WisDOT contract 20260714002 bid tabulation
5845-16-76. Let by Wisconsin DOT on July 14, 2026, Dane. 5 bids received; low bid $33,634,000 by R.G. Huston Company, Inc..
- Owner
- Wisconsin DOT
- Letting
- 14 JUL 2026
- Pay items
- 549
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R.G. Huston Company, Inc. | $33,634,000 | Low |
| 2 | Rock Road Companies, Inc. | $36,684,952 | +9.0% |
| 3 | James Peterson Sons, Inc. | $38,783,097 | +15% |
| 4 | Integrity Grading and Excavating, Inc. | $39,803,589 | +18% |
| 5 | Hoffman Construction Company | $39,978,786 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R.G. Huston Company, Inc. | 2. Rock Road Companies, Inc. | 3. James Peterson Sons, Inc. | 4. Integrity Grading and Excavating, Inc. | 5. Hoffman Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 31 | $275.00 | $775.00 | $775.00 | $775.00 | $775.00 |
| 2 | Grubbing (201.0205) | STA | 55 | $180.00 | $240.00 | $240.00 | $240.00 | $240.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 4 | $425.00 | $457.48 | $2,500.00 | $6,013.01 | $1,600.00 |
| 4 | Removing structure (structure) 01. retaining wall (203.0220) | EACH | 2 | $4,600.00 | $4,471.25 | $1,000.00 | $22,094 | $5,000.00 |
| 5 | Removing structure over waterway minimal debris (structure) 01. B-13- 385 (203.0260) | EACH | 1 | $1,459,000 | $600,000 | $600,000 | $700,000 | $600,000 |
| 6 | Removing concrete pavement (204.0100) | SY | 39,900 | $4.25 | $6.28 | $0.85 | $0.70 | $15.00 |
| 7 | Removing curb & gutter (204.0150) | LF | 6,763 | $4.00 | $10.30 | $3.40 | $7.82 | $4.00 |
| 8 | Removing concrete sidewalk (204.0155) | SY | 1,445 | $5.00 | $24.72 | $5.55 | $4.41 | $6.00 |
| 9 | Removing guardrail (204.0165) | LF | 545 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 10 | Removing fence (204.0170) | LF | 1,105 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 11 | Removing delineators and markers (204.0180) | EACH | 75 | $23.00 | $23.00 | $23.00 | $23.00 | $23.00 |
| 12 | Removing masonry (204.0185) | CY | 2 | $420.00 | $548.98 | $500.00 | $878.97 | $550.00 |
| 13 | Removing concrete bases (204.0195) | EACH | 55 | $250.00 | $300.00 | $400.00 | $346.54 | $400.00 |
| 14 | Removing manholes (204.0210) | EACH | 17 | $550.00 | $548.98 | $600.00 | $1,690.33 | $350.00 |
| 15 | Removing inlets (204.0220) | EACH | 53 | $400.00 | $548.98 | $500.00 | $1,700.04 | $350.00 |
| 16 | Removing building (station) 01. 856+29 'SB' (204.0231) | EACH | 1 | $1,000.00 | $2,462.85 | $5,000.00 | $4,887.89 | $2,500.00 |
| 17 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 414 | $28.00 | $15.24 | $42.00 | $50.74 | $12.50 |
| 18 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 575 | $28.00 | $15.24 | $43.00 | $51.08 | $12.50 |
| 19 | Removing storm sewer (size) 03. 18-inch (204.0245) | LF | 564 | $28.00 | $15.24 | $43.00 | $51.11 | $12.50 |
| 20 | Removing storm sewer (size) 04. 24-inch (204.0245) | LF | 2,368 | $28.00 | $15.24 | $46.00 | $52.04 | $12.50 |
| 21 | Removing storm sewer (size) 05. 24X38-inch (204.0245) | LF | 175 | $40.00 | $15.24 | $55.00 | $53.18 | $12.50 |
| 22 | Removing storm sewer (size) 06. 30-inch (204.0245) | LF | 292 | $40.00 | $15.24 | $51.00 | $52.40 | $12.50 |
| 23 | Removing storm sewer (size) 07. 36-inch (204.0245) | LF | 639 | $40.00 | $15.24 | $90.00 | $52.40 | $25.00 |
| 24 | Removing storm sewer (size) 08. 72-inch (204.0245) | LF | 177 | $88.00 | $20.32 | $76.00 | $75.57 | $25.00 |
| 25 | Sealing pipes (204.0280) | EACH | 3 | $680.00 | $1,072.41 | $1,250.00 | $2,535.19 | $1,000.00 |
| 26 | Abandoning sewer 01. discontinued sewer (204.0291.S) | CY | 28 | $970.06 | $269.09 | $275.00 | $1,126.71 | $500.00 |
| 27 | Removing (item description) 01. flashing beacon assembly (204.9060.S) | EACH | 2 | $225.00 | $1,800.00 | $1,800.00 | $1,800.00 | $1,800.00 |
| 28 | Removing (item description) 02. boulder (204.9060.S) | EACH | 1 | $1,000.00 | $250.00 | $1,000.00 | $120.24 | $300.00 |
| 29 | Removing (item description) 03. street light pole assembly (204.9060.S) | EACH | 21 | $700.00 | $400.00 | $400.00 | $400.00 | $400.00 |
| 30 | Removing (item description) 01. modular block retaining wall (204.9090.S) | LF | 95 | $9.00 | $10.48 | $40.00 | $31.50 | $30.00 |
| 31 | Removing (item description) 02. stone retaining wall (204.9090.S) | LF | 65 | $6.70 | $12.71 | $40.00 | $30.22 | $30.00 |
| 32 | Excavation common (205.0100) | CY | 67,810 | $16.00 | $22.80 | $16.58 | $24.00 | $20.00 |
| 33 | Excavation for structures bridges (structure) 01. B-13-907 (206.1001) | EACH | 1 | $69,500 | $550,000 | $63,750 | $226,357 | $1,000,000 |
| 34 | Excavation for structures retaining walls (structure) 01. R-13-379 (206.3001) | EACH | 1 | $13,000 | $125,000 | $37,750 | $18,552 | $100,000 |
| 35 | Excavation for structures retaining walls (structure) 02. R-13-380 (206.3001) | EACH | 1 | $7,600.00 | $125,000 | $2,200.00 | $23,153 | $100,000 |
| 36 | Excavation for structures retaining walls (structure) 03. R-13-381 (206.3001) | EACH | 1 | $3,000.00 | $75,000 | $4,500.00 | $3,617.96 | $100,000 |
| 37 | Excavation for structures retaining walls (structure) 04. R-13-382 (206.3001) | EACH | 1 | $6,800.00 | $85,000 | $21,000 | $10,981 | $100,000 |
| 38 | Excavation for structures retaining walls (structure) 05. R-13-383 (206.3001) | EACH | 1 | $6,100.00 | $125,000 | $2,000.00 | $7,362.60 | $20,000 |
| 39 | Excavation for structures retaining walls (structure) 06. R-13-384 (206.3001) | EACH | 1 | $6,100.00 | $125,000 | $7,500.00 | $1,935.65 | $20,000 |
| 40 | Excavation for structures retaining walls (structure) 07. R-13-385 (206.3001) | EACH | 1 | $20,000 | $475,000 | $5,000.00 | $7,362.60 | $100,000 |
| 41 | Cofferdams (structure) 01. B-13-907 (206.5001) | EACH | 1 | $356,000 | $850,000 | $850,000 | $850,000 | $850,000 |
| 42 | Cofferdams (structure) 02. dunn sanitary sewer (206.5001) | EACH | 1 | $1,082,000 | $2,088,521 | $5,651,761 | $2,200,000 | $5,650,943 |
| 43 | Backfill controlled low strength (209.0200.S) | CY | 20 | $840.00 | $273.76 | $250.00 | $573.05 | $1,000.00 |
| 44 | Backfill structure type A (210.1500) | TON | 4,783 | $35.00 | $36.26 | $30.13 | $37.64 | $42.00 |
| 45 | Finishing roadway (project) 01. 5845-16-76 (213.0100) | EACH | 1 | $16,000 | $6,241.21 | $5,000.00 | $500.00 | $5,000.00 |
| 46 | Base aggregate dense 3/4-inch (305.0110) | TON | 515 | $29.00 | $48.98 | $30.00 | $48.82 | $47.35 |
| 47 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 37,350 | $22.20 | $21.06 | $16.18 | $25.84 | $0.01 |
| 48 | Base aggregate dense 3-inch (305.0130) | TON | 750 | $18.80 | $28.82 | $30.77 | $32.30 | $35.65 |
| 49 | Base aggregate open-graded (310.0115) | CY | 192 | $45.00 | $31.03 | $57.00 | $50.79 | $57.01 |
| 50 | Select crushed material (312.0110) | TON | 55,800 | $16.30 | $20.63 | $16.39 | $19.34 | $0.01 |
| 51 | Coloring concrete wisdot red (405.0100) | CY | 140 | $83.07 | $83.07 | $83.07 | $83.07 | $83.07 |
| 52 | Stamping colored concrete (405.1000) | CY | 540 | $939.78 | $939.78 | $939.78 | $939.78 | $939.78 |
| 53 | Concrete pavement 8-inch (415.0080) | SY | 39,725 | $52.98 | $52.98 | $52.98 | $52.98 | $52.98 |
| 54 | Concrete pavement gaps (415.0210) | EACH | 14 | $569.92 | $569.92 | $569.92 | $569.92 | $569.92 |
| 55 | Concrete pavement approach slab (415.0410) | SY | 163 | $204.17 | $204.17 | $204.17 | $204.17 | $204.17 |
| 56 | Concrete pavement hes 8-inch (415.1080) | SY | 670 | $83.90 | $83.90 | $83.90 | $83.90 | $83.90 |
| 57 | Concrete truck apron 12-inch (415.2010) | SY | 420 | $81.65 | $81.65 | $81.65 | $81.65 | $81.65 |
| 58 | Concrete pavement joint filling (415.4100) | SY | 40,395 | $1.75 | $1.75 | $1.75 | $1.75 | $1.75 |
| 59 | Rout and seal (415.6000.S) | LF | 1,225 | $6.31 | $6.25 | $6.25 | $6.25 | $6.25 |
| 60 | Drilled tie bars (416.0610) | EACH | 288 | $10.34 | $10.34 | $10.34 | $10.34 | $10.34 |
| 61 | Drilled dowel bars (416.0620) | EACH | 86 | $14.92 | $14.92 | $14.92 | $14.92 | $14.92 |
| 62 | Concrete pavement replacement shes (416.1725) | SY | 775 | $163.27 | $163.27 | $163.27 | $163.27 | $163.27 |
| 63 | HMA cold weather paving (450.4000) | TON | 425 | $6.00 | $3.50 | $6.00 | $6.00 | $6.00 |
| 64 | Tack coat (455.0605) | GAL | 200 | $0.10 | $3.84 | $0.10 | $0.10 | $0.10 |
| 65 | Incentive density HMA pavement (460.2000) | DOL | 740 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 66 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 1,150 | $111.00 | $137.75 | $111.00 | $111.00 | $111.00 |
| 67 | Asphaltic surface (465.0105) | TON | 310 | $98.00 | $117.02 | $98.00 | $98.00 | $98.00 |
| 68 | Asphaltic surface driveways and field entrances (465.0120) | TON | 430 | $120.00 | $143.43 | $120.00 | $120.00 | $120.00 |
| 69 | Asphaltic surface temporary (465.0125) | TON | 2,160 | $99.00 | $114.23 | $99.00 | $99.00 | $99.00 |
| 70 | Asphaltic curb (465.0310) | LF | 3,680 | $9.25 | $12.19 | $9.25 | $9.25 | $9.25 |
| 71 | Asphaltic flumes (465.0315) | SY | 34 | $60.00 | $76.01 | $60.00 | $60.00 | $60.00 |
| 72 | Cold patch (495.1000.S) | TON | 20 | $348.00 | $750.00 | $200.00 | $30.00 | $570.00 |
| 73 | Concrete masonry bridges (502.0100) | CY | 1,167 | $1,155.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 74 | Concrete masonry soldier pile footings (502.0110.S) | CY | 644 | $680.00 | $950.00 | $950.00 | $950.00 | $950.00 |
| 75 | Protective surface treatment (502.3200) | SY | 1,604 | $10.00 | $4.25 | $4.25 | $4.25 | $4.25 |
| 76 | Pigmented surface sealer (502.3210) | SY | 703 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 77 | Prestressed girder type I 36W-inch (503.0137) | LF | 1,330 | $355.00 | $350.00 | $350.00 | $350.00 | $350.00 |
| 78 | Concrete masonry retaining walls (504.0500) | CY | 575 | $1,550.00 | $2,050.00 | $2,050.00 | $2,050.00 | $2,050.00 |
| 79 | Concrete masonry endwalls (504.0900) | CY | 3.15 | $5,060.00 | $2,500.00 | $4,300.00 | $4,300.00 | $4,300.00 |
| 80 | Precast concrete box culvert (FT X FT) 01. 4 FT X 6 FT (504.2000.S) | LF | 169 | $1,210.00 | $963.01 | $956.00 | $1,279.12 | $1,100.00 |
| 81 | Bar steel reinforcement HS structures (505.0400) | LB | 48,970 | $1.10 | $1.85 | $1.85 | $1.85 | $1.85 |
| 82 | Bar steel reinforcement HS coated structures (505.0600) | LB | 165,050 | $1.80 | $2.00 | $2.00 | $2.00 | $2.00 |
| 83 | Bar steel reinforcement HS stainless structures (505.0800.S) | LB | 2,750 | $8.30 | $5.25 | $5.25 | $5.25 | $5.25 |
| 84 | Structural steel HS (506.0605) | LB | 383,000 | $1.82 | $1.95 | $1.95 | $1.95 | $1.95 |
| 85 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 28 | $175.00 | $165.00 | $165.00 | $165.00 | $165.00 |
| 86 | Steel diaphragms (structure) 01. B- 13-907 (506.4000) | EACH | 26 | $760.00 | $1,150.00 | $1,150.00 | $1,150.00 | $1,150.00 |
| 87 | Polymer overlay (509.5100.S) | SY | 2,101 | $41.00 | $36.19 | $37.00 | $37.00 | $37.00 |
| 88 | Piling steel sheet permanent delivered (512.0500) | SF | 8,299 | $73.20 | $72.00 | $72.00 | $72.00 | $72.00 |
| 89 | Railing steel type C3 (513.7016) | LF | 1,372 | $311.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 90 | Railing steel pedestrian type C3 (513.8016) | LF | 734 | $380.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 91 | Rubberized membrane waterproofing (516.0500) | SY | 104 | $40.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 92 | Painting epoxy system (structure) 01. R-13-379 (517.0601) | EACH | 1 | $0.01 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 93 | Painting epoxy system (structure) 02. R-13-380 (517.0601) | EACH | 1 | $0.01 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 94 | Painting epoxy system (structure) 03. R-13-381 (517.0601) | EACH | 1 | $0.01 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 95 | Painting epoxy system (structure) 04. R-13-382 (517.0601) | EACH | 1 | $0.01 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 96 | Concrete staining (structure) 01. R- 13-379 (517.1010.S) | SF | 4,305 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 97 | Concrete staining (structure) 02. R- 13-380 (517.1010.S) | SF | 2,202 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 98 | Concrete staining (structure) 03. R- 13-381 (517.1010.S) | SF | 1,611 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 99 | Concrete staining (structure) 04. R- 13-382 (517.1010.S) | SF | 4,508 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 100 | Concrete staining (structure) 05. R- 13-383 (517.1010.S) | SF | 185 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 101 | Concrete staining (structure) 06. R- 13-384 (517.1010.S) | SF | 62 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 102 | Concrete staining (structure) 07. R- 13-15 (517.1010.S) | SF | 7,890 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 103 | Architectural surface treatment (structure) 01. R-13-379 (517.1050.S) | SF | 2,312 | $0.01 | $3.25 | $3.25 | $3.25 | $3.25 |
| 104 | Architectural surface treatment (structure) 02. R-13-380 (517.1050.S) | SF | 1,289 | $0.01 | $3.25 | $3.25 | $3.25 | $3.25 |
| 105 | Architectural surface treatment (structure) 03. R-13-381 (517.1050.S) | SF | 1,325 | $0.01 | $3.25 | $3.25 | $3.25 | $3.25 |
| 106 | Architectural surface treatment (structure) 04. R-13-382 (517.1050.S) | SF | 2,172 | $0.01 | $3.25 | $3.25 | $3.25 | $3.25 |
| 107 | Architectural surface treatment (structure) 05. R-13-383 (517.1050.S) | SF | 182 | $13.14 | $35.00 | $35.00 | $35.00 | $35.00 |
| 108 | Architectural surface treatment (structure) 06. R-13-384 (517.1050.S) | SF | 127 | $13.18 | $35.00 | $35.00 | $35.00 | $35.00 |
| 109 | Culvert pipe temporary 24-inch (520.2024) | LF | 190 | $170.00 | $191.09 | $325.00 | $95.30 | $74.00 |
| 110 | Culvert pipe temporary 36-inch (520.2036) | LF | 175 | $245.00 | $218.39 | $211.00 | $122.75 | $102.00 |
| 111 | Concrete collars for pipe (520.8000) | EACH | 5 | $1,050.00 | $762.12 | $999.00 | $1,876.27 | $1,200.00 |
| 112 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 5 | $1,650.00 | $1,602.71 | $1,286.00 | $1,838.31 | $2,000.00 |
| 113 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 2 | $1,820.00 | $1,765.29 | $1,486.00 | $1,976.78 | $2,200.00 |
| 114 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 1 | $3,150.00 | $2,653.92 | $1,975.00 | $3,554.36 | $3,200.00 |
| 115 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (522.2429) | LF | 355 | $355.00 | $379.82 | $322.00 | $261.64 | $256.00 |
| 116 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 29X45-inch (522.2629) | EACH | 6 | $3,000.00 | $2,724.04 | $2,396.00 | $3,614.10 | $3,200.00 |
| 117 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 34X53-inch (522.2634) | EACH | 2 | $3,600.00 | $3,287.57 | $2,837.00 | $3,920.31 | $3,600.00 |
| 118 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 38X60-inch (522.2638) | EACH | 1 | $4,100.00 | $4,375.22 | $3,671.00 | $4,325.43 | $4,100.00 |
| 119 | Apron endwalls for culvert pipe salvaged 24-inch (524.0624) | EACH | 1 | $422.00 | $1,669.89 | $1,486.00 | $1,976.78 | $460.00 |
| 120 | Drilling shaft 36-inch (531.2036) | LF | 40 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 |
| 121 | Drilling shaft 42-inch (531.2042) | LF | 36 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 122 | Foundation single-shaft type MC-III (structure) 01. S-13-0610 (531.5130) | EACH | 1 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 |
| 123 | Foundation single-shaft type TC-II (structure) 01. S-13-0609 (531.5320) | EACH | 1 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 |
| 124 | Foundation single-shaft type TF-II (structure) 01. S-13-0611 (531.5420) | EACH | 2 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 |
| 125 | Monotube cantilever type III (structure) 01. S-13-0610 (532.5130) | EACH | 1 | $23,000 | $23,000 | $23,000 | $23,000 | $23,000 |
| 126 | Truss cantilever 2-chord type II (structure) 01. S-13-0609 (532.5320) | EACH | 1 | $31,000 | $31,000 | $31,000 | $31,000 | $31,000 |
| 127 | Truss full span 2-chord type II (structure) 01. S-13-0611 (532.5420) | EACH | 1 | $64,000 | $64,000 | $64,000 | $64,000 | $64,000 |
| 128 | Precast panels for soldier pile walls (542.1000.S) | SF | 5,708 | $51.60 | $50.00 | $50.00 | $50.00 | $50.00 |
| 129 | Pile points (550.0500) | EACH | 72 | $255.00 | $130.00 | $130.00 | $130.00 | $130.00 |
| 130 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 2,260 | $76.25 | $73.00 | $73.00 | $73.00 | $73.00 |
| 131 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 680 | $21.44 | $21.44 | $21.44 | $21.44 | $21.44 |
| 132 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 18,935 | $24.46 | $24.46 | $24.46 | $24.46 | $24.46 |
| 133 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 2,290 | $24.90 | $24.90 | $24.90 | $24.90 | $24.90 |
| 134 | Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551) | LF | 1,125 | $40.79 | $40.79 | $40.79 | $40.79 | $40.79 |
| 135 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 350 | $37.84 | $37.84 | $37.84 | $37.84 | $37.84 |
| 136 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 50 | $131.16 | $131.16 | $131.16 | $131.19 | $131.16 |
| 137 | Concrete curb pedestrian (601.0600) | LF | 1,075 | $116.19 | $116.19 | $116.19 | $116.19 | $116.19 |
| 138 | Concrete sidewalk 4-inch (602.0405) | SF | 36,115 | $5.76 | $5.76 | $5.76 | $5.76 | $5.76 |
| 139 | Concrete sidewalk 5-inch (602.0410) | SF | 76,615 | $6.41 | $6.41 | $6.41 | $6.41 | $6.41 |
| 140 | Curb ramp detectable warning field natural patina (602.0515) | SF | 674 | $52.16 | $52.16 | $52.16 | $52.16 | $52.16 |
| 141 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 197.70 | $75.47 | $75.47 | $75.47 | $75.47 | $75.47 |
| 142 | Concrete driveway 6-inch (602.0810) | SY | 80 | $65.78 | $65.78 | $65.78 | $65.78 | $65.78 |
| 143 | Concrete driveway hes 6-inch (602.0860) | SY | 740 | $69.68 | $69.68 | $69.68 | $69.68 | $69.68 |
| 144 | Concrete barrier type S56 (603.1156) | LF | 450 | $106.21 | $106.21 | $106.21 | $106.21 | $106.21 |
| 145 | Concrete barrier temporary precast delivered (603.8000) | LF | 905 | $18.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 146 | Concrete barrier temporary precast installed (603.8125) | LF | 905 | $8.50 | $12.00 | $12.00 | $12.00 | $12.00 |
| 147 | Riprap medium (606.0200) | CY | 405 | $95.00 | $188.54 | $150.00 | $188.90 | $154.00 |
| 148 | Riprap heavy (606.0300) | CY | 95 | $95.00 | $203.10 | $150.00 | $191.20 | $158.00 |
| 149 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 1,033 | $117.00 | $155.10 | $139.00 | $125.79 | $64.00 |
| 150 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 204 | $143.00 | $165.32 | $145.00 | $137.83 | $68.00 |
| 151 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 165 | $111.00 | $217.75 | $145.00 | $143.02 | $70.00 |
| 152 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 1,057 | $164.00 | $149.62 | $138.00 | $154.33 | $88.00 |
| 153 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 303 | $157.00 | $168.64 | $199.00 | $189.95 | $128.00 |
| 154 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 196 | $317.00 | $298.28 | $384.00 | $239.69 | $166.00 |
| 155 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 1,009 | $126.00 | $144.82 | $139.00 | $120.11 | $64.00 |
| 156 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 106 | $140.00 | $147.60 | $197.00 | $160.21 | $68.00 |
| 157 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 125 | $105.00 | $134.25 | $147.00 | $160.53 | $70.00 |
| 158 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 811 | $127.00 | $154.90 | $152.00 | $177.61 | $94.00 |
| 159 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 143 | $271.00 | $243.08 | $214.00 | $224.85 | $142.00 |
| 160 | Storm sewer pipe reinforced concrete class IV 42-inch (608.0442) | LF | 321 | $388.00 | $306.37 | $296.00 | $309.34 | $230.00 |
| 161 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 38X60-inch (608.2338) | LF | 465 | $441.00 | $395.02 | $342.00 | $379.09 | $302.00 |
| 162 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (608.2424) | LF | 368 | $217.00 | $246.85 | $218.00 | $259.99 | $196.00 |
| 163 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 34X53-inch (608.2434) | LF | 151 | $441.00 | $369.81 | $357.00 | $351.01 | $290.00 |
| 164 | Storm sewer pipe composite 12- inch (608.6012) | LF | 36 | $140.00 | $140.07 | $114.00 | $153.60 | $88.00 |
| 165 | Reconstructing manholes (611.0420) | EACH | 2 | $2,710.00 | $2,020.30 | $2,574.00 | $1,285.35 | $2,500.00 |
| 166 | Manhole covers type J (611.0530) | EACH | 32 | $920.00 | $899.54 | $1,124.00 | $833.66 | $850.00 |
| 167 | Manhole covers type L (611.0545) | EACH | 5 | $770.00 | $1,029.60 | $1,080.00 | $710.23 | $850.00 |
| 168 | Inlet covers type BW (611.0610) | EACH | 3 | $1,225.00 | $1,439.70 | $1,570.00 | $1,088.97 | $1,400.00 |
| 169 | Inlet covers type DW (611.0613) | EACH | 1 | $1,220.00 | $1,379.94 | $1,563.00 | $1,081.59 | $1,300.00 |
| 170 | Inlet covers type H (611.0624) | EACH | 57 | $1,205.00 | $1,253.39 | $1,547.00 | $1,068.93 | $1,200.00 |
| 171 | Inlet covers type HM (611.0627) | EACH | 4 | $1,205.00 | $1,296.75 | $1,547.00 | $1,069.98 | $1,200.00 |
| 172 | Inlet covers type H-S (611.0639) | EACH | 45 | $1,205.00 | $1,253.39 | $1,547.00 | $1,036.88 | $1,100.00 |
| 173 | Inlet covers type MS (611.0642) | EACH | 1 | $930.00 | $862.94 | $1,257.00 | $843.16 | $860.00 |
| 174 | Inlet covers type MS-A (611.0645) | EACH | 6 | $960.00 | $885.20 | $1,279.00 | $864.26 | $880.00 |
| 175 | Inlet covers type T (611.0652) | EACH | 2 | $1,500.00 | $1,588.49 | $1,884.00 | $1,334.79 | $1,500.00 |
| 176 | Catch basins 2X3-FT (611.1230) | EACH | 37 | $1,525.00 | $2,878.23 | $2,135.00 | $4,176.02 | $2,100.00 |
| 177 | Manholes 4-FT diameter (611.2004) | EACH | 10 | $2,350.00 | $3,389.07 | $2,826.00 | $4,513.36 | $2,900.00 |
| 178 | Manholes 5-FT diameter (611.2005) | EACH | 14 | $4,150.00 | $4,796.73 | $4,533.00 | $5,811.27 | $4,900.00 |
| 179 | Manholes 6-FT diameter (611.2006) | EACH | 7 | $6,000.00 | $5,729.03 | $5,512.00 | $8,244.33 | $5,800.00 |
| 180 | Manholes 7-FT diameter (611.2007) | EACH | 1 | $8,500.00 | $7,416.95 | $7,055.00 | $9,883.71 | $8,200.00 |
| 181 | Manholes 8-FT diameter (611.2008) | EACH | 6 | $12,360 | $10,021 | $10,724 | $13,639 | $11,100 |
| 182 | Manholes 9-FT diameter (611.2009) | EACH | 2 | $20,250 | $14,166 | $15,107 | $18,511 | $15,100 |
| 183 | Inlets 4-FT diameter (611.3004) | EACH | 32 | $1,930.00 | $3,156.67 | $2,312.00 | $4,156.55 | $2,800.00 |
| 184 | Inlets 2X2.5-FT (611.3225) | EACH | 2 | $1,030.00 | $2,405.62 | $1,154.00 | $3,772.28 | $1,500.00 |
| 185 | Inlets 2X3-FT (611.3230) | EACH | 36 | $1,520.00 | $2,675.19 | $1,747.00 | $4,090.79 | $1,900.00 |
| 186 | Inlets median 1 grate (611.3901) | EACH | 1 | $2,060.00 | $2,782.02 | $1,957.00 | $4,353.80 | $2,300.00 |
| 187 | Inlets median 2 grate (611.3902) | EACH | 3 | $2,650.00 | $3,816.16 | $2,588.00 | $4,856.50 | $2,900.00 |
| 188 | Cover plates temporary (611.8120.S) | EACH | 45 | $195.00 | $542.17 | $183.00 | $835.35 | $222.00 |
| 189 | Pipe grates (size) 01. 24-inch (611.9850.S) | EACH | 2 | $1,650.00 | $1,596.07 | $1,774.00 | $1,752.04 | $2,000.00 |
| 190 | Pipe grates (size) 02. 36-inch (611.9850.S) | EACH | 1 | $2,825.00 | $2,746.20 | $2,850.00 | $2,731.60 | $3,200.00 |
| 191 | Pipe grates (size) 03. 29X45-inch (611.9850.S) | EACH | 6 | $2,100.00 | $2,043.86 | $2,223.00 | $2,133.42 | $2,400.00 |
| 192 | Pipe grates (size) 04. 34X53-inch (611.9850.S) | EACH | 2 | $2,500.00 | $2,433.12 | $2,671.00 | $2,464.96 | $2,900.00 |
| 193 | Pipe grates (size) 05. 38X60-inch (611.9850.S) | EACH | 1 | $3,250.00 | $3,154.97 | $3,314.00 | $3,079.75 | $3,600.00 |
| 194 | Pipe underdrain 6-inch (612.0106) | LF | 4,775 | $10.00 | $17.19 | $10.18 | $16.76 | $10.00 |
| 195 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 1,694 | $4.50 | $30.35 | $15.00 | $1.84 | $6.00 |
| 196 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 1 | $250.00 | $500.00 | $500.00 | $250.00 | $500.00 |
| 197 | Crash cushions temporary (614.0905) | EACH | 1 | $8,350.00 | $5,500.00 | $7,025.00 | $5,025.00 | $5,500.00 |
| 198 | MGS guardrail 3 (614.2300) | LF | 87.50 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 199 | MGS thrie beam transition (614.2500) | LF | 39.40 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 |
| 200 | MGS guardrail terminal eat (614.2610) | EACH | 1 | $4,200.00 | $4,200.00 | $4,200.00 | $4,200.00 | $4,200.00 |
| 201 | MGS guardrail terminal type 2 (614.2620) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 202 | Fence chain link salvaged 6-FT (616.0406) | LF | 18 | $70.00 | $70.00 | $70.00 | $75.00 | $70.00 |
| 203 | Fence safety (616.0700.S) | LF | 1,500 | $4.25 | $4.25 | $4.25 | $4.00 | $4.25 |
| 204 | Maintenance and repair of haul roads (project) 01. 5845-16-76 (618.0100) | EACH | 1 | $100.00 | $0.01 | $750.00 | $500.00 | $100.00 |
| 205 | Mobilization (619.1000) | EACH | 1 | $3,085,143 | $3,010,516 | $1,955,710 | $2,925,000 | $2,913,896 |
| 206 | Concrete median sloped nose (620.0300) | SF | 1,865 | $13.31 | $13.31 | $13.31 | $13.31 | $13.31 |
| 207 | Water (624.0100) | MGAL | 825 | $30.00 | $0.01 | $65.00 | $66.95 | $134.00 |
| 208 | Salvaged topsoil (625.0500) | SY | 41,550 | $0.01 | $6.33 | $2.57 | $4.83 | $6.00 |
| 209 | Silt fence (628.1504) | LF | 6,000 | $1.90 | $1.90 | $1.90 | $1.90 | $1.90 |
| 210 | Silt fence maintenance (628.1520) | LF | 6,000 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 211 | Silt screen (628.1550) | LF | 50 | $60.00 | $60.00 | $60.00 | $60.00 | $60.00 |
| 212 | Mobilizations erosion control (628.1905) | EACH | 24 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 213 | Mobilizations emergency erosion control (628.1910) | EACH | 16 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 214 | Erosion mat class I type B (628.2004) | SY | 23,500 | $1.10 | $1.10 | $1.10 | $1.10 | $1.10 |
| 215 | Erosion mat urban class I type A (628.2006) | SY | 16,150 | $1.60 | $1.60 | $1.60 | $1.60 | $1.60 |
| 216 | Erosion mat urban class I type B (628.2008) | SY | 1,900 | $1.60 | $1.60 | $1.60 | $1.60 | $1.60 |
| 217 | Turbidity barriers (628.6005) | SY | 470 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 218 | Inlet protection type A (628.7005) | EACH | 125 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 219 | Inlet protection type C (628.7015) | EACH | 154 | $70.00 | $70.00 | $70.00 | $70.00 | $70.00 |
| 220 | Inlet protection type D (628.7020) | EACH | 33 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 221 | Temporary ditch checks (628.7504) | LF | 60 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| 222 | Culvert pipe checks (628.7555) | EACH | 50 | $19.00 | $19.00 | $19.00 | $19.00 | $19.00 |
| 223 | Tracking pads (628.7560) | EACH | 4 | $2,700.00 | $1,250.00 | $3,000.00 | $4,407.92 | $500.00 |
| 224 | Rock bags (628.7570) | EACH | 205 | $19.00 | $19.00 | $19.00 | $19.00 | $19.00 |
| 225 | Fertilizer type B (629.0210) | CWT | 29 | $80.00 | $80.00 | $80.00 | $80.00 | $80.00 |
| 226 | Seeding mixture no. 40 (630.0140) | LB | 1,565 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 |
| 227 | Seeding temporary (630.0200) | LB | 1,175 | $3.75 | $3.75 | $3.75 | $3.75 | $3.75 |
| 228 | Seed water (630.0500) | MGAL | 2,400 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 229 | Shrubs (species, root, size) 01. vancouver jade kinnikinnick, 24" SPRD., #3 cont. (632.0201) | EACH | 28 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 230 | Shrubs (species, root, size) 02. creeping juniper, 24" SPRD., #3 cont. (632.0201) | EACH | 21 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 231 | Shrubs (species, root, size) 03. gro- low fragrant sumac, 24" SPRD., #5 cont. (632.0201) | EACH | 11 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 232 | Landscape planting surveillance and care cycles (632.9101) | EACH | 10 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 233 | Markers culvert end (633.5200) | EACH | 17 | $70.00 | $70.00 | $70.00 | $70.00 | $70.00 |
| 234 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 12 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 |
| 235 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 83 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 |
| 236 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 13 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 |
| 237 | Posts tubular steel 2X2-inch X 5-FT (634.0805) | EACH | 1 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 238 | Posts tubular steel 2X2-inch X 9.5- FT (634.0809) | EACH | 3 | $175.00 | $175.00 | $175.00 | $175.00 | $175.00 |
| 239 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 7 | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 |
| 240 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 21 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 241 | Posts tubular steel 2X2-inch X 16- FT (634.0816) | EACH | 2 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 |
| 242 | Foundation drilling (diameter) 01. 30-inch diameter (636.0050.S) | LF | 2,803 | $173.61 | $100.00 | $100.00 | $100.00 | $100.00 |
| 243 | Foundation drilling (diameter) 02. 42-inch diameter (636.0050.S) | LF | 370 | $218.54 | $153.00 | $153.00 | $153.00 | $153.00 |
| 244 | Signs type I reflective SH (637.1220) | SF | 209 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 |
| 245 | Signs type II reflective H (637.2210) | SF | 966.07 | $23.00 | $23.00 | $23.00 | $23.00 | $23.00 |
| 246 | Signs type II reflective H folding (637.2215) | SF | 52.22 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 247 | Signs type II reflective F (637.2230) | SF | 163.25 | $23.00 | $23.00 | $23.00 | $23.00 | $23.00 |
| 248 | Moving signs type II (638.2102) | EACH | 35 | $175.00 | $175.00 | $175.00 | $175.00 | $175.00 |
| 249 | Removing signs type II (638.2602) | EACH | 95 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 250 | Removing small sign supports (638.3000) | EACH | 80 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 251 | Moving small sign supports (638.4000) | EACH | 5 | $175.00 | $175.00 | $175.00 | $175.00 | $175.00 |
| 252 | Traffic control drums (643.0300) | DAY | 251,000 | $0.03 | $0.03 | $0.03 | $0.03 | $0.03 |
| 253 | Traffic control barricades type III (643.0420) | DAY | 65,500 | $0.16 | $0.16 | $0.16 | $0.16 | $0.16 |
| 254 | Traffic control flexible tubular marker posts (643.0500) | EACH | 50 | $50.51 | $50.00 | $50.00 | $50.00 | $50.00 |
| 255 | Traffic control flexible tubular marker bases (643.0600) | EACH | 50 | $10.10 | $10.00 | $10.00 | $10.00 | $10.00 |
| 256 | Traffic control warning lights type A (643.0705) | DAY | 131,000 | $0.05 | $0.05 | $0.05 | $0.05 | $0.05 |
| 257 | Traffic control warning lights type C (643.0715) | DAY | 46,500 | $0.07 | $0.07 | $0.07 | $0.07 | $0.07 |
| 258 | Traffic control connected arrow boards (643.0810) | DAY | 950 | $4.04 | $4.00 | $4.00 | $4.00 | $4.00 |
| 259 | Traffic control signs (643.0900) | DAY | 100,000 | $0.15 | $0.15 | $0.15 | $0.15 | $0.15 |
| 260 | Traffic control covering signs type II (643.0920) | EACH | 4 | $151.52 | $150.00 | $150.00 | $150.00 | $150.00 |
| 261 | Traffic control signs fixed message (643.1000) | SF | 52 | $25.25 | $25.00 | $25.00 | $25.00 | $25.00 |
| 262 | Traffic control signs PCMS (643.1050) | DAY | 1,600 | $10.10 | $10.00 | $10.00 | $10.00 | $10.00 |
| 263 | Temporary marking line epoxy 6- inch (643.3170) | LF | 11,000 | $0.76 | $0.75 | $0.75 | $0.75 | $0.45 |
| 264 | Temporary marking line removable tape 6-inch (643.3180) | LF | 107,000 | $1.52 | $1.50 | $1.50 | $1.50 | $1.50 |
| 265 | Temporary marking line epoxy 10- inch (643.3270) | LF | 800 | $3.03 | $3.00 | $3.00 | $3.00 | $1.50 |
| 266 | Temporary marking line removable tape 10-inch (643.3280) | LF | 6,300 | $2.53 | $2.50 | $2.50 | $2.50 | $2.50 |
| 267 | Temporary marking crosswalk epoxy 6-inch (643.3320) | LF | 50 | $5.05 | $5.00 | $5.00 | $5.00 | $13.55 |
| 268 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 2,300 | $1.67 | $1.65 | $1.65 | $1.65 | $1.65 |
| 269 | Temporary marking arrow epoxy (643.3520) | EACH | 5 | $126.26 | $125.00 | $125.00 | $125.00 | $271.90 |
| 270 | Temporary marking arrow removable tape (643.3550) | EACH | 35 | $75.76 | $75.00 | $75.00 | $75.00 | $75.00 |
| 271 | Temporary marking word epoxy (643.3620) | EACH | 2 | $101.01 | $100.00 | $100.00 | $100.00 | $279.50 |
| 272 | Temporary marking word removable tape (643.3650) | EACH | 5 | $75.76 | $75.00 | $75.00 | $75.00 | $75.00 |
| 273 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 1,300 | $4.55 | $4.50 | $4.50 | $4.50 | $4.50 |
| 274 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 1,500 | $1.77 | $1.75 | $1.75 | $1.75 | $1.75 |
| 275 | Traffic control (643.5000) | EACH | 1 | $228,343 | $225,975 | $225,975 | $225,975 | $225,975 |
| 276 | Temporary pedestrian surface asphalt (644.1410) | SF | 6,000 | $4.60 | $10.00 | $6.35 | $10.00 | $10.00 |
| 277 | Temporary pedestrian surface plate (644.1430) | SF | 300 | $16.91 | $12.00 | $12.00 | $19.50 | $12.00 |
| 278 | Temporary pedestrian surface matting (644.1440) | SF | 1,500 | $8.08 | $8.00 | $8.00 | $3.75 | $8.00 |
| 279 | Temporary pedestrian curb ramp (644.1601) | DAY | 2,000 | $2.53 | $2.50 | $2.50 | $4.85 | $2.50 |
| 280 | Temporary pedestrian detectable warning field (644.1605) | SF | 1,500 | $5.05 | $5.00 | $5.00 | $6.75 | $5.00 |
| 281 | Temporary pedestrian barricade (644.1810) | LF | 8,500 | $5.05 | $5.00 | $5.00 | $6.25 | $5.00 |
| 282 | Temporary audible message devices (644.1900.S) | DAY | 6,000 | $1.01 | $1.00 | $1.00 | $4.30 | $1.00 |
| 283 | Geotextile type C (645.0105) | SY | 789 | $2.00 | $1.22 | $6.00 | $1.74 | $7.00 |
| 284 | Geotextile type DF schedule A (645.0111) | SY | 4,563 | $1.50 | $4.25 | $1.00 | $1.02 | $4.00 |
| 285 | Geotextile type HR (645.0120) | SY | 555 | $4.00 | $5.32 | $5.00 | $3.04 | $9.00 |
| 286 | Geotextile type sas (645.0140) | SY | 11 | $13.50 | $1.18 | $200.00 | $57.55 | $60.00 |
| 287 | Geogrid type SR (645.0220) | SY | 9,255 | $1.50 | $2.78 | $2.59 | $1.13 | $3.00 |
| 288 | Marking line epoxy 6-inch (646.2020) | LF | 6,500 | $0.51 | $0.85 | $0.85 | $0.50 | $0.50 |
| 289 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 2,890 | $0.91 | $0.80 | $0.80 | $0.90 | $0.90 |
| 290 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 25,110 | $1.36 | $1.60 | $1.60 | $1.35 | $1.35 |
| 291 | Marking line epoxy 10-inch (646.4020) | LF | 220 | $1.11 | $1.40 | $1.40 | $1.10 | $1.10 |
| 292 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 3,915 | $2.93 | $2.60 | $2.60 | $2.90 | $2.90 |
| 293 | Marking arrow epoxy (646.5020) | EACH | 55 | $277.37 | $280.00 | $280.00 | $274.60 | $274.60 |
| 294 | Marking word epoxy (646.5120) | EACH | 3 | $414.39 | $350.00 | $350.00 | $410.25 | $410.25 |
| 295 | Marking symbol epoxy (646.5220) | EACH | 7 | $199.75 | $375.00 | $375.00 | $197.75 | $197.75 |
| 296 | Marking stop line epoxy 18-inch (646.6120) | LF | 275 | $17.12 | $14.00 | $14.00 | $16.95 | $16.95 |
| 297 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 90 | $17.12 | $15.00 | $15.00 | $16.95 | $16.95 |
| 298 | Marking diagonal epoxy 12-inch (646.7120) | LF | 200 | $16.72 | $12.00 | $12.00 | $16.55 | $16.55 |
| 299 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,700 | $16.29 | $13.00 | $13.00 | $16.13 | $16.13 |
| 300 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 230 | $28.13 | $21.00 | $21.00 | $27.85 | $27.85 |
| 301 | Marking curb epoxy (646.8120) | LF | 150 | $8.23 | $9.00 | $9.00 | $8.15 | $8.15 |
| 302 | Marking island nose epoxy (646.8220) | EACH | 15 | $307.27 | $325.00 | $325.00 | $304.20 | $304.20 |
| 303 | Marking parking stall epoxy (646.8320) | LF | 1,165 | $5.56 | $10.00 | $10.00 | $5.50 | $5.50 |
| 304 | Marking removal line 4-inch (646.9000) | LF | 16,000 | $0.91 | $0.90 | $0.90 | $0.20 | $0.90 |
| 305 | Marking removal line 6-inch (646.9002) | LF | 950 | $1.41 | $1.40 | $1.40 | $0.50 | $1.40 |
| 306 | Marking removal line 8-inch (646.9100) | LF | 1,150 | $2.02 | $2.00 | $2.00 | $0.75 | $2.00 |
| 307 | Marking removal line wide (646.9200) | LF | 350 | $2.02 | $2.00 | $2.00 | $3.00 | $2.00 |
| 308 | Marking removal special marking (646.9300) | EACH | 20 | $75.76 | $75.00 | $75.00 | $75.00 | $75.00 |
| 309 | Construction staking storm sewer (650.4000) | EACH | 169 | $350.00 | $10.00 | $350.00 | $150.00 | $500.00 |
| 310 | Construction staking subgrade (650.4500) | LF | 22,246 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 311 | Construction staking base (650.5000) | LF | 10,860 | $2.35 | $0.01 | $2.00 | $0.75 | $5.00 |
| 312 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 2,887 | $2.75 | $1.00 | $6.00 | $1.50 | $7.00 |
| 313 | Construction staking pipe culverts (650.6000) | EACH | 5 | $300.00 | $100.00 | $800.00 | $500.00 | $500.00 |
| 314 | Construction staking structure layout (structure) 01. B-13-907 (650.6501) | EACH | 1 | $43,000 | $125,000 | $15,000 | $40,000 | $40,000 |
| 315 | Construction staking structure layout (structure) 02. R-13-379 (650.6501) | EACH | 1 | $43,000 | $65,000 | $8,000.00 | $20,000 | $40,000 |
| 316 | Construction staking structure layout (structure) 03. R-13-380 (650.6501) | EACH | 1 | $43,000 | $65,000 | $8,000.00 | $20,000 | $40,000 |
| 317 | Construction staking structure layout (structure) 04. R-13-381 (650.6501) | EACH | 1 | $43,000 | $65,000 | $8,000.00 | $20,000 | $40,000 |
| 318 | Construction staking structure layout (structure) 05. R-13-382 (650.6501) | EACH | 1 | $43,000 | $65,000 | $8,000.00 | $20,000 | $40,000 |
| 319 | Construction staking structure layout (structure) 06. R-13-383 (650.6501) | EACH | 1 | $7,500.00 | $65,000 | $8,000.00 | $5,000.00 | $10,000 |
| 320 | Construction staking structure layout (structure) 07. R-13-384 (650.6501) | EACH | 1 | $7,500.00 | $25,000 | $8,000.00 | $5,000.00 | $10,000 |
| 321 | Construction staking structure layout (structure) 08. R-13-385 (650.6501) | EACH | 1 | $8,500.00 | $25,000 | $8,000.00 | $10,000 | $20,000 |
| 322 | Construction staking structure layout (structure) 09. S-13-0609 (650.6501) | EACH | 1 | $2,500.00 | $5,000.00 | $3,000.00 | $2,000.00 | $2,000.00 |
| 323 | Construction staking structure layout (structure) 10. S-13-0610 (650.6501) | EACH | 1 | $2,500.00 | $5,000.00 | $3,000.00 | $2,000.00 | $2,000.00 |
| 324 | Construction staking structure layout (structure) 11. S-13-0611 (650.6501) | EACH | 1 | $2,500.00 | $5,000.00 | $3,000.00 | $4,000.00 | $4,000.00 |
| 325 | Construction staking concrete pavement (650.7000) | LF | 11,386 | $4.25 | $0.30 | $6.00 | $2.00 | $6.00 |
| 326 | Construction staking concrete barrier (650.7500) | LF | 450 | $9.50 | $1.00 | $5.00 | $2.25 | $8.00 |
| 327 | Construction staking electrical installations (project) 01. 5845-16- 76 (650.8501) | EACH | 1 | $27,000 | $5,000.00 | $25,000 | $15,000 | $30,000 |
| 328 | Construction staking curb ramps (650.9000) | EACH | 36 | $750.00 | $10.00 | $500.00 | $250.00 | $500.00 |
| 329 | Construction staking sidewalk (project) 01. 5845-16-76 (650.9500) | EACH | 1 | $7,500.00 | $5,000.00 | $15,000 | $20,000 | $20,000 |
| 330 | Construction staking supplemental control (project) 01. 5845-16-76 (650.9911) | EACH | 1 | $75,000 | $50,000 | $500,000 | $40,000 | $200,000 |
| 331 | Construction staking slope stakes (650.9920) | LF | 17,333 | $3.00 | $0.15 | $6.00 | $1.00 | $5.00 |
| 332 | Conduit rigid nonmetallic schedule 40 1 1/2-inch (652.0220) | LF | 288 | $12.00 | $8.00 | $8.00 | $8.00 | $8.00 |
| 333 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 7,339 | $12.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| 334 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 346 | $15.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| 335 | Conduit rigid nonmetallic schedule 80 2-inch (652.0325) | LF | 1,022 | $15.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 336 | Conduit special 2-inch (652.0605) | LF | 490 | $55.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 337 | Conduit special 3-inch (652.0615) | LF | 746 | $52.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 338 | Conduit loop detector (652.0800) | LF | 1,068 | $10.00 | $7.50 | $7.50 | $7.50 | $7.50 |
| 339 | Pull boxes non-conductive 24X36- inch (653.0154) | EACH | 2 | $2,400.00 | $1,900.00 | $1,900.00 | $1,900.00 | $1,900.00 |
| 340 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 36 | $2,500.00 | $2,050.00 | $2,050.00 | $2,050.00 | $2,050.00 |
| 341 | Junction boxes 8X8X8-inch (653.0208) | EACH | 2 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 342 | Removing pull boxes (653.0905) | EACH | 30 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 343 | Concrete bases type 1 (654.0101) | EACH | 8 | $1,300.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 344 | Concrete bases type 2 (654.0102) | EACH | 24 | $1,900.00 | $1,350.00 | $1,350.00 | $1,350.00 | $1,350.00 |
| 345 | Concrete bases type 5 (654.0105) | EACH | 14 | $1,700.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 346 | Concrete bases type 10 (654.0110) | EACH | 3 | $10,000 | $11,000 | $11,000 | $11,000 | $11,000 |
| 347 | Concrete bases type 10-special (654.0120) | EACH | 1 | $17,000 | $16,000 | $16,000 | $16,000 | $16,000 |
| 348 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $3,000.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 349 | Concrete control cabinet bases type L24 (654.0224) | EACH | 2 | $3,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 350 | Concrete control cabinet bases type L30 (654.0230) | EACH | 2 | $3,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 351 | Cable traffic signal 3-14 AWG (655.0210) | LF | 120 | $1.50 | $2.25 | $2.25 | $2.25 | $2.25 |
| 352 | Cable traffic signal 5-14 AWG (655.0230) | LF | 613 | $1.75 | $2.50 | $2.50 | $2.50 | $2.50 |
| 353 | Cable traffic signal 7-14 AWG (655.0240) | LF | 965 | $1.85 | $3.00 | $3.00 | $3.00 | $3.00 |
| 354 | Cable traffic signal 12-14 AWG (655.0260) | LF | 1,834 | $3.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 355 | Cable traffic signal 15-14 AWG (655.0270) | LF | 149 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 356 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 1,330 | $2.00 | $1.90 | $1.90 | $1.90 | $1.90 |
| 357 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 2,350 | $1.40 | $1.50 | $1.50 | $1.50 | $1.50 |
| 358 | Electrical wire lighting 12 AWG (655.0610) | LF | 10,333 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 |
| 359 | Electrical wire lighting 8 AWG (655.0620) | LF | 5,909 | $1.70 | $2.00 | $2.00 | $2.00 | $2.00 |
| 360 | Electrical wire lighting 6 AWG (655.0625) | LF | 30,604 | $2.00 | $2.25 | $2.25 | $2.25 | $2.25 |
| 361 | Loop detector lead in cable (655.0700) | LF | 5,187 | $1.75 | $1.65 | $1.65 | $1.65 | $1.65 |
| 362 | Loop detector wire (655.0800) | LF | 5,454 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 |
| 363 | Traffic signal evp detector cable (655.0900) | LF | 504 | $2.00 | $1.50 | $1.50 | $1.50 | $1.50 |
| 364 | Electrical service meter breaker pedestal (location) 01. sta. 13+22.41 'rab', 62.9' RT (656.0201) | EACH | 1 | $3,000.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 365 | Electrical service meter breaker pedestal (location) 02. sta. 50+52.70 'upo', 24.8' LT (656.0201) | EACH | 1 | $3,000.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 366 | Electrical service meter breaker pedestal (location) 03. sta. 874+57.61 'SB', 45.50' LT (656.0201) | EACH | 1 | $3,000.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 367 | Electrical service meter breaker pedestal (location) 04. sta. 873+57.00 'SB', 48.60' LT (656.0201) | EACH | 1 | $3,000.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 368 | Pedestal bases (657.0100) | EACH | 8 | $360.00 | $400.00 | $400.00 | $400.00 | $400.00 |
| 369 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 15 | $900.00 | $725.00 | $725.00 | $725.00 | $725.00 |
| 370 | Poles type 3 (657.0310) | EACH | 2 | $4,375.00 | $4,125.00 | $4,125.00 | $4,125.00 | $4,125.00 |
| 371 | Poles type 5-aluminum (657.0322) | EACH | 13 | $3,200.00 | $3,300.00 | $3,300.00 | $3,300.00 | $3,300.00 |
| 372 | Poles type 9 (657.0345) | EACH | 1 | $11,000 | $8,921.00 | $8,921.00 | $8,921.00 | $8,921.00 |
| 373 | Poles type 10 (657.0350) | EACH | 2 | $12,500 | $10,716 | $10,716 | $10,716 | $10,716 |
| 374 | Poles type 10-special (657.0352) | EACH | 1 | $17,000 | $13,655 | $13,655 | $13,655 | $13,655 |
| 375 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 2 | $1,075.00 | $1,194.00 | $1,194.00 | $1,194.00 | $1,194.00 |
| 376 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 3 | $1,200.00 | $1,368.00 | $1,368.00 | $1,368.00 | $1,368.00 |
| 377 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 3 | $925.00 | $1,142.00 | $1,142.00 | $1,142.00 | $1,142.00 |
| 378 | Monotube arms 20-FT (657.0520) | EACH | 1 | $5,300.00 | $4,225.00 | $4,225.00 | $4,225.00 | $4,225.00 |
| 379 | Monotube arms 30-FT (657.0530) | EACH | 2 | $6,800.00 | $5,723.00 | $5,723.00 | $5,723.00 | $5,723.00 |
| 380 | Monotube arms 35-FT-special (657.0536) | EACH | 1 | $6,500.00 | $6,547.00 | $6,547.00 | $6,547.00 | $6,547.00 |
| 381 | Trombone arms 15-FT (657.0585) | EACH | 2 | $2,900.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 382 | Luminaire arms single member 4- inch clamp 8-FT (657.0614) | EACH | 4 | $550.00 | $600.00 | $600.00 | $600.00 | $600.00 |
| 383 | Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615) | EACH | 2 | $550.00 | $625.00 | $625.00 | $625.00 | $625.00 |
| 384 | Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710) | EACH | 11 | $1,250.00 | $1,090.00 | $1,090.00 | $1,090.00 | $1,090.00 |
| 385 | Luminaire arms steel 12-FT (657.0812) | EACH | 4 | $1,175.00 | $1,095.00 | $1,095.00 | $1,095.00 | $1,095.00 |
| 386 | Traffic signal face 3S 12-inch (658.0173) | EACH | 12 | $775.00 | $800.00 | $800.00 | $800.00 | $800.00 |
| 387 | Traffic signal face 4S 12-inch (658.0174) | EACH | 4 | $950.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 388 | Traffic signal face 5S 12-inch (658.0175) | EACH | 2 | $1,225.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,250.00 |
| 389 | Pedestrian signal face 16-inch (658.0416) | EACH | 8 | $450.00 | $425.00 | $425.00 | $425.00 | $425.00 |
| 390 | Pedestrian push buttons (658.0500) | EACH | 8 | $350.00 | $175.00 | $175.00 | $175.00 | $175.00 |
| 391 | Signal mounting hardware (location) 01. ush 51 & farwell street (658.5070) | EACH | 1 | $8,000.00 | $5,300.00 | $5,300.00 | $5,300.00 | $5,300.00 |
| 392 | Luminaires utility LED C (659.1125) | EACH | 21 | $275.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 393 | Luminaires underdeck LED A (659.1205) | EACH | 4 | $800.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 394 | Lighting control cabinets 120/240 24-inch (659.2124) | EACH | 1 | $8,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 395 | Lighting control cabinets 120/240 30-inch (659.2130) | EACH | 2 | $9,000.00 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 |
| 396 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 69 | $400.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 397 | Temporary traffic signals for intersections (location) 01. ush 51 & farwell street (661.0201) | EACH | 1 | $140,000 | $75,000 | $75,000 | $75,000 | $75,000 |
| 398 | Temporary traffic signals for intersections (location) 02. ush 51 & larson beach road (661.0201) | EACH | 1 | $120,000 | $75,000 | $75,000 | $75,000 | $75,000 |
| 399 | Sawing asphalt (690.0150) | LF | 3,080 | $1.30 | $1.39 | $1.95 | $1.95 | $1.39 |
| 400 | Sawing concrete (690.0250) | LF | 9,200 | $2.35 | $1.95 | $2.35 | $2.35 | $1.95 |
| 401 | Incentive strength concrete structures (715.0502) | DOL | 11,800 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 402 | Incentive strength concrete barrier (715.0603) | DOL | 225 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 403 | Incentive compressive strength concrete pavement (715.0720) | DOL | 12,295 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 404 | Incentive iri ride (740.0440) | DOL | 8,600 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 405 | Seismograph (project) 01. 5845-16- 76 (999.1001.S) | EACH | 1 | $18,150 | $21,450 | $16,000 | $20,850 | $56,700 |
| 406 | Crack and damage survey (999.1501.S) | EACH | 1 | $19,400 | $15,000 | $5,000.00 | $5,000.00 | $4,900.00 |
| 407 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,100 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 408 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 6,480 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 409 | Special 001. decomposed granite paving (SPV.0035) | CY | 16 | $300.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 410 | Special 002. planting mixture (SPV.0035) | CY | 138 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 |
| 411 | Special 001. mailbox removal and temporary mailboxes (SPV.0060) | EACH | 3 | $450.00 | $250.00 | $1,500.00 | $85.00 | $450.00 |
| 412 | Special 002. remove traffic signal equipment (ush 51 & farwell street) (SPV.0060) | EACH | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 413 | Special 003. remove traffic signal equipment (ush 51 & larson beach road) (SPV.0060) | EACH | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 414 | Special 004. storm sewer tap (SPV.0060) | EACH | 5 | $1,900.00 | $1,374.10 | $804.00 | $8,881.35 | $2,000.00 |
| 415 | Special 005. manholes 10-FT X 10- FT special (SPV.0060) | EACH | 2 | $36,000 | $26,952 | $27,160 | $31,429 | $30,000 |
| 416 | Special 006. construction staking roundabout (SPV.0060) | EACH | 1 | $55,000 | $45,000 | $60,000 | $20,000 | $60,000 |
| 417 | Special 007. concrete pipe support (SPV.0060) | EACH | 3 | $1,900.00 | $1,911.71 | $3,412.00 | $5,124.55 | $1,200.00 |
| 418 | Special 008. temporary inlets 2X3- FT (SPV.0060) | EACH | 4 | $1,500.00 | $2,675.19 | $1,624.00 | $6,542.48 | $2,400.00 |
| 419 | Special 009. inlet covers flat temporary (SPV.0060) | EACH | 30 | $1,200.00 | $1,578.69 | $1,052.00 | $1,415.31 | $1,100.00 |
| 420 | Special 010. salvage transformer bases breakaway 11 1/2-inch bolt circle (SPV.0060) | EACH | 12 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 421 | Special 011. verify landmark reference monuments (SPV.0060) | EACH | 1 | $500.00 | $2,500.00 | $5,000.00 | $150.00 | $3,000.00 |
| 422 | Special 012. utility line opening (ulo) (SPV.0060) | EACH | 30 | $800.00 | $550.00 | $675.00 | $1,500.00 | $700.00 |
| 423 | Special 013. rectangular rapid flashing beacon (RRFB) single light bar system (SPV.0060) | EACH | 10 | $8,500.00 | $7,572.00 | $7,572.00 | $7,572.00 | $7,572.00 |
| 424 | Special 014. rectangular rapid flashing beacon (RRFB) double light bar system (SPV.0060) | EACH | 1 | $10,000 | $8,897.00 | $8,897.00 | $8,897.00 | $8,897.00 |
| 425 | Special 015. traffic signal equipment (ush 51 & farwell street), black finish (SPV.0060) | EACH | 1 | $1.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 426 | Special 016. lighting unit, black finish (SPV.0060) | EACH | 13 | $1.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 427 | Special 017. rectangular rapid flashing beacon (RRFB) unit, black finish (SPV.0060) | EACH | 11 | $1.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 428 | Special 018. perennials, millenium onion, container, #1 (SPV.0060) | EACH | 25 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 429 | Special 019. perennials, butterfly milkweed, container, #1 (SPV.0060) | EACH | 31 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 430 | Special 020. perennials, blanketflower, container, #1 (SPV.0060) | EACH | 20 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 431 | Special 021. perennials, may night meadow sage, container, #1 (SPV.0060) | EACH | 35 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 432 | Special 022. perennials, autumn joy sedum, container, #1 (SPV.0060) | EACH | 27 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 433 | Special 023. perennials, side oats grama, container, #1 (SPV.0060) | EACH | 35 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 434 | Special 024. perennials, switchgrass, container, #1 (SPV.0060) | EACH | 17 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 435 | Special 025. perennials, little bluestem, container, #1 (SPV.0060) | EACH | 19 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 436 | Special 026. bulbs, violet beauty ornamental onion, bare root, bulb (SPV.0060) | EACH | 34 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 437 | Special 027. bulbs, dutch master daffodil, bare root, bulb (SPV.0060) | EACH | 19 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 438 | Special 028. bulbs, las vegas daffodil, bare root, bulb (SPV.0060) | EACH | 30 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 439 | Special 029. bulbs, mount hood daffodil, bare root, bulb (SPV.0060) | EACH | 22 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 440 | Special 030. remove, salvage and reinstall tree grates (SPV.0060) | EACH | 6 | $2,325.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 441 | Special 031. remove and salvage tree grates (SPV.0060) | EACH | 6 | $220.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 442 | Special 032. lighting unit type special 1 (SPV.0060) | EACH | 19 | $21,000 | $21,697 | $21,697 | $21,697 | $21,697 |
| 443 | Special 033. install lighting unit (SPV.0060) | EACH | 3 | $1,500.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 444 | Special 034. install lighting control cabinet (SPV.0060) | EACH | 1 | $3,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 445 | Special 035. salvage lighting unit (SPV.0060) | EACH | 3 | $1,000.00 | $900.00 | $900.00 | $900.00 | $900.00 |
| 446 | Special 036. salvage lighting control cabinet (SPV.0060) | EACH | 1 | $2,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 447 | Special 037. temporary pipe connection 12-inch (SPV.0060) | EACH | 1 | $680.00 | $1,374.10 | $831.00 | $5,371.80 | $2,300.00 |
| 448 | Special 038. temporary pipe connection 15-inch (SPV.0060) | EACH | 2 | $740.00 | $1,374.10 | $832.00 | $5,371.80 | $2,500.00 |
| 449 | Special 039. temporary pipe connection 18-inch (SPV.0060) | EACH | 1 | $740.00 | $1,374.10 | $887.00 | $5,371.80 | $2,600.00 |
| 450 | Special 040. temporary pipe connection 24-inch (SPV.0060) | EACH | 1 | $840.00 | $1,374.10 | $1,092.00 | $5,371.80 | $2,400.00 |
| 451 | Special 041. temporary pipe connection 36-inch (SPV.0060) | EACH | 3 | $840.00 | $3,325.65 | $1,302.00 | $5,371.80 | $2,800.00 |
| 452 | Special 042. temporary pipe connection 48-inch (SPV.0060) | EACH | 1 | $1,250.00 | $2,598.07 | $1,663.00 | $5,371.80 | $3,400.00 |
| 453 | Special 043. storm sewer plug 12- inch (SPV.0060) | EACH | 5 | $400.00 | $1,374.10 | $167.00 | $1,740.39 | $400.00 |
| 454 | Special 044. storm sewer plug 24- inch (SPV.0060) | EACH | 1 | $435.00 | $1,374.10 | $198.00 | $1,770.26 | $450.00 |
| 455 | Special 045. storm sewer plug 29X45-inch (SPV.0060) | EACH | 4 | $570.00 | $1,374.10 | $420.00 | $2,724.79 | $550.00 |
| 456 | Special 046. storm sewer plug 34X53-inch (SPV.0060) | EACH | 2 | $575.00 | $1,374.10 | $476.00 | $3,567.91 | $600.00 |
| 457 | Special 047. storm sewer plug 38X60-inch (SPV.0060) | EACH | 2 | $630.00 | $1,374.10 | $571.00 | $3,610.85 | $650.00 |
| 458 | Special 048. retroreflective backplate 3S (SPV.0060) | EACH | 6 | $200.00 | $135.00 | $135.00 | $135.00 | $135.00 |
| 459 | Special 049. retroreflective backplate 4S (SPV.0060) | EACH | 4 | $200.00 | $165.00 | $165.00 | $165.00 | $165.00 |
| 460 | Special 050. underwater substructure inspection (SPV.0060) | EACH | 7 | $8,696.00 | $6,500.00 | $6,500.00 | $6,500.00 | $6,500.00 |
| 461 | Special 051. settlement monitoring (SPV.0060) | EACH | 1 | $5,000.00 | $75,000 | $100,000 | $9,923.56 | $36,000 |
| 462 | Special 052. field office special (SPV.0060) | EACH | 1 | $64,000 | $87,000 | $110,000 | $94,000 | $150,000 |
| 463 | Special 053. construction staking staging (SPV.0060) | EACH | 1 | $83,000 | $45,000 | $40,000 | $30,000 | $100,000 |
| 464 | Special 1098. remove, salvage and reinstall security camera pole (SPV.0060) | EACH | 1 | $5,000.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 465 | Special 201. existing sanitary sewer reconnection (SPV.0060) | EACH | 3 | $3,300.00 | $5,223.57 | $21,131 | $24,269 | $20,717 |
| 466 | Special 202. discontinue existing sanitary manhole (SPV.0060) | EACH | 2 | $2,000.00 | $1,926.28 | $5,741.00 | $3,636.36 | $5,628.00 |
| 467 | Special 203. sanitary manhole casting (SPV.0060) | EACH | 4 | $940.00 | $1,881.84 | $883.00 | $1,259.18 | $866.00 |
| 468 | Special 204. existing water main reconnections (SPV.0060) | EACH | 8 | $2,450.00 | $2,283.60 | $3,035.00 | $500.00 | $4,800.00 |
| 469 | Special 205. existing water valve box adjustment (SPV.0060) | EACH | 21 | $155.00 | $407.98 | $665.00 | $1,139.49 | $600.00 |
| 470 | Special 206. utility crossing water main insulation (SPV.0060) | EACH | 11 | $135.00 | $63.83 | $128.00 | $64.00 | $600.00 |
| 471 | Special 207. new hydrants (SPV.0060) | EACH | 5 | $9,400.00 | $9,063.69 | $7,238.00 | $7,750.26 | $8,500.00 |
| 472 | Special 208. existing hydrant removals (SPV.0060) | EACH | 8 | $725.00 | $1,756.82 | $750.00 | $2,462.28 | $1,250.00 |
| 473 | Special 209. 6” valves and boxes (SPV.0060) | EACH | 5 | $3,500.00 | $3,010.86 | $3,176.00 | $1,952.00 | $3,600.00 |
| 474 | Special 210. water main offset (SPV.0060) | EACH | 4 | $13,300 | $12,370 | $5,684.00 | $10,506 | $12,500 |
| 475 | Special 211. temporary sewer bypassing and connections (SPV.0060) | EACH | 1 | $11,000 | $3,992.57 | $38,653 | $25,920 | $37,895 |
| 476 | Special 301. reconstruction/adjust manhole (SPV.0060) | EACH | 3 | $2,600.00 | $3,764.02 | $2,961.00 | $4,950.80 | $2,903.00 |
| 477 | Special 302. manhole covers type J-special (SPV.0060) | EACH | 12 | $940.00 | $1,014.36 | $610.00 | $1,780.74 | $598.00 |
| 478 | Special 303. manhole rehabilitation (SPV.0060) | EACH | 6 | $12,000 | $1,275.00 | $1,432.00 | $1,275.00 | $1,404.00 |
| 479 | Special 304. manhole liner (SPV.0060) | EACH | 11 | $9,860.00 | $9,860.00 | $16,627 | $9,860.00 | $16,301 |
| 480 | Special 305. manhole coating repair (SPV.0060) | EACH | 1 | $3,250.00 | $3,250.00 | $3,652.00 | $3,250.00 | $3,580.00 |
| 481 | Special 306. junction chamber liner (SPV.0060) | EACH | 1 | $16,520 | $16,520 | $18,562 | $16,520 | $18,198 |
| 482 | Special 307. sanitary interceptor manhole 72-inch (SPV.0060) | EACH | 3 | $22,000 | $17,253 | $38,423 | $28,064 | $37,670 |
| 483 | Special 308. doghouse manhole 09- 106A (SPV.0060) | EACH | 1 | $13,860 | $97,378 | $99,482 | $30,579 | $97,531 |
| 484 | Special 309. junction chamber 09- 108A (SPV.0060) | EACH | 1 | $170,000 | $150,607 | $139,664 | $300,000 | $136,925 |
| 485 | Special 310. dewatering - MMSD structure 09-108A (SPV.0060) | EACH | 1 | $56,000 | $99,943 | $133,467 | $500,000 | $130,850 |
| 486 | Special 311. dewatering - MMSD interceptor (SPV.0060) | EACH | 1 | $71,000 | $99,943 | $187,323 | $500,000 | $183,650 |
| 487 | Special 312. bypass pumping - MMSD structure 09-108A (SPV.0060) | EACH | 1 | $119,000 | $50,000 | $44,411 | $250,000 | $43,540 |
| 488 | Special 313. bypass pumping - MMSD structure 09-106A (SPV.0060) | EACH | 1 | $19,000 | $250,000 | $101,415 | $250,000 | $99,426 |
| 489 | Special 314. remove and abandon manhole 09-107 (SPV.0060) | EACH | 1 | $3,825.00 | $10,277 | $2,015.00 | $21,370 | $1,975.00 |
| 490 | Special 315. remove structure 09- 108 (SPV.0060) | EACH | 1 | $3,160.00 | $7,810.62 | $5,733.00 | $92,028 | $5,621.00 |
| 491 | Special 316. connect to existing interceptor sewer - mcfarland (SPV.0060) | EACH | 1 | $6,130.00 | $5,297.82 | $91,902 | $22,978 | $90,100 |
| 492 | Special 317. connect to existing interceptor and benching MH09- 106A (SPV.0060) | EACH | 1 | $4,200.00 | $3,727.81 | $60,424 | $500.00 | $59,239 |
| 493 | Special 318. replace adjustment rings (SPV.0060) | EACH | 8 | $400.00 | $1,386.22 | $618.00 | $4,191.03 | $606.00 |
| 494 | Special 319. adjust manhole rim (SPV.0060) | EACH | 12 | $920.00 | $1,040.39 | $618.00 | $794.99 | $606.00 |
| 495 | Special 320. MMSD structure staking (SPV.0060) | EACH | 1 | $25,000 | $2,500.00 | $15,000 | $10,000 | $30,000 |
| 496 | Special 321. MMSD interceptor staking (SPV.0060) | EACH | 1 | $25,000 | $2,500.00 | $15,000 | $5,000.00 | $30,000 |
| 497 | Special 401. pipe pile supports (SPV.0060) | EACH | 43 | $5,800.00 | $6,000.00 | $26,248 | $6,252.68 | $25,733 |
| 498 | Special 402. sanitary manholes 4-FT diameter (SPV.0060) | EACH | 1 | $11,970 | $9,061.87 | $31,767 | $12,450 | $31,144 |
| 499 | Special 403. sanitary manholes 4-FT diameter pile supported (SPV.0060) | EACH | 1 | $22,000 | $34,954 | $82,618 | $52,957 | $80,998 |
| 500 | Special 404. manhole frame (SPV.0060) | EACH | 2 | $580.00 | $1,153.37 | $317.00 | $255.11 | $311.00 |
| 501 | Special 405. manhole cover (SPV.0060) | EACH | 2 | $360.00 | $405.51 | $244.00 | $974.06 | $239.00 |
| 502 | Special 406. connection to manhole MH 09-108A MMSD (SPV.0060) | EACH | 1 | $9,600.00 | $2,744.92 | $20,876 | $3,469.64 | $20,467 |
| 503 | Special 407. connect to existing sanitary main (SPV.0060) | EACH | 1 | $3,200.00 | $5,230.42 | $21,793 | $14,229 | $21,366 |
| 504 | Special 408. construction staking sanitary sewer (SPV.0060) | EACH | 1 | $25,000 | $5,000.00 | $20,000 | $15,000 | $30,000 |
| 505 | Special 409. sanitary sewer main bypass pumping for town of dunn sanitary district no. 3 (SPV.0060) | EACH | 1 | $201,000 | $326,210 | $81,392 | $1,000,000 | $79,796 |
| 506 | Special 410. reconstruct sanitary manhole 4-FT diameter (SPV.0060) | EACH | 1 | $2,600.00 | $6,079.66 | $2,961.00 | $4,759.28 | $2,903.00 |
| 507 | Special 501. kegonsa sanitary district force main bypass pumping and hauling (SPV.0060) | EACH | 1 | $25,000 | $20,200 | $96,401 | $750,000 | $94,511 |
| 508 | Special 502. connect to existing force main (SPV.0060) | EACH | 1 | $3,450.00 | $4,864.69 | $40,595 | $20,625 | $39,799 |
| 509 | Special 503. connect to MMSD structure (SPV.0060) | EACH | 1 | $2,900.00 | $4,117.38 | $21,706 | $3,437.56 | $21,280 |
| 510 | Special 504. remove existing manhole (SPV.0060) | EACH | 1 | $1,135.00 | $1,097.97 | $4,375.00 | $10,581 | $4,289.00 |
| 511 | Special 505. abandon existing forcemain (SPV.0060) | EACH | 1 | $16,225 | $8,032.03 | $18,889 | $28,050 | $18,519 |
| 512 | Special 506. remove existing forcemain (SPV.0060) | EACH | 1 | $75,000 | $25,210 | $5,909.00 | $3,437.56 | $5,793.00 |
| 513 | Special 507. construction staking force main (SPV.0060) | EACH | 1 | $25,000 | $5,000.00 | $20,000 | $5,000.00 | $30,000 |
| 514 | Special 001. concrete curb & gutter 24-inch type A special (SPV.0090) | LF | 80 | $103.02 | $103.02 | $103.02 | $103.02 | $103.02 |
| 515 | Special 002. storm sewer pipe reinforced concrete horizontal elliptical class HE-IV38X60 (SPV.0090) | LF | 605 | $528.00 | $451.99 | $463.00 | $517.50 | $366.00 |
| 516 | Special 003. remove existing steel piling (SPV.0090) | LF | 55 | $240.00 | $160.00 | $160.00 | $160.00 | $160.00 |
| 517 | Special 004. metal edging (SPV.0090) | LF | 224 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 518 | Special 005. security fence (SPV.0090) | LF | 30 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 519 | Special 201. discontinue existing 8" sanitary sewer (SPV.0090) | LF | 186 | $25.00 | $51.57 | $69.00 | $65.73 | $68.00 |
| 520 | Special 202. 12" sanitary sewer, PVC (SPV.0090) | LF | 82 | $235.00 | $230.51 | $679.00 | $438.61 | $666.00 |
| 521 | Special 203. 8" sanitary sewer, PVC (SPV.0090) | LF | 78 | $226.00 | $223.45 | $662.00 | $429.61 | $649.00 |
| 522 | Special 204. 6" water main, ductile iron (SPV.0090) | LF | 50 | $168.00 | $162.95 | $217.00 | $182.11 | $250.00 |
| 523 | Special 205. 10" water main, ductile iron (SPV.0090) | LF | 35 | $232.00 | $196.36 | $172.00 | $181.84 | $260.00 |
| 524 | Special 301. sanitary sewer 18-inch (SPV.0090) | LF | 12 | $497.00 | $319.20 | $1,969.00 | $149.40 | $1,930.00 |
| 525 | Special 302. sanitary interceptor sewer 30-inch (SPV.0090) | LF | 433 | $583.00 | $724.53 | $984.00 | $725.50 | $965.00 |
| 526 | Special 303. trench backfill (SPV.0090) | LF | 445 | $0.01 | $209.67 | $1.00 | $0.01 | $1.00 |
| 527 | Special 304. abandon existing sanitary sewer (SPV.0090) | LF | 456 | $43.00 | $9.81 | $41.00 | $71.38 | $40.00 |
| 528 | Special 305. remove existing sanitary sewer (SPV.0090) | LF | 36 | $171.00 | $175.48 | $68.00 | $313.54 | $67.00 |
| 529 | Special 306. televise sanitary interceptor (SPV.0090) | LF | 445 | $3.22 | $6.50 | $11.00 | $5.00 | $11.00 |
| 530 | Special 401. remove existing sanitary main (SPV.0090) | LF | 110 | $42.00 | $124.77 | $67.00 | $77.93 | $66.00 |
| 531 | Special 402. ductile iron sanitary sewer 18-inch (SPV.0090) | LF | 148 | $2,211.00 | $554.27 | $726.00 | $1,762.66 | $712.00 |
| 532 | Special 403. ductile iron sanitary sewer 18-inch with ball and socket joints (SPV.0090) | LF | 397 | $3,335.00 | $1,351.31 | $1,813.00 | $4,000.00 | $1,777.00 |
| 533 | Special 501. sanitary sewer force main, 10-inch (C900 PVC) (SPV.0090) | LF | 824 | $213.00 | $127.31 | $451.00 | $167.33 | $442.00 |
| 534 | Special 502. sanitary sewer force main, 10-inch (DR11 HDPE) (SPV.0090) | LF | 421 | $338.00 | $348.66 | $1,388.00 | $371.00 | $1,361.00 |
| 535 | Special 001. hardscape - stone "M" (SPV.0165) | SF | 280 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 536 | Special 002. soil separation fabric (SPV.0165) | SF | 2,660 | $0.25 | $0.50 | $0.50 | $0.50 | $0.50 |
| 537 | Special 003. concrete sidewalk 5- inch, special (SPV.0165) | SF | 3,235 | $74.98 | $74.98 | $74.98 | $74.98 | $74.98 |
| 538 | Special 004. cut-stone boulders (SPV.0165) | SF | 448 | $225.00 | $225.00 | $225.00 | $225.00 | $225.00 |
| 539 | Special 005. wall concrete panel mechanically stabilized earth R-13- 379 (SPV.0165) | SF | 887 | $204.00 | $181.91 | $128.00 | $228.13 | $109.22 |
| 540 | Special 006. wall concrete panel mechanically stabilized earth R-13- 382 (SPV.0165) | SF | 1,070 | $197.00 | $173.81 | $127.00 | $228.54 | $109.22 |
| 541 | Special 007. piling steel sheet permanent installed R-13-383 (SPV.0165) | SF | 1,842 | $48.70 | $79.00 | $79.00 | $85.00 | $79.00 |
| 542 | Special 008. piling steel sheet permanent installed R-13-384 (SPV.0165) | SF | 1,817 | $39.50 | $79.00 | $79.00 | $85.00 | $79.00 |
| 543 | Special 009. piling steel sheet permanent installed R-13-385 (SPV.0165) | SF | 4,640 | $42.00 | $63.00 | $63.00 | $85.00 | $63.00 |
| 544 | Special 301. geoweb access cells (SPV.0165) | SF | 1,600 | $10.00 | $18.00 | $10.50 | $18.00 | $18.00 |
| 545 | Special 001. pavement cleanup project 5845-16-76 (SPV.0170) | STA | 120 | $220.00 | $85.00 | $90.00 | $150.00 | $100.00 |
| 546 | Special 001. excavation, hauling, and disposal of contaminated soil and groundwater (SPV.0195) | TON | 600 | $85.75 | $62.79 | $55.00 | $54.97 | $110.00 |
| 547 | Special 201. standard sanitary manhole masonry 48-inch diameter (SPV.0200) | VF | 9 | $585.00 | $910.94 | $3,494.00 | $1,591.86 | $3,425.00 |
| 548 | Special 202. drop sanitary manhole masonry 48-inch diameter (SPV.0200) | VF | 6.64 | $1,340.00 | $1,698.09 | $5,377.00 | $4,231.82 | $5,272.00 |
| 549 | Special 203. construct new drop connection to existing manhole (SPV.0200) | VF | 1.30 | $3,400.00 | $5,742.64 | $37,009 | $5,288.55 | $36,283 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of July 14, 2026. Compiled by Mirage Metrics.