0% |
| 3 | Super Western, Inc. | $23,197,394 | +4.0% |
| 4 | Lalonde Contractors Incorporated | $23,766,563 | +6.0% |
| 5 | Zignego Company, Inc. | $24,890,943 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hoffman Construction Company | 2. Vinton Construction Company | 3. Super Western, Inc. | 4. Lalonde Contractors Incorporated | 5. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 19 | $265.00 | $267.65 | $275.00 | $265.00 | $250.00 |
| 2 | Grubbing (201.0220) | ID | 126 | $10.00 | $10.10 | $10.00 | $10.00 | $15.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 51,495 | $30.00 | $1.50 | $1.90 | $6.34 | $8.00 |
| 4 | Removing curb (204.0130) | LF | 95 | $10.00 | $10.00 | $6.27 | $6.18 | $10.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 495 | $10.00 | $10.00 | $4.71 | $6.33 | $10.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 6,255 | $10.00 | $9.54 | $6.25 | $9.97 | $8.00 |
| 7 | Removing fence (204.0170) | LF | 260 | $5.00 | $2.00 | $6.00 | $2.00 | $2.00 |
| 8 | Removing concrete slope paving (204.0175) | SY | 280 | $22.00 | $25.00 | $16.37 | $18.70 | $50.00 |
| 9 | Removing concrete bases (204.0195) | EACH | 93 | $400.00 | $200.00 | $300.00 | $200.00 | $300.00 |
| 10 | Removing manholes (204.0210) | EACH | 38 | $350.00 | $797.93 | $840.00 | $1,000.00 | $1,847.00 |
| 11 | Removing catch basins (204.0215) | EACH | 60 | $350.00 | $556.50 | $335.00 | $1,000.00 | $929.00 |
| 12 | Removing storm sewer (size) 001. 10-inch (204.0245) | LF | 85 | $12.50 | $29.36 | $20.00 | $25.00 | $35.00 |
| 13 | Removing storm sewer (size) 002. 12-inch (204.0245) | LF | 2,540 | $12.50 | $35.65 | $40.00 | $25.00 | $27.00 |
| 14 | Removing storm sewer (size) 003. 15-inch (204.0245) | LF | 735 | $12.50 | $22.60 | $46.00 | $25.00 | $26.00 |
| 15 | Removing storm sewer (size) 004. 18-inch (204.0245) | LF | 1,330 | $12.50 | $54.29 | $55.00 | $25.00 | $37.00 |
| 16 | Removing storm sewer (size) 005. 21-inch (204.0245) | LF | 675 | $12.50 | $66.61 | $60.00 | $25.00 | $41.00 |
| 17 | Removing storm sewer (size) 006. 24-inch (204.0245) | LF | 375 | $12.50 | $27.65 | $80.00 | $25.00 | $28.00 |
| 18 | Removing storm sewer (size) 007. 27-inch (204.0245) | LF | 35 | $12.50 | $15.61 | $80.00 | $25.00 | $35.00 |
| 19 | Removing storm sewer (size) 008. 36-inch (204.0245) | LF | 305 | $25.00 | $67.99 | $100.00 | $35.00 | $73.00 |
| 20 | Removing storm sewer (size) 009. 48-inch (204.0245) | LF | 1,795 | $25.00 | $246.42 | $260.00 | $35.00 | $71.00 |
| 21 | Removing storm sewer (size) 010. 60-inch (204.0245) | LF | 595 | $25.00 | $25.08 | $135.00 | $35.00 | $78.00 |
| 22 | Removing storm sewer (size) 011. 84-inch (204.0245) | LF | 945 | $75.00 | $46.69 | $222.00 | $35.00 | $53.00 |
| 23 | Removing (item description) 001. landscaping bed (204.9060.S) | EACH | 1 | $3,500.00 | $1,000.00 | $5,181.70 | $1,490.00 | $1,800.00 |
| 24 | Removing (item description) 101. traffic signals national ave & cleveland ave (204.9060.S) | EACH | 1 | $7,198.00 | $7,198.00 | $5,996.09 | $7,198.00 | $7,198.00 |
| 25 | Removing (item description) 102. traffic signals national ave & 102ND ST (204.9060.S) | EACH | 1 | $7,198.00 | $7,198.00 | $6,178.09 | $7,198.00 | $7,198.00 |
| 26 | Removing (item description) 103. loop detector wire & lead-in cable STH 100 & national ave (204.9060.S) | EACH | 1 | $1,448.00 | $1,448.00 | $2,753.75 | $1,448.00 | $1,448.00 |
| 27 | Removing (item description) 001. pipe railing partial (204.9090.S) | LF | 15 | $80.00 | $15.00 | $103.83 | $1.00 | $100.00 |
| 28 | Removing (item description) 201. removing electrical conductors from existing conduit (204.9090.S) | LF | 990 | $2.06 | $2.06 | $2.02 | $2.06 | $2.06 |
| 29 | Removing (item description) 202. removing or abandoning conduit (204.9090.S) | LF | 990 | $3.00 | $3.00 | $3.84 | $3.00 | $3.00 |
| 30 | Excavation common (205.0100) | CY | 55,441 | $30.00 | $29.16 | $23.71 | $18.98 | $25.00 |
| 31 | Finishing roadway (project) 001. 2410-15-70 (213.0100) | EACH | 1 | $500.00 | $10,000 | $6,067.26 | $4,150.00 | $1,000.00 |
| 32 | Base aggregate dense 3/4-inch (305.0110) | TON | 10 | $146.67 | $100.00 | $47.52 | $44.20 | $100.00 |
| 33 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 24,410 | $0.01 | $18.20 | $19.90 | $19.57 | $25.00 |
| 34 | Base aggregate open-graded (310.0110) | TON | 325 | $29.74 | $50.18 | $34.08 | $40.00 | $50.00 |
| 35 | Breaker run (311.0110) | TON | 38,169 | $0.01 | $17.60 | $19.73 | $19.42 | $0.01 |
| 36 | Concrete base 9-inch (320.0155) | SY | 2,030 | $83.31 | $70.18 | $83.31 | $73.28 | $95.00 |
| 37 | Coloring concrete custom (405.0200) | CY | 655 | $127.99 | $97.02 | $127.99 | $125.45 | $100.00 |
| 38 | Concrete pavement 8-inch (415.0080) | SY | 34,695 | $58.24 | $72.50 | $58.24 | $57.41 | $75.22 |
| 39 | Concrete pavement gaps (415.0210) | EACH | 4 | $854.89 | $2,000.00 | $854.89 | $1,325.33 | $1,000.00 |
| 40 | Concrete pavement hes 8-inch (415.1080) | SY | 285 | $78.97 | $95.61 | $78.97 | $84.11 | $92.00 |
| 41 | Concrete pavement joint filling (415.4100) | SY | 38,905 | $1.70 | $2.00 | $1.70 | $1.61 | $1.25 |
| 42 | Drilled tie bars (416.0610) | EACH | 2,095 | $9.64 | $6.00 | $9.64 | $14.40 | $15.00 |
| 43 | Drilled dowel bars (416.0620) | EACH | 705 | $14.00 | $11.00 | $14.00 | $18.56 | $20.00 |
| 44 | Tack coat (455.0605) | GAL | 255 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 45 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 85 | $119.00 | $119.00 | $119.00 | $119.00 | $119.00 |
| 46 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 420 | $119.00 | $119.00 | $119.00 | $119.00 | $119.00 |
| 47 | Asphaltic surface driveways and field entrances (465.0120) | TON | 215 | $245.00 | $245.00 | $245.00 | $245.00 | $245.00 |
| 48 | Asphaltic surface temporary (465.0125) | TON | 1,280 | $103.25 | $103.25 | $103.25 | $103.25 | $103.25 |
| 49 | Cold patch (495.1000.S) | TON | 50 | $550.00 | $249.00 | $131.86 | $396.80 | $0.01 |
| 50 | Concrete collars for pipe (520.8000) | EACH | 11 | $750.00 | $975.00 | $425.00 | $2,500.00 | $951.00 |
| 51 | Drilling shaft 48-inch (531.2048) | LF | 28 | $500.00 | $18.00 | $450.00 | $330.00 | $500.00 |
| 52 | Foundation single-shaft type TC-IV (structure) 001. S-40-673 (531.5340) | EACH | 1 | $19,950 | $23,066 | $22,500 | $22,970 | $19,950 |
| 53 | Truss cantilever 2-chord type IV (structure) 001. S-40-673 (532.5340) | EACH | 1 | $69,900 | $68,600 | $73,000 | $65,000 | $69,900 |
| 54 | Concrete curb type D (601.0110) | LF | 100 | $86.13 | $42.74 | $86.13 | $53.47 | $42.75 |
| 55 | Concrete curb integral type D (601.0150) | LF | 1,525 | $4.60 | $40.58 | $4.60 | $15.97 | $40.00 |
| 56 | Concrete curb & gutter 19-inch (601.0319) | LF | 1,030 | $29.76 | $28.29 | $29.76 | $19.71 | $28.36 |
| 57 | Concrete curb & gutter 31-inch (601.0331) | LF | 18,315 | $25.15 | $27.12 | $25.15 | $31.88 | $27.08 |
| 58 | Concrete curb pedestrian (601.0600) | LF | 1,730 | $82.54 | $35.69 | $82.54 | $45.66 | $35.68 |
| 59 | Concrete sidewalk 5-inch (602.0410) | SF | 95,845 | $6.46 | $7.36 | $6.46 | $8.34 | $6.81 |
| 60 | Concrete sidewalk 7-inch (602.0420) | SF | 5,440 | $15.69 | $13.81 | $15.69 | $8.60 | $15.35 |
| 61 | Curb ramp detectable warning field yellow (602.0505) | SF | 1,475 | $54.15 | $32.16 | $54.15 | $45.88 | $32.76 |
| 62 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 445 | $75.66 | $44.03 | $75.66 | $61.45 | $44.86 |
| 63 | Concrete driveway 7-inch (602.0815) | SY | 1,685 | $74.24 | $85.97 | $74.24 | $73.38 | $71.07 |
| 64 | Concrete safety islands (602.2400) | SF | 6,300 | $11.81 | $14.95 | $11.81 | $15.33 | $14.98 |
| 65 | Slope paving concrete (604.0400) | SY | 300 | $53.51 | $85.57 | $53.51 | $137.28 | $200.00 |
| 66 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 2,310 | $64.00 | $117.02 | $135.00 | $190.00 | $82.00 |
| 67 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 407 | $66.00 | $141.47 | $150.00 | $200.00 | $90.00 |
| 68 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 40 | $86.00 | $203.09 | $250.00 | $225.00 | $112.00 |
| 69 | Storm sewer pipe reinforced concrete class III 21-inch (608.0321) | LF | 189 | $78.00 | $175.90 | $188.00 | $230.00 | $98.00 |
| 70 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 1,114 | $90.00 | $202.77 | $230.00 | $235.00 | $116.00 |
| 71 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 140 | $132.00 | $251.22 | $323.00 | $260.00 | $173.00 |
| 72 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 418 | $156.00 | $251.99 | $350.00 | $320.00 | $186.00 |
| 73 | Storm sewer pipe reinforced concrete class III 42-inch (608.0342) | LF | 200 | $182.00 | $295.55 | $470.00 | $385.00 | $228.00 |
| 74 | Storm sewer pipe reinforced concrete class III 48-inch (608.0348) | LF | 39 | $256.00 | $342.32 | $695.00 | $500.00 | $275.00 |
| 75 | Storm sewer pipe reinforced concrete class III 60-inch (608.0360) | LF | 406 | $388.00 | $506.72 | $565.00 | $700.00 | $458.00 |
| 76 | Storm sewer pipe reinforced concrete class III 66-inch (608.0366) | LF | 183 | $424.00 | $625.57 | $690.00 | $750.00 | $604.00 |
| 77 | Storm sewer pipe reinforced concrete class III 108-inch (608.0398) | LF | 923 | $1,900.00 | $2,066.22 | $1,995.00 | $2,700.00 | $2,310.00 |
| 78 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 1,011 | $64.00 | $95.70 | $130.00 | $190.00 | $79.00 |
| 79 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 241 | $66.00 | $107.11 | $143.00 | $200.00 | $84.00 |
| 80 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 293 | $128.00 | $199.49 | $240.00 | $275.00 | $144.00 |
| 81 | Storm sewer pipe reinforced concrete class IV 66-inch (608.0466) | LF | 1,022 | $456.00 | $532.00 | $385.00 | $800.00 | $578.00 |
| 82 | Reconstructing manholes (611.0420) | EACH | 3 | $1,800.00 | $3,455.00 | $4,370.00 | $4,500.00 | $1,800.00 |
| 83 | Manhole covers type J (611.0530) | EACH | 40 | $850.00 | $540.99 | $500.00 | $465.00 | $1,800.00 |
| 84 | Inlet covers type C (611.0612) | EACH | 2 | $900.00 | $563.15 | $525.00 | $527.00 | $1,800.00 |
| 85 | Inlet covers type H (611.0624) | EACH | 1 | $1,200.00 | $776.26 | $768.00 | $562.00 | $1,800.00 |
| 86 | Inlet covers type MS (611.0642) | EACH | 6 | $900.00 | $550.49 | $512.00 | $515.00 | $1,000.00 |
| 87 | Inlet covers type R (611.0648) | EACH | 124 | $1,700.00 | $1,211.97 | $1,250.00 | $1,275.00 | $1,650.00 |
| 88 | Inlet covers type Z (611.0666) | EACH | 9 | $1,200.00 | $789.97 | $785.00 | $790.00 | $1,200.00 |
| 89 | Catch basins 3-FT diameter (611.1003) | EACH | 6 | $1,600.00 | $4,716.78 | $1,610.00 | $2,800.00 | $2,138.00 |
| 90 | Catch basins 4-FT diameter (611.1004) | EACH | 1 | $2,100.00 | $5,641.05 | $1,765.00 | $3,300.00 | $2,813.00 |
| 91 | Catch basins 6-FT diameter (611.1006) | EACH | 1 | $4,300.00 | $8,794.35 | $3,200.00 | $5,400.00 | $5,092.00 |
| 92 | Manholes 4-FT diameter (611.2004) | EACH | 6 | $2,100.00 | $5,849.56 | $2,020.00 | $4,300.00 | $3,170.00 |
| 93 | Manholes 5-FT diameter (611.2005) | EACH | 11 | $3,500.00 | $7,632.80 | $3,050.00 | $6,500.00 | $5,797.00 |
| 94 | Manholes 6-FT diameter (611.2006) | EACH | 4 | $5,500.00 | $10,089 | $4,750.00 | $11,000 | $8,145.00 |
| 95 | Manholes 7-FT diameter (611.2007) | EACH | 3 | $9,800.00 | $19,039 | $10,910 | $12,800 | $11,411 |
| 96 | Manholes 8-FT diameter (611.2008) | EACH | 1 | $15,300 | $27,546 | $17,130 | $22,500 | $22,879 |
| 97 | Manholes 9-FT diameter (611.2009) | EACH | 1 | $14,500 | $30,423 | $22,000 | $25,000 | $21,905 |
| 98 | Manholes 10-FT diameter (611.2010) | EACH | 1 | $27,200 | $37,974 | $32,500 | $35,000 | $27,940 |
| 99 | Manholes variable tee 4-FT diameter (611.2504) | EACH | 13 | $3,400.00 | $36,193 | $11,150 | $40,000 | $42,530 |
| 100 | Inlets 3-FT diameter (611.3003) | EACH | 1 | $1,400.00 | $4,640.13 | $1,650.00 | $2,700.00 | $1,565.00 |
| 101 | Inlets 2X3-FT (611.3230) | EACH | 1 | $1,750.00 | $4,862.43 | $1,950.00 | $3,800.00 | $3,450.00 |
| 102 | Inlets median 1 grate (611.3901) | EACH | 6 | $2,600.00 | $3,818.45 | $4,300.00 | $3,600.00 | $2,615.00 |
| 103 | Adjusting inlet covers (611.8115) | EACH | 2 | $2,450.00 | $540.00 | $940.00 | $2,900.00 | $800.00 |
| 104 | Cover plates temporary (611.8120.S) | EACH | 10 | $200.00 | $209.95 | $500.00 | $150.00 | $650.00 |
| 105 | Pipe underdrain 6-inch (612.0106) | LF | 2,845 | $14.83 | $37.71 | $22.22 | $50.00 | $15.00 |
| 106 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 295 | $36.00 | $41.33 | $20.00 | $50.00 | $12.00 |
| 107 | Pipe underdrain unperforated 8- inch (612.0208) | LF | 305 | $24.00 | $47.30 | $38.07 | $60.00 | $45.00 |
| 108 | Pipe underdrain unperforated 10- inch (612.0210) | LF | 65 | $38.00 | $54.05 | $57.87 | $70.00 | $50.00 |
| 109 | Insulation board polystyrene (inch) 001. 2-inch (612.0902.S) | SY | 15 | $150.00 | $45.54 | $5.00 | $50.00 | $48.00 |
| 110 | Fence chain link 6-FT (616.0206) | LF | 175 | $75.00 | $55.00 | $75.00 | $75.00 | $40.00 |
| 111 | Gates chain link (width) 001. 12-FT (616.0329) | EACH | 1 | $2,500.00 | $5,000.00 | $2,500.00 | $2,500.00 | $3,500.00 |
| 112 | Mobilization (619.1000) | EACH | 1 | $2,214,219 | $706,000 | $1,095,510 | $785,909 | $3,539,000 |
| 113 | Concrete median sloped nose (620.0300) | SF | 605 | $12.10 | $24.52 | $12.10 | $17.77 | $24.53 |
| 114 | Dust control surface treatment (623.0200) | SY | 22,500 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 115 | Water (624.0100) | MGAL | 600 | $110.00 | $0.01 | $20.88 | $0.01 | $50.00 |
| 116 | Topsoil (625.0100) | SY | 27,225 | $9.00 | $6.80 | $10.62 | $4.60 | $8.00 |
| 117 | Mulching (627.0200) | SY | 10,380 | $0.05 | $0.29 | $0.30 | $0.01 | $0.05 |
| 118 | Erosion bales (628.1104) | EACH | 100 | $1.00 | $10.00 | $20.00 | $0.01 | $1.00 |
| 119 | Silt fence (628.1504) | LF | 3,030 | $2.00 | $2.00 | $3.00 | $2.10 | $2.00 |
| 120 | Silt fence maintenance (628.1520) | LF | 1,517 | $0.05 | $0.01 | $0.01 | $0.01 | $0.05 |
| 121 | Mobilizations erosion control (628.1905) | EACH | 21 | $100.00 | $25.00 | $250.00 | $50.00 | $100.00 |
| 122 | Mobilizations emergency erosion control (628.1910) | EACH | 15 | $150.00 | $50.00 | $150.00 | $10.00 | $150.00 |
| 123 | Erosion mat class I type B (628.2004) | SY | 2,000 | $1.10 | $1.00 | $1.00 | $0.01 | $1.10 |
| 124 | Soil stabilizer type B (628.6510) | ACRE | 1.70 | $500.00 | $200.00 | $1,000.00 | $500.00 | $500.00 |
| 125 | Inlet protection type A (628.7005) | EACH | 137 | $115.00 | $50.00 | $125.00 | $0.01 | $115.00 |
| 126 | Inlet protection type B (628.7010) | EACH | 17 | $45.00 | $50.00 | $85.00 | $60.00 | $45.00 |
| 127 | Inlet protection type D (628.7020) | EACH | 375 | $115.00 | $95.00 | $125.00 | $110.00 | $115.00 |
| 128 | Temporary ditch checks (628.7504) | LF | 171 | $4.50 | $7.00 | $12.00 | $0.01 | $4.50 |
| 129 | Tracking pads (628.7560) | EACH | 24 | $100.00 | $0.01 | $100.00 | $0.01 | $0.01 |
| 130 | Rock bags (628.7570) | EACH | 250 | $10.00 | $5.00 | $15.00 | $0.01 | $10.00 |
| 131 | Fertilizer type B (629.0210) | CWT | 17.30 | $75.00 | $80.00 | $150.00 | $80.00 | $75.00 |
| 132 | Seeding mixture no. 40 (630.0140) | LB | 360 | $8.00 | $10.00 | $8.00 | $0.01 | $8.00 |
| 133 | Seeding temporary (630.0200) | LB | 215 | $2.90 | $1.00 | $3.00 | $0.01 | $2.90 |
| 134 | Seeding borrow pit (630.0300) | LB | 200 | $7.00 | $9.00 | $8.00 | $0.01 | $7.00 |
| 135 | Seed water (630.0500) | MGAL | 190 | $1.00 | $1.00 | $1.00 | $0.01 | $1.00 |
| 136 | Sod water (631.0300) | MGAL | 519 | $1.00 | $28.90 | $1.00 | $30.00 | $1.00 |
| 137 | Sod lawn (631.1000) | SY | 19,823 | $8.50 | $6.70 | $12.00 | $7.10 | $8.50 |
| 138 | Landscape planting surveillance and care cycles (632.9101) | EACH | 10 | $700.00 | $100.00 | $1,250.00 | $100.00 | $700.00 |
| 139 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 63 | $95.00 | $115.00 | $150.00 | $120.00 | $95.00 |
| 140 | Posts wood 4X6-inch X 20-FT (634.0620) | EACH | 3 | $110.00 | $115.00 | $160.00 | $140.00 | $110.00 |
| 141 | Posts wood 4X6-inch X 22-FT (634.0622) | EACH | 4 | $125.00 | $115.00 | $200.00 | $180.00 | $125.00 |
| 142 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 14 | $175.00 | $210.00 | $300.00 | $200.00 | $175.00 |
| 143 | Signs type I reflective SH (637.1220) | SF | 148.50 | $29.75 | $30.90 | $32.00 | $29.10 | $29.75 |
| 144 | Signs type II reflective H (637.2210) | SF | 1,363.78 | $24.50 | $21.90 | $28.00 | $20.10 | $24.50 |
| 145 | Signs type II reflective H folding (637.2215) | SF | 223.96 | $32.00 | $29.90 | $40.00 | $24.10 | $32.00 |
| 146 | Signs type II reflective F (637.2230) | SF | 387.50 | $24.50 | $23.90 | $28.00 | $22.10 | $24.50 |
| 147 | Removing signs type II (638.2602) | EACH | 157 | $25.00 | $10.00 | $50.00 | $10.00 | $25.00 |
| 148 | Removing small sign supports (638.3000) | EACH | 63 | $25.00 | $20.00 | $50.00 | $10.00 | $25.00 |
| 149 | Field office type D (642.5401) | EACH | 1 | $25,000 | $35,000 | $63,754 | $59,080 | $50,000 |
| 150 | Traffic control drums (643.0300) | DAY | 97,675 | $0.20 | $0.20 | $0.20 | $0.20 | $0.20 |
| 151 | Traffic control barricades type III (643.0420) | DAY | 41,975 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 |
| 152 | Traffic control warning lights type A (643.0705) | DAY | 83,950 | $0.10 | $0.10 | $0.10 | $0.10 | $0.10 |
| 153 | Traffic control warning lights type C (643.0715) | DAY | 13,300 | $0.10 | $0.10 | $0.10 | $0.10 | $0.10 |
| 154 | Traffic control connected arrow boards (643.0810) | DAY | 565 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 155 | Traffic control signs (643.0900) | DAY | 201,215 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 |
| 156 | Traffic control covering signs type I (643.0910) | EACH | 6 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 157 | Traffic control covering signs type II (643.0920) | EACH | 22 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 158 | Traffic control signs fixed message (643.1000) | SF | 196 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 159 | Traffic control signs PCMS (643.1050) | DAY | 227 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 160 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 930 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 161 | Temporary marking line paint 6- inch (643.3165) | LF | 12,200 | $1.45 | $1.45 | $1.45 | $1.45 | $1.45 |
| 162 | Temporary marking line epoxy 6- inch (643.3170) | LF | 935 | $0.42 | $0.42 | $3.35 | $3.35 | $3.35 |
| 163 | Temporary marking line removable tape 6-inch (643.3180) | LF | 11,355 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 164 | Temporary marking line paint 10- inch (643.3265) | LF | 800 | $2.55 | $2.55 | $2.55 | $2.55 | $2.55 |
| 165 | Temporary marking line epoxy 10- inch (643.3270) | LF | 945 | $1.42 | $1.42 | $5.55 | $5.55 | $5.55 |
| 166 | Temporary marking line removable tape 10-inch (643.3280) | LF | 1,755 | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 |
| 167 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 605 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 168 | Temporary marking arrow epoxy (643.3520) | EACH | 2 | $355.90 | $355.90 | $115.00 | $115.00 | $115.00 |
| 169 | Temporary marking word epoxy (643.3620) | EACH | 1 | $363.10 | $363.10 | $130.00 | $130.00 | $130.00 |
| 170 | Traffic control (643.5000) | EACH | 1 | $68,000 | $68,000 | $80,000 | $68,000 | $68,000 |
| 171 | Temporary pedestrian surface matting (644.1440) | SF | 2,565 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 172 | Temporary pedestrian curb ramp (644.1601) | DAY | 1,374 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 173 | Temporary pedestrian detectable warning field (644.1605) | SF | 530 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 174 | Temporary pedestrian barricade (644.1810) | LF | 20,425 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 |
| 175 | Temporary audible message devices (644.1900.S) | DAY | 4,666 | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 |
| 176 | Geotextile type DF schedule A (645.0111) | SY | 1,560 | $3.00 | $6.57 | $4.01 | $3.00 | $4.00 |
| 177 | Geotextile type DF schedule B (645.0112) | SY | 2,260 | $3.00 | $2.62 | $4.00 | $3.00 | $4.00 |
| 178 | Geogrid type SR (645.0220) | SY | 46,855 | $1.50 | $1.65 | $2.50 | $1.73 | $2.50 |
| 179 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 8,445 | $1.37 | $1.37 | $3.10 | $2.10 | $1.36 |
| 180 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 4,625 | $2.72 | $2.72 | $5.50 | $3.40 | $2.72 |
| 181 | Marking arrow epoxy (646.5020) | EACH | 34 | $358.50 | $358.50 | $330.00 | $250.00 | $358.33 |
| 182 | Marking arrow mma (646.5060.S) | EACH | 8 | $1,000.00 | $1,000.00 | $450.00 | $325.00 | $1,000.00 |
| 183 | Marking word epoxy (646.5120) | EACH | 9 | $363.10 | $363.10 | $350.00 | $275.00 | $362.91 |
| 184 | Marking symbol epoxy (646.5220) | EACH | 32 | $347.40 | $347.40 | $315.00 | $350.00 | $347.22 |
| 185 | Marking symbol mma (646.5260.S) | EACH | 8 | $900.00 | $900.00 | $440.00 | $325.00 | $900.00 |
| 186 | Marking stop line epoxy 18-inch (646.6120) | LF | 550 | $15.07 | $15.07 | $21.00 | $13.25 | $15.06 |
| 187 | Cold weather marking epoxy 6-inch (646.6466) | LF | 4,240 | $0.47 | $0.47 | $0.40 | $1.40 | $0.47 |
| 188 | Cold weather marking epoxy 10- inch (646.6470) | LF | 2,325 | $1.05 | $1.05 | $0.60 | $2.35 | $1.04 |
| 189 | Marking diagonal epoxy 12-inch (646.7120) | LF | 530 | $14.66 | $14.66 | $9.00 | $10.00 | $14.65 |
| 190 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 3,125 | $14.25 | $14.25 | $15.50 | $11.00 | $14.24 |
| 191 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 2,305 | $24.71 | $24.71 | $28.50 | $18.50 | $24.69 |
| 192 | Marking bike lane mma (646.7760.S) | SF | 4,345 | $8.80 | $8.80 | $17.50 | $14.50 | $8.80 |
| 193 | Marking curb epoxy (646.8120) | LF | 285 | $7.19 | $7.19 | $15.00 | $8.50 | $7.19 |
| 194 | Marking island nose epoxy (646.8220) | EACH | 17 | $271.91 | $271.91 | $330.00 | $300.00 | $271.78 |
| 195 | Marking removal line 6-inch (646.9002) | LF | 6,835 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 196 | Marking removal line water blasting 6-inch (646.9012) | LF | 275 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 197 | Marking removal line 10-inch (646.9102) | LF | 2,675 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 198 | Marking removal line water blasting 10-inch (646.9112) | LF | 510 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 199 | Marking removal line wide (646.9200) | LF | 335 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 200 | Marking removal special marking (646.9300) | EACH | 16 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 201 | Marking removal special marking water blasting (646.9310) | EACH | 2 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 202 | Construction staking storm sewer (650.4000) | EACH | 182 | $120.00 | $120.00 | $120.00 | $120.00 | $120.00 |
| 203 | Construction staking subgrade (650.4500) | LF | 9,250 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 204 | Construction staking base (650.5000) | LF | 85 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 205 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 170 | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 |
| 206 | Construction staking structure layout (structure) 001. S-40-673 (650.6501) | EACH | 1 | $550.00 | $550.00 | $550.00 | $550.00 | $550.00 |
| 207 | Construction staking concrete pavement (650.7000) | LF | 9,170 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 208 | Construction staking electrical installations (project) 001. 2410-15- 70 (650.8501) | EACH | 1 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 |
| 209 | Construction staking curb ramps (650.9000) | EACH | 74 | $130.00 | $130.00 | $130.00 | $130.00 | $130.00 |
| 210 | Construction staking sidewalk (project) 001. 2410-15-70 (650.9500) | EACH | 1 | $14,000 | $14,000 | $14,000 | $14,000 | $14,000 |
| 211 | Construction staking supplemental control (project) 001. 2410-15-70 (650.9911) | EACH | 1 | $23,000 | $23,000 | $23,000 | $23,000 | $23,000 |
| 212 | Construction staking slope stakes (650.9920) | LF | 10,700 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 |
| 213 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 12,149 | $10.02 | $10.02 | $9.00 | $10.02 | $10.02 |
| 214 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 958 | $11.34 | $11.34 | $11.42 | $11.34 | $11.34 |
| 215 | Conduit rigid nonmetallic schedule 80 2-inch (652.0325) | LF | 1,485 | $11.12 | $11.12 | $12.85 | $11.12 | $11.12 |
| 216 | Conduit special 2-inch (652.0605) | LF | 1,315 | $21.00 | $21.00 | $20.46 | $21.00 | $21.00 |
| 217 | Conduit special 3-inch (652.0615) | LF | 1,953 | $27.00 | $27.00 | $23.20 | $27.00 | $27.00 |
| 218 | Install conduit into existing item (652.0700.S) | EACH | 8 | $422.00 | $422.00 | $364.01 | $422.00 | $422.00 |
| 219 | Conduit loop detector (652.0800) | LF | 3,686 | $7.00 | $7.00 | $10.16 | $7.00 | $7.00 |
| 220 | Pull boxes steel 24X36-inch (653.0135) | EACH | 9 | $1,135.00 | $1,135.00 | $1,303.42 | $1,135.00 | $1,135.00 |
| 221 | Pull boxes steel 24X42-inch (653.0140) | EACH | 37 | $1,180.00 | $1,180.00 | $1,409.62 | $1,180.00 | $1,180.00 |
| 222 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 56 | $2,148.00 | $2,148.00 | $2,426.86 | $2,148.00 | $2,148.00 |
| 223 | Adjusting pull boxes (653.0900) | EACH | 1 | $498.00 | $498.00 | $1,078.71 | $498.00 | $498.00 |
| 224 | Removing pull boxes (653.0905) | EACH | 26 | $87.00 | $87.00 | $103.14 | $87.00 | $87.00 |
| 225 | Concrete bases type 1 (654.0101) | EACH | 11 | $1,138.00 | $1,138.00 | $965.26 | $1,138.00 | $1,138.00 |
| 226 | Concrete bases type 2 (654.0102) | EACH | 8 | $1,434.00 | $1,434.00 | $1,259.94 | $1,434.00 | $1,434.00 |
| 227 | Concrete bases type 5 (654.0105) | EACH | 35 | $1,298.00 | $1,298.00 | $1,121.11 | $1,298.00 | $1,298.00 |
| 228 | Concrete bases type 10 (654.0110) | EACH | 4 | $8,976.00 | $8,976.00 | $6,346.18 | $8,976.00 | $8,976.00 |
| 229 | Concrete bases type 10-special (654.0120) | EACH | 4 | $9,908.00 | $9,908.00 | $8,595.58 | $9,908.00 | $9,908.00 |
| 230 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 2 | $2,100.00 | $2,100.00 | $2,563.19 | $2,100.00 | $2,100.00 |
| 231 | Cable traffic signal 5-14 AWG (655.0230) | LF | 1,490 | $1.42 | $1.42 | $1.87 | $1.42 | $1.42 |
| 232 | Cable traffic signal 7-14 AWG (655.0240) | LF | 2,021 | $1.99 | $1.99 | $2.59 | $1.99 | $1.99 |
| 233 | Cable traffic signal 12-14 AWG (655.0260) | LF | 2,395 | $3.24 | $3.24 | $3.91 | $3.24 | $3.24 |
| 234 | Cable traffic signal 15-14 AWG (655.0270) | LF | 3,033 | $3.97 | $3.97 | $4.61 | $3.97 | $3.97 |
| 235 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 2,281 | $1.54 | $1.54 | $1.74 | $1.54 | $1.54 |
| 236 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 4,694 | $0.98 | $0.98 | $1.93 | $0.98 | $0.98 |
| 237 | Electrical wire lighting 12 AWG (655.0610) | LF | 15,136 | $0.85 | $0.85 | $0.90 | $0.85 | $0.85 |
| 238 | Electrical wire lighting 6 AWG (655.0625) | LF | 25,215 | $1.68 | $1.68 | $1.82 | $1.68 | $1.68 |
| 239 | Loop detector lead in cable (655.0700) | LF | 14,091 | $1.16 | $1.16 | $1.20 | $1.16 | $1.16 |
| 240 | Loop detector wire (655.0800) | LF | 14,364 | $0.88 | $0.88 | $0.91 | $0.88 | $0.88 |
| 241 | Traffic signal evp detector cable (655.0900) | LF | 1,968 | $2.75 | $2.75 | $0.99 | $2.75 | $2.75 |
| 242 | Electrical service meter breaker pedestal (location) 101. national ave & cleveland ave (656.0201) | EACH | 1 | $1,336.00 | $1,336.00 | $1,427.77 | $1,336.00 | $1,336.00 |
| 243 | Electrical service meter breaker pedestal (location) 102. national ave & 102ND ST (656.0201) | EACH | 1 | $1,336.00 | $1,336.00 | $1,427.77 | $1,336.00 | $1,336.00 |
| 244 | Pedestal bases (657.0100) | EACH | 11 | $315.00 | $315.00 | $387.74 | $315.00 | $315.00 |
| 245 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 8 | $672.00 | $672.00 | $703.03 | $672.00 | $672.00 |
| 246 | Poles type 3 (657.0310) | EACH | 8 | $3,456.00 | $3,456.00 | $3,527.94 | $3,456.00 | $3,456.00 |
| 247 | Poles type 9 (657.0345) | EACH | 1 | $8,378.00 | $8,378.00 | $8,615.30 | $8,378.00 | $8,378.00 |
| 248 | Poles type 9-special (657.0347) | EACH | 3 | $11,264 | $11,264 | $11,957 | $11,264 | $11,264 |
| 249 | Poles type 10 (657.0350) | EACH | 3 | $9,724.00 | $9,724.00 | $10,603 | $9,724.00 | $9,724.00 |
| 250 | Poles type 10-special (657.0352) | EACH | 1 | $12,516 | $12,516 | $13,951 | $12,516 | $12,516 |
| 251 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 9 | $784.00 | $784.00 | $980.04 | $784.00 | $784.00 |
| 252 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 2 | $718.00 | $718.00 | $856.14 | $718.00 | $718.00 |
| 253 | Monotube arms 30-FT (657.0530) | EACH | 4 | $6,156.00 | $6,156.00 | $5,781.43 | $6,156.00 | $6,156.00 |
| 254 | Monotube arms 40-FT-special (657.0541) | EACH | 2 | $6,935.00 | $6,935.00 | $6,308.40 | $6,935.00 | $6,935.00 |
| 255 | Monotube arms 45-FT-special (657.0546) | EACH | 2 | $7,283.00 | $7,283.00 | $6,418.27 | $7,283.00 | $7,283.00 |
| 256 | Luminaire arms single member 4- inch clamp 6-FT (657.0609) | EACH | 10 | $292.00 | $292.00 | $357.52 | $292.00 | $292.00 |
| 257 | Luminaire arms steel 6-FT (657.0806) | EACH | 6 | $962.00 | $962.00 | $760.31 | $962.00 | $962.00 |
| 258 | Traffic signal face 3S 12-inch (658.0173) | EACH | 25 | $740.00 | $740.00 | $847.12 | $740.00 | $740.00 |
| 259 | Traffic signal face 4S 12-inch (658.0174) | EACH | 20 | $900.00 | $900.00 | $1,045.84 | $900.00 | $900.00 |
| 260 | Traffic signal face 5S 12-inch (658.0175) | EACH | 2 | $1,090.00 | $1,090.00 | $1,268.61 | $1,090.00 | $1,090.00 |
| 261 | Pedestrian signal face 16-inch (658.0416) | EACH | 24 | $580.00 | $580.00 | $544.38 | $580.00 | $580.00 |
| 262 | Signal mounting hardware (location) 101. national ave & cleveland ave (658.5070) | EACH | 1 | $7,496.00 | $7,496.00 | $7,740.05 | $7,496.00 | $7,496.00 |
| 263 | Signal mounting hardware (location) 102. national ave & 102ND ST (658.5070) | EACH | 1 | $6,278.00 | $6,278.00 | $6,337.32 | $6,278.00 | $6,278.00 |
| 264 | Underdeck lighting (structure) 001. B-40-123 (659.0601) | EACH | 1 | $9,652.00 | $9,652.00 | $17,953 | $9,652.00 | $9,652.00 |
| 265 | Underdeck lighting (structure) 002. B-40-124 (659.0601) | EACH | 1 | $9,652.00 | $9,652.00 | $17,953 | $9,652.00 | $9,652.00 |
| 266 | Luminaires utility LED B (659.1120) | EACH | 16 | $248.00 | $248.00 | $562.91 | $248.00 | $248.00 |
| 267 | Luminaires underdeck LED B (659.1210) | EACH | 4 | $585.00 | $585.00 | $842.84 | $585.00 | $585.00 |
| 268 | Temporary traffic signals for intersections (location) 101. national ave & cleveland ave (661.0201) | EACH | 1 | $51,539 | $51,539 | $98,641 | $51,539 | $51,539 |
| 269 | Temporary traffic signals for intersections (location) 102. national ave & 102ND ST (661.0201) | EACH | 1 | $51,539 | $51,539 | $80,302 | $51,539 | $51,539 |
| 270 | Generators (661.0300) | DAY | 2 | $206.00 | $206.00 | $384.25 | $206.00 | $206.00 |
| 271 | Sawing asphalt (690.0150) | LF | 1,905 | $1.39 | $1.50 | $1.39 | $1.15 | $1.15 |
| 272 | Sawing concrete (690.0250) | LF | 5,705 | $2.50 | $2.50 | $2.50 | $2.25 | $2.25 |
| 273 | Incentive compressive strength concrete pavement (715.0720) | DOL | 10,410 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 274 | Incentive iri ride (740.0440) | DOL | 1,565 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 275 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 10,500 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 276 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 36,000 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 277 | Special 001. backfill slurry (SPV.0035) | CY | 150 | $140.00 | $125.33 | $110.00 | $150.00 | $106.00 |
| 278 | Special 002. engineered soil bioswales (SPV.0035) | CY | 1,515 | $115.00 | $60.50 | $85.00 | $60.00 | $60.50 |
| 279 | Special 003. bedding layer bioswales (SPV.0035) | CY | 200 | $125.00 | $60.50 | $80.00 | $60.00 | $60.50 |
| 280 | Special 004. storage layer bioswales (SPV.0035) | CY | 2,260 | $62.00 | $60.50 | $70.00 | $53.00 | $60.50 |
| 281 | Special 005. cobblestones (SPV.0035) | CY | 1,540 | $0.01 | $60.00 | $175.00 | $5.00 | $80.00 |
| 282 | Special 001. manholes 6X11-FT (SPV.0060) | EACH | 1 | $102,000 | $58,823 | $111,000 | $50,000 | $41,055 |
| 283 | Special 002. storm sewer chamber (SPV.0060) | EACH | 1 | $90,000 | $136,098 | $470,000 | $225,000 | $259,748 |
| 284 | Special 003. bioswale drains (SPV.0060) | EACH | 32 | $2,700.00 | $2,850.00 | $700.00 | $1,200.00 | $5,000.00 |
| 285 | Special 004. bus stop bench (SPV.0060) | EACH | 7 | $4,500.00 | $3,600.00 | $6,000.00 | $3,000.00 | $4,500.00 |
| 286 | Special 005. trash receptacle (SPV.0060) | EACH | 7 | $3,500.00 | $3,600.00 | $4,000.00 | $2,400.00 | $3,500.00 |
| 287 | Special 006. tree root sawing (SPV.0060) | EACH | 74 | $125.00 | $150.00 | $111.37 | $219.78 | $50.00 |
| 288 | Special 007. utility line opening (ulo) (SPV.0060) | EACH | 25 | $350.00 | $1,153.30 | $1,782.66 | $1,453.03 | $0.01 |
| 289 | Special 008. catmint nepeta 'blue wonder' 1 gallon (SPV.0060) | EACH | 205 | $33.00 | $25.00 | $5.00 | $20.00 | $33.00 |
| 290 | Special 009. daylilies 'stella D'oro' 1 gallon (SPV.0060) | EACH | 295 | $35.00 | $25.00 | $5.00 | $20.00 | $35.00 |
| 291 | Special 010. false indigo 'midnight prairie blue eyes' 1 gallon (SPV.0060) | EACH | 143 | $34.00 | $25.00 | $5.00 | $20.00 | $34.00 |
| 292 | Special 011. gro low sumac 2 gallon (SPV.0060) | EACH | 95 | $80.00 | $50.00 | $5.00 | $30.00 | $80.00 |
| 293 | Special 012. karl foerster grass 1 gallon (SPV.0060) | EACH | 67 | $46.00 | $20.00 | $5.00 | $20.00 | $46.00 |
| 294 | Special 013. panicum grass 'apache rose' 1 gallon (SPV.0060) | EACH | 176 | $46.00 | $40.00 | $5.00 | $20.00 | $46.00 |
| 295 | Special 014. purple coneflower 'magnus' 1 gallon (SPV.0060) | EACH | 250 | $34.00 | $20.00 | $5.00 | $20.00 | $34.00 |
| 296 | Special 015. red twigged dogwood 3 gallon (SPV.0060) | EACH | 59 | $65.00 | $60.00 | $5.00 | $30.00 | $65.00 |
| 297 | Special 016. connection to existing storm sewer (SPV.0060) | EACH | 1 | $1,700.00 | $5,688.50 | $5,600.00 | $2,800.00 | $9,663.00 |
| 298 | Special 017. inlets 3.5-FT diameter (SPV.0060) | EACH | 6 | $2,000.00 | $3,703.50 | $2,100.00 | $2,700.00 | $1,801.00 |
| 299 | Special 018. dewatering for storm sewer construction (SPV.0060) | EACH | 1 | $500.00 | $56,000 | $110,000 | $50,000 | $65,083 |
| 300 | Special 029. concrete saddle (SPV.0060) | EACH | 8 | $4,000.00 | $3,087.50 | $1,400.00 | $1,200.00 | $697.00 |
| 301 | Special 030. catch basins 3.5-FT diameter (SPV.0060) | EACH | 86 | $2,300.00 | $4,820.26 | $2,310.00 | $3,800.00 | $2,839.00 |
| 302 | Special 031. round steel sign post system (SPV.0060) | EACH | 150 | $200.00 | $275.00 | $390.00 | $287.00 | $200.00 |
| 303 | Special 100. furnish & install signal cabinet & controller national ave & cleveland ave (SPV.0060) | EACH | 1 | $30,765 | $30,765 | $37,183 | $30,765 | $30,765 |
| 304 | Special 101. furnish & install signal cabinet & controller national ave & 102ND ST (SPV.0060) | EACH | 1 | $30,478 | $30,478 | $36,385 | $30,478 | $30,478 |
| 305 | Special 102. furnish & install evp system national ave & cleveland ave (SPV.0060) | EACH | 1 | $8,012.00 | $8,012.00 | $9,698.10 | $8,012.00 | $8,012.00 |
| 306 | Special 103. furnish & install evp system national ave & 102ND ST (SPV.0060) | EACH | 1 | $8,012.00 | $8,012.00 | $10,608 | $8,012.00 | $8,012.00 |
| 307 | Special 104. furnish & install accessible ped signals national ave & cleveland ave (SPV.0060) | EACH | 1 | $11,274 | $11,274 | $13,979 | $11,274 | $11,274 |
| 308 | Special 105. furnish & install accessible ped signals national ave & 102ND ST (SPV.0060) | EACH | 1 | $11,274 | $11,274 | $13,979 | $11,274 | $11,274 |
| 309 | Special 106. removing concrete monotube traffic signals (SPV.0060) | EACH | 8 | $1,668.00 | $1,668.00 | $2,047.57 | $1,668.00 | $1,668.00 |
| 310 | Special 107. temporary infrared evp system national ave & cleveland ave (SPV.0060) | EACH | 1 | $3,693.40 | $3,693.40 | $3,526.90 | $3,693.40 | $3,693.40 |
| 311 | Special 108. temporary infrared evp system national ave & 102ND ST (SPV.0060) | EACH | 1 | $3,693.40 | $3,693.40 | $3,526.90 | $3,693.40 | $3,693.40 |
| 312 | Special 200. transformer bases breakaway 11 1/2-inch bolt circle bronze (SPV.0060) | EACH | 2 | $745.00 | $745.00 | $760.81 | $745.00 | $745.00 |
| 313 | Special 201. poles type 5- aluminum bronze (SPV.0060) | EACH | 35 | $2,980.00 | $2,980.00 | $2,895.15 | $2,980.00 | $2,980.00 |
| 314 | Special 202. luminaire arms single member 4 1/2-inch clamp 6-FT bronze (SPV.0060) | EACH | 60 | $412.00 | $412.00 | $479.09 | $412.00 | $412.00 |
| 315 | Special 203. luminaires utility LED B bronze (SPV.0060) | EACH | 60 | $264.00 | $264.00 | $520.92 | $264.00 | $264.00 |
| 316 | Special 204. remove and salvage lighting unit (SPV.0060) | EACH | 73 | $639.50 | $639.50 | $444.90 | $639.50 | $639.50 |
| 317 | Special 300. internal sanitary manhole seal (SPV.0060) | EACH | 20 | $595.00 | $595.00 | $1,200.00 | $1,000.00 | $800.00 |
| 318 | Special 301. adjust sanitary manhole frame (SPV.0060) | EACH | 20 | $597.50 | $597.50 | $1,100.00 | $2,900.00 | $1,400.00 |
| 319 | Special 302. sanitary manhole frame with solid gasketed lid (SPV.0060) | EACH | 20 | $1,127.06 | $1,127.06 | $1,300.00 | $850.00 | $1,400.00 |
| 320 | Special 303. sanitary manhole abandonment (SPV.0060) | EACH | 9 | $2,846.64 | $2,846.64 | $2,600.00 | $2,100.00 | $2,448.00 |
| 321 | Special 304. construction staking sanitary sewer (SPV.0060) | EACH | 19 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 322 | Special 305. reconstructing MMSD manhole (SPV.0060) | EACH | 4 | $3,268.44 | $3,268.44 | $1,260.00 | $4,700.00 | $4,127.00 |
| 323 | Special 400. water main connection 6-inch (SPV.0060) | EACH | 5 | $5,642.64 | $5,642.64 | $8,000.00 | $9,500.00 | $7,018.00 |
| 324 | Special 401. water main connection 8-inch (SPV.0060) | EACH | 4 | $7,463.76 | $7,463.76 | $7,500.00 | $12,000 | $7,461.00 |
| 325 | Special 402. water main connection 12-inch (SPV.0060) | EACH | 5 | $8,400.29 | $8,400.29 | $9,500.00 | $13,500 | $8,615.00 |
| 326 | Special 403. water main valve 6- inch (SPV.0060) | EACH | 5 | $2,504.51 | $2,504.51 | $2,400.00 | $2,800.00 | $3,012.00 |
| 327 | Special 404. water main valve 8- inch (SPV.0060) | EACH | 3 | $3,575.91 | $3,575.91 | $3,300.00 | $3,800.00 | $4,109.00 |
| 328 | Special 405. water main valve 12- inch (SPV.0060) | EACH | 12 | $6,123.90 | $6,123.90 | $6,000.00 | $6,700.00 | $7,028.00 |
| 329 | Special 406. short side hydrant (SPV.0060) | EACH | 14 | $14,050 | $14,050 | $14,600 | $17,000 | $20,159 |
| 330 | Special 407. long side hydrant (SPV.0060) | EACH | 7 | $21,510 | $21,510 | $20,700 | $25,000 | $24,778 |
| 331 | Special 408. air release assembly 1.5-inch (SPV.0060) | EACH | 3 | $8,409.77 | $8,409.77 | $5,900.00 | $8,000.00 | $5,144.00 |
| 332 | Special 409. adjust water valve box (SPV.0060) | EACH | 41 | $439.36 | $439.36 | $240.00 | $800.00 | $850.00 |
| 333 | Special 410. water service reconnect 4-inch (SPV.0060) | EACH | 1 | $9,879.49 | $9,879.49 | $8,050.00 | $12,000 | $10,663 |
| 334 | Special 411. water service reconnect 6-inch (SPV.0060) | EACH | 1 | $8,953.20 | $8,953.20 | $6,800.00 | $13,500 | $7,321.00 |
| 335 | Special 412. temporary water main connection (SPV.0060) | EACH | 4 | $5,997.08 | $5,997.08 | $8,700.00 | $15,000 | $8,615.00 |
| 336 | Special 001. pipe railing black (SPV.0090) | LF | 30 | $535.00 | $50.00 | $40.00 | $722.00 | $40.00 |
| 337 | Special 002. concrete curb & gutter 19-inch type D 9-inch gutter (SPV.0090) | LF | 20 | $90.33 | $55.38 | $90.33 | $87.10 | $55.46 |
| 338 | Special 003. construction staking fence (SPV.0090) | LF | 100 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 339 | Special 004. marking crosswalk epoxy block style 12-inch (SPV.0090) | LF | 295 | $15.00 | $15.00 | $28.00 | $16.00 | $16.00 |
| 340 | Special 300. sanitary sewer relay SDR 35 PVC SP 8-inch (SPV.0090) | LF | 2,836 | $288.22 | $288.22 | $290.00 | $290.00 | $200.00 |
| 341 | Special 301. sanitary sewer relay SDR 35 PVC SP 10-inch (SPV.0090) | LF | 700 | $296.29 | $296.29 | $320.00 | $350.00 | $229.00 |
| 342 | Special 302. building sanitary sewer 6-inch (SPV.0090) | LF | 1,025 | $299.89 | $299.89 | $283.00 | $330.00 | $201.00 |
| 343 | Special 400. water main relay 6- inch (SPV.0090) | LF | 377 | $236.08 | $236.08 | $248.00 | $245.00 | $271.00 |
| 344 | Special 401. water main relay 8- inch (SPV.0090) | LF | 490 | $257.50 | $257.50 | $242.00 | $250.00 | $188.00 |
| 345 | Special 402. water main relay 12- inch (SPV.0090) | LF | 5,880 | $253.47 | $253.47 | $223.00 | $280.00 | $220.00 |
| 346 | Special 403. water service 1-inch (SPV.0090) | LF | 864 | $242.89 | $242.89 | $205.00 | $260.00 | $225.00 |
| 347 | Special 404. water service 1.5-inch (SPV.0090) | LF | 105 | $248.49 | $248.49 | $202.00 | $270.00 | $210.00 |
| 348 | Special 405. water service 2-inch (SPV.0090) | LF | 216 | $232.50 | $232.52 | $210.00 | $275.00 | $165.00 |
| 349 | Special 406. construction staking water main (SPV.0090) | LF | 6,750 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 350 | Special 001. detectable edge tiles (SPV.0165) | SF | 840 | $54.12 | $48.54 | $54.12 | $49.83 | $49.19 |
| 351 | Special 001. mulch bioswales (SPV.0180) | SY | 2,260 | $6.00 | $2.49 | $13.00 | $2.10 | $6.00 |
| 352 | Special 300. sanitary sewer 48-inch diameter (SPV.0200) | VF | 214 | $726.97 | $726.97 | $326.00 | $650.00 | $752.00 |
| 353 | Special 301. sanitary riser 6-inch (SPV.0200) | VF | 4 | $325.33 | $325.33 | $650.00 | $275.00 | $982.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.