WisDOT contract 20260915007 bid tabulation

2040-23-70. Let by Wisconsin DOT on September 15, 2026, Milwaukee. 3 bids received; low bid $14,368,201 by Payne and Dolan, Inc.

Owner
Wisconsin DOT
Letting
15 SEP 2026
Pay items
281
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Payne and Dolan, Inc$14,368,201Low
2Zignego Company, Inc.$14,728,429+3.0%
3Lalonde Contractors Incorporated$15,095,744+5.0%
WisDOT contract 20260915007: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Payne and Dolan, Inc2. Zignego Company, Inc.3. Lalonde Contractors Incorporated
1CPM progress schedule (108.4400)EACH1$14,280$1,000.00$14,280
2Debris containment over waterway (structure) 05. C-40-50 (203.0335)EACH1$1,865.00$1,865.00$1,865.00
3Removing concrete pavement (204.0100)SY640$15.00$40.00$14.97
4Removing asphaltic surface (204.0110)SY3,817$15.00$10.00$14.29
5Removing asphaltic surface butt joints (204.0115)SY625$11.50$11.50$11.50
6Removing asphaltic surface milling (204.0120)SY317,800$2.65$2.65$2.65
7Removing curb (204.0130)LF177$10.00$30.00$15.30
8Removing curb & gutter (204.0150)LF8,142$10.00$8.00$11.42
9Removing concrete sidewalk (204.0155)SY4,690$12.00$8.00$14.46
10Removing guardrail (204.0165)LF340$2.50$2.75$2.75
11Removing surface drains (204.0190)EACH1$200.00$1,000.00$226.70
12Removing concrete bases (204.0195)EACH26$270.00$500.00$270.00
13Removing inlets (204.0220)EACH76$400.00$757.00$757.00
14Removing storm sewer (size) 01. 8- inch (204.0245)LF10$22.00$102.00$102.00
15Removing storm sewer (size) 02. 10-inch (204.0245)LF5$22.00$97.00$97.00
16Removing storm sewer (size) 03. 12-inch (204.0245)LF380$22.00$22.00$22.00
17Removing storm sewer (size) 04. 15-inch (204.0245)LF295$22.00$25.00$25.00
18Removing storm sewer (size) 05. 18-inch (204.0245)LF25$27.00$58.00$58.00
19Removing storm sewer (size) 06. 24-inch (204.0245)LF72$30.00$42.00$42.00
20Removing (item description) 01. removing traffic signals STH 100 & shepard (204.9060.S)EACH1$6,485.00$6,485.00$6,485.00
21Removing (item description) 02. removing loop detector wire and lead-in cable STH 100 & shepard (204.9060.S)EACH1$1,621.00$1,621.00$1,621.00
22Removing (item description) 03. traffic signals STH 38 & oakwood (204.9060.S)EACH1$6,506.00$6,506.00$6,506.00
23Removing (item description) 04. loop detector wire and lead-in cable STH 38 & oakwood (204.9060.S)EACH1$1,621.26$1,621.26$1,621.26
24Removing (item description) 05. traffic signals STH 38 & STH 100 (204.9060.S)EACH1$1,642.47$1,642.47$1,642.47
25Removing (item description) 06. traffic signals STH 38 & centennial (204.9060.S)EACH1$1,642.47$1,642.47$1,642.47
26Removing (item description) 07. traffic signals STH 38 & forest hill (204.9060.S)EACH1$1,642.47$1,642.47$1,642.47
27Removing (item description) 08. traffic signals STH 38 & susan (204.9060.S)EACH1$1,642.47$1,642.47$1,642.47
28Removing (item description) 09. traffic signals STH 38 & drexel (204.9060.S)EACH1$1,642.47$1,642.47$1,642.47
29Removing (item description) 10. traffic signals STH 38 & rawson (204.9060.S)EACH1$1,642.47$1,642.47$1,642.47
30Removing (item description) 11. traffic signals STH 38 & college (204.9060.S)EACH1$1,642.47$1,642.47$1,642.47
31Removing (item description) 12. traffic signals STH 38 & STH 119 ramps (204.9060.S)EACH1$993.96$993.96$993.96
32Removing (item description) 13. traffic signals STH 38 & grange (204.9060.S)EACH1$1,642.47$1,642.47$1,642.47
33Prepare foundation for asphaltic paving (project) 01. 2040-23-70 (211.0101)EACH1$4,750.00$4,750.00$4,750.00
34Prepare foundation for asphaltic paving (project) 02. 2060-20-70 (211.0101)EACH1$24,650$24,650$24,650
35Finishing roadway (project) 01. 2040-23-70 (213.0100)EACH1$3,300.00$1,000.00$3,132.00
36Finishing roadway (project) 02. 2060-20-70 (213.0100)EACH1$6,600.00$1,000.00$5,220.00
37Base aggregate dense 3/4-inch (305.0110)TON7$100.00$200.00$106.83
38Base aggregate dense 1 1/4-inch (305.0120)TON115$40.00$100.00$89.90
39Base aggregate open-graded (310.0110)TON159$31.00$50.00$28.00
40Removing pavement for base patching (390.0100)CY2,681$100.00$100.00$77.58
41Base patching concrete hes (390.0305)CY2,681$225.00$341.00$346.72
42Base patching concrete shes (390.0405)CY118$265.00$600.00$612.40
43Drilled tie bars (416.0610)EACH4,042$15.00$12.00$14.75
44Drilled dowel bars (416.0620)EACH4,069$30.00$22.00$18.69
45Concrete pavement repair (416.1710)SY261$200.00$150.00$134.35
46Concrete pavement replacement (416.1720)SY3,065$123.00$98.00$121.39
47HMA cold weather paving (450.4000)TON12,660$1.00$1.00$1.00
48Tack coat (455.0605)GAL44,609$2.30$2.30$2.30
49HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH2$1,700.00$1,700.00$1,700.00
50HMA percent within limits (PWL) test strip density (460.0110.S)EACH2$13,750$13,750$13,750
51Incentive density HMA pavement (460.2000)DOL5,780$1.00$1.00$1.00
52Incentive density PWL HMA pavement (460.2005)DOL30,000$1.00$1.00$1.00
53Incentive density HMA pavement longitudinal joints (460.2007)DOL14,440$1.00$1.00$1.00
54Incentive air voids HMA pavement (460.2010)DOL50,400$1.00$1.00$1.00
55HMA pavement 5 MT 58-28 H (460.6425)TON59,290$84.00$84.65$84.65
56Asphaltic surface (465.0105)TON910$103.00$103.00$103.00
57Asphaltic surface patching (465.0110)TON956$103.00$103.00$103.00
58Asphaltic surface driveways and field entrances (465.0120)TON15$211.50$211.50$211.50
59Asphaltic surface safety islands (465.0305)TON9$270.00$270.00$270.00
60Cleaning and sealing cracks and joints with hot-applied sealant (492.2020.S)MI2.34$20,450$19,500$19,500
61Concrete surface repair (509.1500)SF70$645.00$645.00$645.00
62Concrete collars for pipe (520.8000)EACH148$400.00$451.00$451.00
63Drilling shaft 36-inch (531.2036)LF18$200.00$450.00$200.00
64Foundation single-shaft type TC-I (structure) 05. S-40-3124 (531.5310)EACH1$8,000.00$12,500$8,000.00
65Truss cantilever 2-chord type I (structure) 05. S-40-3124 (532.5310)EACH1$38,200$40,000$38,200
66Concrete curb type A (601.0105)LF74$42.00$60.00$62.79
67Concrete curb & gutter 19-inch (601.0319)LF388$42.00$60.00$66.11
68Concrete curb & gutter 31-inch (601.0331)LF6,636$42.00$56.18$66.11
69Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413)LF100$42.00$60.00$69.19
70Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF173$42.00$60.00$71.53
71Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF704$42.00$60.00$67.02
72Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581)LF53$42.00$60.00$71.59
73Concrete curb pedestrian (601.0600)LF1,588$50.00$60.00$61.29
74Concrete sidewalk 5-inch (602.0410)SF41,704$8.00$11.10$13.22
75Curb ramp detectable warning field yellow (602.0505)SF2,960$52.00$60.00$50.41
76Curb ramp detectable warning field radial yellow (602.0605)SF786$73.00$100.00$70.66
77Concrete surface drains (602.3010)CY1$2,500.00$1,000.00$1,218.67
78Slope paving repair crushed aggregate (604.9010.S)CY80$2.50$200.00$2.50
79Riprap medium (606.0200)CY30$185.00$240.00$203.20
80Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF375$113.00$338.00$338.00
81Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF310$116.00$270.00$270.00
82Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF25$145.00$438.00$438.00
83Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF70$175.00$305.00$305.00
84Inlet covers type HM (611.0627)EACH3$915.00$1,142.00$1,142.00
85Inlet covers type V (611.0654)EACH7$860.00$1,199.00$1,199.00
86Inlet covers type X (611.0663)EACH7$985.00$1,330.00$1,330.00
87Catch basins 4-FT diameter (611.1004)EACH4$4,000.00$3,546.00$3,546.00
88Inlets 4-FT diameter (611.3004)EACH28$3,500.00$2,432.00$2,432.00
89Inlets 2X2.5-FT (611.3225)EACH43$2,700.00$2,402.00$2,402.00
90Adjusting manhole covers (611.8110)EACH60$1,000.00$437.00$1,418.71
91Adjusting inlet covers (611.8115)EACH39$950.00$982.00$1,099.75
92Cover plates temporary (611.8120.S)EACH60$350.00$292.00$393.00
93Salvaged inlet covers (611.9710)EACH58$150.00$337.00$337.00
94Pipe underdrain wrapped 6-inch (612.0406)LF370$30.00$45.00$45.00
95Barrier system grading shaping finishing (614.0010)EACH2$3,850.00$9,000.00$4,000.00
96Steel thrie beam bullnose terminal (614.0220)EACH2$14,500$12,500$12,500
97Steel thrie beam (614.0230)LF325$35.90$38.00$38.00
98Guardrail mow strip emulsified asphalt (614.0397)SY910$14.50$22.00$14.48
99MGS thrie beam transition (614.2500)LF192$94.50$96.00$96.00
100Maintenance and repair of haul roads (project) 01. 2040-23-70 (618.0100)EACH1$3,000.00$1.00$1.00
101Maintenance and repair of haul roads (project) 02. 2060-20-70 (618.0100)EACH1$3,000.00$1.00$1.00
102Mobilization (619.1000)EACH1$912,000$759,000$732,867
103Concrete median blunt nose (620.0200)SF78$16.50$20.00$21.70
104Concrete median sloped nose (620.0300)SF296$16.50$20.00$21.70
105Water (624.0100)MGAL2$1,900.00$500.00$142.00
106Topsoil (625.0100)SY576$6.50$5.95$5.95
107Silt fence (628.1504)LF114$5.00$2.05$2.05
108Silt fence maintenance (628.1520)LF114$0.01$0.00$0.01
109Silt fence heavy duty (628.1530.S)LF204$10.00$14.00$14.00
110Silt fence heavy duty maintenance (628.1535.S)LF204$1.00$2.25$2.25
111Mobilizations erosion control (628.1905)EACH40$1.00$50.00$50.00
112Mobilizations emergency erosion control (628.1910)EACH15$1.00$50.00$50.00
113Erosion mat urban class I type A (628.2006)SY127$5.00$1.25$1.25
114Inlet protection type A (628.7005)EACH3$150.00$105.00$105.00
115Inlet protection type B (628.7010)EACH229$54.00$50.00$50.00
116Inlet protection type C (628.7015)EACH111$56.00$55.00$55.00
117Inlet protection type D (628.7020)EACH271$120.00$85.00$85.00
118Fertilizer type B (629.0210)CWT39$70.00$80.00$80.00
119Seeding mixture no. 20 (630.0120)LB2$100.00$125.00$125.00
120Sod water (631.0300)MGAL0.10$1,000.00$150.00$150.00
121Sod lawn (631.1000)SY449$12.00$8.95$8.95
122Sod erosion control (631.1100)SY5$12.00$5.00$5.00
123Posts wood 4X6-inch X 18-FT (634.0618)EACH897$74.00$120.00$120.00
124Posts tubular steel 2X2-inch X 12- FT (634.0812)EACH1$150.00$225.00$225.00
125Signs type I reflective SH (637.1220)SF49$33.00$28.00$28.00
126Signs type II reflective H (637.2210)SF9,844.41$22.50$20.00$20.00
127Signs type II reflective H folding (637.2215)SF720.16$26.00$25.00$25.00
128Signs type II reflective F (637.2230)SF1,937$22.75$22.00$22.00
129Removing signs type II (638.2602)EACH1,350$20.00$25.00$25.00
130Removing small sign supports (638.3000)EACH880$25.00$25.00$25.00
131Field office type D (642.5401)EACH1$72,500$40,000$46,070
132Traffic control drums (643.0300)DAY518,970$0.05$0.05$0.05
133Traffic control barricades type III (643.0420)DAY57,220$0.35$0.35$0.35
134Traffic control flexible tubular marker posts (643.0500)EACH208$25.00$25.00$25.00
135Traffic control flexible tubular marker bases (643.0600)EACH208$5.00$5.00$5.00
136Traffic control warning lights type A (643.0705)DAY114,310$0.10$0.10$0.10
137Traffic control warning lights type C (643.0715)DAY75,380$0.10$0.10$0.10
138Traffic control connected arrow boards (643.0810)DAY5,031$15.00$15.00$15.00
139Traffic control signs (643.0900)DAY190,900$0.18$0.18$0.18
140Traffic control covering signs type II (643.0920)EACH68$30.00$30.00$30.00
141Traffic control signs fixed message (643.1000)SF151$12.50$12.50$12.50
142Traffic control signs PCMS (643.1050)DAY96$35.00$35.00$35.00
143Traffic control cones 42-inch (643.1070)DAY738,100$0.07$0.07$0.07
144Traffic control connected work zone start and end location markers (643.1220)DAY626$7.25$7.25$7.25
145Temporary marking line removable tape 4-inch (643.3150)LF6,040$0.90$0.90$0.90
146Temporary marking line paint 6- inch (643.3165)LF92,330$0.43$0.43$0.43
147Temporary marking line removable tape 6-inch (643.3180)LF87,578$1.25$1.25$1.25
148Temporary marking crosswalk paint 6-inch (643.3305)LF16,300$0.68$0.68$0.68
149Temporary marking crosswalk removable tape 6-inch (643.3350)LF2,345$1.25$1.25$1.25
150Temporary marking removable mask out tape 6-inch (643.3960)LF14,717$1.60$1.60$1.60
151Temporary marking removable mask out tape 12-inch (643.3990)LF53$4.50$4.50$4.50
152Traffic control (643.5000)EACH1$43,767$43,767$43,767
153Temporary pedestrian surface asphalt (644.1410)SF17,390$14.25$0.01$8.66
154Temporary pedestrian surface matting (644.1440)SF699$4.38$4.38$4.38
155Temporary pedestrian curb ramp (644.1601)DAY4,945$3.47$3.47$3.47
156Temporary pedestrian detectable warning field (644.1605)SF2,931$3.52$3.52$3.52
157Temporary pedestrian barricade (644.1810)LF40,435$2.17$0.01$2.17
158Temporary audible message devices (644.1900.S)DAY5,083$2.43$2.43$2.43
159Geotextile type HR (645.0120)SY60$10.00$10.00$6.34
160Geotextile type R (645.0130)SY10$15.00$19.00$5.84
161Marking line epoxy 4-inch (646.1020)LF5,262$0.36$0.36$0.75
162Marking line grooved black epoxy 6-inch (646.2025)LF23,410$0.75$0.75$1.25
163Marking line grooved wet ref epoxy 6-inch (646.2040)LF133,519$1.18$1.18$1.40
164Marking line epoxy 8-inch (646.3020)LF5,139$0.99$0.99$1.50
165Marking line grooved wet ref epoxy 10-inch (646.4040)LF35,604$2.78$2.78$2.80
166Marking arrow epoxy (646.5020)EACH180$214.18$214.18$230.00
167Marking word epoxy (646.5120)EACH76$286.04$286.04$255.00
168Marking stop line epoxy 18-inch (646.6120)LF2,168$12.78$12.78$13.00
169Marking diagonal epoxy 12-inch (646.7120)LF11,434$12.35$12.35$9.50
170Marking crosswalk epoxy transverse line 6-inch (646.7420)LF11,188$11.92$11.92$11.00
171Marking crosswalk epoxy block style 24-inch (646.7520)LF256$21.83$21.83$19.00
172Marking curb epoxy (646.8120)LF4,664$6.47$6.47$8.00
173Marking island nose epoxy (646.8220)EACH89$311.52$311.52$315.00
174Marking removal line water blasting 4-inch (646.9010)LF3,798$0.75$0.75$0.75
175Marking removal line water blasting 6-inch (646.9012)LF1,644$1.00$1.00$1.00
176Marking removal line grooved permanent tape 4-inch (646.9050)LF16,190$0.85$0.85$0.85
177Marking removal line water blasting 8-inch (646.9110)LF14$5.00$5.00$5.00
178Marking removal line water blasting wide (646.9210)LF214$5.00$5.00$5.00
179Marking removal special marking water blasting (646.9310)EACH78$83.00$83.00$83.00
180Construction staking storm sewer (650.4000)EACH78$90.91$90.00$90.00
181Construction staking curb gutter and curb & gutter (650.5500)LF8,759$1.01$1.00$1.00
182Construction staking resurfacing reference (650.8000)LF73,210$0.10$0.10$0.10
183Construction staking electrical installations (project) 01. 2040-23- 70 (650.8501)EACH1$5,050.51$5,000.00$5,000.00
184Construction staking electrical installations (project) 02. 2060-20- 70 (650.8501)EACH1$5,050.51$5,000.00$5,000.00
185Construction staking curb ramps (650.9000)EACH480$10.10$10.00$10.00
186Construction staking sidewalk (project) 01. 2040-23-70 (650.9500)EACH1$2,525.25$2,500.00$2,500.00
187Construction staking sidewalk (project) 02. 2060-20-70 (650.9500)EACH1$3,535.35$3,500.00$3,500.00
188Construction staking supplemental control (project) 01. 2040-23-70 (650.9911)EACH1$1,515.15$1,500.00$1,500.00
189Construction staking supplemental control (project) 02. 2060-20-70 (650.9911)EACH1$3,030.30$3,000.00$3,000.00
190Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF2,550$9.37$9.37$9.37
191Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF890$10.49$10.49$10.49
192Conduit special 2-inch (652.0605)LF820$18.79$18.79$18.79
193Conduit special 3-inch (652.0615)LF710$19.88$19.88$19.88
194Conduit loop detector (652.0800)LF17,234$7.53$7.53$7.53
195Pull boxes steel 24X36-inch (653.0135)EACH30$1,302.34$1,302.34$1,302.34
196Pull boxes steel 24X42-inch (653.0140)EACH16$1,325.67$1,325.67$1,325.67
197Removing pull boxes (653.0905)EACH21$178.04$178.04$178.04
198Concrete bases type 1 (654.0101)EACH15$939.57$939.57$939.57
199Concrete bases type 2 (654.0102)EACH3$1,275.54$1,275.54$1,275.54
200Concrete bases type 10 (654.0110)EACH4$4,795.17$4,795.17$4,795.17
201Concrete bases type 10-special (654.0120)EACH4$5,982.93$5,982.93$5,982.93
202Concrete control cabinet bases type 9 special (654.0217)EACH1$2,430.46$2,430.46$2,430.46
203Cable traffic signal 5-14 AWG (655.0230)LF946$2.03$2.03$2.03
204Cable traffic signal 7-14 AWG (655.0240)LF3,469$2.44$2.44$2.44
205Cable traffic signal 12-14 AWG (655.0260)LF3,980$3.85$3.85$3.85
206Cable type UF 2-12 AWG grounded (655.0305)LF860$1.64$1.64$1.64
207Electrical wire traffic signals 10 AWG (655.0515)LF5,115$1.32$1.32$1.32
208Electrical wire lighting 12 AWG (655.0610)LF745$1.08$1.08$1.08
209Loop detector lead in cable (655.0700)LF48,553$2.07$2.07$2.07
210Loop detector wire (655.0800)LF59,859$1.52$1.52$1.52
211Traffic signal evp detector cable (655.0900)LF2,565$1.34$1.34$1.34
212Electrical service meter breaker pedestal (location) 01. STH 100 & shepard (656.0201)EACH1$1,704.63$1,704.63$1,704.63
213Pedestal bases (657.0100)EACH15$354.94$354.94$354.94
214Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH3$719.75$719.75$719.75
215Poles type 3 (657.0310)EACH3$4,287.12$4,287.12$4,287.12
216Traffic signal standards aluminum 15-FT (657.0425)EACH5$908.37$908.37$908.37
217Traffic signal standards aluminum 10-FT (657.0430)EACH10$702.00$702.00$702.00
218Luminaire arms single member 4- inch clamp 6-FT (657.0609)EACH5$412.00$412.00$412.00
219Traffic signal face 3S 12-inch (658.0173)EACH21$819.00$819.00$819.00
220Traffic signal face 4S 12-inch (658.0174)EACH14$1,008.00$1,008.00$1,008.00
221Pedestrian signal face 16-inch (658.0416)EACH16$514.00$514.00$514.00
222Pedestrian push buttons (658.0500)EACH18$427.00$427.00$427.00
223Signal mounting hardware (location) 01. STH 100 & shepard (658.5070)EACH1$5,395.00$5,395.00$5,395.00
224Signal mounting hardware (location) 02. STH 38 & oakwood (658.5070)EACH1$3,995.00$3,995.00$3,995.00
225Luminaires utility LED C (659.1125)EACH6$346.00$346.00$346.00
226Lamp, ballast, LED, switch disposal by contractor (659.5000.S)EACH45$15.00$15.00$15.00
227Sawing asphalt (690.0150)LF4,720$1.40$2.00$2.00
228Sawing concrete (690.0250)LF25,443$2.30$4.00$2.00
229Incentive iri ride (740.0440)DOL52,670$1.00$1.00$1.00
230On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS7,000$5.00$5.00$5.00
231On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS9,600$5.00$5.00$5.00
232Special 01. inlet covers type 57 (SPV.0060)EACH9$845.00$1,109.00$1,109.00
233Special 02. clean inlets (SPV.0060)EACH49$185.00$476.00$476.00
234Special 03. repair inlets (SPV.0060)EACH179$300.00$448.00$448.00
235Special 04. connect underdrain (SPV.0060)EACH74$100.00$1,055.00$1,055.00
236Special 05. temporary bus stop (SPV.0060)EACH20$2,250.00$0.10$2,808.00
237Special 06. section corner monuments (SPV.0060)EACH13$500.00$1,000.00$1.00
238Special 07. adjusting water valve boxes (SPV.0060)EACH25$175.00$334.00$334.00
239Special 08. resetting apron endwall (SPV.0060)EACH2$1,500.00$1,593.00$1,593.00
240Special 09. tuck point storm sewer structure (SPV.0060)EACH9$350.00$618.00$537.00
241Special 10. adjusting cuc manhole covers (SPV.0060)EACH6$1,500.00$739.00$3,135.82
242Special 11. curb ramp grading, shaping, and finishing (SPV.0060)EACH161$1,135.50$1,515.00$1,062.50
243Special 12. moving (RRFB) system STH 38 at oak creek pkwy northbound (SPV.0060)EACH1$1,615.00$1,615.00$1,615.00
244Special 13. moving (RRFB) system STH 38 at oak creek pkwy northbound median back to back (SPV.0060)EACH1$1,615.00$1,615.00$1,615.00
245Special 14. moving (RRFB) system STH 38 at oak creek pkwy southbound (SPV.0060)EACH1$1,615.00$1,615.00$1,615.00
246Special 15. moving (RRFB) system STH 38 at groveland drive northbound east (SPV.0060)EACH1$2,570.00$2,570.00$2,570.00
247Special 16. moving (RRFB) system STH 38 at groveland DR NB east median back to back (SPV.0060)EACH1$1,615.00$1,615.00$1,615.00
248Special 17. moving (RRFB) system STH 38 northbound west (SPV.0060)EACH1$1,615.00$1,615.00$1,615.00
249Special 18. moving (RRFB) system STH 38 at groveland drive southbound west (SPV.0060)EACH1$1,615.00$1,615.00$1,615.00
250Special 19. moving (RRFB) system STH 38 at groveland drive southbound east (SPV.0060)EACH1$1,615.00$1,615.00$1,615.00
251Special 20. moving (RRFB) system STH 38 at groveland DR NB west median back to back (SPV.0060)EACH1$1,615.00$1,615.00$1,615.00
252Special 50. install type 9 pole (SPV.0060)EACH4$675.00$675.00$675.00
253Special 51. install type 9 special pole (SPV.0060)EACH3$675.00$675.00$675.00
254Special 52. install type 10 special pole (SPV.0060)EACH1$675.00$675.00$675.00
255Special 53. install monotube arms 20-FT (SPV.0060)EACH1$675.00$675.00$675.00
256Special 54. install monotube arms 25-FT (SPV.0060)EACH2$914.00$914.00$914.00
257Special 55. install monotube arms 30-FT (SPV.0060)EACH1$914.00$914.00$914.00
258Special 56. install monotube arms 35-FT special (SPV.0060)EACH1$914.00$914.00$914.00
259Special 57. install monotube arms 40-FT special (SPV.0060)EACH1$914.00$914.00$914.00
260Special 58. install monotube arms 45-FT special (SPV.0060)EACH2$967.00$967.00$967.00
261Special 59. install luminaire arms steel 15-FT (SPV.0060)EACH1$589.00$589.00$589.00
262Special 60. transport & install state furnished traffic signal cabinet STH 100 & shepard (SPV.0060)EACH1$1,833.00$1,833.00$1,833.00
263Special 61. transport traffic signal & intersection lighting materials STH 100 & shepard (SPV.0060)EACH1$832.00$832.00$832.00
264Special 62. transport traffic signal & intersection lighting materials STH 38 & oakwood (SPV.0060)EACH1$832.00$832.00$832.00
265Special 63. transport and install state furnished evp detector heads STH 100 & shepard (SPV.0060)EACH1$1,642.00$1,642.00$1,642.00
266Special 64. transport and install state furnished evp detector heads STH 38 & oakwood (SPV.0060)EACH1$1,642.00$1,642.00$1,642.00
267Special 65. modify traffic signals STH 38 & oakwood (SPV.0060)EACH1$1,886.00$1,886.00$1,886.00
268Special 66. transport and install state furnished observation camera STH 38 & STH 100 (SPV.0060)EACH1$994.00$994.00$994.00
269Special 67. transport and install state furnished observation camera STH 38 & puetz (SPV.0060)EACH1$993.96$993.96$993.96
270Special 68. transport and install state furnished observation camera STH 38 & drexel (SPV.0060)EACH1$993.96$993.96$993.96
271Special 69. transport and install state furnished observation camera STH 38 & rawson (SPV.0060)EACH1$993.96$993.96$993.96
272Special 70. transport and install state furnished observation camera STH 38 & college (SPV.0060)EACH1$993.96$993.96$993.96
273Special 01. sawing curb head (SPV.0090)LF349$26.00$25.00$25.00
274Special 02. ditching and shaping (SPV.0090)LF127$75.00$200.00$49.98
275Special 03. storm sewer pipe PVC SDR 35 8-inch (SPV.0090)LF10$160.00$479.00$479.00
276Special 04. storm sewer pipe PVC SDR 35 10-inch (SPV.0090)LF5$160.00$560.00$560.00
277Special 05. storm sewer pipe PVC SDR 35 12-inch (SPV.0090)LF5$185.00$557.00$557.00
278Special 01. remove riprap & regrade channel (SPV.0180)SY60$62.00$100.00$118.50
279Special 02. methacrylate flood seal (SPV.0180)SY954$24.81$24.81$21.71
280Special 03. reseal crushed aggregate slope paving special (SPV.0180)SY945$69.50$40.00$40.00
281Special 01. asphaltic repair (SPV.0195)TON158$265.00$270.00$270.00
WisDOT contract 20260915007: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy