WisDOT contract 20260915007 bid tabulation
2040-23-70. Let by Wisconsin DOT on September 15, 2026, Milwaukee. 3 bids received; low bid $14,368,201 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 15 SEP 2026
- Pay items
- 281
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $14,368,201 | Low |
| 2 | Zignego Company, Inc. | $14,728,429 | +3.0% |
| 3 | Lalonde Contractors Incorporated | $15,095,744 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Zignego Company, Inc. | 3. Lalonde Contractors Incorporated |
|---|---|---|---|---|---|---|
| 1 | CPM progress schedule (108.4400) | EACH | 1 | $14,280 | $1,000.00 | $14,280 |
| 2 | Debris containment over waterway (structure) 05. C-40-50 (203.0335) | EACH | 1 | $1,865.00 | $1,865.00 | $1,865.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 640 | $15.00 | $40.00 | $14.97 |
| 4 | Removing asphaltic surface (204.0110) | SY | 3,817 | $15.00 | $10.00 | $14.29 |
| 5 | Removing asphaltic surface butt joints (204.0115) | SY | 625 | $11.50 | $11.50 | $11.50 |
| 6 | Removing asphaltic surface milling (204.0120) | SY | 317,800 | $2.65 | $2.65 | $2.65 |
| 7 | Removing curb (204.0130) | LF | 177 | $10.00 | $30.00 | $15.30 |
| 8 | Removing curb & gutter (204.0150) | LF | 8,142 | $10.00 | $8.00 | $11.42 |
| 9 | Removing concrete sidewalk (204.0155) | SY | 4,690 | $12.00 | $8.00 | $14.46 |
| 10 | Removing guardrail (204.0165) | LF | 340 | $2.50 | $2.75 | $2.75 |
| 11 | Removing surface drains (204.0190) | EACH | 1 | $200.00 | $1,000.00 | $226.70 |
| 12 | Removing concrete bases (204.0195) | EACH | 26 | $270.00 | $500.00 | $270.00 |
| 13 | Removing inlets (204.0220) | EACH | 76 | $400.00 | $757.00 | $757.00 |
| 14 | Removing storm sewer (size) 01. 8- inch (204.0245) | LF | 10 | $22.00 | $102.00 | $102.00 |
| 15 | Removing storm sewer (size) 02. 10-inch (204.0245) | LF | 5 | $22.00 | $97.00 | $97.00 |
| 16 | Removing storm sewer (size) 03. 12-inch (204.0245) | LF | 380 | $22.00 | $22.00 | $22.00 |
| 17 | Removing storm sewer (size) 04. 15-inch (204.0245) | LF | 295 | $22.00 | $25.00 | $25.00 |
| 18 | Removing storm sewer (size) 05. 18-inch (204.0245) | LF | 25 | $27.00 | $58.00 | $58.00 |
| 19 | Removing storm sewer (size) 06. 24-inch (204.0245) | LF | 72 | $30.00 | $42.00 | $42.00 |
| 20 | Removing (item description) 01. removing traffic signals STH 100 & shepard (204.9060.S) | EACH | 1 | $6,485.00 | $6,485.00 | $6,485.00 |
| 21 | Removing (item description) 02. removing loop detector wire and lead-in cable STH 100 & shepard (204.9060.S) | EACH | 1 | $1,621.00 | $1,621.00 | $1,621.00 |
| 22 | Removing (item description) 03. traffic signals STH 38 & oakwood (204.9060.S) | EACH | 1 | $6,506.00 | $6,506.00 | $6,506.00 |
| 23 | Removing (item description) 04. loop detector wire and lead-in cable STH 38 & oakwood (204.9060.S) | EACH | 1 | $1,621.26 | $1,621.26 | $1,621.26 |
| 24 | Removing (item description) 05. traffic signals STH 38 & STH 100 (204.9060.S) | EACH | 1 | $1,642.47 | $1,642.47 | $1,642.47 |
| 25 | Removing (item description) 06. traffic signals STH 38 & centennial (204.9060.S) | EACH | 1 | $1,642.47 | $1,642.47 | $1,642.47 |
| 26 | Removing (item description) 07. traffic signals STH 38 & forest hill (204.9060.S) | EACH | 1 | $1,642.47 | $1,642.47 | $1,642.47 |
| 27 | Removing (item description) 08. traffic signals STH 38 & susan (204.9060.S) | EACH | 1 | $1,642.47 | $1,642.47 | $1,642.47 |
| 28 | Removing (item description) 09. traffic signals STH 38 & drexel (204.9060.S) | EACH | 1 | $1,642.47 | $1,642.47 | $1,642.47 |
| 29 | Removing (item description) 10. traffic signals STH 38 & rawson (204.9060.S) | EACH | 1 | $1,642.47 | $1,642.47 | $1,642.47 |
| 30 | Removing (item description) 11. traffic signals STH 38 & college (204.9060.S) | EACH | 1 | $1,642.47 | $1,642.47 | $1,642.47 |
| 31 | Removing (item description) 12. traffic signals STH 38 & STH 119 ramps (204.9060.S) | EACH | 1 | $993.96 | $993.96 | $993.96 |
| 32 | Removing (item description) 13. traffic signals STH 38 & grange (204.9060.S) | EACH | 1 | $1,642.47 | $1,642.47 | $1,642.47 |
| 33 | Prepare foundation for asphaltic paving (project) 01. 2040-23-70 (211.0101) | EACH | 1 | $4,750.00 | $4,750.00 | $4,750.00 |
| 34 | Prepare foundation for asphaltic paving (project) 02. 2060-20-70 (211.0101) | EACH | 1 | $24,650 | $24,650 | $24,650 |
| 35 | Finishing roadway (project) 01. 2040-23-70 (213.0100) | EACH | 1 | $3,300.00 | $1,000.00 | $3,132.00 |
| 36 | Finishing roadway (project) 02. 2060-20-70 (213.0100) | EACH | 1 | $6,600.00 | $1,000.00 | $5,220.00 |
| 37 | Base aggregate dense 3/4-inch (305.0110) | TON | 7 | $100.00 | $200.00 | $106.83 |
| 38 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 115 | $40.00 | $100.00 | $89.90 |
| 39 | Base aggregate open-graded (310.0110) | TON | 159 | $31.00 | $50.00 | $28.00 |
| 40 | Removing pavement for base patching (390.0100) | CY | 2,681 | $100.00 | $100.00 | $77.58 |
| 41 | Base patching concrete hes (390.0305) | CY | 2,681 | $225.00 | $341.00 | $346.72 |
| 42 | Base patching concrete shes (390.0405) | CY | 118 | $265.00 | $600.00 | $612.40 |
| 43 | Drilled tie bars (416.0610) | EACH | 4,042 | $15.00 | $12.00 | $14.75 |
| 44 | Drilled dowel bars (416.0620) | EACH | 4,069 | $30.00 | $22.00 | $18.69 |
| 45 | Concrete pavement repair (416.1710) | SY | 261 | $200.00 | $150.00 | $134.35 |
| 46 | Concrete pavement replacement (416.1720) | SY | 3,065 | $123.00 | $98.00 | $121.39 |
| 47 | HMA cold weather paving (450.4000) | TON | 12,660 | $1.00 | $1.00 | $1.00 |
| 48 | Tack coat (455.0605) | GAL | 44,609 | $2.30 | $2.30 | $2.30 |
| 49 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $1,700.00 | $1,700.00 | $1,700.00 |
| 50 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $13,750 | $13,750 | $13,750 |
| 51 | Incentive density HMA pavement (460.2000) | DOL | 5,780 | $1.00 | $1.00 | $1.00 |
| 52 | Incentive density PWL HMA pavement (460.2005) | DOL | 30,000 | $1.00 | $1.00 | $1.00 |
| 53 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 14,440 | $1.00 | $1.00 | $1.00 |
| 54 | Incentive air voids HMA pavement (460.2010) | DOL | 50,400 | $1.00 | $1.00 | $1.00 |
| 55 | HMA pavement 5 MT 58-28 H (460.6425) | TON | 59,290 | $84.00 | $84.65 | $84.65 |
| 56 | Asphaltic surface (465.0105) | TON | 910 | $103.00 | $103.00 | $103.00 |
| 57 | Asphaltic surface patching (465.0110) | TON | 956 | $103.00 | $103.00 | $103.00 |
| 58 | Asphaltic surface driveways and field entrances (465.0120) | TON | 15 | $211.50 | $211.50 | $211.50 |
| 59 | Asphaltic surface safety islands (465.0305) | TON | 9 | $270.00 | $270.00 | $270.00 |
| 60 | Cleaning and sealing cracks and joints with hot-applied sealant (492.2020.S) | MI | 2.34 | $20,450 | $19,500 | $19,500 |
| 61 | Concrete surface repair (509.1500) | SF | 70 | $645.00 | $645.00 | $645.00 |
| 62 | Concrete collars for pipe (520.8000) | EACH | 148 | $400.00 | $451.00 | $451.00 |
| 63 | Drilling shaft 36-inch (531.2036) | LF | 18 | $200.00 | $450.00 | $200.00 |
| 64 | Foundation single-shaft type TC-I (structure) 05. S-40-3124 (531.5310) | EACH | 1 | $8,000.00 | $12,500 | $8,000.00 |
| 65 | Truss cantilever 2-chord type I (structure) 05. S-40-3124 (532.5310) | EACH | 1 | $38,200 | $40,000 | $38,200 |
| 66 | Concrete curb type A (601.0105) | LF | 74 | $42.00 | $60.00 | $62.79 |
| 67 | Concrete curb & gutter 19-inch (601.0319) | LF | 388 | $42.00 | $60.00 | $66.11 |
| 68 | Concrete curb & gutter 31-inch (601.0331) | LF | 6,636 | $42.00 | $56.18 | $66.11 |
| 69 | Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413) | LF | 100 | $42.00 | $60.00 | $69.19 |
| 70 | Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551) | LF | 173 | $42.00 | $60.00 | $71.53 |
| 71 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 704 | $42.00 | $60.00 | $67.02 |
| 72 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 53 | $42.00 | $60.00 | $71.59 |
| 73 | Concrete curb pedestrian (601.0600) | LF | 1,588 | $50.00 | $60.00 | $61.29 |
| 74 | Concrete sidewalk 5-inch (602.0410) | SF | 41,704 | $8.00 | $11.10 | $13.22 |
| 75 | Curb ramp detectable warning field yellow (602.0505) | SF | 2,960 | $52.00 | $60.00 | $50.41 |
| 76 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 786 | $73.00 | $100.00 | $70.66 |
| 77 | Concrete surface drains (602.3010) | CY | 1 | $2,500.00 | $1,000.00 | $1,218.67 |
| 78 | Slope paving repair crushed aggregate (604.9010.S) | CY | 80 | $2.50 | $200.00 | $2.50 |
| 79 | Riprap medium (606.0200) | CY | 30 | $185.00 | $240.00 | $203.20 |
| 80 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 375 | $113.00 | $338.00 | $338.00 |
| 81 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 310 | $116.00 | $270.00 | $270.00 |
| 82 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 25 | $145.00 | $438.00 | $438.00 |
| 83 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 70 | $175.00 | $305.00 | $305.00 |
| 84 | Inlet covers type HM (611.0627) | EACH | 3 | $915.00 | $1,142.00 | $1,142.00 |
| 85 | Inlet covers type V (611.0654) | EACH | 7 | $860.00 | $1,199.00 | $1,199.00 |
| 86 | Inlet covers type X (611.0663) | EACH | 7 | $985.00 | $1,330.00 | $1,330.00 |
| 87 | Catch basins 4-FT diameter (611.1004) | EACH | 4 | $4,000.00 | $3,546.00 | $3,546.00 |
| 88 | Inlets 4-FT diameter (611.3004) | EACH | 28 | $3,500.00 | $2,432.00 | $2,432.00 |
| 89 | Inlets 2X2.5-FT (611.3225) | EACH | 43 | $2,700.00 | $2,402.00 | $2,402.00 |
| 90 | Adjusting manhole covers (611.8110) | EACH | 60 | $1,000.00 | $437.00 | $1,418.71 |
| 91 | Adjusting inlet covers (611.8115) | EACH | 39 | $950.00 | $982.00 | $1,099.75 |
| 92 | Cover plates temporary (611.8120.S) | EACH | 60 | $350.00 | $292.00 | $393.00 |
| 93 | Salvaged inlet covers (611.9710) | EACH | 58 | $150.00 | $337.00 | $337.00 |
| 94 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 370 | $30.00 | $45.00 | $45.00 |
| 95 | Barrier system grading shaping finishing (614.0010) | EACH | 2 | $3,850.00 | $9,000.00 | $4,000.00 |
| 96 | Steel thrie beam bullnose terminal (614.0220) | EACH | 2 | $14,500 | $12,500 | $12,500 |
| 97 | Steel thrie beam (614.0230) | LF | 325 | $35.90 | $38.00 | $38.00 |
| 98 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 910 | $14.50 | $22.00 | $14.48 |
| 99 | MGS thrie beam transition (614.2500) | LF | 192 | $94.50 | $96.00 | $96.00 |
| 100 | Maintenance and repair of haul roads (project) 01. 2040-23-70 (618.0100) | EACH | 1 | $3,000.00 | $1.00 | $1.00 |
| 101 | Maintenance and repair of haul roads (project) 02. 2060-20-70 (618.0100) | EACH | 1 | $3,000.00 | $1.00 | $1.00 |
| 102 | Mobilization (619.1000) | EACH | 1 | $912,000 | $759,000 | $732,867 |
| 103 | Concrete median blunt nose (620.0200) | SF | 78 | $16.50 | $20.00 | $21.70 |
| 104 | Concrete median sloped nose (620.0300) | SF | 296 | $16.50 | $20.00 | $21.70 |
| 105 | Water (624.0100) | MGAL | 2 | $1,900.00 | $500.00 | $142.00 |
| 106 | Topsoil (625.0100) | SY | 576 | $6.50 | $5.95 | $5.95 |
| 107 | Silt fence (628.1504) | LF | 114 | $5.00 | $2.05 | $2.05 |
| 108 | Silt fence maintenance (628.1520) | LF | 114 | $0.01 | $0.00 | $0.01 |
| 109 | Silt fence heavy duty (628.1530.S) | LF | 204 | $10.00 | $14.00 | $14.00 |
| 110 | Silt fence heavy duty maintenance (628.1535.S) | LF | 204 | $1.00 | $2.25 | $2.25 |
| 111 | Mobilizations erosion control (628.1905) | EACH | 40 | $1.00 | $50.00 | $50.00 |
| 112 | Mobilizations emergency erosion control (628.1910) | EACH | 15 | $1.00 | $50.00 | $50.00 |
| 113 | Erosion mat urban class I type A (628.2006) | SY | 127 | $5.00 | $1.25 | $1.25 |
| 114 | Inlet protection type A (628.7005) | EACH | 3 | $150.00 | $105.00 | $105.00 |
| 115 | Inlet protection type B (628.7010) | EACH | 229 | $54.00 | $50.00 | $50.00 |
| 116 | Inlet protection type C (628.7015) | EACH | 111 | $56.00 | $55.00 | $55.00 |
| 117 | Inlet protection type D (628.7020) | EACH | 271 | $120.00 | $85.00 | $85.00 |
| 118 | Fertilizer type B (629.0210) | CWT | 39 | $70.00 | $80.00 | $80.00 |
| 119 | Seeding mixture no. 20 (630.0120) | LB | 2 | $100.00 | $125.00 | $125.00 |
| 120 | Sod water (631.0300) | MGAL | 0.10 | $1,000.00 | $150.00 | $150.00 |
| 121 | Sod lawn (631.1000) | SY | 449 | $12.00 | $8.95 | $8.95 |
| 122 | Sod erosion control (631.1100) | SY | 5 | $12.00 | $5.00 | $5.00 |
| 123 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 897 | $74.00 | $120.00 | $120.00 |
| 124 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 1 | $150.00 | $225.00 | $225.00 |
| 125 | Signs type I reflective SH (637.1220) | SF | 49 | $33.00 | $28.00 | $28.00 |
| 126 | Signs type II reflective H (637.2210) | SF | 9,844.41 | $22.50 | $20.00 | $20.00 |
| 127 | Signs type II reflective H folding (637.2215) | SF | 720.16 | $26.00 | $25.00 | $25.00 |
| 128 | Signs type II reflective F (637.2230) | SF | 1,937 | $22.75 | $22.00 | $22.00 |
| 129 | Removing signs type II (638.2602) | EACH | 1,350 | $20.00 | $25.00 | $25.00 |
| 130 | Removing small sign supports (638.3000) | EACH | 880 | $25.00 | $25.00 | $25.00 |
| 131 | Field office type D (642.5401) | EACH | 1 | $72,500 | $40,000 | $46,070 |
| 132 | Traffic control drums (643.0300) | DAY | 518,970 | $0.05 | $0.05 | $0.05 |
| 133 | Traffic control barricades type III (643.0420) | DAY | 57,220 | $0.35 | $0.35 | $0.35 |
| 134 | Traffic control flexible tubular marker posts (643.0500) | EACH | 208 | $25.00 | $25.00 | $25.00 |
| 135 | Traffic control flexible tubular marker bases (643.0600) | EACH | 208 | $5.00 | $5.00 | $5.00 |
| 136 | Traffic control warning lights type A (643.0705) | DAY | 114,310 | $0.10 | $0.10 | $0.10 |
| 137 | Traffic control warning lights type C (643.0715) | DAY | 75,380 | $0.10 | $0.10 | $0.10 |
| 138 | Traffic control connected arrow boards (643.0810) | DAY | 5,031 | $15.00 | $15.00 | $15.00 |
| 139 | Traffic control signs (643.0900) | DAY | 190,900 | $0.18 | $0.18 | $0.18 |
| 140 | Traffic control covering signs type II (643.0920) | EACH | 68 | $30.00 | $30.00 | $30.00 |
| 141 | Traffic control signs fixed message (643.1000) | SF | 151 | $12.50 | $12.50 | $12.50 |
| 142 | Traffic control signs PCMS (643.1050) | DAY | 96 | $35.00 | $35.00 | $35.00 |
| 143 | Traffic control cones 42-inch (643.1070) | DAY | 738,100 | $0.07 | $0.07 | $0.07 |
| 144 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 626 | $7.25 | $7.25 | $7.25 |
| 145 | Temporary marking line removable tape 4-inch (643.3150) | LF | 6,040 | $0.90 | $0.90 | $0.90 |
| 146 | Temporary marking line paint 6- inch (643.3165) | LF | 92,330 | $0.43 | $0.43 | $0.43 |
| 147 | Temporary marking line removable tape 6-inch (643.3180) | LF | 87,578 | $1.25 | $1.25 | $1.25 |
| 148 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 16,300 | $0.68 | $0.68 | $0.68 |
| 149 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 2,345 | $1.25 | $1.25 | $1.25 |
| 150 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 14,717 | $1.60 | $1.60 | $1.60 |
| 151 | Temporary marking removable mask out tape 12-inch (643.3990) | LF | 53 | $4.50 | $4.50 | $4.50 |
| 152 | Traffic control (643.5000) | EACH | 1 | $43,767 | $43,767 | $43,767 |
| 153 | Temporary pedestrian surface asphalt (644.1410) | SF | 17,390 | $14.25 | $0.01 | $8.66 |
| 154 | Temporary pedestrian surface matting (644.1440) | SF | 699 | $4.38 | $4.38 | $4.38 |
| 155 | Temporary pedestrian curb ramp (644.1601) | DAY | 4,945 | $3.47 | $3.47 | $3.47 |
| 156 | Temporary pedestrian detectable warning field (644.1605) | SF | 2,931 | $3.52 | $3.52 | $3.52 |
| 157 | Temporary pedestrian barricade (644.1810) | LF | 40,435 | $2.17 | $0.01 | $2.17 |
| 158 | Temporary audible message devices (644.1900.S) | DAY | 5,083 | $2.43 | $2.43 | $2.43 |
| 159 | Geotextile type HR (645.0120) | SY | 60 | $10.00 | $10.00 | $6.34 |
| 160 | Geotextile type R (645.0130) | SY | 10 | $15.00 | $19.00 | $5.84 |
| 161 | Marking line epoxy 4-inch (646.1020) | LF | 5,262 | $0.36 | $0.36 | $0.75 |
| 162 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 23,410 | $0.75 | $0.75 | $1.25 |
| 163 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 133,519 | $1.18 | $1.18 | $1.40 |
| 164 | Marking line epoxy 8-inch (646.3020) | LF | 5,139 | $0.99 | $0.99 | $1.50 |
| 165 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 35,604 | $2.78 | $2.78 | $2.80 |
| 166 | Marking arrow epoxy (646.5020) | EACH | 180 | $214.18 | $214.18 | $230.00 |
| 167 | Marking word epoxy (646.5120) | EACH | 76 | $286.04 | $286.04 | $255.00 |
| 168 | Marking stop line epoxy 18-inch (646.6120) | LF | 2,168 | $12.78 | $12.78 | $13.00 |
| 169 | Marking diagonal epoxy 12-inch (646.7120) | LF | 11,434 | $12.35 | $12.35 | $9.50 |
| 170 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 11,188 | $11.92 | $11.92 | $11.00 |
| 171 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 256 | $21.83 | $21.83 | $19.00 |
| 172 | Marking curb epoxy (646.8120) | LF | 4,664 | $6.47 | $6.47 | $8.00 |
| 173 | Marking island nose epoxy (646.8220) | EACH | 89 | $311.52 | $311.52 | $315.00 |
| 174 | Marking removal line water blasting 4-inch (646.9010) | LF | 3,798 | $0.75 | $0.75 | $0.75 |
| 175 | Marking removal line water blasting 6-inch (646.9012) | LF | 1,644 | $1.00 | $1.00 | $1.00 |
| 176 | Marking removal line grooved permanent tape 4-inch (646.9050) | LF | 16,190 | $0.85 | $0.85 | $0.85 |
| 177 | Marking removal line water blasting 8-inch (646.9110) | LF | 14 | $5.00 | $5.00 | $5.00 |
| 178 | Marking removal line water blasting wide (646.9210) | LF | 214 | $5.00 | $5.00 | $5.00 |
| 179 | Marking removal special marking water blasting (646.9310) | EACH | 78 | $83.00 | $83.00 | $83.00 |
| 180 | Construction staking storm sewer (650.4000) | EACH | 78 | $90.91 | $90.00 | $90.00 |
| 181 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 8,759 | $1.01 | $1.00 | $1.00 |
| 182 | Construction staking resurfacing reference (650.8000) | LF | 73,210 | $0.10 | $0.10 | $0.10 |
| 183 | Construction staking electrical installations (project) 01. 2040-23- 70 (650.8501) | EACH | 1 | $5,050.51 | $5,000.00 | $5,000.00 |
| 184 | Construction staking electrical installations (project) 02. 2060-20- 70 (650.8501) | EACH | 1 | $5,050.51 | $5,000.00 | $5,000.00 |
| 185 | Construction staking curb ramps (650.9000) | EACH | 480 | $10.10 | $10.00 | $10.00 |
| 186 | Construction staking sidewalk (project) 01. 2040-23-70 (650.9500) | EACH | 1 | $2,525.25 | $2,500.00 | $2,500.00 |
| 187 | Construction staking sidewalk (project) 02. 2060-20-70 (650.9500) | EACH | 1 | $3,535.35 | $3,500.00 | $3,500.00 |
| 188 | Construction staking supplemental control (project) 01. 2040-23-70 (650.9911) | EACH | 1 | $1,515.15 | $1,500.00 | $1,500.00 |
| 189 | Construction staking supplemental control (project) 02. 2060-20-70 (650.9911) | EACH | 1 | $3,030.30 | $3,000.00 | $3,000.00 |
| 190 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 2,550 | $9.37 | $9.37 | $9.37 |
| 191 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 890 | $10.49 | $10.49 | $10.49 |
| 192 | Conduit special 2-inch (652.0605) | LF | 820 | $18.79 | $18.79 | $18.79 |
| 193 | Conduit special 3-inch (652.0615) | LF | 710 | $19.88 | $19.88 | $19.88 |
| 194 | Conduit loop detector (652.0800) | LF | 17,234 | $7.53 | $7.53 | $7.53 |
| 195 | Pull boxes steel 24X36-inch (653.0135) | EACH | 30 | $1,302.34 | $1,302.34 | $1,302.34 |
| 196 | Pull boxes steel 24X42-inch (653.0140) | EACH | 16 | $1,325.67 | $1,325.67 | $1,325.67 |
| 197 | Removing pull boxes (653.0905) | EACH | 21 | $178.04 | $178.04 | $178.04 |
| 198 | Concrete bases type 1 (654.0101) | EACH | 15 | $939.57 | $939.57 | $939.57 |
| 199 | Concrete bases type 2 (654.0102) | EACH | 3 | $1,275.54 | $1,275.54 | $1,275.54 |
| 200 | Concrete bases type 10 (654.0110) | EACH | 4 | $4,795.17 | $4,795.17 | $4,795.17 |
| 201 | Concrete bases type 10-special (654.0120) | EACH | 4 | $5,982.93 | $5,982.93 | $5,982.93 |
| 202 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,430.46 | $2,430.46 | $2,430.46 |
| 203 | Cable traffic signal 5-14 AWG (655.0230) | LF | 946 | $2.03 | $2.03 | $2.03 |
| 204 | Cable traffic signal 7-14 AWG (655.0240) | LF | 3,469 | $2.44 | $2.44 | $2.44 |
| 205 | Cable traffic signal 12-14 AWG (655.0260) | LF | 3,980 | $3.85 | $3.85 | $3.85 |
| 206 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 860 | $1.64 | $1.64 | $1.64 |
| 207 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 5,115 | $1.32 | $1.32 | $1.32 |
| 208 | Electrical wire lighting 12 AWG (655.0610) | LF | 745 | $1.08 | $1.08 | $1.08 |
| 209 | Loop detector lead in cable (655.0700) | LF | 48,553 | $2.07 | $2.07 | $2.07 |
| 210 | Loop detector wire (655.0800) | LF | 59,859 | $1.52 | $1.52 | $1.52 |
| 211 | Traffic signal evp detector cable (655.0900) | LF | 2,565 | $1.34 | $1.34 | $1.34 |
| 212 | Electrical service meter breaker pedestal (location) 01. STH 100 & shepard (656.0201) | EACH | 1 | $1,704.63 | $1,704.63 | $1,704.63 |
| 213 | Pedestal bases (657.0100) | EACH | 15 | $354.94 | $354.94 | $354.94 |
| 214 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 3 | $719.75 | $719.75 | $719.75 |
| 215 | Poles type 3 (657.0310) | EACH | 3 | $4,287.12 | $4,287.12 | $4,287.12 |
| 216 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 5 | $908.37 | $908.37 | $908.37 |
| 217 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 10 | $702.00 | $702.00 | $702.00 |
| 218 | Luminaire arms single member 4- inch clamp 6-FT (657.0609) | EACH | 5 | $412.00 | $412.00 | $412.00 |
| 219 | Traffic signal face 3S 12-inch (658.0173) | EACH | 21 | $819.00 | $819.00 | $819.00 |
| 220 | Traffic signal face 4S 12-inch (658.0174) | EACH | 14 | $1,008.00 | $1,008.00 | $1,008.00 |
| 221 | Pedestrian signal face 16-inch (658.0416) | EACH | 16 | $514.00 | $514.00 | $514.00 |
| 222 | Pedestrian push buttons (658.0500) | EACH | 18 | $427.00 | $427.00 | $427.00 |
| 223 | Signal mounting hardware (location) 01. STH 100 & shepard (658.5070) | EACH | 1 | $5,395.00 | $5,395.00 | $5,395.00 |
| 224 | Signal mounting hardware (location) 02. STH 38 & oakwood (658.5070) | EACH | 1 | $3,995.00 | $3,995.00 | $3,995.00 |
| 225 | Luminaires utility LED C (659.1125) | EACH | 6 | $346.00 | $346.00 | $346.00 |
| 226 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 45 | $15.00 | $15.00 | $15.00 |
| 227 | Sawing asphalt (690.0150) | LF | 4,720 | $1.40 | $2.00 | $2.00 |
| 228 | Sawing concrete (690.0250) | LF | 25,443 | $2.30 | $4.00 | $2.00 |
| 229 | Incentive iri ride (740.0440) | DOL | 52,670 | $1.00 | $1.00 | $1.00 |
| 230 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 7,000 | $5.00 | $5.00 | $5.00 |
| 231 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 9,600 | $5.00 | $5.00 | $5.00 |
| 232 | Special 01. inlet covers type 57 (SPV.0060) | EACH | 9 | $845.00 | $1,109.00 | $1,109.00 |
| 233 | Special 02. clean inlets (SPV.0060) | EACH | 49 | $185.00 | $476.00 | $476.00 |
| 234 | Special 03. repair inlets (SPV.0060) | EACH | 179 | $300.00 | $448.00 | $448.00 |
| 235 | Special 04. connect underdrain (SPV.0060) | EACH | 74 | $100.00 | $1,055.00 | $1,055.00 |
| 236 | Special 05. temporary bus stop (SPV.0060) | EACH | 20 | $2,250.00 | $0.10 | $2,808.00 |
| 237 | Special 06. section corner monuments (SPV.0060) | EACH | 13 | $500.00 | $1,000.00 | $1.00 |
| 238 | Special 07. adjusting water valve boxes (SPV.0060) | EACH | 25 | $175.00 | $334.00 | $334.00 |
| 239 | Special 08. resetting apron endwall (SPV.0060) | EACH | 2 | $1,500.00 | $1,593.00 | $1,593.00 |
| 240 | Special 09. tuck point storm sewer structure (SPV.0060) | EACH | 9 | $350.00 | $618.00 | $537.00 |
| 241 | Special 10. adjusting cuc manhole covers (SPV.0060) | EACH | 6 | $1,500.00 | $739.00 | $3,135.82 |
| 242 | Special 11. curb ramp grading, shaping, and finishing (SPV.0060) | EACH | 161 | $1,135.50 | $1,515.00 | $1,062.50 |
| 243 | Special 12. moving (RRFB) system STH 38 at oak creek pkwy northbound (SPV.0060) | EACH | 1 | $1,615.00 | $1,615.00 | $1,615.00 |
| 244 | Special 13. moving (RRFB) system STH 38 at oak creek pkwy northbound median back to back (SPV.0060) | EACH | 1 | $1,615.00 | $1,615.00 | $1,615.00 |
| 245 | Special 14. moving (RRFB) system STH 38 at oak creek pkwy southbound (SPV.0060) | EACH | 1 | $1,615.00 | $1,615.00 | $1,615.00 |
| 246 | Special 15. moving (RRFB) system STH 38 at groveland drive northbound east (SPV.0060) | EACH | 1 | $2,570.00 | $2,570.00 | $2,570.00 |
| 247 | Special 16. moving (RRFB) system STH 38 at groveland DR NB east median back to back (SPV.0060) | EACH | 1 | $1,615.00 | $1,615.00 | $1,615.00 |
| 248 | Special 17. moving (RRFB) system STH 38 northbound west (SPV.0060) | EACH | 1 | $1,615.00 | $1,615.00 | $1,615.00 |
| 249 | Special 18. moving (RRFB) system STH 38 at groveland drive southbound west (SPV.0060) | EACH | 1 | $1,615.00 | $1,615.00 | $1,615.00 |
| 250 | Special 19. moving (RRFB) system STH 38 at groveland drive southbound east (SPV.0060) | EACH | 1 | $1,615.00 | $1,615.00 | $1,615.00 |
| 251 | Special 20. moving (RRFB) system STH 38 at groveland DR NB west median back to back (SPV.0060) | EACH | 1 | $1,615.00 | $1,615.00 | $1,615.00 |
| 252 | Special 50. install type 9 pole (SPV.0060) | EACH | 4 | $675.00 | $675.00 | $675.00 |
| 253 | Special 51. install type 9 special pole (SPV.0060) | EACH | 3 | $675.00 | $675.00 | $675.00 |
| 254 | Special 52. install type 10 special pole (SPV.0060) | EACH | 1 | $675.00 | $675.00 | $675.00 |
| 255 | Special 53. install monotube arms 20-FT (SPV.0060) | EACH | 1 | $675.00 | $675.00 | $675.00 |
| 256 | Special 54. install monotube arms 25-FT (SPV.0060) | EACH | 2 | $914.00 | $914.00 | $914.00 |
| 257 | Special 55. install monotube arms 30-FT (SPV.0060) | EACH | 1 | $914.00 | $914.00 | $914.00 |
| 258 | Special 56. install monotube arms 35-FT special (SPV.0060) | EACH | 1 | $914.00 | $914.00 | $914.00 |
| 259 | Special 57. install monotube arms 40-FT special (SPV.0060) | EACH | 1 | $914.00 | $914.00 | $914.00 |
| 260 | Special 58. install monotube arms 45-FT special (SPV.0060) | EACH | 2 | $967.00 | $967.00 | $967.00 |
| 261 | Special 59. install luminaire arms steel 15-FT (SPV.0060) | EACH | 1 | $589.00 | $589.00 | $589.00 |
| 262 | Special 60. transport & install state furnished traffic signal cabinet STH 100 & shepard (SPV.0060) | EACH | 1 | $1,833.00 | $1,833.00 | $1,833.00 |
| 263 | Special 61. transport traffic signal & intersection lighting materials STH 100 & shepard (SPV.0060) | EACH | 1 | $832.00 | $832.00 | $832.00 |
| 264 | Special 62. transport traffic signal & intersection lighting materials STH 38 & oakwood (SPV.0060) | EACH | 1 | $832.00 | $832.00 | $832.00 |
| 265 | Special 63. transport and install state furnished evp detector heads STH 100 & shepard (SPV.0060) | EACH | 1 | $1,642.00 | $1,642.00 | $1,642.00 |
| 266 | Special 64. transport and install state furnished evp detector heads STH 38 & oakwood (SPV.0060) | EACH | 1 | $1,642.00 | $1,642.00 | $1,642.00 |
| 267 | Special 65. modify traffic signals STH 38 & oakwood (SPV.0060) | EACH | 1 | $1,886.00 | $1,886.00 | $1,886.00 |
| 268 | Special 66. transport and install state furnished observation camera STH 38 & STH 100 (SPV.0060) | EACH | 1 | $994.00 | $994.00 | $994.00 |
| 269 | Special 67. transport and install state furnished observation camera STH 38 & puetz (SPV.0060) | EACH | 1 | $993.96 | $993.96 | $993.96 |
| 270 | Special 68. transport and install state furnished observation camera STH 38 & drexel (SPV.0060) | EACH | 1 | $993.96 | $993.96 | $993.96 |
| 271 | Special 69. transport and install state furnished observation camera STH 38 & rawson (SPV.0060) | EACH | 1 | $993.96 | $993.96 | $993.96 |
| 272 | Special 70. transport and install state furnished observation camera STH 38 & college (SPV.0060) | EACH | 1 | $993.96 | $993.96 | $993.96 |
| 273 | Special 01. sawing curb head (SPV.0090) | LF | 349 | $26.00 | $25.00 | $25.00 |
| 274 | Special 02. ditching and shaping (SPV.0090) | LF | 127 | $75.00 | $200.00 | $49.98 |
| 275 | Special 03. storm sewer pipe PVC SDR 35 8-inch (SPV.0090) | LF | 10 | $160.00 | $479.00 | $479.00 |
| 276 | Special 04. storm sewer pipe PVC SDR 35 10-inch (SPV.0090) | LF | 5 | $160.00 | $560.00 | $560.00 |
| 277 | Special 05. storm sewer pipe PVC SDR 35 12-inch (SPV.0090) | LF | 5 | $185.00 | $557.00 | $557.00 |
| 278 | Special 01. remove riprap & regrade channel (SPV.0180) | SY | 60 | $62.00 | $100.00 | $118.50 |
| 279 | Special 02. methacrylate flood seal (SPV.0180) | SY | 954 | $24.81 | $24.81 | $21.71 |
| 280 | Special 03. reseal crushed aggregate slope paving special (SPV.0180) | SY | 945 | $69.50 | $40.00 | $40.00 |
| 281 | Special 01. asphaltic repair (SPV.0195) | TON | 158 | $265.00 | $270.00 | $270.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.