WisDOT contract 20260714004 bid tabulation

N Mayfair Rd/N Lovers Ln; W Burleigh St to W Silver Spring Dr (STH 100, Milwaukee County N Mayfair Rd/N Lovers Ln). Let by Wisconsin DOT on July 14, 2026, Milwaukee. 6 bids received; low bid $18,145,045 by Lalonde Contractors Incorporated.

Owner
Wisconsin DOT
Letting
14 JUL 2026
Pay items
331
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lalonde Contractors Incorporated$18,145,045Low
2Vinton Construction Company$18,526,304+2.0%
3Zignego Company, Inc.$18,618,725+3.0%
4Lunda Construction Company$18,949,394+4.0%
5Kraemer North America, LLC$19,335,103+7.0%
6Zenith Tech., Inc. - Waukesha$21,185,993+17%
WisDOT contract 20260714004: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lalonde Contractors Incorporated2. Vinton Construction Company3. Zignego Company, Inc.4. Lunda Construction Company5. Kraemer North America, LLC6. Zenith Tech., Inc. - Waukesha
1CPM progress schedule (108.4400)EACH1$1.00$5,000.00$1,000.00$4,000.00$0.01$2,500.00
2Grubbing (201.0205)STA36$317.70$300.00$345.00$345.00$345.00$345.00
3Grubbing (201.0220)ID36$10.59$10.00$15.00$15.00$15.00$15.00
4Abatement of asbestos containing material (structure) 01. B-40-339 (203.0211.S)EACH1$9,500.00$9,500.00$9,500.00$9,500.00$5,835.00$19,000
5Abatement of asbestos containing material (structure) 02. B-40-340 (203.0211.S)EACH1$9,500.00$9,500.00$9,500.00$9,500.00$5,835.00$19,000
6Removing structure over waterway remove debris (structure) 01. B-40- 339 (203.0250)EACH1$250,000$250,000$250,000$250,000$250,000$350,000
7Removing structure over waterway remove debris (structure) 02. B-40- 340 (203.0250)EACH1$250,000$250,000$250,000$250,000$250,000$350,000
8Debris containment over waterway (structure) 01. B-40-344 (203.0335)EACH1$100.00$100.00$100.00$100.00$5,000.00$25,000
9Debris containment over waterway (structure) 02. B-40-345 (203.0335)EACH1$100.00$100.00$100.00$100.00$5,000.00$25,000
10Removing concrete pavement (204.0100)SY13,535$7.92$6.87$4.78$6.87$3.70$6.87
11Removing asphaltic surface (204.0110)SY1,588$8.30$6.55$4.00$6.55$6.70$6.55
12Removing asphaltic surface butt joints (204.0115)SY178$10.55$10.55$10.55$10.55$10.55$12.00
13Removing asphaltic surface milling (204.0120)SY126,404$0.65$0.65$0.65$0.65$0.65$3.40
14Removing curb (204.0130)LF250$12.05$15.00$10.00$15.00$11.00$15.00
15Removing curb & gutter (204.0150)LF2,811$9.43$10.99$8.00$10.99$5.00$10.99
16Removing concrete sidewalk (204.0155)SY2,373$12.19$13.50$8.00$13.50$7.40$13.50
17Removing guardrail (204.0165)LF368$5.00$4.55$5.00$5.00$5.00$5.00
18Removing fence (204.0170)LF48$5.00$4.55$5.00$5.00$5.00$5.00
19Removing concrete bases (204.0195)EACH23$406.30$350.00$500.00$350.00$250.00$350.00
20Removing manholes (204.0210)EACH5$500.00$888.30$1,162.00$888.30$1,162.00$888.30
21Removing inlets (204.0220)EACH41$400.00$533.23$722.00$533.23$722.00$533.23
22Removing storm sewer (size) 01. 8- inch (204.0245)LF29$15.00$26.32$48.00$26.32$48.00$26.32
23Removing storm sewer (size) 02. 12-inch (204.0245)LF578$15.00$19.91$26.00$19.91$26.00$19.91
24Removing storm sewer (size) 03. 15-inch (204.0245)LF8$20.00$44.38$110.00$44.38$110.00$44.38
25Removing storm sewer (size) 04. 18-inch (204.0245)LF51$20.00$24.16$51.00$24.16$51.00$24.16
26Removing storm sewer (size) 05. 30-inch (204.0245)LF170$25.00$24.13$31.00$24.13$31.00$24.13
27Removing storm sewer (size) 06. 36-inch (204.0245)LF8$25.00$47.20$109.00$47.20$109.00$47.20
28Removing storm sewer (size) 07. 21-inch (204.0245)LF3$25.00$140.93$105.00$140.93$105.00$140.93
29Removing (item description) 01. removing loop detector wire and lead-in cable (STH 100 & W burleigh ST) (204.9060.S)EACH1$1,122.00$1,122.00$1,122.00$1,122.00$1,122.00$1,122.00
30Removing (item description) 02. removing loop detector wire and lead-in cable (STH100 & STH190) (204.9060.S)EACH1$1,122.00$1,122.00$1,122.00$1,122.00$1,122.00$1,122.00
31Removing (item description) 03. removing loop detector wire and lead-in cable (STH100 & CTH E) (204.9060.S)EACH1$1,122.00$1,122.00$1,122.00$1,122.00$1,122.00$1,122.00
32Removing (item description) 04. removing lighting system (204.9060.S)EACH17$527.00$527.00$527.00$527.00$527.00$527.00
33Removing (item description) 05. removing communication vault (204.9060.S)EACH2$814.00$814.00$814.00$814.00$814.00$814.00
34Removing (item description) 06. removing traffic signals (STH 100 & STH 190) (204.9060.S)EACH1$714.00$714.00$714.00$714.00$714.00$714.00
35Removing (item description) 07. removing traffic signals (STH 100 & CTH EE) (204.9060.S)EACH1$1,071.00$1,071.00$1,071.00$1,071.00$1,071.00$1,071.00
36Removing (item description) 08. removing permanent tubular marker post (204.9060.S)EACH44$25.00$30.00$25.00$25.00$25.00$25.00
37Excavation common (205.0100)CY8,109$15.68$13.84$13.17$13.84$32.30$13.84
38Excavation for structures bridges (structure) 01. B-40-1029 (206.1001)EACH1$150,000$150,000$180,000$150,000$300,000$500,000
39Underwater foundation inspection (location) 01. pier 1 (206.1050.S)EACH1$6,900.00$6,900.00$6,900.00$6,900.00$0.01$6,900.00
40Underwater foundation inspection (location) 02. pier 2 (206.1050.S)EACH1$6,900.00$6,900.00$6,900.00$6,900.00$0.01$6,900.00
41Excavation for structures retaining walls (structure) 01. R-40-731 (206.3001)EACH1$6,746.97$6,000.00$30,000$2,500.00$7,700.04$30,000
42Excavation for structures retaining walls (structure) 02. R-40-732 (206.3001)EACH1$3,270.00$3,000.00$30,000$2,500.00$4,499.95$16,000
43Cofferdams (structure) 01. B-40- 1029 (206.5001)EACH1$350,000$350,000$350,000$350,000$365,000$400,000
44Borrow (208.0100)CY11,411$14.77$0.01$15.00$0.01$23.60$0.01
45Backfill granular grade 1 (209.1500)TON16$118.31$50.00$100.00$50.00$75.00$50.00
46Backfill structure type A (210.1500)TON3,573$28.11$31.07$40.00$31.07$38.70$31.07
47Finishing roadway (project) 01. 2030-10-71 (213.0100)EACH1$4,650.00$5,000.00$1,000.00$5,000.00$2,500.00$2,995.87
48Base aggregate dense 3/4-inch (305.0110)TON120$35.09$75.00$50.00$75.00$48.50$75.00
49Base aggregate dense 1 1/4-inch (305.0120)TON8,138$26.34$23.00$18.00$23.00$27.70$23.00
50Base aggregate open-graded (310.0110)TON43$45.00$65.00$100.00$65.00$83.00$65.00
51Breaker run (311.0110)TON8,154$23.89$13.00$19.00$13.00$24.90$13.00
52Concrete base 8-inch (320.0145)SY243$81.27$88.27$95.00$88.27$84.00$88.27
53Removing pavement for base patching (390.0100)CY3,111$61.13$0.01$75.00$0.01$68.00$0.01
54Base patching concrete hes (390.0305)CY3,067$349.48$455.30$211.00$455.30$275.00$455.30
55Base patching concrete shes (390.0405)CY43$620.13$600.30$973.00$600.30$400.00$600.30
56Coloring concrete wisdot red (405.0100)CY17$169.80$150.00$200.00$150.00$150.00$150.00
57Concrete pavement 8-inch (415.0080)SY9,658$74.15$83.88$65.50$83.88$68.00$83.88
58Concrete pavement approach slab (415.0410)SY238$199.82$250.00$250.00$250.00$225.00$250.00
59Concrete pavement hes 8-inch (415.1080)SY1,160$92.50$105.03$85.00$105.03$73.00$105.03
60Drilled tie bars (416.0610)EACH4,692$12.50$0.01$15.00$0.01$15.00$0.01
61Drilled dowel bars (416.0620)EACH14,708$16.05$0.01$20.00$0.01$23.00$0.01
62Concrete pavement replacement (416.1720)SY534$156.50$115.00$106.00$115.00$112.00$115.00
63Tack coat (455.0605)GAL14,706$2.55$2.55$2.55$2.55$2.55$2.50
64HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH2$3,486.00$3,486.00$3,486.00$3,486.00$3,486.00$1,500.00
65HMA pavement 3 MT 58-28 S (460.6223)TON15,799$75.20$75.20$75.20$75.20$75.20$71.90
66HMA pavement 4 MT 58-28 S (460.6224)TON12,225$79.70$79.70$79.70$79.70$79.70$78.20
67Asphaltic surface patching (465.0110)TON36$228.00$228.00$228.00$228.00$228.00$475.00
68Asphaltic surface driveways and field entrances (465.0120)TON218$193.00$193.00$193.00$193.00$193.00$135.00
69Asphaltic surface temporary (465.0125)TON260$211.00$211.00$211.00$211.00$211.00$241.54
70Concrete masonry bridges (502.0100)CY2,221$1,025.00$1,025.00$1,025.00$1,025.00$1,200.00$1,100.00
71Concrete masonry soldier pile footings (502.0110.S)CY57$1,600.00$1,600.00$1,600.00$1,600.00$1,600.00$2,000.00
72Concrete masonry seal (502.1100)CY817$210.00$210.00$210.00$210.00$400.00$350.00
73Protective surface treatment (502.3200)SY3,624$5.00$5.00$5.00$5.00$1.40$4.00
74Pigmented surface sealer reseal (502.3205)SY208$18.00$18.00$18.00$18.00$30.00$29.00
75Protective surface treatment reseal (502.3215)SY1,159$8.00$8.00$8.00$8.00$7.00$12.00
76Underwater substructure inspection (structure) 01. B-40-1029 (502.9000.S)EACH1$0.01$0.01$0.01$0.01$0.01$6,900.00
77Prestressed girder type I 36W-inch (503.0137)LF3,064$235.00$235.00$235.00$235.00$250.00$300.00
78Concrete masonry retaining walls (504.0500)CY99$875.00$875.00$875.00$875.00$1,500.00$1,400.00
79Bar steel reinforcement HS structures (505.0400)LB85,960$1.30$1.30$1.30$1.30$1.30$1.50
80Bar steel reinforcement HS coated structures (505.0600)LB295,640$1.45$1.45$1.45$1.45$1.50$1.60
81Bar steel reinforcement HS stainless structures (505.0800.S)LB3,600$3.70$3.70$3.70$3.70$4.00$4.50
82Structural steel carbon (506.0105)LB55$13.00$13.00$13.00$13.00$50.00$300.00
83Structural steel HS (506.0605)LB25,092$2.60$2.60$2.60$2.60$2.50$2.50
84Bearing pads elastomeric non- laminated (506.2605)EACH65$85.00$85.00$85.00$85.00$80.00$160.00
85Bearing pads elastomeric laminated (506.2610)EACH13$1,400.00$1,400.00$1,400.00$1,400.00$1,500.00$1,800.00
86Steel diaphragms (structure) 01. B- 40-1029 (506.4000)EACH48$750.00$750.00$750.00$750.00$700.00$1,200.00
87Treated lumber and timber (507.0200)MBM7.20$6,300.00$6,300.00$6,300.00$6,300.00$4,000.00$8,500.00
88Concrete surface repair (509.1500)SF735$225.00$225.00$225.00$225.00$300.00$255.00
89Railing steel type C4 (513.7021)LF779$205.00$205.00$205.00$205.00$250.00$225.00
90Rubberized membrane waterproofing (516.0500)SY139$35.00$35.00$35.00$35.00$10.00$68.00
91Painting epoxy system (structure) 01. R-40-731 (517.0601)EACH1$3,300.00$3,300.00$3,300.00$3,300.00$2,940.01$5,000.00
92Painting epoxy system (structure) 02. R-40-732 (517.0601)EACH1$1,100.00$1,100.00$1,100.00$1,100.00$1,120.01$5,000.00
93Concrete staining (structure) 01. B- 40-1029 (517.1010.S)SF14,594$1.85$1.85$1.85$1.85$1.85$1.85
94Concrete staining (structure) 02. R- 40-729 (517.1010.S)SF1,337$1.85$1.85$1.85$1.85$1.85$1.85
95Concrete staining (structure) 03. R- 40-730 (517.1010.S)SF766$1.85$1.85$1.85$1.85$1.85$1.85
96Concrete staining multi-color (structure) 01. B-40-1029 (517.1015.S)SF983$5.00$5.00$5.00$5.00$5.00$5.00
97Concrete staining multi-color (structure) 02. R-40-729 (517.1015.S)SF411$5.00$5.00$5.00$5.00$5.00$5.00
98Concrete staining multi-color (structure) 03. R-40-730 (517.1015.S)SF214$5.00$5.00$5.00$5.00$5.00$5.00
99Architectural surface treatment (structure) 01. B-40-1029 (517.1050.S)SF983$8.50$8.50$8.50$8.50$25.00$25.00
100Architectural surface treatment (structure) 02. R-40-729 (517.1050.S)SF411$30.00$5.00$1.00$0.01$0.01$26.00
101Architectural surface treatment (structure) 03. R-40-730 (517.1050.S)SF214$40.00$5.00$1.00$0.01$0.01$28.00
102Concrete collars for pipe (520.8000)EACH13$500.00$987.00$787.00$987.00$787.00$987.00
103Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH1$2,500.00$2,199.33$2,644.00$2,199.33$2,644.00$2,199.33
104Drilling shaft 42-inch (531.2042)LF36$750.00$400.00$750.00$750.00$750.00$801.82
105Foundation single-shaft type MC-III (structure) 01. S-40-3106 (531.5130)EACH1$12,000$12,600$12,000$12,000$12,000$12,000
106Foundation single-shaft type MC-III (structure) 02. S-40-3107 (531.5130)EACH1$12,000$12,600$12,000$12,000$12,000$12,000
107Anchor assemblies poles on structures (531.8990)EACH2$796.00$796.00$796.00$796.00$796.00$1,600.00
108Monotube cantilever type III (structure) 01. S-40-3106 (532.5130)EACH1$31,000$37,500$31,000$31,000$31,000$31,000
109Monotube cantilever type III (structure) 02. S-40-3107 (532.5130)EACH1$31,500$37,500$31,500$31,500$31,500$31,500
110Pre-boring unconsolidated materials (550.0010)LF220$200.00$200.00$200.00$200.00$200.00$295.00
111Pre-boring rock or consolidated materials (550.0020)LF66$635.00$635.00$635.00$635.00$635.00$1,050.00
112Piling steel HP 10-inch X 42 LB (550.1100)LF330$58.00$58.00$58.00$58.00$65.00$85.00
113Concrete curb & gutter 31-inch (601.0331)LF6,765$48.80$38.00$42.00$38.00$40.00$38.00
114Concrete curb pedestrian (601.0600)LF1,593$56.10$45.00$50.00$45.00$50.00$45.00
115Concrete sidewalk 5-inch (602.0410)SF51,550$11.28$10.40$7.12$10.40$7.00$10.40
116Curb ramp detectable warning field yellow (602.0505)SF1,006$47.25$48.00$30.00$48.00$55.00$48.00
117Curb ramp detectable warning field radial yellow (602.0605)SF344$66.53$58.00$60.00$58.00$75.00$58.00
118Concrete driveway 6-inch (602.0810)SY62$89.42$90.00$200.00$90.00$75.00$90.00
119Concrete driveway 7-inch (602.0815)SY93$94.81$91.00$200.00$91.00$80.00$91.00
120Concrete barrier temporary precast delivered (603.8000)LF747$3.00$3.00$3.00$3.00$25.00$32.00
121Concrete barrier temporary precast installed (603.8125)LF747$10.00$10.00$10.00$10.00$4.00$6.50
122Riprap heavy (606.0300)CY615$110.00$105.00$168.00$110.00$90.00$105.00
123Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF736$75.00$136.15$120.00$136.15$120.00$136.15
124Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF36$90.00$155.23$180.00$155.23$180.00$155.23
125Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF108$90.00$208.60$191.00$208.60$191.00$208.60
126Storm sewer pipe reinforced concrete class III 30-inch (608.0330)LF173$120.00$275.36$210.00$275.36$210.00$275.36
127Storm sewer pipe reinforced concrete class III 36-inch (608.0336)LF9$150.00$422.76$891.00$422.76$891.00$422.76
128Storm sewer pipe composite 8-inch (608.6008)LF27$70.00$142.51$307.00$142.51$307.00$142.51
129Reconstructing manholes (611.0420)EACH2$2,500.00$2,714.55$2,424.00$2,714.55$2,424.00$2,714.55
130Reconstructing inlets (611.0430)EACH5$2,000.00$1,892.80$1,634.00$1,892.80$1,634.00$1,892.80
131Manhole covers type J (611.0530)EACH6$850.00$591.34$1,370.00$591.34$1,370.00$591.34
132Inlet covers type MS (611.0642)EACH4$850.00$601.01$871.00$601.01$871.00$601.01
133Inlet covers type R (611.0648)EACH25$1,550.00$1,261.97$1,484.00$1,261.97$1,484.00$1,261.97
134Inlet covers type S (611.0651)EACH1$980.00$825.20$1,672.00$825.20$1,672.00$825.20
135Inlet covers type W (611.0657)EACH25$1,925.00$1,612.23$2,288.00$1,612.23$2,288.00$1,612.23
136Manholes 4-FT diameter (611.2004)EACH3$3,950.00$4,277.93$5,016.00$4,277.93$5,016.00$4,277.93
137Manholes 5-FT diameter (611.2005)EACH1$5,950.00$6,194.98$8,076.00$6,194.98$8,076.00$6,194.98
138Manholes 6-FT diameter (611.2006)EACH2$8,950.00$8,208.87$9,075.00$8,208.87$9,075.00$8,208.87
139Manholes 8-FT diameter (611.2008)EACH1$12,000$13,702$13,841$13,702$13,841$13,702
140Inlets 4-FT diameter (611.3004)EACH2$4,000.00$4,363.74$2,652.00$4,363.74$2,652.00$4,363.74
141Inlets 2X2-FT (611.3220)EACH25$3,000.00$3,296.47$2,423.00$3,296.47$2,423.00$3,296.47
142Inlets 2X2.5-FT (611.3225)EACH23$3,200.00$3,639.88$1,947.00$3,639.88$1,947.00$3,639.88
143Inlets median 1 grate (611.3901)EACH4$4,500.00$4,043.07$4,244.00$4,043.07$4,244.00$4,043.07
144Adjusting manhole covers (611.8110)EACH7$1,200.00$980.00$1,478.00$980.00$1,478.00$980.00
145Adjusting inlet covers (611.8115)EACH5$1,200.00$812.00$1,236.00$812.00$1,236.00$812.00
146Cover plates temporary (611.8120.S)EACH63$300.00$508.56$469.00$508.56$469.00$508.56
147Pipe underdrain 6-inch (612.0106)LF258$20.00$20.88$30.62$20.88$10.00$20.88
148Pipe underdrain unperforated 6- inch (612.0206)LF478$30.00$34.87$30.62$34.87$10.00$34.87
149Pipe underdrain wrapped 6-inch (612.0406)LF550$25.00$7.50$30.93$7.50$7.00$7.50
150Apron endwalls for underdrain reinforced concrete 6-inch (612.0806)EACH2$500.00$764.06$750.00$764.06$400.00$764.06
151Fence safety (616.0700.S)LF1,194$4.50$4.55$4.50$4.50$4.50$4.50
152Maintenance and repair of haul roads (project) 01. 2030-10-71 (618.0100)EACH1$1.00$0.01$1.00$0.01$1,000.00$4,476.22
153Mobilization (619.1000)EACH1$1,263,705$1,985,000$2,103,000$2,329,253$1,630,500$1,500,000
154Concrete median sloped nose (620.0300)SF322$16.06$17.00$20.00$17.00$20.00$17.00
155Water (624.0100)MGAL112$42.42$50.00$100.00$50.00$50.00$50.00
156Topsoil (625.0100)SY17,716$8.76$11.00$6.00$11.00$9.10$11.00
157Mulching (627.0200)SY2,302$0.28$0.48$0.28$0.28$0.28$0.28
158Silt fence (628.1504)LF1,862$2.00$1.85$2.00$2.00$2.00$2.00
159Silt fence maintenance (628.1520)LF1,862$0.10$0.05$0.10$0.10$0.10$0.10
160Silt fence heavy duty maintenance (628.1535.S)LF1,550$1.00$0.10$1.00$1.00$1.00$1.00
161Mobilizations erosion control (628.1905)EACH3$180.00$400.00$180.00$180.00$180.00$180.00
162Mobilizations emergency erosion control (628.1910)EACH6$270.00$150.00$270.00$270.00$270.00$270.00
163Erosion mat urban class I type B (628.2008)SY10,776$1.80$2.40$1.80$1.80$1.80$1.80
164Turbidity barriers (628.6005)SY633$48.00$39.90$48.00$48.00$48.00$48.00
165Inlet protection type A (628.7005)EACH32$130.00$92.00$130.00$130.00$130.00$130.00
166Inlet protection type B (628.7010)EACH74$55.00$40.00$55.00$55.00$55.00$55.00
167Inlet protection type C (628.7015)EACH133$65.00$43.00$65.00$65.00$65.00$65.00
168Inlet protection type D (628.7020)EACH40$110.00$76.00$110.00$110.00$110.00$110.00
169Temporary ditch checks (628.7504)LF30$10.00$11.00$10.00$10.00$10.00$10.00
170Tracking pads (628.7560)EACH4$1,850.99$0.01$1.00$2,000.00$1,700.00$1,700.00
171Fertilizer type A (629.0205)CWT11$85.00$88.00$85.00$85.00$85.00$85.00
172Seeding mixture no. 40 (630.0140)LB204$7.00$11.00$7.00$7.00$7.00$7.00
173Seeding mixture no. 60 (630.0160)LB29$10.00$16.00$10.00$10.00$10.00$10.00
174Seeding temporary (630.0200)LB380$3.00$4.00$3.00$3.00$3.00$3.00
175Seed water (630.0500)MGAL253$1.00$10.00$1.00$1.00$1.00$1.00
176Sod water (631.0300)MGAL58$20.00$10.00$20.00$20.00$20.00$20.00
177Sod lawn (631.1000)SY5,118$9.00$8.80$9.00$9.00$9.00$9.00
178Posts wood 4X6-inch X 18-FT (634.0618)EACH81$80.00$92.00$80.00$80.00$80.00$80.00
179Posts tubular steel 2X2-inch X 8-FT (634.0808)EACH4$300.00$170.00$300.00$300.00$300.00$300.00
180Foundation drilling (diameter) 01. 24-inch (636.0050.S)LF649$5.00$5.00$5.00$5.00$5.00$5.00
181Signs type II reflective H (637.2210)SF621.24$22.50$22.00$22.50$22.50$22.50$22.50
182Signs type II reflective F (637.2230)SF376.75$24.00$22.00$24.00$24.00$24.00$24.00
183Moving signs type II (638.2102)EACH2$500.00$250.00$500.00$500.00$500.00$500.00
184Removing signs type II (638.2602)EACH128$25.00$27.00$25.00$25.00$25.00$25.00
185Removing small sign supports (638.3000)EACH70$25.00$29.00$25.00$25.00$25.00$25.00
186Traffic control drums (643.0300)DAY167,365$0.20$0.20$0.10$0.20$0.20$0.20
187Traffic control barricades type III (643.0420)DAY64,543$0.50$0.50$0.31$0.50$0.50$0.50
188Traffic control warning lights type A (643.0705)DAY123,414$0.01$0.01$0.05$0.01$0.01$0.01
189Traffic control warning lights type C (643.0715)DAY17,272$0.01$0.01$0.07$0.01$0.01$0.01
190Traffic control connected arrow boards (643.0810)DAY1,184$16.65$16.65$7.50$16.65$16.65$16.65
191Traffic control signs (643.0900)DAY250,093$0.20$0.20$0.25$0.20$0.20$0.20
192Traffic control covering signs type II (643.0920)EACH10$75.00$75.00$150.00$75.00$75.00$75.00
193Traffic control signs fixed message (643.1000)SF165.50$16.00$16.00$25.00$16.00$16.00$16.00
194Traffic control signs PCMS (643.1050)DAY280$32.49$32.49$17.00$32.49$32.49$32.49
195Traffic control cones 42-inch (643.1070)DAY232,937$0.50$0.50$0.15$0.50$0.50$0.50
196Traffic control connected work zone start and end location markers (643.1220)DAY770$6.00$6.00$4.00$6.00$6.00$6.00
197Temporary marking line paint 6- inch (643.3165)LF3,093$4.00$4.00$0.35$4.00$4.00$4.00
198Temporary marking line removable tape 6-inch (643.3180)LF9,875$2.52$2.52$1.50$2.52$2.52$2.52
199Temporary marking line removable tape 10-inch (643.3280)LF2,742$4.58$4.58$2.30$4.58$4.58$4.58
200Temporary marking arrow removable tape (643.3550)EACH25$181.64$181.64$75.00$181.64$181.64$181.64
201Temporary marking stop line paint 18-inch (643.3805)LF72$20.00$20.00$10.00$20.00$20.00$20.00
202Temporary marking stop line removable tape 18-inch (643.3850)LF200$8.07$8.07$4.00$8.07$8.07$8.07
203Traffic control interim lane closure (643.4100)EACH10$454.98$454.98$1,950.00$454.98$454.98$454.98
204Traffic control (643.5000)EACH1$62,133$62,133$198,314$62,133$62,133$250,000
205Temporary pedestrian surface asphalt (644.1410)SF1,075$9.55$10.00$10.30$10.30$10.30$32.85
206Temporary pedestrian surface plate (644.1430)SF2,089$10.00$10.00$12.00$10.00$10.00$10.00
207Temporary pedestrian curb ramp (644.1601)DAY686$7.00$7.00$5.00$7.00$7.00$7.00
208Temporary pedestrian detectable warning field (644.1605)SF640$1.00$1.00$5.00$1.00$1.00$1.00
209Temporary pedestrian barricade (644.1810)LF11,635$2.00$2.00$5.00$2.00$2.00$2.00
210Temporary audible message devices (644.1900.S)DAY2,394$2.92$2.92$7.00$2.92$2.92$2.92
211Geotextile type DF schedule A (645.0111)SY504$6.00$5.21$4.00$5.21$3.30$5.21
212Geotextile type HR (645.0120)SY1,051$9.00$5.00$4.00$9.00$2.00$5.00
213Geogrid type SR (645.0220)SY12,905$2.06$1.90$4.00$1.90$2.00$1.90
214Marking line epoxy 4-inch (646.1020)LF968$0.60$0.60$0.60$1.00$1.00$1.00
215Marking line grooved black epoxy 6-inch (646.2025)LF9,608$1.25$1.25$1.25$1.50$1.50$1.50
216Marking line grooved wet ref epoxy 6-inch (646.2040)LF65,385$1.35$1.35$1.35$1.80$1.80$1.80
217Marking line grooved wet ref epoxy 10-inch (646.4040)LF9,132$2.50$2.50$2.50$3.30$3.30$3.30
218Marking arrow epoxy (646.5020)EACH30$230.00$230.00$230.00$330.00$330.00$330.00
219Marking word epoxy (646.5120)EACH12$255.00$255.00$255.00$425.00$425.00$425.00
220Marking stop line epoxy 18-inch (646.6120)LF816$12.50$12.50$12.50$22.00$22.00$22.00
221Marking yield line epoxy 18-inch (646.6220)EACH73$45.00$45.00$45.00$120.00$120.00$120.00
222Marking diagonal epoxy 12-inch (646.7120)LF5,359$9.50$9.50$9.50$9.00$9.00$9.00
223Marking crosswalk epoxy transverse line 6-inch (646.7420)LF3,988$10.50$10.50$10.50$11.00$11.00$11.00
224Marking crosswalk epoxy block style 24-inch (646.7520)LF1,238$18.00$18.00$18.00$30.00$30.00$30.00
225Marking curb epoxy (646.8120)LF2,046$7.50$7.50$7.50$9.00$9.00$9.00
226Marking island nose epoxy (646.8220)EACH45$300.00$300.00$300.00$310.00$310.00$310.00
227Marking removal line water blasting 4-inch (646.9010)LF6,025$1.20$1.20$2.40$1.20$1.20$1.20
228Marking removal line wide (646.9200)LF72$4.00$4.00$9.00$4.00$4.00$4.00
229Construction staking storm sewer (650.4000)EACH62$150.00$150.00$150.00$150.00$150.00$150.00
230Construction staking subgrade (650.4500)LF1,476$0.01$0.01$0.01$0.01$0.01$0.01
231Construction staking base (650.5000)LF921$0.01$0.01$0.01$0.01$0.01$0.01
232Construction staking curb gutter and curb & gutter (650.5500)LF6,050$1.25$1.25$1.25$1.25$1.25$1.25
233Construction staking structure layout (structure) 01. B-40-1029 (650.6501)EACH1$7,000.00$7,000.00$7,000.00$7,000.00$7,000.00$7,000.00
234Construction staking structure layout (structure) 02. R-40-729 (650.6501)EACH1$7,000.00$7,000.00$7,000.00$7,000.00$7,000.00$7,000.00
235Construction staking structure layout (structure) 03. R-40-730 (650.6501)EACH1$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00$5,000.00
236Construction staking structure layout (structure) 04. R-40-731 (650.6501)EACH1$7,000.00$7,000.00$7,000.00$7,000.00$7,000.00$7,000.00
237Construction staking structure layout (structure) 05. R-40-732 (650.6501)EACH1$2,500.00$2,500.00$2,500.00$2,500.00$2,500.00$2,500.00
238Construction staking concrete pavement (650.7000)LF1,476$2.20$2.20$2.20$2.20$2.20$2.20
239Construction staking resurfacing reference (650.8000)LF14,120$0.35$0.35$0.35$0.35$0.35$0.35
240Construction staking curb ramps (650.9000)EACH59$180.00$180.00$180.00$180.00$180.00$180.00
241Construction staking sidewalk (project) 01. 2030-10-71 (650.9500)EACH1$10,000$10,000$10,000$10,000$10,000$10,000
242Construction staking supplemental control (project) 01. 2030-10-71 (650.9911)EACH1$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00$6,000.00
243Construction staking slope stakes (650.9920)LF3,655$1.25$1.25$1.25$1.25$1.25$1.25
244Conduit rigid metallic 2-inch (652.0125)LF132$184.00$184.00$184.00$184.00$184.00$184.00
245Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF2,485$8.05$8.05$8.05$8.05$8.05$8.05
246Conduit rigid nonmetallic schedule 80 3-inch (652.0335)LF255$12.85$12.85$12.85$12.85$12.85$12.85
247Conduit special 2-inch (652.0605)LF66$52.70$52.70$52.70$52.70$52.70$52.70
248Install conduit into existing item (652.0700.S)EACH2$161.00$161.00$161.00$161.00$161.00$161.00
249Conduit loop detector (652.0800)LF5,104$10.35$10.35$10.35$10.35$10.35$10.35
250Pull boxes steel 24X36-inch (653.0135)EACH24$1,271.00$1,271.00$1,271.00$1,271.00$1,271.00$1,271.00
251Junction boxes 18X12X6-inch (653.0222)EACH2$1,951.00$1,951.00$1,951.00$1,951.00$1,951.00$1,951.00
252Removing pull boxes (653.0905)EACH1$305.00$305.00$305.00$305.00$305.00$305.00
253Concrete bases type 1 (654.0101)EACH3$1,191.60$1,191.60$1,191.60$1,191.60$1,191.60$1,191.60
254Concrete bases type 5 (654.0105)EACH19$1,316.00$1,316.00$1,316.00$1,316.00$1,316.00$1,316.00
255Cable in duct 3-4 AWG (655.0124)LF4,180$15.40$15.40$15.40$15.40$15.40$15.40
256Cable traffic signal 5-14 AWG (655.0230)LF152$2.14$2.14$2.14$2.14$2.14$2.14
257Cable traffic signal 7-14 AWG (655.0240)LF295$2.37$2.37$2.37$2.37$2.37$2.37
258Electrical wire traffic signals 10 AWG (655.0515)LF6,466$1.58$1.58$1.58$1.58$1.58$1.58
259Electrical wire lighting 12 AWG (655.0610)LF1,984$1.34$1.34$1.34$1.34$1.34$1.34
260Loop detector lead in cable (655.0700)LF18,164$2.32$2.32$2.32$2.32$2.32$2.32
261Loop detector wire (655.0800)LF18,708$1.34$1.34$1.34$1.34$1.34$1.34
262Pedestal bases (657.0100)EACH2$343.00$343.00$343.00$343.00$343.00$343.00
263Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH16$717.00$717.00$717.00$717.00$717.00$717.00
264Poles type 5-aluminum (657.0322)EACH16$2,591.40$2,591.40$2,591.40$2,591.40$2,591.40$2,591.40
265Traffic signal standards aluminum 3.5-FT (657.0405)EACH1$297.00$297.00$297.00$297.00$297.00$297.00
266Traffic signal standards aluminum 15-FT (657.0425)EACH1$686.00$686.00$686.00$686.00$686.00$686.00
267Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610)EACH16$317.20$317.20$317.20$317.20$317.20$317.20
268Traffic signal face 4S 12-inch (658.0174)EACH2$1,274.00$1,274.00$1,274.00$1,274.00$1,274.00$1,274.00
269Signal mounting hardware (location) 01. STH 100 & STH 190 (658.5070)EACH1$743.00$743.00$743.00$743.00$743.00$743.00
270Signal mounting hardware (location) 02. STH 100 & CTH EE (658.5070)EACH1$1,116.00$1,116.00$1,116.00$1,116.00$1,116.00$1,116.00
271Underdeck lighting (structure) 01. B-40-1029 (659.0601)EACH2$3,106.00$3,106.00$3,106.00$3,106.00$3,106.00$3,106.00
272Luminaires utility LED C (659.1125)EACH21$336.00$336.00$336.00$336.00$336.00$336.00
273Luminaires underdeck LED B (659.1210)EACH4$1,162.00$1,162.00$1,162.00$1,162.00$1,162.00$1,162.00
274Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH23$8.00$8.00$8.00$8.00$8.00$8.00
275ITS documentation (670.0201)EACH1$6,744.00$6,744.00$6,744.00$6,744.00$6,744.00$6,744.00
276Conduit HDPE 4-duct 2-inch (671.0142)LF1,415$16.12$16.12$16.12$16.12$16.12$16.12
277Communication vault type 1 (673.0105)EACH2$2,883.00$2,883.00$2,883.00$2,883.00$2,883.00$2,883.00
278Remove cable (674.0300)LF15,915$0.71$0.71$0.71$0.71$0.71$0.71
279Install fiber optic cable outdoor plant 72-CT (678.0072)LF7,060$1.85$1.85$1.85$1.85$1.85$1.85
280Fiber optic splice enclosure (678.0200)EACH2$2,011.00$2,011.00$2,011.00$2,011.00$2,011.00$2,011.00
281Fiber optic splice (678.0300)EACH148$151.00$151.00$151.00$151.00$151.00$151.00
282Communication system testing (678.0501)EACH1$5,724.00$5,724.00$5,724.00$5,724.00$5,724.00$5,724.00
283Sawing asphalt (690.0150)LF2,030$1.95$1.39$1.39$1.95$1.43$1.39
284Sawing concrete (690.0250)LF32,596$2.55$2.15$2.15$2.55$2.22$2.15
285Incentive strength concrete structures (715.0502)DOL13,920$1.00$1.00$1.00$1.00$1.00$1.00
286Incentive compressive strength concrete pavement (715.0720)DOL2,969$1.00$1.00$1.00$1.00$1.00$1.00
287Incentive iri ride (740.0440)DOL35,400$1.00$1.00$1.00$1.00$1.00$1.00
288On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS9,100$5.00$5.00$5.00$5.00$5.00$5.00
289On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS18,000$5.00$5.00$5.00$5.00$5.00$5.00
290Special 01. portable speed trailer (SPV.0045)DAY670$22.55$22.50$15.00$22.55$22.55$22.55
291Special 01. incentive density PWL HMA pavement core only (SPV.0055)DOL16,975$1.00$1.00$1.00$1.00$1.00$1.00
292Special 02. PWL incentive air voids HMA pavement core only (SPV.0055)DOL27,288$1.00$1.00$1.00$1.00$1.00$1.00
293Special 03. incentive density HMA pavement longitudinal joint (SPV.0055)DOL34,083$1.00$1.00$1.00$1.00$1.00$1.00
294Special 01. ground improvement system R-40-729 (SPV.0060)EACH1$202,000$202,000$202,000$202,000$146,000$125,000
295Special 02. ground improvement system R-40-730 (SPV.0060)EACH1$101,000$101,000$101,000$101,000$84,000$110,000
296Special 03. embedded galvanic anodes (SPV.0060)EACH485$45.00$45.00$45.00$45.00$50.00$38.00
297Special 04. modifying existing traffic signal during construction STH 100 & burleigh ST (SPV.0060)EACH1$448.00$448.00$448.00$448.00$448.00$448.00
298Special 05. modifying existing traffic signal during construction STH 100 & STH 190 (SPV.0060)EACH1$1,648.00$1,648.00$1,648.00$1,648.00$1,648.00$1,648.00
299Special 06. modifying existing traffic signal during construction STH 100 & CTH EE (SPV.0060)EACH1$1,588.00$1,588.00$1,588.00$1,588.00$1,588.00$1,588.00
300Special 07. remove video equipment STH 100 & burleigh ST (SPV.0060)EACH1$3,366.00$3,366.00$3,366.00$3,366.00$3,366.00$3,366.00
301Special 08. remove video equipment STH 100 & STH 190 (SPV.0060)EACH1$3,366.00$3,366.00$3,366.00$3,366.00$3,366.00$3,366.00
302Special 09. remove video equipment STH 100 & CTH EE (SPV.0060)EACH1$3,366.00$3,366.00$3,366.00$3,366.00$3,366.00$3,366.00
303Special 11. connect to existing box culvert (SPV.0060)EACH1$5,000.00$3,225.00$4,000.00$3,225.00$1,000.00$3,225.00
304Special 12. curb ramp grading, shaping, and finishing (SPV.0060)EACH58$601.23$1,175.00$2,000.00$1,650.00$2,932.00$1,650.00
305Special 13. temporary causeway (SPV.0060)EACH1$180,000$180,000$180,000$180,000$220,000$1,150,000
306Special 14. permanant causeway to BE left-in-place (SPV.0060)EACH1$70,000$70,000$70,000$70,000$60,000$175,000
307Special 15. galvanizing steel soldier piles (SPV.0060)EACH29$0.01$0.01$0.01$0.01$0.01$1.00
308Special 16. adjusting city of milwaukee water valve boxes (SPV.0060)EACH17$700.00$650.00$749.00$650.00$749.00$650.00
309Special 17. adjusting city of wauwatosa water valve boxes (SPV.0060)EACH52$700.00$650.00$904.00$650.00$904.00$650.00
310Special 18. adjusting sanitary manhole, wauwatosa (SPV.0060)EACH30$1,800.00$1,042.00$1,342.00$1,042.00$1,342.00$1,042.00
311Special 19. field facilities office space (SPV.0060)EACH1$49,576$65,000$60,000$65,000$28,761$100,000
312Special 20. utility line opening (SPV.0060)EACH5$900.00$984.00$1,000.00$984.00$2,398.00$984.00
313Special 21. removing, salvaging, & reinstalling traffic signal equipment STH 100 & STH (SPV.0060)EACH1$1,478.00$1,478.00$1,478.00$1,478.00$1,478.00$1,478.00
314Special 22. removing, salvaging, & reinstalling traffic signal equipment STH 100 & CTH (SPV.0060)EACH1$1,478.00$1,478.00$1,478.00$1,478.00$1,478.00$1,478.00
315Special 23. install state-furnished video detection system STH 100 & STH 190 (SPV.0060)EACH1$2,752.00$2,752.00$2,752.00$2,752.00$2,752.00$2,752.00
316Special 24. install state-furnished video detection system STH 100 & CTH EE (SPV.0060)EACH1$4,688.00$4,688.00$4,688.00$4,688.00$4,688.00$4,688.00
317Special 25. water hydrant extension (SPV.0060)EACH3$2,250.00$2,293.00$4,361.00$2,293.00$4,361.00$2,293.00
318Special 26. water valve vault manhole 60” riser (SPV.0060)EACH1$4,850.00$3,980.60$3,114.00$3,980.60$3,114.00$3,980.60
319Special 27. replace city water valve vault with water valve boxes (SPV.0060)EACH4$3,000.00$4,245.70$2,672.00$4,245.70$2,672.00$4,245.70
320Special 28. temporary lighting system (SPV.0060)EACH1$11,674$11,674$11,674$11,674$11,674$11,674
321Special 29. sanitary sewer manhole adjustment (SPV.0060)EACH22$1,100.00$1,031.82$1,457.00$1,031.82$1,457.00$1,031.82
322Special 30. sanitary manhole internal seal replacement (SPV.0060)EACH22$700.00$718.18$709.00$718.18$709.00$718.18
323Special 01. split rail fence (SPV.0090)LF316$18.50$79.00$18.50$18.50$18.50$18.50
324Special 02. concrete curb and gutter integral 67-inch (SPV.0090)LF2,165$57.50$45.00$83.20$45.00$44.00$45.00
325Special 03. remove, salvage, and reinstall fence (SPV.0090)LF117$65.00$65.00$155.00$143.00$143.00$65.00
326Special 04. concrete joint and crack cleaning and repair (SPV.0090)LF7,920$12.20$12.20$12.20$12.20$12.20$9.25
327Special 05. state furnished silt fence heavy duty (SPV.0090)LF1,550$8.50$5.85$8.50$8.50$8.50$8.50
328Special 01. wall concrete panel mechanically stabilized earth R-40- 729 (SPV.0165)SF788$148.10$171.00$197.00$137.00$158.00$171.00
329Special 02. wall concrete panel mechanically stabilized earth R-40- 730 (SPV.0165)SF430$148.77$195.00$206.00$151.00$178.00$195.00
330Special 03. removing loose concrete (SPV.0165)SF205$150.00$150.00$150.00$150.00$175.00$63.00
331Special 01. infill riprap B-40-1029 (SPV.0195)TON32$125.00$125.00$300.00$125.00$110.00$250.00
WisDOT contract 20260714004: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of July 14, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy