WisDOT contract 20260714004 bid tabulation
N Mayfair Rd/N Lovers Ln; W Burleigh St to W Silver Spring Dr (STH 100, Milwaukee County N Mayfair Rd/N Lovers Ln). Let by Wisconsin DOT on July 14, 2026, Milwaukee. 6 bids received; low bid $18,145,045 by Lalonde Contractors Incorporated.
- Owner
- Wisconsin DOT
- Letting
- 14 JUL 2026
- Pay items
- 331
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lalonde Contractors Incorporated | $18,145,045 | Low |
| 2 | Vinton Construction Company | $18,526,304 | +2.0% |
| 3 | Zignego Company, Inc. | $18,618,725 | +3.0% |
| 4 | Lunda Construction Company | $18,949,394 | +4.0% |
| 5 | Kraemer North America, LLC | $19,335,103 | +7.0% |
| 6 | Zenith Tech., Inc. - Waukesha | $21,185,993 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lalonde Contractors Incorporated | 2. Vinton Construction Company | 3. Zignego Company, Inc. | 4. Lunda Construction Company | 5. Kraemer North America, LLC | 6. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|---|---|---|
| 1 | CPM progress schedule (108.4400) | EACH | 1 | $1.00 | $5,000.00 | $1,000.00 | $4,000.00 | $0.01 | $2,500.00 |
| 2 | Grubbing (201.0205) | STA | 36 | $317.70 | $300.00 | $345.00 | $345.00 | $345.00 | $345.00 |
| 3 | Grubbing (201.0220) | ID | 36 | $10.59 | $10.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 4 | Abatement of asbestos containing material (structure) 01. B-40-339 (203.0211.S) | EACH | 1 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 | $5,835.00 | $19,000 |
| 5 | Abatement of asbestos containing material (structure) 02. B-40-340 (203.0211.S) | EACH | 1 | $9,500.00 | $9,500.00 | $9,500.00 | $9,500.00 | $5,835.00 | $19,000 |
| 6 | Removing structure over waterway remove debris (structure) 01. B-40- 339 (203.0250) | EACH | 1 | $250,000 | $250,000 | $250,000 | $250,000 | $250,000 | $350,000 |
| 7 | Removing structure over waterway remove debris (structure) 02. B-40- 340 (203.0250) | EACH | 1 | $250,000 | $250,000 | $250,000 | $250,000 | $250,000 | $350,000 |
| 8 | Debris containment over waterway (structure) 01. B-40-344 (203.0335) | EACH | 1 | $100.00 | $100.00 | $100.00 | $100.00 | $5,000.00 | $25,000 |
| 9 | Debris containment over waterway (structure) 02. B-40-345 (203.0335) | EACH | 1 | $100.00 | $100.00 | $100.00 | $100.00 | $5,000.00 | $25,000 |
| 10 | Removing concrete pavement (204.0100) | SY | 13,535 | $7.92 | $6.87 | $4.78 | $6.87 | $3.70 | $6.87 |
| 11 | Removing asphaltic surface (204.0110) | SY | 1,588 | $8.30 | $6.55 | $4.00 | $6.55 | $6.70 | $6.55 |
| 12 | Removing asphaltic surface butt joints (204.0115) | SY | 178 | $10.55 | $10.55 | $10.55 | $10.55 | $10.55 | $12.00 |
| 13 | Removing asphaltic surface milling (204.0120) | SY | 126,404 | $0.65 | $0.65 | $0.65 | $0.65 | $0.65 | $3.40 |
| 14 | Removing curb (204.0130) | LF | 250 | $12.05 | $15.00 | $10.00 | $15.00 | $11.00 | $15.00 |
| 15 | Removing curb & gutter (204.0150) | LF | 2,811 | $9.43 | $10.99 | $8.00 | $10.99 | $5.00 | $10.99 |
| 16 | Removing concrete sidewalk (204.0155) | SY | 2,373 | $12.19 | $13.50 | $8.00 | $13.50 | $7.40 | $13.50 |
| 17 | Removing guardrail (204.0165) | LF | 368 | $5.00 | $4.55 | $5.00 | $5.00 | $5.00 | $5.00 |
| 18 | Removing fence (204.0170) | LF | 48 | $5.00 | $4.55 | $5.00 | $5.00 | $5.00 | $5.00 |
| 19 | Removing concrete bases (204.0195) | EACH | 23 | $406.30 | $350.00 | $500.00 | $350.00 | $250.00 | $350.00 |
| 20 | Removing manholes (204.0210) | EACH | 5 | $500.00 | $888.30 | $1,162.00 | $888.30 | $1,162.00 | $888.30 |
| 21 | Removing inlets (204.0220) | EACH | 41 | $400.00 | $533.23 | $722.00 | $533.23 | $722.00 | $533.23 |
| 22 | Removing storm sewer (size) 01. 8- inch (204.0245) | LF | 29 | $15.00 | $26.32 | $48.00 | $26.32 | $48.00 | $26.32 |
| 23 | Removing storm sewer (size) 02. 12-inch (204.0245) | LF | 578 | $15.00 | $19.91 | $26.00 | $19.91 | $26.00 | $19.91 |
| 24 | Removing storm sewer (size) 03. 15-inch (204.0245) | LF | 8 | $20.00 | $44.38 | $110.00 | $44.38 | $110.00 | $44.38 |
| 25 | Removing storm sewer (size) 04. 18-inch (204.0245) | LF | 51 | $20.00 | $24.16 | $51.00 | $24.16 | $51.00 | $24.16 |
| 26 | Removing storm sewer (size) 05. 30-inch (204.0245) | LF | 170 | $25.00 | $24.13 | $31.00 | $24.13 | $31.00 | $24.13 |
| 27 | Removing storm sewer (size) 06. 36-inch (204.0245) | LF | 8 | $25.00 | $47.20 | $109.00 | $47.20 | $109.00 | $47.20 |
| 28 | Removing storm sewer (size) 07. 21-inch (204.0245) | LF | 3 | $25.00 | $140.93 | $105.00 | $140.93 | $105.00 | $140.93 |
| 29 | Removing (item description) 01. removing loop detector wire and lead-in cable (STH 100 & W burleigh ST) (204.9060.S) | EACH | 1 | $1,122.00 | $1,122.00 | $1,122.00 | $1,122.00 | $1,122.00 | $1,122.00 |
| 30 | Removing (item description) 02. removing loop detector wire and lead-in cable (STH100 & STH190) (204.9060.S) | EACH | 1 | $1,122.00 | $1,122.00 | $1,122.00 | $1,122.00 | $1,122.00 | $1,122.00 |
| 31 | Removing (item description) 03. removing loop detector wire and lead-in cable (STH100 & CTH E) (204.9060.S) | EACH | 1 | $1,122.00 | $1,122.00 | $1,122.00 | $1,122.00 | $1,122.00 | $1,122.00 |
| 32 | Removing (item description) 04. removing lighting system (204.9060.S) | EACH | 17 | $527.00 | $527.00 | $527.00 | $527.00 | $527.00 | $527.00 |
| 33 | Removing (item description) 05. removing communication vault (204.9060.S) | EACH | 2 | $814.00 | $814.00 | $814.00 | $814.00 | $814.00 | $814.00 |
| 34 | Removing (item description) 06. removing traffic signals (STH 100 & STH 190) (204.9060.S) | EACH | 1 | $714.00 | $714.00 | $714.00 | $714.00 | $714.00 | $714.00 |
| 35 | Removing (item description) 07. removing traffic signals (STH 100 & CTH EE) (204.9060.S) | EACH | 1 | $1,071.00 | $1,071.00 | $1,071.00 | $1,071.00 | $1,071.00 | $1,071.00 |
| 36 | Removing (item description) 08. removing permanent tubular marker post (204.9060.S) | EACH | 44 | $25.00 | $30.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 37 | Excavation common (205.0100) | CY | 8,109 | $15.68 | $13.84 | $13.17 | $13.84 | $32.30 | $13.84 |
| 38 | Excavation for structures bridges (structure) 01. B-40-1029 (206.1001) | EACH | 1 | $150,000 | $150,000 | $180,000 | $150,000 | $300,000 | $500,000 |
| 39 | Underwater foundation inspection (location) 01. pier 1 (206.1050.S) | EACH | 1 | $6,900.00 | $6,900.00 | $6,900.00 | $6,900.00 | $0.01 | $6,900.00 |
| 40 | Underwater foundation inspection (location) 02. pier 2 (206.1050.S) | EACH | 1 | $6,900.00 | $6,900.00 | $6,900.00 | $6,900.00 | $0.01 | $6,900.00 |
| 41 | Excavation for structures retaining walls (structure) 01. R-40-731 (206.3001) | EACH | 1 | $6,746.97 | $6,000.00 | $30,000 | $2,500.00 | $7,700.04 | $30,000 |
| 42 | Excavation for structures retaining walls (structure) 02. R-40-732 (206.3001) | EACH | 1 | $3,270.00 | $3,000.00 | $30,000 | $2,500.00 | $4,499.95 | $16,000 |
| 43 | Cofferdams (structure) 01. B-40- 1029 (206.5001) | EACH | 1 | $350,000 | $350,000 | $350,000 | $350,000 | $365,000 | $400,000 |
| 44 | Borrow (208.0100) | CY | 11,411 | $14.77 | $0.01 | $15.00 | $0.01 | $23.60 | $0.01 |
| 45 | Backfill granular grade 1 (209.1500) | TON | 16 | $118.31 | $50.00 | $100.00 | $50.00 | $75.00 | $50.00 |
| 46 | Backfill structure type A (210.1500) | TON | 3,573 | $28.11 | $31.07 | $40.00 | $31.07 | $38.70 | $31.07 |
| 47 | Finishing roadway (project) 01. 2030-10-71 (213.0100) | EACH | 1 | $4,650.00 | $5,000.00 | $1,000.00 | $5,000.00 | $2,500.00 | $2,995.87 |
| 48 | Base aggregate dense 3/4-inch (305.0110) | TON | 120 | $35.09 | $75.00 | $50.00 | $75.00 | $48.50 | $75.00 |
| 49 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 8,138 | $26.34 | $23.00 | $18.00 | $23.00 | $27.70 | $23.00 |
| 50 | Base aggregate open-graded (310.0110) | TON | 43 | $45.00 | $65.00 | $100.00 | $65.00 | $83.00 | $65.00 |
| 51 | Breaker run (311.0110) | TON | 8,154 | $23.89 | $13.00 | $19.00 | $13.00 | $24.90 | $13.00 |
| 52 | Concrete base 8-inch (320.0145) | SY | 243 | $81.27 | $88.27 | $95.00 | $88.27 | $84.00 | $88.27 |
| 53 | Removing pavement for base patching (390.0100) | CY | 3,111 | $61.13 | $0.01 | $75.00 | $0.01 | $68.00 | $0.01 |
| 54 | Base patching concrete hes (390.0305) | CY | 3,067 | $349.48 | $455.30 | $211.00 | $455.30 | $275.00 | $455.30 |
| 55 | Base patching concrete shes (390.0405) | CY | 43 | $620.13 | $600.30 | $973.00 | $600.30 | $400.00 | $600.30 |
| 56 | Coloring concrete wisdot red (405.0100) | CY | 17 | $169.80 | $150.00 | $200.00 | $150.00 | $150.00 | $150.00 |
| 57 | Concrete pavement 8-inch (415.0080) | SY | 9,658 | $74.15 | $83.88 | $65.50 | $83.88 | $68.00 | $83.88 |
| 58 | Concrete pavement approach slab (415.0410) | SY | 238 | $199.82 | $250.00 | $250.00 | $250.00 | $225.00 | $250.00 |
| 59 | Concrete pavement hes 8-inch (415.1080) | SY | 1,160 | $92.50 | $105.03 | $85.00 | $105.03 | $73.00 | $105.03 |
| 60 | Drilled tie bars (416.0610) | EACH | 4,692 | $12.50 | $0.01 | $15.00 | $0.01 | $15.00 | $0.01 |
| 61 | Drilled dowel bars (416.0620) | EACH | 14,708 | $16.05 | $0.01 | $20.00 | $0.01 | $23.00 | $0.01 |
| 62 | Concrete pavement replacement (416.1720) | SY | 534 | $156.50 | $115.00 | $106.00 | $115.00 | $112.00 | $115.00 |
| 63 | Tack coat (455.0605) | GAL | 14,706 | $2.55 | $2.55 | $2.55 | $2.55 | $2.55 | $2.50 |
| 64 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $3,486.00 | $3,486.00 | $3,486.00 | $3,486.00 | $3,486.00 | $1,500.00 |
| 65 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 15,799 | $75.20 | $75.20 | $75.20 | $75.20 | $75.20 | $71.90 |
| 66 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 12,225 | $79.70 | $79.70 | $79.70 | $79.70 | $79.70 | $78.20 |
| 67 | Asphaltic surface patching (465.0110) | TON | 36 | $228.00 | $228.00 | $228.00 | $228.00 | $228.00 | $475.00 |
| 68 | Asphaltic surface driveways and field entrances (465.0120) | TON | 218 | $193.00 | $193.00 | $193.00 | $193.00 | $193.00 | $135.00 |
| 69 | Asphaltic surface temporary (465.0125) | TON | 260 | $211.00 | $211.00 | $211.00 | $211.00 | $211.00 | $241.54 |
| 70 | Concrete masonry bridges (502.0100) | CY | 2,221 | $1,025.00 | $1,025.00 | $1,025.00 | $1,025.00 | $1,200.00 | $1,100.00 |
| 71 | Concrete masonry soldier pile footings (502.0110.S) | CY | 57 | $1,600.00 | $1,600.00 | $1,600.00 | $1,600.00 | $1,600.00 | $2,000.00 |
| 72 | Concrete masonry seal (502.1100) | CY | 817 | $210.00 | $210.00 | $210.00 | $210.00 | $400.00 | $350.00 |
| 73 | Protective surface treatment (502.3200) | SY | 3,624 | $5.00 | $5.00 | $5.00 | $5.00 | $1.40 | $4.00 |
| 74 | Pigmented surface sealer reseal (502.3205) | SY | 208 | $18.00 | $18.00 | $18.00 | $18.00 | $30.00 | $29.00 |
| 75 | Protective surface treatment reseal (502.3215) | SY | 1,159 | $8.00 | $8.00 | $8.00 | $8.00 | $7.00 | $12.00 |
| 76 | Underwater substructure inspection (structure) 01. B-40-1029 (502.9000.S) | EACH | 1 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $6,900.00 |
| 77 | Prestressed girder type I 36W-inch (503.0137) | LF | 3,064 | $235.00 | $235.00 | $235.00 | $235.00 | $250.00 | $300.00 |
| 78 | Concrete masonry retaining walls (504.0500) | CY | 99 | $875.00 | $875.00 | $875.00 | $875.00 | $1,500.00 | $1,400.00 |
| 79 | Bar steel reinforcement HS structures (505.0400) | LB | 85,960 | $1.30 | $1.30 | $1.30 | $1.30 | $1.30 | $1.50 |
| 80 | Bar steel reinforcement HS coated structures (505.0600) | LB | 295,640 | $1.45 | $1.45 | $1.45 | $1.45 | $1.50 | $1.60 |
| 81 | Bar steel reinforcement HS stainless structures (505.0800.S) | LB | 3,600 | $3.70 | $3.70 | $3.70 | $3.70 | $4.00 | $4.50 |
| 82 | Structural steel carbon (506.0105) | LB | 55 | $13.00 | $13.00 | $13.00 | $13.00 | $50.00 | $300.00 |
| 83 | Structural steel HS (506.0605) | LB | 25,092 | $2.60 | $2.60 | $2.60 | $2.60 | $2.50 | $2.50 |
| 84 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 65 | $85.00 | $85.00 | $85.00 | $85.00 | $80.00 | $160.00 |
| 85 | Bearing pads elastomeric laminated (506.2610) | EACH | 13 | $1,400.00 | $1,400.00 | $1,400.00 | $1,400.00 | $1,500.00 | $1,800.00 |
| 86 | Steel diaphragms (structure) 01. B- 40-1029 (506.4000) | EACH | 48 | $750.00 | $750.00 | $750.00 | $750.00 | $700.00 | $1,200.00 |
| 87 | Treated lumber and timber (507.0200) | MBM | 7.20 | $6,300.00 | $6,300.00 | $6,300.00 | $6,300.00 | $4,000.00 | $8,500.00 |
| 88 | Concrete surface repair (509.1500) | SF | 735 | $225.00 | $225.00 | $225.00 | $225.00 | $300.00 | $255.00 |
| 89 | Railing steel type C4 (513.7021) | LF | 779 | $205.00 | $205.00 | $205.00 | $205.00 | $250.00 | $225.00 |
| 90 | Rubberized membrane waterproofing (516.0500) | SY | 139 | $35.00 | $35.00 | $35.00 | $35.00 | $10.00 | $68.00 |
| 91 | Painting epoxy system (structure) 01. R-40-731 (517.0601) | EACH | 1 | $3,300.00 | $3,300.00 | $3,300.00 | $3,300.00 | $2,940.01 | $5,000.00 |
| 92 | Painting epoxy system (structure) 02. R-40-732 (517.0601) | EACH | 1 | $1,100.00 | $1,100.00 | $1,100.00 | $1,100.00 | $1,120.01 | $5,000.00 |
| 93 | Concrete staining (structure) 01. B- 40-1029 (517.1010.S) | SF | 14,594 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 |
| 94 | Concrete staining (structure) 02. R- 40-729 (517.1010.S) | SF | 1,337 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 |
| 95 | Concrete staining (structure) 03. R- 40-730 (517.1010.S) | SF | 766 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 |
| 96 | Concrete staining multi-color (structure) 01. B-40-1029 (517.1015.S) | SF | 983 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 97 | Concrete staining multi-color (structure) 02. R-40-729 (517.1015.S) | SF | 411 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 98 | Concrete staining multi-color (structure) 03. R-40-730 (517.1015.S) | SF | 214 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 99 | Architectural surface treatment (structure) 01. B-40-1029 (517.1050.S) | SF | 983 | $8.50 | $8.50 | $8.50 | $8.50 | $25.00 | $25.00 |
| 100 | Architectural surface treatment (structure) 02. R-40-729 (517.1050.S) | SF | 411 | $30.00 | $5.00 | $1.00 | $0.01 | $0.01 | $26.00 |
| 101 | Architectural surface treatment (structure) 03. R-40-730 (517.1050.S) | SF | 214 | $40.00 | $5.00 | $1.00 | $0.01 | $0.01 | $28.00 |
| 102 | Concrete collars for pipe (520.8000) | EACH | 13 | $500.00 | $987.00 | $787.00 | $987.00 | $787.00 | $987.00 |
| 103 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 1 | $2,500.00 | $2,199.33 | $2,644.00 | $2,199.33 | $2,644.00 | $2,199.33 |
| 104 | Drilling shaft 42-inch (531.2042) | LF | 36 | $750.00 | $400.00 | $750.00 | $750.00 | $750.00 | $801.82 |
| 105 | Foundation single-shaft type MC-III (structure) 01. S-40-3106 (531.5130) | EACH | 1 | $12,000 | $12,600 | $12,000 | $12,000 | $12,000 | $12,000 |
| 106 | Foundation single-shaft type MC-III (structure) 02. S-40-3107 (531.5130) | EACH | 1 | $12,000 | $12,600 | $12,000 | $12,000 | $12,000 | $12,000 |
| 107 | Anchor assemblies poles on structures (531.8990) | EACH | 2 | $796.00 | $796.00 | $796.00 | $796.00 | $796.00 | $1,600.00 |
| 108 | Monotube cantilever type III (structure) 01. S-40-3106 (532.5130) | EACH | 1 | $31,000 | $37,500 | $31,000 | $31,000 | $31,000 | $31,000 |
| 109 | Monotube cantilever type III (structure) 02. S-40-3107 (532.5130) | EACH | 1 | $31,500 | $37,500 | $31,500 | $31,500 | $31,500 | $31,500 |
| 110 | Pre-boring unconsolidated materials (550.0010) | LF | 220 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $295.00 |
| 111 | Pre-boring rock or consolidated materials (550.0020) | LF | 66 | $635.00 | $635.00 | $635.00 | $635.00 | $635.00 | $1,050.00 |
| 112 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 330 | $58.00 | $58.00 | $58.00 | $58.00 | $65.00 | $85.00 |
| 113 | Concrete curb & gutter 31-inch (601.0331) | LF | 6,765 | $48.80 | $38.00 | $42.00 | $38.00 | $40.00 | $38.00 |
| 114 | Concrete curb pedestrian (601.0600) | LF | 1,593 | $56.10 | $45.00 | $50.00 | $45.00 | $50.00 | $45.00 |
| 115 | Concrete sidewalk 5-inch (602.0410) | SF | 51,550 | $11.28 | $10.40 | $7.12 | $10.40 | $7.00 | $10.40 |
| 116 | Curb ramp detectable warning field yellow (602.0505) | SF | 1,006 | $47.25 | $48.00 | $30.00 | $48.00 | $55.00 | $48.00 |
| 117 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 344 | $66.53 | $58.00 | $60.00 | $58.00 | $75.00 | $58.00 |
| 118 | Concrete driveway 6-inch (602.0810) | SY | 62 | $89.42 | $90.00 | $200.00 | $90.00 | $75.00 | $90.00 |
| 119 | Concrete driveway 7-inch (602.0815) | SY | 93 | $94.81 | $91.00 | $200.00 | $91.00 | $80.00 | $91.00 |
| 120 | Concrete barrier temporary precast delivered (603.8000) | LF | 747 | $3.00 | $3.00 | $3.00 | $3.00 | $25.00 | $32.00 |
| 121 | Concrete barrier temporary precast installed (603.8125) | LF | 747 | $10.00 | $10.00 | $10.00 | $10.00 | $4.00 | $6.50 |
| 122 | Riprap heavy (606.0300) | CY | 615 | $110.00 | $105.00 | $168.00 | $110.00 | $90.00 | $105.00 |
| 123 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 736 | $75.00 | $136.15 | $120.00 | $136.15 | $120.00 | $136.15 |
| 124 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 36 | $90.00 | $155.23 | $180.00 | $155.23 | $180.00 | $155.23 |
| 125 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 108 | $90.00 | $208.60 | $191.00 | $208.60 | $191.00 | $208.60 |
| 126 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 173 | $120.00 | $275.36 | $210.00 | $275.36 | $210.00 | $275.36 |
| 127 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 9 | $150.00 | $422.76 | $891.00 | $422.76 | $891.00 | $422.76 |
| 128 | Storm sewer pipe composite 8-inch (608.6008) | LF | 27 | $70.00 | $142.51 | $307.00 | $142.51 | $307.00 | $142.51 |
| 129 | Reconstructing manholes (611.0420) | EACH | 2 | $2,500.00 | $2,714.55 | $2,424.00 | $2,714.55 | $2,424.00 | $2,714.55 |
| 130 | Reconstructing inlets (611.0430) | EACH | 5 | $2,000.00 | $1,892.80 | $1,634.00 | $1,892.80 | $1,634.00 | $1,892.80 |
| 131 | Manhole covers type J (611.0530) | EACH | 6 | $850.00 | $591.34 | $1,370.00 | $591.34 | $1,370.00 | $591.34 |
| 132 | Inlet covers type MS (611.0642) | EACH | 4 | $850.00 | $601.01 | $871.00 | $601.01 | $871.00 | $601.01 |
| 133 | Inlet covers type R (611.0648) | EACH | 25 | $1,550.00 | $1,261.97 | $1,484.00 | $1,261.97 | $1,484.00 | $1,261.97 |
| 134 | Inlet covers type S (611.0651) | EACH | 1 | $980.00 | $825.20 | $1,672.00 | $825.20 | $1,672.00 | $825.20 |
| 135 | Inlet covers type W (611.0657) | EACH | 25 | $1,925.00 | $1,612.23 | $2,288.00 | $1,612.23 | $2,288.00 | $1,612.23 |
| 136 | Manholes 4-FT diameter (611.2004) | EACH | 3 | $3,950.00 | $4,277.93 | $5,016.00 | $4,277.93 | $5,016.00 | $4,277.93 |
| 137 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $5,950.00 | $6,194.98 | $8,076.00 | $6,194.98 | $8,076.00 | $6,194.98 |
| 138 | Manholes 6-FT diameter (611.2006) | EACH | 2 | $8,950.00 | $8,208.87 | $9,075.00 | $8,208.87 | $9,075.00 | $8,208.87 |
| 139 | Manholes 8-FT diameter (611.2008) | EACH | 1 | $12,000 | $13,702 | $13,841 | $13,702 | $13,841 | $13,702 |
| 140 | Inlets 4-FT diameter (611.3004) | EACH | 2 | $4,000.00 | $4,363.74 | $2,652.00 | $4,363.74 | $2,652.00 | $4,363.74 |
| 141 | Inlets 2X2-FT (611.3220) | EACH | 25 | $3,000.00 | $3,296.47 | $2,423.00 | $3,296.47 | $2,423.00 | $3,296.47 |
| 142 | Inlets 2X2.5-FT (611.3225) | EACH | 23 | $3,200.00 | $3,639.88 | $1,947.00 | $3,639.88 | $1,947.00 | $3,639.88 |
| 143 | Inlets median 1 grate (611.3901) | EACH | 4 | $4,500.00 | $4,043.07 | $4,244.00 | $4,043.07 | $4,244.00 | $4,043.07 |
| 144 | Adjusting manhole covers (611.8110) | EACH | 7 | $1,200.00 | $980.00 | $1,478.00 | $980.00 | $1,478.00 | $980.00 |
| 145 | Adjusting inlet covers (611.8115) | EACH | 5 | $1,200.00 | $812.00 | $1,236.00 | $812.00 | $1,236.00 | $812.00 |
| 146 | Cover plates temporary (611.8120.S) | EACH | 63 | $300.00 | $508.56 | $469.00 | $508.56 | $469.00 | $508.56 |
| 147 | Pipe underdrain 6-inch (612.0106) | LF | 258 | $20.00 | $20.88 | $30.62 | $20.88 | $10.00 | $20.88 |
| 148 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 478 | $30.00 | $34.87 | $30.62 | $34.87 | $10.00 | $34.87 |
| 149 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 550 | $25.00 | $7.50 | $30.93 | $7.50 | $7.00 | $7.50 |
| 150 | Apron endwalls for underdrain reinforced concrete 6-inch (612.0806) | EACH | 2 | $500.00 | $764.06 | $750.00 | $764.06 | $400.00 | $764.06 |
| 151 | Fence safety (616.0700.S) | LF | 1,194 | $4.50 | $4.55 | $4.50 | $4.50 | $4.50 | $4.50 |
| 152 | Maintenance and repair of haul roads (project) 01. 2030-10-71 (618.0100) | EACH | 1 | $1.00 | $0.01 | $1.00 | $0.01 | $1,000.00 | $4,476.22 |
| 153 | Mobilization (619.1000) | EACH | 1 | $1,263,705 | $1,985,000 | $2,103,000 | $2,329,253 | $1,630,500 | $1,500,000 |
| 154 | Concrete median sloped nose (620.0300) | SF | 322 | $16.06 | $17.00 | $20.00 | $17.00 | $20.00 | $17.00 |
| 155 | Water (624.0100) | MGAL | 112 | $42.42 | $50.00 | $100.00 | $50.00 | $50.00 | $50.00 |
| 156 | Topsoil (625.0100) | SY | 17,716 | $8.76 | $11.00 | $6.00 | $11.00 | $9.10 | $11.00 |
| 157 | Mulching (627.0200) | SY | 2,302 | $0.28 | $0.48 | $0.28 | $0.28 | $0.28 | $0.28 |
| 158 | Silt fence (628.1504) | LF | 1,862 | $2.00 | $1.85 | $2.00 | $2.00 | $2.00 | $2.00 |
| 159 | Silt fence maintenance (628.1520) | LF | 1,862 | $0.10 | $0.05 | $0.10 | $0.10 | $0.10 | $0.10 |
| 160 | Silt fence heavy duty maintenance (628.1535.S) | LF | 1,550 | $1.00 | $0.10 | $1.00 | $1.00 | $1.00 | $1.00 |
| 161 | Mobilizations erosion control (628.1905) | EACH | 3 | $180.00 | $400.00 | $180.00 | $180.00 | $180.00 | $180.00 |
| 162 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $270.00 | $150.00 | $270.00 | $270.00 | $270.00 | $270.00 |
| 163 | Erosion mat urban class I type B (628.2008) | SY | 10,776 | $1.80 | $2.40 | $1.80 | $1.80 | $1.80 | $1.80 |
| 164 | Turbidity barriers (628.6005) | SY | 633 | $48.00 | $39.90 | $48.00 | $48.00 | $48.00 | $48.00 |
| 165 | Inlet protection type A (628.7005) | EACH | 32 | $130.00 | $92.00 | $130.00 | $130.00 | $130.00 | $130.00 |
| 166 | Inlet protection type B (628.7010) | EACH | 74 | $55.00 | $40.00 | $55.00 | $55.00 | $55.00 | $55.00 |
| 167 | Inlet protection type C (628.7015) | EACH | 133 | $65.00 | $43.00 | $65.00 | $65.00 | $65.00 | $65.00 |
| 168 | Inlet protection type D (628.7020) | EACH | 40 | $110.00 | $76.00 | $110.00 | $110.00 | $110.00 | $110.00 |
| 169 | Temporary ditch checks (628.7504) | LF | 30 | $10.00 | $11.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 170 | Tracking pads (628.7560) | EACH | 4 | $1,850.99 | $0.01 | $1.00 | $2,000.00 | $1,700.00 | $1,700.00 |
| 171 | Fertilizer type A (629.0205) | CWT | 11 | $85.00 | $88.00 | $85.00 | $85.00 | $85.00 | $85.00 |
| 172 | Seeding mixture no. 40 (630.0140) | LB | 204 | $7.00 | $11.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 173 | Seeding mixture no. 60 (630.0160) | LB | 29 | $10.00 | $16.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 174 | Seeding temporary (630.0200) | LB | 380 | $3.00 | $4.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 175 | Seed water (630.0500) | MGAL | 253 | $1.00 | $10.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 176 | Sod water (631.0300) | MGAL | 58 | $20.00 | $10.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 177 | Sod lawn (631.1000) | SY | 5,118 | $9.00 | $8.80 | $9.00 | $9.00 | $9.00 | $9.00 |
| 178 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 81 | $80.00 | $92.00 | $80.00 | $80.00 | $80.00 | $80.00 |
| 179 | Posts tubular steel 2X2-inch X 8-FT (634.0808) | EACH | 4 | $300.00 | $170.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 180 | Foundation drilling (diameter) 01. 24-inch (636.0050.S) | LF | 649 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 181 | Signs type II reflective H (637.2210) | SF | 621.24 | $22.50 | $22.00 | $22.50 | $22.50 | $22.50 | $22.50 |
| 182 | Signs type II reflective F (637.2230) | SF | 376.75 | $24.00 | $22.00 | $24.00 | $24.00 | $24.00 | $24.00 |
| 183 | Moving signs type II (638.2102) | EACH | 2 | $500.00 | $250.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 184 | Removing signs type II (638.2602) | EACH | 128 | $25.00 | $27.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 185 | Removing small sign supports (638.3000) | EACH | 70 | $25.00 | $29.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 186 | Traffic control drums (643.0300) | DAY | 167,365 | $0.20 | $0.20 | $0.10 | $0.20 | $0.20 | $0.20 |
| 187 | Traffic control barricades type III (643.0420) | DAY | 64,543 | $0.50 | $0.50 | $0.31 | $0.50 | $0.50 | $0.50 |
| 188 | Traffic control warning lights type A (643.0705) | DAY | 123,414 | $0.01 | $0.01 | $0.05 | $0.01 | $0.01 | $0.01 |
| 189 | Traffic control warning lights type C (643.0715) | DAY | 17,272 | $0.01 | $0.01 | $0.07 | $0.01 | $0.01 | $0.01 |
| 190 | Traffic control connected arrow boards (643.0810) | DAY | 1,184 | $16.65 | $16.65 | $7.50 | $16.65 | $16.65 | $16.65 |
| 191 | Traffic control signs (643.0900) | DAY | 250,093 | $0.20 | $0.20 | $0.25 | $0.20 | $0.20 | $0.20 |
| 192 | Traffic control covering signs type II (643.0920) | EACH | 10 | $75.00 | $75.00 | $150.00 | $75.00 | $75.00 | $75.00 |
| 193 | Traffic control signs fixed message (643.1000) | SF | 165.50 | $16.00 | $16.00 | $25.00 | $16.00 | $16.00 | $16.00 |
| 194 | Traffic control signs PCMS (643.1050) | DAY | 280 | $32.49 | $32.49 | $17.00 | $32.49 | $32.49 | $32.49 |
| 195 | Traffic control cones 42-inch (643.1070) | DAY | 232,937 | $0.50 | $0.50 | $0.15 | $0.50 | $0.50 | $0.50 |
| 196 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 770 | $6.00 | $6.00 | $4.00 | $6.00 | $6.00 | $6.00 |
| 197 | Temporary marking line paint 6- inch (643.3165) | LF | 3,093 | $4.00 | $4.00 | $0.35 | $4.00 | $4.00 | $4.00 |
| 198 | Temporary marking line removable tape 6-inch (643.3180) | LF | 9,875 | $2.52 | $2.52 | $1.50 | $2.52 | $2.52 | $2.52 |
| 199 | Temporary marking line removable tape 10-inch (643.3280) | LF | 2,742 | $4.58 | $4.58 | $2.30 | $4.58 | $4.58 | $4.58 |
| 200 | Temporary marking arrow removable tape (643.3550) | EACH | 25 | $181.64 | $181.64 | $75.00 | $181.64 | $181.64 | $181.64 |
| 201 | Temporary marking stop line paint 18-inch (643.3805) | LF | 72 | $20.00 | $20.00 | $10.00 | $20.00 | $20.00 | $20.00 |
| 202 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 200 | $8.07 | $8.07 | $4.00 | $8.07 | $8.07 | $8.07 |
| 203 | Traffic control interim lane closure (643.4100) | EACH | 10 | $454.98 | $454.98 | $1,950.00 | $454.98 | $454.98 | $454.98 |
| 204 | Traffic control (643.5000) | EACH | 1 | $62,133 | $62,133 | $198,314 | $62,133 | $62,133 | $250,000 |
| 205 | Temporary pedestrian surface asphalt (644.1410) | SF | 1,075 | $9.55 | $10.00 | $10.30 | $10.30 | $10.30 | $32.85 |
| 206 | Temporary pedestrian surface plate (644.1430) | SF | 2,089 | $10.00 | $10.00 | $12.00 | $10.00 | $10.00 | $10.00 |
| 207 | Temporary pedestrian curb ramp (644.1601) | DAY | 686 | $7.00 | $7.00 | $5.00 | $7.00 | $7.00 | $7.00 |
| 208 | Temporary pedestrian detectable warning field (644.1605) | SF | 640 | $1.00 | $1.00 | $5.00 | $1.00 | $1.00 | $1.00 |
| 209 | Temporary pedestrian barricade (644.1810) | LF | 11,635 | $2.00 | $2.00 | $5.00 | $2.00 | $2.00 | $2.00 |
| 210 | Temporary audible message devices (644.1900.S) | DAY | 2,394 | $2.92 | $2.92 | $7.00 | $2.92 | $2.92 | $2.92 |
| 211 | Geotextile type DF schedule A (645.0111) | SY | 504 | $6.00 | $5.21 | $4.00 | $5.21 | $3.30 | $5.21 |
| 212 | Geotextile type HR (645.0120) | SY | 1,051 | $9.00 | $5.00 | $4.00 | $9.00 | $2.00 | $5.00 |
| 213 | Geogrid type SR (645.0220) | SY | 12,905 | $2.06 | $1.90 | $4.00 | $1.90 | $2.00 | $1.90 |
| 214 | Marking line epoxy 4-inch (646.1020) | LF | 968 | $0.60 | $0.60 | $0.60 | $1.00 | $1.00 | $1.00 |
| 215 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 9,608 | $1.25 | $1.25 | $1.25 | $1.50 | $1.50 | $1.50 |
| 216 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 65,385 | $1.35 | $1.35 | $1.35 | $1.80 | $1.80 | $1.80 |
| 217 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 9,132 | $2.50 | $2.50 | $2.50 | $3.30 | $3.30 | $3.30 |
| 218 | Marking arrow epoxy (646.5020) | EACH | 30 | $230.00 | $230.00 | $230.00 | $330.00 | $330.00 | $330.00 |
| 219 | Marking word epoxy (646.5120) | EACH | 12 | $255.00 | $255.00 | $255.00 | $425.00 | $425.00 | $425.00 |
| 220 | Marking stop line epoxy 18-inch (646.6120) | LF | 816 | $12.50 | $12.50 | $12.50 | $22.00 | $22.00 | $22.00 |
| 221 | Marking yield line epoxy 18-inch (646.6220) | EACH | 73 | $45.00 | $45.00 | $45.00 | $120.00 | $120.00 | $120.00 |
| 222 | Marking diagonal epoxy 12-inch (646.7120) | LF | 5,359 | $9.50 | $9.50 | $9.50 | $9.00 | $9.00 | $9.00 |
| 223 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 3,988 | $10.50 | $10.50 | $10.50 | $11.00 | $11.00 | $11.00 |
| 224 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 1,238 | $18.00 | $18.00 | $18.00 | $30.00 | $30.00 | $30.00 |
| 225 | Marking curb epoxy (646.8120) | LF | 2,046 | $7.50 | $7.50 | $7.50 | $9.00 | $9.00 | $9.00 |
| 226 | Marking island nose epoxy (646.8220) | EACH | 45 | $300.00 | $300.00 | $300.00 | $310.00 | $310.00 | $310.00 |
| 227 | Marking removal line water blasting 4-inch (646.9010) | LF | 6,025 | $1.20 | $1.20 | $2.40 | $1.20 | $1.20 | $1.20 |
| 228 | Marking removal line wide (646.9200) | LF | 72 | $4.00 | $4.00 | $9.00 | $4.00 | $4.00 | $4.00 |
| 229 | Construction staking storm sewer (650.4000) | EACH | 62 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 230 | Construction staking subgrade (650.4500) | LF | 1,476 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 231 | Construction staking base (650.5000) | LF | 921 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 232 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 6,050 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 |
| 233 | Construction staking structure layout (structure) 01. B-40-1029 (650.6501) | EACH | 1 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 |
| 234 | Construction staking structure layout (structure) 02. R-40-729 (650.6501) | EACH | 1 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 |
| 235 | Construction staking structure layout (structure) 03. R-40-730 (650.6501) | EACH | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 236 | Construction staking structure layout (structure) 04. R-40-731 (650.6501) | EACH | 1 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 | $7,000.00 |
| 237 | Construction staking structure layout (structure) 05. R-40-732 (650.6501) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 238 | Construction staking concrete pavement (650.7000) | LF | 1,476 | $2.20 | $2.20 | $2.20 | $2.20 | $2.20 | $2.20 |
| 239 | Construction staking resurfacing reference (650.8000) | LF | 14,120 | $0.35 | $0.35 | $0.35 | $0.35 | $0.35 | $0.35 |
| 240 | Construction staking curb ramps (650.9000) | EACH | 59 | $180.00 | $180.00 | $180.00 | $180.00 | $180.00 | $180.00 |
| 241 | Construction staking sidewalk (project) 01. 2030-10-71 (650.9500) | EACH | 1 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 |
| 242 | Construction staking supplemental control (project) 01. 2030-10-71 (650.9911) | EACH | 1 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 243 | Construction staking slope stakes (650.9920) | LF | 3,655 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 |
| 244 | Conduit rigid metallic 2-inch (652.0125) | LF | 132 | $184.00 | $184.00 | $184.00 | $184.00 | $184.00 | $184.00 |
| 245 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 2,485 | $8.05 | $8.05 | $8.05 | $8.05 | $8.05 | $8.05 |
| 246 | Conduit rigid nonmetallic schedule 80 3-inch (652.0335) | LF | 255 | $12.85 | $12.85 | $12.85 | $12.85 | $12.85 | $12.85 |
| 247 | Conduit special 2-inch (652.0605) | LF | 66 | $52.70 | $52.70 | $52.70 | $52.70 | $52.70 | $52.70 |
| 248 | Install conduit into existing item (652.0700.S) | EACH | 2 | $161.00 | $161.00 | $161.00 | $161.00 | $161.00 | $161.00 |
| 249 | Conduit loop detector (652.0800) | LF | 5,104 | $10.35 | $10.35 | $10.35 | $10.35 | $10.35 | $10.35 |
| 250 | Pull boxes steel 24X36-inch (653.0135) | EACH | 24 | $1,271.00 | $1,271.00 | $1,271.00 | $1,271.00 | $1,271.00 | $1,271.00 |
| 251 | Junction boxes 18X12X6-inch (653.0222) | EACH | 2 | $1,951.00 | $1,951.00 | $1,951.00 | $1,951.00 | $1,951.00 | $1,951.00 |
| 252 | Removing pull boxes (653.0905) | EACH | 1 | $305.00 | $305.00 | $305.00 | $305.00 | $305.00 | $305.00 |
| 253 | Concrete bases type 1 (654.0101) | EACH | 3 | $1,191.60 | $1,191.60 | $1,191.60 | $1,191.60 | $1,191.60 | $1,191.60 |
| 254 | Concrete bases type 5 (654.0105) | EACH | 19 | $1,316.00 | $1,316.00 | $1,316.00 | $1,316.00 | $1,316.00 | $1,316.00 |
| 255 | Cable in duct 3-4 AWG (655.0124) | LF | 4,180 | $15.40 | $15.40 | $15.40 | $15.40 | $15.40 | $15.40 |
| 256 | Cable traffic signal 5-14 AWG (655.0230) | LF | 152 | $2.14 | $2.14 | $2.14 | $2.14 | $2.14 | $2.14 |
| 257 | Cable traffic signal 7-14 AWG (655.0240) | LF | 295 | $2.37 | $2.37 | $2.37 | $2.37 | $2.37 | $2.37 |
| 258 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 6,466 | $1.58 | $1.58 | $1.58 | $1.58 | $1.58 | $1.58 |
| 259 | Electrical wire lighting 12 AWG (655.0610) | LF | 1,984 | $1.34 | $1.34 | $1.34 | $1.34 | $1.34 | $1.34 |
| 260 | Loop detector lead in cable (655.0700) | LF | 18,164 | $2.32 | $2.32 | $2.32 | $2.32 | $2.32 | $2.32 |
| 261 | Loop detector wire (655.0800) | LF | 18,708 | $1.34 | $1.34 | $1.34 | $1.34 | $1.34 | $1.34 |
| 262 | Pedestal bases (657.0100) | EACH | 2 | $343.00 | $343.00 | $343.00 | $343.00 | $343.00 | $343.00 |
| 263 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 16 | $717.00 | $717.00 | $717.00 | $717.00 | $717.00 | $717.00 |
| 264 | Poles type 5-aluminum (657.0322) | EACH | 16 | $2,591.40 | $2,591.40 | $2,591.40 | $2,591.40 | $2,591.40 | $2,591.40 |
| 265 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 1 | $297.00 | $297.00 | $297.00 | $297.00 | $297.00 | $297.00 |
| 266 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 1 | $686.00 | $686.00 | $686.00 | $686.00 | $686.00 | $686.00 |
| 267 | Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610) | EACH | 16 | $317.20 | $317.20 | $317.20 | $317.20 | $317.20 | $317.20 |
| 268 | Traffic signal face 4S 12-inch (658.0174) | EACH | 2 | $1,274.00 | $1,274.00 | $1,274.00 | $1,274.00 | $1,274.00 | $1,274.00 |
| 269 | Signal mounting hardware (location) 01. STH 100 & STH 190 (658.5070) | EACH | 1 | $743.00 | $743.00 | $743.00 | $743.00 | $743.00 | $743.00 |
| 270 | Signal mounting hardware (location) 02. STH 100 & CTH EE (658.5070) | EACH | 1 | $1,116.00 | $1,116.00 | $1,116.00 | $1,116.00 | $1,116.00 | $1,116.00 |
| 271 | Underdeck lighting (structure) 01. B-40-1029 (659.0601) | EACH | 2 | $3,106.00 | $3,106.00 | $3,106.00 | $3,106.00 | $3,106.00 | $3,106.00 |
| 272 | Luminaires utility LED C (659.1125) | EACH | 21 | $336.00 | $336.00 | $336.00 | $336.00 | $336.00 | $336.00 |
| 273 | Luminaires underdeck LED B (659.1210) | EACH | 4 | $1,162.00 | $1,162.00 | $1,162.00 | $1,162.00 | $1,162.00 | $1,162.00 |
| 274 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 23 | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 |
| 275 | ITS documentation (670.0201) | EACH | 1 | $6,744.00 | $6,744.00 | $6,744.00 | $6,744.00 | $6,744.00 | $6,744.00 |
| 276 | Conduit HDPE 4-duct 2-inch (671.0142) | LF | 1,415 | $16.12 | $16.12 | $16.12 | $16.12 | $16.12 | $16.12 |
| 277 | Communication vault type 1 (673.0105) | EACH | 2 | $2,883.00 | $2,883.00 | $2,883.00 | $2,883.00 | $2,883.00 | $2,883.00 |
| 278 | Remove cable (674.0300) | LF | 15,915 | $0.71 | $0.71 | $0.71 | $0.71 | $0.71 | $0.71 |
| 279 | Install fiber optic cable outdoor plant 72-CT (678.0072) | LF | 7,060 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 |
| 280 | Fiber optic splice enclosure (678.0200) | EACH | 2 | $2,011.00 | $2,011.00 | $2,011.00 | $2,011.00 | $2,011.00 | $2,011.00 |
| 281 | Fiber optic splice (678.0300) | EACH | 148 | $151.00 | $151.00 | $151.00 | $151.00 | $151.00 | $151.00 |
| 282 | Communication system testing (678.0501) | EACH | 1 | $5,724.00 | $5,724.00 | $5,724.00 | $5,724.00 | $5,724.00 | $5,724.00 |
| 283 | Sawing asphalt (690.0150) | LF | 2,030 | $1.95 | $1.39 | $1.39 | $1.95 | $1.43 | $1.39 |
| 284 | Sawing concrete (690.0250) | LF | 32,596 | $2.55 | $2.15 | $2.15 | $2.55 | $2.22 | $2.15 |
| 285 | Incentive strength concrete structures (715.0502) | DOL | 13,920 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 286 | Incentive compressive strength concrete pavement (715.0720) | DOL | 2,969 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 287 | Incentive iri ride (740.0440) | DOL | 35,400 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 288 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 9,100 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 289 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 18,000 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 290 | Special 01. portable speed trailer (SPV.0045) | DAY | 670 | $22.55 | $22.50 | $15.00 | $22.55 | $22.55 | $22.55 |
| 291 | Special 01. incentive density PWL HMA pavement core only (SPV.0055) | DOL | 16,975 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 292 | Special 02. PWL incentive air voids HMA pavement core only (SPV.0055) | DOL | 27,288 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 293 | Special 03. incentive density HMA pavement longitudinal joint (SPV.0055) | DOL | 34,083 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 294 | Special 01. ground improvement system R-40-729 (SPV.0060) | EACH | 1 | $202,000 | $202,000 | $202,000 | $202,000 | $146,000 | $125,000 |
| 295 | Special 02. ground improvement system R-40-730 (SPV.0060) | EACH | 1 | $101,000 | $101,000 | $101,000 | $101,000 | $84,000 | $110,000 |
| 296 | Special 03. embedded galvanic anodes (SPV.0060) | EACH | 485 | $45.00 | $45.00 | $45.00 | $45.00 | $50.00 | $38.00 |
| 297 | Special 04. modifying existing traffic signal during construction STH 100 & burleigh ST (SPV.0060) | EACH | 1 | $448.00 | $448.00 | $448.00 | $448.00 | $448.00 | $448.00 |
| 298 | Special 05. modifying existing traffic signal during construction STH 100 & STH 190 (SPV.0060) | EACH | 1 | $1,648.00 | $1,648.00 | $1,648.00 | $1,648.00 | $1,648.00 | $1,648.00 |
| 299 | Special 06. modifying existing traffic signal during construction STH 100 & CTH EE (SPV.0060) | EACH | 1 | $1,588.00 | $1,588.00 | $1,588.00 | $1,588.00 | $1,588.00 | $1,588.00 |
| 300 | Special 07. remove video equipment STH 100 & burleigh ST (SPV.0060) | EACH | 1 | $3,366.00 | $3,366.00 | $3,366.00 | $3,366.00 | $3,366.00 | $3,366.00 |
| 301 | Special 08. remove video equipment STH 100 & STH 190 (SPV.0060) | EACH | 1 | $3,366.00 | $3,366.00 | $3,366.00 | $3,366.00 | $3,366.00 | $3,366.00 |
| 302 | Special 09. remove video equipment STH 100 & CTH EE (SPV.0060) | EACH | 1 | $3,366.00 | $3,366.00 | $3,366.00 | $3,366.00 | $3,366.00 | $3,366.00 |
| 303 | Special 11. connect to existing box culvert (SPV.0060) | EACH | 1 | $5,000.00 | $3,225.00 | $4,000.00 | $3,225.00 | $1,000.00 | $3,225.00 |
| 304 | Special 12. curb ramp grading, shaping, and finishing (SPV.0060) | EACH | 58 | $601.23 | $1,175.00 | $2,000.00 | $1,650.00 | $2,932.00 | $1,650.00 |
| 305 | Special 13. temporary causeway (SPV.0060) | EACH | 1 | $180,000 | $180,000 | $180,000 | $180,000 | $220,000 | $1,150,000 |
| 306 | Special 14. permanant causeway to BE left-in-place (SPV.0060) | EACH | 1 | $70,000 | $70,000 | $70,000 | $70,000 | $60,000 | $175,000 |
| 307 | Special 15. galvanizing steel soldier piles (SPV.0060) | EACH | 29 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $1.00 |
| 308 | Special 16. adjusting city of milwaukee water valve boxes (SPV.0060) | EACH | 17 | $700.00 | $650.00 | $749.00 | $650.00 | $749.00 | $650.00 |
| 309 | Special 17. adjusting city of wauwatosa water valve boxes (SPV.0060) | EACH | 52 | $700.00 | $650.00 | $904.00 | $650.00 | $904.00 | $650.00 |
| 310 | Special 18. adjusting sanitary manhole, wauwatosa (SPV.0060) | EACH | 30 | $1,800.00 | $1,042.00 | $1,342.00 | $1,042.00 | $1,342.00 | $1,042.00 |
| 311 | Special 19. field facilities office space (SPV.0060) | EACH | 1 | $49,576 | $65,000 | $60,000 | $65,000 | $28,761 | $100,000 |
| 312 | Special 20. utility line opening (SPV.0060) | EACH | 5 | $900.00 | $984.00 | $1,000.00 | $984.00 | $2,398.00 | $984.00 |
| 313 | Special 21. removing, salvaging, & reinstalling traffic signal equipment STH 100 & STH (SPV.0060) | EACH | 1 | $1,478.00 | $1,478.00 | $1,478.00 | $1,478.00 | $1,478.00 | $1,478.00 |
| 314 | Special 22. removing, salvaging, & reinstalling traffic signal equipment STH 100 & CTH (SPV.0060) | EACH | 1 | $1,478.00 | $1,478.00 | $1,478.00 | $1,478.00 | $1,478.00 | $1,478.00 |
| 315 | Special 23. install state-furnished video detection system STH 100 & STH 190 (SPV.0060) | EACH | 1 | $2,752.00 | $2,752.00 | $2,752.00 | $2,752.00 | $2,752.00 | $2,752.00 |
| 316 | Special 24. install state-furnished video detection system STH 100 & CTH EE (SPV.0060) | EACH | 1 | $4,688.00 | $4,688.00 | $4,688.00 | $4,688.00 | $4,688.00 | $4,688.00 |
| 317 | Special 25. water hydrant extension (SPV.0060) | EACH | 3 | $2,250.00 | $2,293.00 | $4,361.00 | $2,293.00 | $4,361.00 | $2,293.00 |
| 318 | Special 26. water valve vault manhole 60” riser (SPV.0060) | EACH | 1 | $4,850.00 | $3,980.60 | $3,114.00 | $3,980.60 | $3,114.00 | $3,980.60 |
| 319 | Special 27. replace city water valve vault with water valve boxes (SPV.0060) | EACH | 4 | $3,000.00 | $4,245.70 | $2,672.00 | $4,245.70 | $2,672.00 | $4,245.70 |
| 320 | Special 28. temporary lighting system (SPV.0060) | EACH | 1 | $11,674 | $11,674 | $11,674 | $11,674 | $11,674 | $11,674 |
| 321 | Special 29. sanitary sewer manhole adjustment (SPV.0060) | EACH | 22 | $1,100.00 | $1,031.82 | $1,457.00 | $1,031.82 | $1,457.00 | $1,031.82 |
| 322 | Special 30. sanitary manhole internal seal replacement (SPV.0060) | EACH | 22 | $700.00 | $718.18 | $709.00 | $718.18 | $709.00 | $718.18 |
| 323 | Special 01. split rail fence (SPV.0090) | LF | 316 | $18.50 | $79.00 | $18.50 | $18.50 | $18.50 | $18.50 |
| 324 | Special 02. concrete curb and gutter integral 67-inch (SPV.0090) | LF | 2,165 | $57.50 | $45.00 | $83.20 | $45.00 | $44.00 | $45.00 |
| 325 | Special 03. remove, salvage, and reinstall fence (SPV.0090) | LF | 117 | $65.00 | $65.00 | $155.00 | $143.00 | $143.00 | $65.00 |
| 326 | Special 04. concrete joint and crack cleaning and repair (SPV.0090) | LF | 7,920 | $12.20 | $12.20 | $12.20 | $12.20 | $12.20 | $9.25 |
| 327 | Special 05. state furnished silt fence heavy duty (SPV.0090) | LF | 1,550 | $8.50 | $5.85 | $8.50 | $8.50 | $8.50 | $8.50 |
| 328 | Special 01. wall concrete panel mechanically stabilized earth R-40- 729 (SPV.0165) | SF | 788 | $148.10 | $171.00 | $197.00 | $137.00 | $158.00 | $171.00 |
| 329 | Special 02. wall concrete panel mechanically stabilized earth R-40- 730 (SPV.0165) | SF | 430 | $148.77 | $195.00 | $206.00 | $151.00 | $178.00 | $195.00 |
| 330 | Special 03. removing loose concrete (SPV.0165) | SF | 205 | $150.00 | $150.00 | $150.00 | $150.00 | $175.00 | $63.00 |
| 331 | Special 01. infill riprap B-40-1029 (SPV.0195) | TON | 32 | $125.00 | $125.00 | $300.00 | $125.00 | $110.00 | $250.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of July 14, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.