WisDOT contract 20261110017 bid tabulation
3170-09-70. Let by Wisconsin DOT on November 10, 2026, Walworth. 5 bids received; low bid $18,813,968 by James Peterson Sons, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 NOV 2026
- Pay items
- 452
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | James Peterson Sons, Inc. | $18,813,968 | Low |
| 2 | Rock Road Companies, Inc. | $18,828,667 | 0.0% |
| 3 | Integrity Grading and Excavating, Inc. | $18,916,329 | +1.0% |
| 4 | Payne and Dolan, Inc | $19,149,938 | +2.0% |
| 5 | Hoffman Construction Company | $20,244,628 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. James Peterson Sons, Inc. | 2. Rock Road Companies, Inc. | 3. Integrity Grading and Excavating, Inc. | 4. Payne and Dolan, Inc | 5. Hoffman Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 29 | $1,240.00 | $1,240.00 | $1,240.00 | $1,240.00 | $1,240.00 |
| 2 | Clearing (201.0120) | ID | 72 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 3 | Grubbing (201.0205) | STA | 29 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 |
| 4 | Grubbing (201.0220) | ID | 72 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 5 | Removing small pipe culverts (203.0100) | EACH | 2 | $504.00 | $413.93 | $617.23 | $504.00 | $1,000.00 |
| 6 | Removing concrete pavement (204.0100) | SY | 36,265 | $5.06 | $0.01 | $4.00 | $5.06 | $1.50 |
| 7 | Removing asphaltic surface (204.0110) | SY | 1,696 | $6.76 | $4.71 | $3.49 | $6.76 | $12.00 |
| 8 | Removing asphaltic surface butt joints (204.0115) | SY | 205 | $0.01 | $11.82 | $2.00 | $0.01 | $0.01 |
| 9 | Removing asphaltic surface milling (204.0120) | SY | 58,215 | $4.97 | $5.76 | $3.46 | $5.94 | $4.97 |
| 10 | Removing curb (204.0130) | LF | 250 | $6.50 | $13.98 | $9.67 | $6.50 | $10.00 |
| 11 | Removing curb & gutter (204.0150) | LF | 3,895 | $6.00 | $11.18 | $9.84 | $6.00 | $10.00 |
| 12 | Removing concrete sidewalk (204.0155) | SY | 4,320 | $10.55 | $18.64 | $4.98 | $10.55 | $10.00 |
| 13 | Removing guardrail (204.0165) | LF | 458 | $2.00 | $2.00 | $2.25 | $4.00 | $2.00 |
| 14 | Removing surface drains (204.0190) | EACH | 1 | $500.00 | $482.22 | $737.45 | $500.00 | $1,000.00 |
| 15 | Removing concrete bases (204.0195) | EACH | 100 | $350.00 | $293.24 | $285.04 | $293.24 | $293.24 |
| 16 | Removing inlets (204.0220) | EACH | 11 | $500.00 | $496.72 | $1,599.42 | $500.00 | $400.00 |
| 17 | Removing storm sewer (size) 010. 10-inch (204.0245) | LF | 30 | $15.00 | $14.10 | $32.91 | $15.00 | $13.00 |
| 18 | Removing storm sewer (size) 012. 12-inch (204.0245) | LF | 170 | $15.00 | $14.10 | $28.23 | $15.00 | $13.00 |
| 19 | Removing storm sewer (size) 015. 15-inch (204.0245) | LF | 130 | $15.00 | $14.10 | $29.01 | $15.00 | $13.00 |
| 20 | Removing storm sewer (size) 018. 18-inch (204.0245) | LF | 70 | $15.00 | $14.10 | $28.77 | $15.00 | $13.00 |
| 21 | Removing storm sewer (size) 024. 24-inch (204.0245) | LF | 25 | $15.00 | $14.10 | $34.36 | $15.00 | $13.00 |
| 22 | Removing ancillary structure (structure) 001. S-64-0203 (204.0246) | EACH | 1 | $4,000.00 | $4,000.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 23 | Abandoning inlets (204.0260) | EACH | 1 | $500.00 | $496.72 | $500.00 | $500.00 | $2,200.00 |
| 24 | Sealing pipes (204.0280) | EACH | 1 | $500.00 | $947.13 | $974.51 | $500.00 | $1,000.00 |
| 25 | Abandoning sewer (204.0291.S) | CY | 5 | $1,000.00 | $236.75 | $500.00 | $1,000.00 | $600.00 |
| 26 | Removing (item description) 001. overhead sign support (204.9060.S) | EACH | 6 | $4,000.00 | $4,000.00 | $1,500.00 | $1,500.00 | $4,000.00 |
| 27 | Removing (item description) 002. apron endwalls (204.9060.S) | EACH | 1 | $500.00 | $496.72 | $770.06 | $500.00 | $400.00 |
| 28 | Removing (item description) 601. traffic signals STH 50 & cook ST (204.9060.S) | EACH | 1 | $3,925.43 | $3,925.43 | $3,925.43 | $3,925.43 | $3,925.43 |
| 29 | Removing (item description) 602. traffic signals STH 50 & broad ST (204.9060.S) | EACH | 1 | $3,925.43 | $3,925.43 | $3,925.43 | $3,925.43 | $3,925.43 |
| 30 | Removing (item description) 603. traffic signals STH 50 & center ST (204.9060.S) | EACH | 1 | $3,925.43 | $3,925.43 | $3,925.43 | $3,925.43 | $3,925.43 |
| 31 | Removing (item description) 604. traffic signals STH 50 & wells ST (204.9060.S) | EACH | 1 | $3,925.43 | $3,925.43 | $3,925.43 | $3,925.43 | $3,925.43 |
| 32 | Removing (item description) 605. traffic signals STH 50 & edwards BLVD (204.9060.S) | EACH | 1 | $3,925.43 | $3,925.43 | $3,925.43 | $3,925.43 | $3,925.43 |
| 33 | Removing (item description) 606. traffic signals STH 50 & ush 12 SB ramp (204.9060.S) | EACH | 1 | $3,925.43 | $3,925.43 | $3,925.43 | $3,925.43 | $3,925.43 |
| 34 | Removing (item description) 607. loop detector wire & lead-in cable STH 50 & wells ST (204.9060.S) | EACH | 1 | $1,308.48 | $1,308.48 | $1,308.48 | $1,308.48 | $1,308.48 |
| 35 | Removing (item description) 608. loop detector wire & lead-in cable STH 50 & edwards BLVD (204.9060.S) | EACH | 1 | $1,308.48 | $1,308.48 | $1,308.48 | $1,308.48 | $1,308.48 |
| 36 | Removing (item description) 609. loop detector wire & lead-in cable STH 50 & ush 12 SB ramp (204.9060.S) | EACH | 1 | $1,308.48 | $1,308.48 | $1,308.48 | $1,308.48 | $1,308.48 |
| 37 | Excavation common (205.0100) | CY | 41,305 | $25.35 | $24.64 | $27.93 | $25.35 | $30.00 |
| 38 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 72 | $25.00 | $71.79 | $386.15 | $26.72 | $200.00 |
| 39 | Finishing roadway (project) 001. 3170-09-70 (213.0100) | EACH | 1 | $6,000.00 | $5,615.88 | $500.00 | $4,039.22 | $100.00 |
| 40 | Finishing roadway (project) 002. 3170-09-71 (213.0100) | EACH | 1 | $6,000.00 | $5,615.88 | $500.00 | $4,180.49 | $100.00 |
| 41 | Base aggregate dense 3/4-inch (305.0110) | TON | 565 | $71.45 | $42.08 | $48.19 | $71.45 | $60.00 |
| 42 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 32,112 | $20.66 | $20.80 | $27.10 | $20.66 | $32.00 |
| 43 | Base aggregate open-graded (310.0110) | TON | 115 | $37.86 | $18.16 | $29.32 | $37.86 | $45.00 |
| 44 | Pit run (313.0110) | TON | 34,318 | $17.26 | $19.35 | $21.75 | $17.26 | $30.00 |
| 45 | QMP base aggregate dense 1 1/4- inch compaction (371.2000.S) | EACH | 16 | $861.25 | $500.00 | $679.84 | $861.25 | $1,200.00 |
| 46 | Drilled tie bars (416.0610) | EACH | 174 | $15.00 | $15.00 | $15.00 | $7.67 | $15.00 |
| 47 | HMA cold weather paving (450.4000) | TON | 1,000 | $3.00 | $4.00 | $4.00 | $3.00 | $3.00 |
| 48 | Tack coat (455.0605) | GAL | 13,015 | $2.19 | $3.40 | $3.40 | $2.51 | $2.19 |
| 49 | Incentive density HMA pavement (460.2000) | DOL | 16,170 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 50 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 16,445 | $93.12 | $88.00 | $88.00 | $104.57 | $93.12 |
| 51 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 9,333 | $106.20 | $99.00 | $99.00 | $122.05 | $106.20 |
| 52 | Asphaltic surface (465.0105) | TON | 1,055 | $149.43 | $140.00 | $140.00 | $170.40 | $149.43 |
| 53 | Asphaltic surface driveways and field entrances (465.0120) | TON | 125 | $216.89 | $157.00 | $157.00 | $249.20 | $216.89 |
| 54 | Asphaltic surface temporary (465.0125) | TON | 500 | $99.47 | $114.00 | $114.00 | $114.28 | $99.47 |
| 55 | Cold patch (495.1000.S) | TON | 200 | $105.50 | $100.00 | $250.00 | $200.98 | $0.01 |
| 56 | Concrete collars for pipe (520.8000) | EACH | 7 | $754.70 | $671.35 | $1,573.36 | $754.70 | $800.00 |
| 57 | Culvert pipe reinforced concrete class III 12-inch (522.0112) | LF | 51 | $92.90 | $124.47 | $94.53 | $92.90 | $68.00 |
| 58 | Culvert pipe reinforced concrete class III 30-inch (522.0130) | LF | 13 | $185.71 | $241.36 | $164.10 | $185.71 | $130.00 |
| 59 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 3 | $993.35 | $1,427.91 | $2,280.68 | $993.35 | $830.00 |
| 60 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 3 | $1,098.33 | $1,484.49 | $2,378.10 | $1,098.33 | $962.00 |
| 61 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $1,439.38 | $1,727.54 | $2,593.46 | $1,439.38 | $1,300.00 |
| 62 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 1 | $1,903.48 | $1,971.04 | $3,417.51 | $1,903.48 | $1,900.00 |
| 63 | Drilling shaft 42-inch (531.2042) | LF | 46 | $925.00 | $925.00 | $300.00 | $300.00 | $925.00 |
| 64 | Foundation single-shaft type TF-IV (structure) 001. S-64-0610 (531.5440) | EACH | 2 | $14,000 | $14,000 | $12,500 | $12,500 | $14,000 |
| 65 | Truss full span 2-chord type IV (structure) 001. S-64-0610 (532.5440) | EACH | 1 | $76,750 | $76,750 | $85,000 | $85,000 | $76,750 |
| 66 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 5,940 | $26.00 | $26.00 | $26.00 | $25.82 | $26.00 |
| 67 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 10,600 | $27.00 | $27.00 | $27.00 | $32.87 | $27.00 |
| 68 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 475 | $23.00 | $23.00 | $23.00 | $28.28 | $23.00 |
| 69 | Concrete curb pedestrian (601.0600) | LF | 848 | $50.00 | $50.00 | $50.00 | $40.43 | $50.00 |
| 70 | Concrete sidewalk 5-inch (602.0410) | SF | 48,770 | $11.50 | $11.50 | $11.50 | $9.99 | $11.50 |
| 71 | Curb ramp detectable warning field yellow (602.0505) | SF | 1,133 | $50.00 | $50.00 | $50.00 | $39.60 | $50.00 |
| 72 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 255.20 | $65.00 | $65.00 | $65.00 | $62.23 | $65.00 |
| 73 | Concrete driveway 6-inch (602.0810) | SY | 1,080 | $75.00 | $75.00 | $75.00 | $75.31 | $75.00 |
| 74 | Concrete driveway hes 6-inch (602.0860) | SY | 580 | $85.00 | $85.00 | $85.00 | $77.97 | $85.00 |
| 75 | Concrete steps (602.1500) | SF | 15 | $165.00 | $165.00 | $165.00 | $177.92 | $165.00 |
| 76 | Concrete surface drains (602.3010) | CY | 1.50 | $1,150.00 | $1,150.00 | $1,150.00 | $835.36 | $1,150.00 |
| 77 | Concrete barrier temporary precast delivered (603.8000) | LF | 200 | $50.00 | $30.00 | $9.52 | $50.00 | $50.00 |
| 78 | Concrete barrier temporary precast installed (603.8125) | LF | 200 | $50.00 | $10.00 | $9.31 | $50.00 | $50.00 |
| 79 | Riprap medium (606.0200) | CY | 40 | $152.00 | $118.26 | $175.93 | $152.00 | $225.00 |
| 80 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 1,124 | $109.29 | $195.09 | $112.15 | $109.29 | $64.00 |
| 81 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 1,909 | $131.20 | $138.48 | $125.51 | $131.20 | $68.00 |
| 82 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 303 | $153.61 | $148.87 | $135.63 | $153.61 | $76.00 |
| 83 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 43 | $289.29 | $164.60 | $195.49 | $289.29 | $100.00 |
| 84 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 104 | $108.11 | $171.34 | $124.06 | $108.11 | $64.00 |
| 85 | Storm sewer pipe reinforced concrete class V 12-inch (608.0512) | LF | 16 | $180.82 | $156.77 | $164.93 | $180.82 | $64.00 |
| 86 | Manhole covers type J (611.0530) | EACH | 10 | $1,548.19 | $1,186.29 | $794.09 | $1,548.19 | $800.00 |
| 87 | Inlet covers type A (611.0600) | EACH | 2 | $1,489.39 | $1,137.54 | $1,010.48 | $1,489.39 | $1,100.00 |
| 88 | Inlet covers type BW (611.0610) | EACH | 1 | $1,843.72 | $1,337.15 | $1,042.28 | $1,843.72 | $1,100.00 |
| 89 | Inlet covers type DW (611.0613) | EACH | 1 | $1,860.52 | $1,351.08 | $1,037.15 | $1,860.52 | $1,100.00 |
| 90 | Inlet covers type V-B (611.0655) | EACH | 3 | $740.60 | $1,085.32 | $969.47 | $740.60 | $1,000.00 |
| 91 | Inlet covers type WM (611.0660) | EACH | 33 | $2,067.72 | $1,522.84 | $1,789.85 | $2,067.72 | $2,100.00 |
| 92 | Inlet covers type Z (611.0666) | EACH | 14 | $1,521.59 | $1,164.24 | $1,036.11 | $1,521.59 | $1,100.00 |
| 93 | Catch basins 3-FT diameter (611.1003) | EACH | 8 | $1,961.71 | $2,936.20 | $3,824.64 | $1,961.71 | $2,100.00 |
| 94 | Catch basins 4-FT diameter (611.1004) | EACH | 33 | $2,817.80 | $3,542.08 | $4,143.58 | $2,817.80 | $2,700.00 |
| 95 | Manholes 4-FT diameter (611.2004) | EACH | 7 | $2,225.27 | $2,914.50 | $3,831.57 | $2,225.27 | $2,300.00 |
| 96 | Manholes 5-FT diameter (611.2005) | EACH | 2 | $3,072.42 | $4,029.98 | $4,395.22 | $3,072.42 | $3,000.00 |
| 97 | Manholes 6-FT diameter (611.2006) | EACH | 1 | $5,138.56 | $5,901.98 | $5,932.13 | $5,138.86 | $5,300.00 |
| 98 | Inlets 4-FT diameter (611.3004) | EACH | 9 | $1,794.30 | $2,760.12 | $3,597.02 | $1,794.30 | $2,100.00 |
| 99 | Inlets 2X2.5-FT (611.3225) | EACH | 2 | $1,589.58 | $2,224.73 | $3,697.90 | $1,589.58 | $1,700.00 |
| 100 | Adjusting catch basin covers (611.8105) | EACH | 6 | $974.32 | $879.00 | $730.90 | $974.32 | $2,600.00 |
| 101 | Adjusting manhole covers (611.8110) | EACH | 24 | $660.79 | $879.00 | $730.90 | $660.79 | $2,600.00 |
| 102 | Adjusting inlet covers (611.8115) | EACH | 31 | $774.32 | $879.00 | $730.90 | $774.32 | $2,600.00 |
| 103 | Cover plates temporary (611.8120.S) | EACH | 50 | $200.00 | $471.40 | $365.44 | $200.00 | $210.00 |
| 104 | Pipe underdrain 6-inch (612.0106) | LF | 1,710 | $13.04 | $19.80 | $14.18 | $13.04 | $13.00 |
| 105 | Barrier system grading shaping finishing (614.0010) | EACH | 3 | $4,900.00 | $2,804.02 | $2,478.34 | $6,575.00 | $1,150.00 |
| 106 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 180 | $38.90 | $38.90 | $21.00 | $35.00 | $38.90 |
| 107 | MGS guardrail 3 (614.2300) | LF | 525 | $32.50 | $32.50 | $28.60 | $29.00 | $32.50 |
| 108 | MGS guardrail terminal eat (614.2610) | EACH | 3 | $3,500.00 | $3,500.00 | $4,100.00 | $4,900.00 | $3,500.00 |
| 109 | MGS guardrail terminal type 2 (614.2620) | EACH | 3 | $3,000.00 | $3,000.00 | $2,500.00 | $3,900.00 | $3,000.00 |
| 110 | Maintenance and repair of haul roads (project) 001. 3170-09-70 (618.0100) | EACH | 1 | $500.00 | $0.01 | $500.00 | $0.01 | $100.00 |
| 111 | Maintenance and repair of haul roads (project) 002. 3170-09-71 (618.0100) | EACH | 1 | $500.00 | $0.01 | $500.00 | $0.01 | $100.00 |
| 112 | Mobilization (619.1000) | EACH | 1 | $1,117,242 | $1,660,000 | $1,590,530 | $1,176,903 | $1,812,780 |
| 113 | Concrete median blunt nose (620.0200) | SF | 47 | $20.00 | $20.00 | $20.00 | $26.77 | $20.00 |
| 114 | Concrete median sloped nose (620.0300) | SF | 11 | $20.00 | $20.00 | $20.00 | $21.21 | $20.00 |
| 115 | Water (624.0100) | MGAL | 1,000 | $28.00 | $0.01 | $62.89 | $28.00 | $130.00 |
| 116 | Topsoil (625.0100) | SY | 2,947 | $8.89 | $0.01 | $14.00 | $8.89 | $13.00 |
| 117 | Salvaged topsoil (625.0500) | SY | 18,225 | $6.49 | $0.01 | $8.80 | $6.49 | $8.00 |
| 118 | Mulching (627.0200) | SY | 3,000 | $0.30 | $0.30 | $0.55 | $0.30 | $0.30 |
| 119 | Erosion bales (628.1104) | EACH | 100 | $20.00 | $20.00 | $14.00 | $8.00 | $20.00 |
| 120 | Silt fence (628.1504) | LF | 4,580 | $2.10 | $2.10 | $2.00 | $2.25 | $2.10 |
| 121 | Silt fence maintenance (628.1520) | LF | 6,870 | $0.01 | $0.01 | $0.15 | $0.01 | $0.01 |
| 122 | Mobilizations erosion control (628.1905) | EACH | 22 | $1.00 | $1.00 | $260.00 | $1.00 | $1.00 |
| 123 | Mobilizations emergency erosion control (628.1910) | EACH | 16 | $2.00 | $2.00 | $260.00 | $1.00 | $2.00 |
| 124 | Erosion mat urban class I type B (628.2008) | SY | 13,972 | $1.75 | $1.75 | $1.80 | $2.00 | $1.75 |
| 125 | Erosion mat class III type D (628.2039) | SY | 1,750 | $25.00 | $25.00 | $13.00 | $10.00 | $25.00 |
| 126 | Soil stabilizer type A (628.6505) | ACRE | 1 | $4,000.00 | $4,000.00 | $3,000.00 | $1,500.00 | $4,000.00 |
| 127 | Soil stabilizer type B (628.6510) | ACRE | 4 | $800.00 | $800.00 | $700.00 | $500.00 | $800.00 |
| 128 | Inlet protection type A (628.7005) | EACH | 15 | $10.00 | $10.00 | $90.00 | $125.00 | $10.00 |
| 129 | Inlet protection type B (628.7010) | EACH | 20 | $60.00 | $60.00 | $70.00 | $100.00 | $60.00 |
| 130 | Inlet protection type C (628.7015) | EACH | 90 | $60.00 | $60.00 | $70.00 | $100.00 | $60.00 |
| 131 | Inlet protection type D (628.7020) | EACH | 40 | $125.00 | $125.00 | $90.00 | $125.00 | $125.00 |
| 132 | Temporary ditch checks (628.7504) | LF | 120 | $8.00 | $8.00 | $6.00 | $10.00 | $8.00 |
| 133 | Culvert pipe checks (628.7555) | EACH | 30 | $25.00 | $25.00 | $17.00 | $30.00 | $25.00 |
| 134 | Tracking pads (628.7560) | EACH | 20 | $250.00 | $100.00 | $500.00 | $250.00 | $100.00 |
| 135 | Rock bags (628.7570) | EACH | 200 | $25.00 | $25.00 | $12.00 | $10.00 | $25.00 |
| 136 | Fertilizer type B (629.0210) | CWT | 9 | $75.00 | $75.00 | $100.00 | $150.00 | $75.00 |
| 137 | Seeding mixture no. 40 (630.0140) | LB | 740 | $7.50 | $7.50 | $11.00 | $10.00 | $7.50 |
| 138 | Seeding temporary (630.0200) | LB | 1,000 | $3.00 | $3.00 | $4.00 | $0.01 | $3.00 |
| 139 | Seed water (630.0500) | MGAL | 390 | $1.00 | $1.00 | $9.00 | $0.01 | $1.00 |
| 140 | Sod water (631.0300) | MGAL | 80 | $40.00 | $40.00 | $55.00 | $0.01 | $40.00 |
| 141 | Sod lawn (631.1000) | SY | 2,665 | $9.75 | $9.75 | $8.00 | $8.00 | $9.75 |
| 142 | Markers culvert end (633.5200) | EACH | 2 | $100.00 | $100.00 | $75.00 | $100.00 | $100.00 |
| 143 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 136 | $74.00 | $74.00 | $135.00 | $150.00 | $74.00 |
| 144 | Posts wood 4X6-inch X 22-FT (634.0622) | EACH | 37 | $110.00 | $110.00 | $180.00 | $225.00 | $110.00 |
| 145 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 48 | $200.00 | $200.00 | $230.00 | $275.00 | $200.00 |
| 146 | Posts tubular steel 2X2-inch X 18- FT (634.0818) | EACH | 4 | $250.00 | $250.00 | $240.00 | $275.00 | $250.00 |
| 147 | Signs type I reflective SH (637.1220) | SF | 117.50 | $40.00 | $40.00 | $28.00 | $35.00 | $40.00 |
| 148 | Signs type II reflective H (637.2210) | SF | 2,505.66 | $23.25 | $23.25 | $22.00 | $24.00 | $23.25 |
| 149 | Signs type II reflective H folding (637.2215) | SF | 186.50 | $30.00 | $30.00 | $26.00 | $32.00 | $30.00 |
| 150 | Signs type II reflective F (637.2230) | SF | 773.96 | $24.75 | $24.75 | $24.00 | $26.00 | $24.75 |
| 151 | Removing signs type II (638.2602) | EACH | 257 | $20.00 | $20.00 | $26.00 | $35.00 | $20.00 |
| 152 | Removing small sign supports (638.3000) | EACH | 187 | $30.00 | $30.00 | $24.00 | $35.00 | $30.00 |
| 153 | Traffic control drums (643.0300) | DAY | 91,120 | $0.25 | $0.08 | $0.08 | $0.08 | $0.13 |
| 154 | Temporary tape rumble strip orange (643.0320.S) | LF | 450 | $20.00 | $8.00 | $8.00 | $8.08 | $20.00 |
| 155 | Traffic control barricades type III (643.0420) | DAY | 35,020 | $0.60 | $0.22 | $0.22 | $0.22 | $0.45 |
| 156 | Traffic control flexible tubular marker posts (643.0500) | EACH | 430 | $25.00 | $25.00 | $25.00 | $25.25 | $25.00 |
| 157 | Traffic control flexible tubular marker bases (643.0600) | EACH | 390 | $7.00 | $4.00 | $4.00 | $4.04 | $5.00 |
| 158 | Traffic control warning lights type A (643.0705) | DAY | 70,040 | $0.05 | $0.06 | $0.06 | $0.06 | $0.10 |
| 159 | Traffic control warning lights type C (643.0715) | DAY | 6,445 | $0.05 | $0.07 | $0.07 | $0.07 | $0.10 |
| 160 | Traffic control connected arrow boards (643.0810) | DAY | 260 | $30.00 | $7.00 | $7.00 | $7.07 | $25.00 |
| 161 | Traffic control signs (643.0900) | DAY | 229,255 | $0.35 | $0.16 | $0.16 | $0.16 | $0.22 |
| 162 | Traffic control covering signs type I (643.0910) | EACH | 50 | $255.00 | $50.00 | $50.00 | $50.51 | $227.00 |
| 163 | Traffic control covering signs type II (643.0920) | EACH | 60 | $35.00 | $150.00 | $150.00 | $151.52 | $40.00 |
| 164 | Traffic control signs fixed message (643.1000) | SF | 250 | $22.00 | $16.00 | $16.00 | $16.16 | $16.00 |
| 165 | Traffic control signs PCMS (643.1050) | DAY | 470 | $35.00 | $30.00 | $30.00 | $30.30 | $45.00 |
| 166 | Traffic control cones 42-inch (643.1070) | DAY | 11,930 | $0.25 | $0.15 | $0.15 | $0.15 | $0.15 |
| 167 | Traffic control connected work zone end location marker (643.1222) | DAY | 260 | $15.00 | $10.00 | $10.00 | $10.10 | $15.00 |
| 168 | Temporary marking line epoxy 6- inch (643.3170) | LF | 40,510 | $0.75 | $0.60 | $0.60 | $0.61 | $0.75 |
| 169 | Temporary marking line removable tape 6-inch (643.3180) | LF | 19,750 | $1.80 | $1.65 | $1.65 | $1.67 | $1.80 |
| 170 | Temporary marking line epoxy 10- inch (643.3270) | LF | 640 | $1.20 | $1.15 | $1.15 | $1.16 | $1.20 |
| 171 | Temporary marking line removable tape 10-inch (643.3280) | LF | 715 | $3.50 | $2.65 | $2.65 | $2.68 | $3.00 |
| 172 | Temporary marking crosswalk epoxy 6-inch (643.3320) | LF | 770 | $11.00 | $0.75 | $0.75 | $0.76 | $11.00 |
| 173 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 1,995 | $2.00 | $1.65 | $1.65 | $1.67 | $1.40 |
| 174 | Temporary marking arrow epoxy (643.3520) | EACH | 22 | $250.00 | $50.00 | $50.00 | $50.51 | $250.00 |
| 175 | Temporary marking arrow removable tape (643.3550) | EACH | 35 | $350.00 | $75.00 | $75.00 | $75.76 | $75.00 |
| 176 | Temporary marking stop line epoxy 18-inch (643.3820) | LF | 430 | $14.00 | $1.80 | $1.80 | $1.82 | $14.00 |
| 177 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 560 | $7.50 | $4.80 | $4.80 | $4.85 | $5.00 |
| 178 | Traffic control (643.5000) | EACH | 1 | $86,000 | $194,000 | $194,000 | $195,960 | $206,050 |
| 179 | Temporary pedestrian surface matting (644.1440) | SF | 7,750 | $8.00 | $1.50 | $1.50 | $1.52 | $4.90 |
| 180 | Temporary pedestrian curb ramp (644.1601) | DAY | 500 | $10.00 | $5.00 | $5.00 | $5.05 | $5.00 |
| 181 | Temporary pedestrian detectable warning field (644.1605) | SF | 190 | $17.00 | $8.00 | $8.00 | $8.08 | $5.00 |
| 182 | Temporary pedestrian barricade (644.1810) | LF | 10,210 | $6.50 | $2.00 | $2.00 | $2.02 | $4.11 |
| 183 | Temporary audible message devices (644.1900.S) | DAY | 7,550 | $5.00 | $1.60 | $1.60 | $1.62 | $2.50 |
| 184 | Geotextile type DF schedule A (645.0111) | SY | 760 | $1.50 | $0.71 | $0.97 | $1.50 | $8.00 |
| 185 | Geotextile type HR (645.0120) | SY | 120 | $10.00 | $1.83 | $3.25 | $10.00 | $22.00 |
| 186 | Geotextile type R (645.0130) | SY | 24 | $32.00 | $1.33 | $10.88 | $32.00 | $28.00 |
| 187 | Geogrid type SR (645.0220) | SY | 43,111 | $1.05 | $2.43 | $0.85 | $1.05 | $2.00 |
| 188 | Marking line epoxy 4-inch (646.1020) | LF | 3,901 | $0.80 | $0.80 | $0.80 | $0.81 | $0.80 |
| 189 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 1,149 | $1.10 | $1.10 | $1.10 | $1.11 | $1.10 |
| 190 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 36,076 | $1.30 | $1.30 | $1.30 | $1.31 | $1.30 |
| 191 | Marking line epoxy 8-inch (646.3020) | LF | 1,163 | $1.60 | $1.60 | $1.60 | $1.62 | $1.60 |
| 192 | Marking line grooved black epoxy 10-inch (646.4025) | LF | 1,027 | $2.10 | $2.10 | $2.10 | $2.12 | $2.10 |
| 193 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 8,644 | $2.60 | $2.60 | $2.60 | $2.63 | $2.60 |
| 194 | Marking line same day epoxy 6- inch (646.4720) | LF | 9,300 | $0.75 | $0.75 | $0.75 | $0.76 | $0.75 |
| 195 | Marking line same day epoxy 10- inch (646.4820) | LF | 450 | $2.00 | $2.00 | $2.00 | $2.02 | $2.00 |
| 196 | Marking arrow epoxy (646.5020) | EACH | 104 | $275.00 | $275.00 | $275.00 | $277.78 | $275.00 |
| 197 | Marking word epoxy (646.5120) | EACH | 44 | $350.00 | $350.00 | $350.00 | $353.54 | $350.00 |
| 198 | Marking symbol epoxy (646.5220) | EACH | 12 | $300.00 | $300.00 | $300.00 | $303.03 | $300.00 |
| 199 | Marking stop line epoxy 18-inch (646.6120) | LF | 1,151 | $15.00 | $15.00 | $15.00 | $15.15 | $15.00 |
| 200 | Cold weather marking epoxy 6-inch (646.6466) | LF | 6,000 | $0.75 | $0.75 | $0.75 | $0.76 | $0.75 |
| 201 | Cold weather marking epoxy 10- inch (646.6470) | LF | 300 | $1.50 | $1.50 | $1.50 | $1.52 | $1.50 |
| 202 | Marking diagonal epoxy 12-inch (646.7120) | LF | 1,046 | $14.00 | $14.00 | $14.00 | $14.14 | $14.00 |
| 203 | Marking chevron epoxy 24-inch (646.7220) | LF | 82 | $18.00 | $18.00 | $18.00 | $18.18 | $18.00 |
| 204 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 3,569 | $12.00 | $12.00 | $12.00 | $12.12 | $12.00 |
| 205 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 593 | $22.00 | $22.00 | $22.00 | $22.22 | $22.00 |
| 206 | Marking corrugated median epoxy (646.8020) | SF | 42 | $9.00 | $9.00 | $9.00 | $9.09 | $9.00 |
| 207 | Marking curb epoxy (646.8120) | LF | 145 | $9.00 | $9.00 | $9.00 | $9.09 | $9.00 |
| 208 | Marking island nose epoxy (646.8220) | EACH | 5 | $375.00 | $375.00 | $375.00 | $378.79 | $375.00 |
| 209 | Marking parking stall epoxy (646.8320) | LF | 6,900 | $9.00 | $9.00 | $9.00 | $9.09 | $9.00 |
| 210 | Marking removal line 4-inch (646.9000) | LF | 13,080 | $0.40 | $0.40 | $0.40 | $0.40 | $0.40 |
| 211 | Marking removal line water blasting 4-inch (646.9010) | LF | 2,870 | $1.25 | $1.00 | $1.25 | $1.01 | $1.25 |
| 212 | Marking removal line 8-inch (646.9100) | LF | 530 | $0.90 | $0.70 | $0.90 | $0.71 | $0.90 |
| 213 | Marking removal line water blasting 8-inch (646.9110) | LF | 1,115 | $2.00 | $2.00 | $2.00 | $2.02 | $2.00 |
| 214 | Marking removal line wide (646.9200) | LF | 130 | $1.00 | $1.00 | $1.00 | $1.01 | $1.00 |
| 215 | Marking removal special marking (646.9300) | EACH | 10 | $200.00 | $75.00 | $200.00 | $75.76 | $200.00 |
| 216 | Marking removal special marking water blasting (646.9310) | EACH | 12 | $400.00 | $90.00 | $400.00 | $90.91 | $400.00 |
| 217 | Construction staking storm sewer (650.4000) | EACH | 66 | $110.00 | $5.00 | $110.00 | $110.00 | $110.00 |
| 218 | Construction staking subgrade (650.4500) | LF | 9,385 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 219 | Construction staking base (650.5000) | LF | 7,205 | $1.50 | $0.01 | $1.50 | $1.50 | $1.50 |
| 220 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 17,930 | $2.00 | $0.30 | $2.00 | $2.00 | $2.00 |
| 221 | Construction staking pipe culverts (650.6000) | EACH | 1 | $130.00 | $50.00 | $130.00 | $130.00 | $130.00 |
| 222 | Construction staking structure layout (structure) 001. S-64-0610 (650.6501) | EACH | 1 | $1,200.00 | $5,000.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 223 | Construction staking resurfacing reference (650.8000) | LF | 14,075 | $0.17 | $0.01 | $0.17 | $0.17 | $0.17 |
| 224 | Construction staking curb ramps (650.9000) | EACH | 101 | $180.00 | $10.00 | $180.00 | $180.00 | $180.00 |
| 225 | Construction staking sidewalk (project) 001. 3170-09-70 (650.9500) | EACH | 1 | $1,800.00 | $5,000.00 | $1,800.00 | $1,800.00 | $1,800.00 |
| 226 | Construction staking sidewalk (project) 002. 3170-09-71 (650.9500) | EACH | 1 | $4,500.00 | $5,000.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 227 | Construction staking supplemental control (project) 001. 3170-09-70 (650.9911) | EACH | 1 | $1,500.00 | $5,000.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 228 | Construction staking supplemental control (project) 002. 3170-09-71 (650.9911) | EACH | 1 | $1,500.00 | $5,000.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 229 | Construction staking slope stakes (650.9920) | LF | 9,385 | $0.50 | $0.01 | $0.50 | $0.50 | $0.50 |
| 230 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 681 | $6.79 | $6.79 | $6.79 | $6.79 | $6.79 |
| 231 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 3,179 | $8.81 | $8.81 | $8.81 | $8.81 | $8.81 |
| 232 | Conduit special 3-inch (652.0615) | LF | 2,180 | $20.33 | $20.33 | $20.33 | $20.33 | $20.33 |
| 233 | Pull boxes steel 24X42-inch (653.0140) | EACH | 40 | $1,364.76 | $1,364.76 | $1,364.76 | $1,364.76 | $1,364.76 |
| 234 | Removing pull boxes (653.0905) | EACH | 55 | $149.78 | $149.78 | $149.78 | $149.78 | $149.78 |
| 235 | Concrete bases type 1 (654.0101) | EACH | 37 | $1,064.20 | $1,064.20 | $1,064.20 | $1,064.20 | $1,064.20 |
| 236 | Concrete bases type 2 (654.0102) | EACH | 7 | $1,607.14 | $1,607.14 | $1,607.14 | $1,607.14 | $1,607.14 |
| 237 | Concrete bases type 5 (654.0105) | EACH | 26 | $1,252.39 | $1,252.39 | $1,252.39 | $1,252.39 | $1,252.39 |
| 238 | Concrete bases type 10 (654.0110) | EACH | 6 | $7,968.18 | $7,968.18 | $7,968.18 | $7,968.18 | $7,968.18 |
| 239 | Concrete bases type 13 (654.0113) | EACH | 1 | $13,162 | $13,162 | $13,162 | $13,162 | $13,162 |
| 240 | Concrete bases type 10-special (654.0120) | EACH | 13 | $9,955.00 | $9,955.00 | $9,955.00 | $9,955.00 | $9,955.00 |
| 241 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 6 | $2,929.50 | $2,929.50 | $2,929.50 | $2,929.50 | $2,929.50 |
| 242 | Cable traffic signal 5-14 AWG (655.0230) | LF | 4,046 | $1.70 | $1.70 | $1.70 | $1.70 | $1.70 |
| 243 | Cable traffic signal 7-14 AWG (655.0240) | LF | 3,854 | $1.94 | $1.94 | $1.94 | $1.94 | $1.94 |
| 244 | Cable traffic signal 12-14 AWG (655.0260) | LF | 8,781 | $2.51 | $2.51 | $2.51 | $2.51 | $2.51 |
| 245 | Cable traffic signal 15-14 AWG (655.0270) | LF | 779 | $4.27 | $4.27 | $4.27 | $4.27 | $4.27 |
| 246 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 1,904 | $1.53 | $1.53 | $1.53 | $1.53 | $1.53 |
| 247 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 9,017 | $1.13 | $1.13 | $1.13 | $1.13 | $1.13 |
| 248 | Electrical wire lighting 12 AWG (655.0610) | LF | 1,944 | $0.97 | $0.97 | $0.97 | $0.97 | $0.97 |
| 249 | Traffic signal evp detector cable (655.0900) | LF | 5,171 | $1.23 | $1.23 | $1.23 | $1.23 | $1.23 |
| 250 | Electrical service meter breaker pedestal (location) 601. STH 50 & cook ST (656.0201) | EACH | 1 | $2,522.00 | $2,522.00 | $2,522.00 | $2,522.00 | $2,522.00 |
| 251 | Electrical service meter breaker pedestal (location) 602. STH 50 & broad ST (656.0201) | EACH | 1 | $2,522.00 | $2,522.00 | $2,522.00 | $2,522.00 | $2,522.00 |
| 252 | Electrical service meter breaker pedestal (location) 603. STH 50 & center ST (656.0201) | EACH | 1 | $2,522.00 | $2,522.00 | $2,522.00 | $2,522.00 | $2,522.00 |
| 253 | Electrical service meter breaker pedestal (location) 604. STH 50 & wells ST (656.0201) | EACH | 1 | $2,522.00 | $2,522.00 | $2,522.00 | $2,522.00 | $2,522.00 |
| 254 | Electrical service meter breaker pedestal (location) 605. STH 50 & edwards BLVD (656.0201) | EACH | 1 | $2,522.00 | $2,522.00 | $2,522.00 | $2,522.00 | $2,522.00 |
| 255 | Electrical service meter breaker pedestal (location) 606. STH 50 & ush 12 SB ramp (656.0201) | EACH | 1 | $2,522.00 | $2,522.00 | $2,522.00 | $2,522.00 | $2,522.00 |
| 256 | Pedestal bases (657.0100) | EACH | 37 | $338.52 | $338.52 | $338.52 | $338.52 | $338.52 |
| 257 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 7 | $813.97 | $813.97 | $813.97 | $813.97 | $813.97 |
| 258 | Poles type 3 (657.0310) | EACH | 7 | $4,942.55 | $4,942.55 | $4,942.55 | $4,942.55 | $4,942.55 |
| 259 | Poles type 9 (657.0345) | EACH | 2 | $9,475.72 | $9,475.72 | $9,475.72 | $9,475.72 | $9,475.72 |
| 260 | Poles type 9-special (657.0347) | EACH | 9 | $12,110 | $12,110 | $12,110 | $12,110 | $12,110 |
| 261 | Poles type 10 (657.0350) | EACH | 4 | $11,568 | $11,568 | $11,568 | $11,568 | $11,568 |
| 262 | Poles type 10-special (657.0352) | EACH | 4 | $14,816 | $14,816 | $14,816 | $14,816 | $14,816 |
| 263 | Poles type 13 (657.0360) | EACH | 1 | $19,352 | $19,352 | $19,352 | $19,352 | $19,352 |
| 264 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 2 | $400.66 | $400.66 | $400.66 | $400.66 | $400.66 |
| 265 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 19 | $981.20 | $981.20 | $981.20 | $981.20 | $981.20 |
| 266 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 12 | $1,072.06 | $1,072.06 | $1,072.06 | $1,072.06 | $1,072.06 |
| 267 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 4 | $748.55 | $748.55 | $748.55 | $748.55 | $748.55 |
| 268 | Monotube arms 20-FT (657.0520) | EACH | 1 | $4,342.55 | $4,342.55 | $4,342.55 | $4,342.55 | $4,342.55 |
| 269 | Monotube arms 25-FT (657.0525) | EACH | 2 | $4,658.05 | $4,658.05 | $4,658.05 | $4,658.05 | $4,658.05 |
| 270 | Monotube arms 30-FT (657.0530) | EACH | 3 | $6,186.76 | $6,186.76 | $6,186.76 | $6,186.76 | $6,186.76 |
| 271 | Monotube arms 35-FT-special (657.0536) | EACH | 6 | $6,904.83 | $6,904.83 | $6,904.83 | $6,904.83 | $6,904.83 |
| 272 | Monotube arms 40-FT-special (657.0541) | EACH | 5 | $7,047.43 | $7,047.43 | $7,047.43 | $7,047.43 | $7,047.43 |
| 273 | Monotube arms 45-FT-special (657.0546) | EACH | 2 | $7,466.87 | $7,466.87 | $7,466.87 | $7,466.87 | $7,466.87 |
| 274 | Monotube arms 55-FT (657.0555) | EACH | 1 | $17,053 | $17,053 | $17,053 | $17,053 | $17,053 |
| 275 | Luminaire arms single member 4- inch clamp 6-FT (657.0609) | EACH | 9 | $432.84 | $432.84 | $432.84 | $432.84 | $432.84 |
| 276 | Luminaire arms steel 8-FT (657.0808) | EACH | 5 | $1,342.41 | $1,342.41 | $1,342.41 | $1,342.41 | $1,342.41 |
| 277 | Luminaire arms steel 15-FT (657.0815) | EACH | 5 | $1,381.28 | $1,381.28 | $1,381.28 | $1,381.28 | $1,381.28 |
| 278 | Traffic signal face 3S 12-inch (658.0173) | EACH | 87 | $724.99 | $724.99 | $724.99 | $724.99 | $724.99 |
| 279 | Traffic signal face 4S 12-inch (658.0174) | EACH | 24 | $927.68 | $927.68 | $927.68 | $927.68 | $927.68 |
| 280 | Pedestrian signal face 16-inch (658.0416) | EACH | 42 | $458.87 | $458.87 | $458.87 | $458.87 | $458.87 |
| 281 | Signal mounting hardware (location) 601. STH 50 & cook ST (658.5070) | EACH | 1 | $4,701.29 | $4,701.29 | $4,701.29 | $4,701.29 | $4,701.29 |
| 282 | Signal mounting hardware (location) 602. STH 50 & broad ST (658.5070) | EACH | 1 | $7,540.73 | $7,540.73 | $7,540.73 | $7,540.73 | $7,540.73 |
| 283 | Signal mounting hardware (location) 603. STH 50 & center ST (658.5070) | EACH | 1 | $7,105.35 | $7,105.35 | $7,105.35 | $7,105.35 | $7,105.35 |
| 284 | Signal mounting hardware (location) 604. STH 50 & wells ST (658.5070) | EACH | 1 | $4,379.49 | $4,379.49 | $4,379.49 | $4,379.49 | $4,379.49 |
| 285 | Signal mounting hardware (location) 605. STH 50 & edwards BLVD (658.5070) | EACH | 1 | $9,547.27 | $9,547.27 | $9,547.27 | $9,547.27 | $9,547.27 |
| 286 | Signal mounting hardware (location) 606. STH 50 & ush 12 SB ramp (658.5070) | EACH | 1 | $3,458.25 | $3,458.25 | $3,458.25 | $3,458.25 | $3,458.25 |
| 287 | Luminaires utility LED C (659.1125) | EACH | 15 | $377.45 | $377.45 | $377.45 | $377.45 | $377.45 |
| 288 | Temporary traffic signals for intersections (location) 601. STH 50 & cook ST (661.0201) | EACH | 1 | $45,768 | $45,768 | $45,768 | $45,768 | $45,768 |
| 289 | Temporary traffic signals for intersections (location) 602. STH 50 & broad ST (661.0201) | EACH | 1 | $45,768 | $45,768 | $45,768 | $45,768 | $45,768 |
| 290 | Temporary traffic signals for intersections (location) 603. STH 50 & center ST (661.0201) | EACH | 1 | $45,768 | $45,768 | $45,768 | $45,768 | $45,768 |
| 291 | Temporary traffic signals for intersections (location) 604. STH 50 & wells ST (661.0201) | EACH | 1 | $45,768 | $45,768 | $45,768 | $45,768 | $45,768 |
| 292 | Temporary traffic signals for intersections (location) 605. STH 50 & edwards BLVD (661.0201) | EACH | 1 | $47,065 | $47,065 | $47,065 | $47,065 | $47,065 |
| 293 | Temporary traffic signals for intersections (location) 606. STH 50 & ush 12 SB ramp (661.0201) | EACH | 1 | $46,102 | $46,102 | $46,102 | $46,102 | $46,102 |
| 294 | Generators (661.0300) | DAY | 6 | $834.11 | $834.11 | $834.11 | $834.11 | $834.11 |
| 295 | Communication system testing (678.0501) | EACH | 1 | $930.76 | $930.76 | $930.76 | $930.76 | $930.76 |
| 296 | Sawing asphalt (690.0150) | LF | 6,876 | $1.60 | $1.60 | $1.39 | $2.05 | $1.60 |
| 297 | Sawing concrete (690.0250) | LF | 4,740 | $2.40 | $2.40 | $2.25 | $2.75 | $2.40 |
| 298 | Incentive iri ride (740.0440) | DOL | 14,100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 299 | Crack and damage survey (999.1501.S) | EACH | 69 | $790.00 | $900.00 | $750.72 | $900.00 | $900.00 |
| 300 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,100 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 301 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 37,500 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 302 | Special 001. backfill slurry (SPV.0035) | CY | 50 | $121.55 | $186.02 | $43.52 | $121.55 | $440.00 |
| 303 | Special 500. utility trench slurry backfill for sanitary sewer (SPV.0035) | CY | 1,500 | $121.55 | $139.26 | $44.06 | $121.55 | $121.55 |
| 304 | Special 501. utility trench slurry backfill for water main (SPV.0035) | CY | 900 | $121.55 | $139.26 | $44.06 | $121.55 | $121.55 |
| 305 | Special 001. utility line opening (ulo) (SPV.0060) | EACH | 30 | $1,000.00 | $200.00 | $1,260.86 | $1,000.00 | $700.00 |
| 306 | Special 002. field facilities office space (SPV.0060) | EACH | 1 | $161,380 | $48,000 | $120,000 | $170,965 | $50,000 |
| 307 | Special 003. inlet covers type B special (SPV.0060) | EACH | 1 | $2,073.19 | $1,621.48 | $1,497.97 | $2,073.19 | $1,250.00 |
| 308 | Special 004. curb ramp grading, shaping, and finishing (SPV.0060) | EACH | 29 | $2,350.00 | $1,332.86 | $868.74 | $2,575.00 | $1,100.00 |
| 309 | Special 005. tension anchor rods, S-64-204 (SPV.0060) | EACH | 1 | $250.00 | $250.00 | $7,500.00 | $7,500.00 | $250.00 |
| 310 | Special 007. remove, salvage, and reinstall city owned signs (SPV.0060) | EACH | 15 | $1,000.00 | $1,000.00 | $110.00 | $500.00 | $1,000.00 |
| 311 | Special 009. remove, salvage, and reinstall city owned tree grate (SPV.0060) | EACH | 22 | $1,000.00 | $1,000.00 | $519.59 | $1,200.00 | $250.00 |
| 312 | Special 010. pipe connection to existing structure (SPV.0060) | EACH | 14 | $850.00 | $1,392.67 | $9,889.95 | $850.00 | $770.00 |
| 313 | Special 011. baseline CPM progress schedule (SPV.0060) | EACH | 1 | $20,000 | $0.01 | $14,460 | $14,606 | $0.01 |
| 314 | Special 012. monthly CPM progress schedule updates (SPV.0060) | EACH | 22 | $1,000.00 | $0.01 | $200.00 | $202.02 | $0.01 |
| 315 | Special 020. RRFB system STH 50 NW quad maxwell ST (SPV.0060) | EACH | 1 | $7,958.85 | $7,958.85 | $7,958.85 | $7,958.85 | $7,958.85 |
| 316 | Special 021. RRFB system STH 50 SW quad maxwell ST (SPV.0060) | EACH | 1 | $7,832.65 | $7,832.65 | $7,832.65 | $7,832.65 | $7,832.65 |
| 317 | Special 022. RRFB system STH 50 NE quad maxwell ST (SPV.0060) | EACH | 1 | $7,958.85 | $7,958.85 | $7,958.85 | $7,958.85 | $7,958.85 |
| 318 | Special 023. RRFB system STH 50 SE quad maxwell ST (SPV.0060) | EACH | 1 | $7,832.65 | $7,832.65 | $7,832.65 | $7,832.65 | $7,832.65 |
| 319 | Special 024. RRFB system STH 50 NW quad mill ST (SPV.0060) | EACH | 1 | $7,782.17 | $7,782.17 | $7,782.17 | $7,782.17 | $7,782.17 |
| 320 | Special 025. RRFB system STH 50 SW quad mill ST (SPV.0060) | EACH | 1 | $7,655.97 | $7,655.97 | $7,655.97 | $7,655.97 | $7,655.97 |
| 321 | Special 300. construction staking shared-use path (3170-09-70) (SPV.0060) | EACH | 1 | $1,900.00 | $5,000.00 | $3,300.00 | $1,900.00 | $1,900.00 |
| 322 | Special 420. RRFB system STH 50 NE quad sky LN (SPV.0060) | EACH | 1 | $7,958.85 | $7,958.85 | $7,958.85 | $7,958.85 | $7,958.85 |
| 323 | Special 421. RRFB system STH 50 SE quad sky LN (SPV.0060) | EACH | 1 | $7,832.65 | $7,832.65 | $7,832.65 | $7,832.65 | $7,832.65 |
| 324 | Special 422. RRFB system STH 50 NE quad elmwood ave (SPV.0060) | EACH | 1 | $7,958.85 | $7,958.85 | $7,958.85 | $7,958.85 | $7,958.85 |
| 325 | Special 423. RRFB system STH 50 SE quad elmwood ave (SPV.0060) | EACH | 1 | $7,832.65 | $7,832.65 | $7,832.68 | $7,832.65 | $7,832.65 |
| 326 | Special 424. RRFB system STH 50 NW quad warren ST (SPV.0060) | EACH | 1 | $7,958.85 | $7,958.85 | $7,958.85 | $7,958.85 | $7,958.85 |
| 327 | Special 425. RRFB system STH 50 SW quad warren ST (SPV.0060) | EACH | 1 | $7,832.65 | $7,832.65 | $7,832.65 | $7,832.65 | $7,832.65 |
| 328 | Special 426. RRFB system STH 50 NE quad warren ST (SPV.0060) | EACH | 1 | $7,958.85 | $7,958.85 | $7,958.85 | $7,958.85 | $7,958.85 |
| 329 | Special 427. RRFB system STH 50 SE quad warren ST (SPV.0060) | EACH | 1 | $7,832.65 | $7,832.65 | $7,832.65 | $7,832.65 | $7,832.65 |
| 330 | Special 428. RRFB system STH 50 NW quad madison ST (SPV.0060) | EACH | 1 | $7,958.85 | $7,958.85 | $7,958.85 | $7,958.85 | $7,958.85 |
| 331 | Special 429. RRFB system STH 50 SW quad madison ST (SPV.0060) | EACH | 1 | $7,832.65 | $7,832.65 | $7,832.65 | $7,832.65 | $7,832.65 |
| 332 | Special 430. RRFB system STH 50 NE quad madison ST (SPV.0060) | EACH | 1 | $7,958.95 | $7,958.95 | $7,958.95 | $7,958.95 | $7,958.95 |
| 333 | Special 431. RRFB system STH 50 SE quad madison ST (SPV.0060) | EACH | 1 | $7,832.65 | $7,832.65 | $7,832.65 | $7,832.65 | $7,832.65 |
| 334 | Special 432. RRFB system STH 50 NW quad west ST (SPV.0060) | EACH | 1 | $7,782.17 | $7,782.17 | $7,782.17 | $7,782.17 | $7,782.17 |
| 335 | Special 433. RRFB system STH 50 SW quad west ST (SPV.0060) | EACH | 1 | $7,655.97 | $7,655.97 | $7,655.97 | $7,655.97 | $7,655.97 |
| 336 | Special 500. construction staking sanitary sewer (SPV.0060) | EACH | 1 | $90.00 | $5,000.00 | $5,000.00 | $90.00 | $90.00 |
| 337 | Special 501. abandon existing sanitary manhole (SPV.0060) | EACH | 7 | $750.00 | $827.86 | $500.00 | $750.00 | $750.00 |
| 338 | Special 502. sanitary sewer manhole, 48-inch (SPV.0060) | EACH | 15 | $6,100.77 | $8,011.09 | $7,606.94 | $6,100.77 | $6,100.77 |
| 339 | Special 503. sanitary sewer manhole outside drop (SPV.0060) | EACH | 2 | $14,098 | $36,230 | $14,221 | $14,098 | $14,098 |
| 340 | Special 504. connect to existing sanitary sewer (SPV.0060) | EACH | 9 | $2,862.56 | $3,549.27 | $6,231.49 | $2,862.56 | $2,862.56 |
| 341 | Special 505. wye 12-inch X 6-inch (SPV.0060) | EACH | 19 | $536.55 | $1,752.90 | $362.00 | $536.55 | $536.55 |
| 342 | Special 506. wye 8-inch X 6-inch (SPV.0060) | EACH | 9 | $205.69 | $1,459.43 | $115.00 | $205.69 | $205.69 |
| 343 | Special 507. dewatering (for sanitary sewer) (SPV.0060) | EACH | 1 | $0.01 | $0.01 | $1.00 | $0.01 | $0.01 |
| 344 | Special 508. utility line opening (for sanitary sewer) (SPV.0060) | EACH | 5 | $1,000.00 | $200.00 | $1,260.87 | $1,000.00 | $1,000.00 |
| 345 | Special 509. construction staking water main (SPV.0060) | EACH | 1 | $14,050 | $5,000.00 | $20,000 | $14,050 | $14,050 |
| 346 | Special 510. remove existing hydrant assembly (SPV.0060) | EACH | 8 | $2,188.70 | $1,531.42 | $2,310.19 | $2,188.70 | $2,188.70 |
| 347 | Special 511. remove existing valve box (SPV.0060) | EACH | 12 | $1,500.00 | $612.57 | $770.06 | $1,500.00 | $1,500.00 |
| 348 | Special 512. remove existing water main structure (SPV.0060) | EACH | 4 | $1,469.70 | $1,531.42 | $4,052.29 | $1,469.70 | $1,469.70 |
| 349 | Special 513. abandon existing water main (6 inch dia and less) (SPV.0060) | EACH | 17 | $552.50 | $491.08 | $500.00 | $552.50 | $552.50 |
| 350 | Special 514. connect to existing water main (SPV.0060) | EACH | 15 | $2,790.37 | $4,976.10 | $4,620.40 | $2,790.37 | $2,790.37 |
| 351 | Special 515. hydrant (SPV.0060) | EACH | 11 | $8,283.81 | $11,285 | $8,044.77 | $8,283.81 | $8,283.81 |
| 352 | Special 516. valve & box 16-inch (SPV.0060) | EACH | 19 | $11,683 | $11,090 | $7,206.00 | $11,683 | $11,683 |
| 353 | Special 517. valve & box 12-inch (SPV.0060) | EACH | 2 | $6,749.40 | $6,568.30 | $4,723.00 | $6,749.40 | $6,749.40 |
| 354 | Special 518. valve & box 10-inch (SPV.0060) | EACH | 1 | $5,443.20 | $5,409.73 | $3,842.00 | $5,443.20 | $5,443.20 |
| 355 | Special 519. valve & box 8-inch (SPV.0060) | EACH | 10 | $3,739.40 | $3,898.51 | $2,811.00 | $3,739.40 | $3,739.40 |
| 356 | Special 520. valve & box 6-inch (SPV.0060) | EACH | 15 | $2,675.40 | $2,954.77 | $2,023.00 | $2,675.40 | $2,675.40 |
| 357 | Special 521. cross 16-inch X 16- inch (SPV.0060) | EACH | 1 | $6,927.20 | $6,871.44 | $4,696.00 | $6,927.20 | $6,927.20 |
| 358 | Special 522. tee 16-inch X 16-inch (SPV.0060) | EACH | 8 | $4,565.40 | $4,776.59 | $3,097.00 | $4,565.40 | $4,565.40 |
| 359 | Special 523. tee 16-inch X 12-inch (SPV.0060) | EACH | 1 | $4,971.40 | $3,894.94 | $2,423.00 | $4,971.40 | $4,971.40 |
| 360 | Special 524. tee 12-inch X 6-inch (SPV.0060) | EACH | 1 | $1,468.60 | $1,884.37 | $996.00 | $1,468.60 | $1,468.60 |
| 361 | Special 525. tee 16-inch X 8-inch (SPV.0060) | EACH | 1 | $3,176.60 | $3,399.32 | $2,156.00 | $3,176.60 | $3,176.60 |
| 362 | Special 526. tee 16-inch X 6-inch (SPV.0060) | EACH | 11 | $3,003.00 | $3,245.34 | $2,039.00 | $3,003.00 | $3,003.00 |
| 363 | Special 527. tee 8-inch X 6-inch (SPV.0060) | EACH | 2 | $886.20 | $1,367.80 | $605.00 | $886.20 | $886.20 |
| 364 | Special 528. bend 16-inch (SPV.0060) | EACH | 22 | $2,590.28 | $2,879.26 | $1,776.14 | $2,590.28 | $2,590.28 |
| 365 | Special 529. bend 8-inch (SPV.0060) | EACH | 2 | $543.90 | $1,064.19 | $385.00 | $543.90 | $543.90 |
| 366 | Special 530. bend 6-inch (SPV.0060) | EACH | 6 | $412.54 | $947.67 | $290.00 | $412.54 | $412.54 |
| 367 | Special 531. reducer 16-inch X 12- inch (SPV.0060) | EACH | 2 | $1,880.20 | $2,249.45 | $1,276.00 | $1,880.20 | $1,880.20 |
| 368 | Special 532. reducer 16-inch X 8- inch (SPV.0060) | EACH | 8 | $1,846.60 | $2,219.65 | $1,254.00 | $1,846.60 | $1,846.60 |
| 369 | Special 533. reducer 8-inch X 6- inch (SPV.0060) | EACH | 5 | $476.00 | $1,003.97 | $326.00 | $476.00 | $476.00 |
| 370 | Special 534. reducer 8-inch X 4- inch (SPV.0060) | EACH | 1 | $431.20 | $964.23 | $295.00 | $431.20 | $431.20 |
| 371 | Special 535. cap 8-inch (SPV.0060) | EACH | 1 | $336.00 | $879.79 | $230.00 | $336.00 | $336.00 |
| 372 | Special 536. plug 16-inch (SPV.0060) | EACH | 1 | $1,670.20 | $2,063.19 | $861.00 | $1,670.20 | $1,670.20 |
| 373 | Special 537. corporation, curb stop, box & reconnect 2 inch (SPV.0060) | EACH | 5 | $2,175.38 | $3,170.26 | $1,701.00 | $2,175.38 | $2,175.38 |
| 374 | Special 538. corporation, curb stop, box & reconnect 1.5 inch (SPV.0060) | EACH | 28 | $1,586.26 | $2,692.37 | $1,348.50 | $1,586.26 | $1,586.26 |
| 375 | Special 539. corporation, curb stop, box & reconnect 1 inch (SPV.0060) | EACH | 34 | $935.27 | $2,201.38 | $906.00 | $935.27 | $935.27 |
| 376 | Special 540. temporary water service (SPV.0060) | EACH | 67 | $842.50 | $0.01 | $50.00 | $842.50 | $842.50 |
| 377 | Special 541. dewatering (for water main) (SPV.0060) | EACH | 1 | $99,300 | $0.01 | $1.00 | $99,300 | $99,300 |
| 378 | Special 542. utility line opening (for water main) (SPV.0060) | EACH | 5 | $1,000.00 | $200.00 | $1,260.87 | $1,000.00 | $1,000.00 |
| 379 | Special 543. temporary testing items (SPV.0060) | EACH | 1 | $17,331 | $100.00 | $15,909 | $17,331 | $17,331 |
| 380 | Special 544. adjust existing water main valve box and lid (SPV.0060) | EACH | 32 | $250.00 | $400.00 | $730.90 | $250.00 | $250.00 |
| 381 | Special 545. replace water main valve box and lid (SPV.0060) | EACH | 16 | $390.00 | $1,186.03 | $1,095.42 | $390.00 | $390.00 |
| 382 | Special 546. adjust existing sanitary sewer manhole (SPV.0060) | EACH | 12 | $1,136.72 | $1,536.12 | $730.90 | $1,136.72 | $1,136.72 |
| 383 | Special 547. replace sanitary manhole casting and lid (SPV.0060) | EACH | 6 | $758.80 | $2,165.13 | $1,497.83 | $758.80 | $758.80 |
| 384 | Special 548. abandon existing water valve manhole (SPV.0060) | EACH | 1 | $1,500.00 | $1,045.23 | $730.90 | $1,500.00 | $1,500.00 |
| 385 | Special 549. adjust existing water main manhole and lid (SPV.0060) | EACH | 2 | $1,136.72 | $879.00 | $730.90 | $1,136.72 | $1,136.72 |
| 386 | Special 550. reducer 16-inch X 10- inch (SPV.0060) | EACH | 1 | $1,822.80 | $2,198.54 | $1,236.00 | $1,822.80 | $1,822.80 |
| 387 | Special 551. bend 12-inch (SPV.0060) | EACH | 1 | $1,264.08 | $1,702.97 | $767.00 | $1,264.08 | $1,264.08 |
| 388 | Special 552. tee 16-inch X 10-inch (SPV.0060) | EACH | 1 | $3,442.60 | $3,635.26 | $2,335.00 | $3,442.60 | $3,442.60 |
| 389 | Special 599. remove, salvage, and reinstall decorative stone wall (SPV.0060) | EACH | 1 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 |
| 390 | Special 600. traffic signal cabinet & controller STH 50 & cook ST (SPV.0060) | EACH | 1 | $35,440 | $35,440 | $35,440 | $35,440 | $35,440 |
| 391 | Special 601. traffic signal cabinet & controller STH 50 & broad ST (SPV.0060) | EACH | 1 | $35,623 | $35,623 | $35,623 | $35,623 | $35,623 |
| 392 | Special 602. traffic signal cabinet & controller STH 50 & center ST (SPV.0060) | EACH | 1 | $35,623 | $35,623 | $35,623 | $35,623 | $35,623 |
| 393 | Special 603. traffic signal cabinet & controller STH 50 & wells ST (SPV.0060) | EACH | 1 | $35,495 | $35,495 | $35,495 | $35,495 | $35,495 |
| 394 | Special 604. traffic signal cabinet & controller STH 50 & edwards BLVD (SPV.0060) | EACH | 1 | $35,549 | $35,549 | $35,549 | $35,549 | $35,549 |
| 395 | Special 605. traffic signal cabinet & controller STH 50 & ush 12 SB ramp (SPV.0060) | EACH | 1 | $35,109 | $35,109 | $35,109 | $35,109 | $35,109 |
| 396 | Special 606. emergency vehicle preemption system STH 50 & cook ST (SPV.0060) | EACH | 1 | $9,087.09 | $9,087.09 | $9,087.09 | $9,087.09 | $9,087.09 |
| 397 | Special 607. emergency vehicle preemption system STH 50 & broad ST (SPV.0060) | EACH | 1 | $9,877.09 | $9,877.09 | $9,877.09 | $9,877.09 | $9,877.09 |
| 398 | Special 608. emergency vehicle preemption system STH 50 & center ST (SPV.0060) | EACH | 1 | $9,877.09 | $9,877.09 | $9,877.09 | $9,877.09 | $9,877.09 |
| 399 | Special 609. emergency vehicle preemption system STH 50 & wells ST (SPV.0060) | EACH | 1 | $9,087.09 | $9,087.09 | $9,087.09 | $9,087.09 | $9,087.09 |
| 400 | Special 610. emergency vehicle preemption system STH 50 & edwards BLVD (SPV.0060) | EACH | 1 | $9,877.09 | $9,877.09 | $9,877.09 | $9,877.09 | $9,877.09 |
| 401 | Special 611. emergency vehicle preemption system STH 50 & ush 12 SB ramp (SPV.0060) | EACH | 1 | $9,087.09 | $9,087.09 | $9,087.09 | $9,087.09 | $9,087.09 |
| 402 | Special 612. temporary infrared evp system STH 50 & cook ST (SPV.0060) | EACH | 1 | $2,903.68 | $2,903.68 | $2,903.68 | $2,903.68 | $2,903.68 |
| 403 | Special 613. temporary infrared evp system STH 50 & broad ST (SPV.0060) | EACH | 1 | $2,903.68 | $2,903.68 | $2,903.68 | $2,903.68 | $2,903.68 |
| 404 | Special 614. temporary infrared evp system STH 50 & center ST (SPV.0060) | EACH | 1 | $2,903.68 | $2,903.68 | $2,903.68 | $2,903.68 | $2,903.68 |
| 405 | Special 615. temporary infrared evp system STH 50 & wells ST (SPV.0060) | EACH | 1 | $2,903.68 | $2,903.68 | $2,903.68 | $2,903.68 | $2,903.68 |
| 406 | Special 616. temporary infrared evp system STH 50 & edwards BLVD (SPV.0060) | EACH | 1 | $2,903.68 | $2,903.68 | $2,903.68 | $2,903.68 | $2,903.68 |
| 407 | Special 617. temporary infrared evp system STH 50 & ush 12 SB ramp (SPV.0060) | EACH | 1 | $2,903.68 | $2,903.68 | $2,903.68 | $2,903.68 | $2,903.68 |
| 408 | Special 618. video detection system STH 50 & cook ST (SPV.0060) | EACH | 1 | $39,941 | $39,941 | $39,941 | $39,941 | $39,941 |
| 409 | Special 619. video detection system STH 50 & broad ST (SPV.0060) | EACH | 1 | $39,941 | $39,941 | $39,941 | $39,941 | $39,941 |
| 410 | Special 620. video detection system STH 50 & center ST (SPV.0060) | EACH | 1 | $39,941 | $39,941 | $39,941 | $39,941 | $39,941 |
| 411 | Special 621. video detection system STH 50 & wells ST (SPV.0060) | EACH | 1 | $36,414 | $36,414 | $36,414 | $36,414 | $36,414 |
| 412 | Special 622. video detection system STH 50 & edwards BLVD (SPV.0060) | EACH | 1 | $39,941 | $39,941 | $39,941 | $39,941 | $39,941 |
| 413 | Special 623. video detection system STH 50 & ush 12 SB ramp (SPV.0060) | EACH | 1 | $36,414 | $36,414 | $36,414 | $36,414 | $36,414 |
| 414 | Special 624. radio interconnect system STH 50 & cook ST (SPV.0060) | EACH | 1 | $7,248.40 | $7,248.40 | $7,248.40 | $7,248.40 | $7,248.40 |
| 415 | Special 625. radio interconnect system STH 50 & broad ST (SPV.0060) | EACH | 1 | $9,574.22 | $9,574.22 | $9,574.22 | $9,574.22 | $9,574.22 |
| 416 | Special 626. radio interconnect system STH 50 & center ST (SPV.0060) | EACH | 1 | $7,248.40 | $7,248.40 | $7,248.40 | $7,248.40 | $7,248.40 |
| 417 | Special 627. radio interconnect system STH 50 & wells ST (SPV.0060) | EACH | 1 | $7,248.40 | $7,248.40 | $7,248.40 | $7,248.40 | $7,248.40 |
| 418 | Special 628. accessible pedestrian push button system STH 50 & cook ST (SPV.0060) | EACH | 1 | $11,042 | $11,042 | $11,042 | $11,042 | $11,042 |
| 419 | Special 629. accessible pedestrian push button system STH 50 & broad ST (SPV.0060) | EACH | 1 | $11,042 | $11,042 | $11,042 | $11,042 | $11,042 |
| 420 | Special 630. accessible pedestrian push button system STH 50 & center ST (SPV.0060) | EACH | 1 | $11,042 | $11,042 | $11,042 | $11,042 | $11,042 |
| 421 | Special 631. accessible pedestrian push button system STH 50 & wells ST (SPV.0060) | EACH | 1 | $9,650.52 | $9,650.52 | $9,650.52 | $9,650.52 | $9,650.52 |
| 422 | Special 632. accessible pedestrian push button system STH 50 & edwards BLVD (SPV.0060) | EACH | 1 | $14,523 | $14,523 | $14,523 | $14,523 | $14,523 |
| 423 | Special 633. install cellular modem (SPV.0060) | EACH | 1 | $1,582.12 | $1,582.12 | $1,582.12 | $1,582.12 | $1,582.12 |
| 424 | Special 634. black paint for signal & lighting materials (project ID 3170-09-71) (SPV.0060) | EACH | 1 | $22,282 | $22,282 | $22,282 | $22,282 | $22,282 |
| 425 | Special 001. street sweeping (SPV.0075) | HRS | 100 | $350.00 | $190.00 | $656.49 | $261.23 | $270.00 |
| 426 | Special 001. asphaltic curb temporary (SPV.0090) | LF | 1,260 | $8.04 | $9.00 | $9.00 | $9.24 | $8.04 |
| 427 | Special 002. concrete curb & gutter 24-inch type D (SPV.0090) | LF | 965 | $30.00 | $30.00 | $30.00 | $32.11 | $30.00 |
| 428 | Special 003. sawing concrete curb head (SPV.0090) | LF | 190 | $26.00 | $26.00 | $26.00 | $25.00 | $26.00 |
| 429 | Special 500. sanitary sewer PVC 15 inch (SPV.0090) | LF | 69 | $201.95 | $284.99 | $523.01 | $201.95 | $201.95 |
| 430 | Special 502. sanitary sewer PVC 12 inch (SPV.0090) | LF | 292 | $185.58 | $261.59 | $169.66 | $185.58 | $185.58 |
| 431 | Special 503. sanitary sewer PVC 8 inch (SPV.0090) | LF | 2,372 | $253.73 | $186.49 | $189.90 | $253.73 | $253.73 |
| 432 | Special 504. RCP class V 36 inch (SPV.0090) | LF | 80 | $390.66 | $470.45 | $1,700.00 | $390.66 | $390.66 |
| 433 | Special 505. sanitary lateral 6 inch (SPV.0090) | LF | 1,121 | $213.68 | $183.54 | $161.83 | $213.68 | $213.68 |
| 434 | Special 506. abandon existing sanitary sewer (greater than 6 inch dia) (SPV.0090) | LF | 1,101 | $25.58 | $10.07 | $5.00 | $25.58 | $25.58 |
| 435 | Special 507. water main ductile iron 16 inch (SPV.0090) | LF | 5,364 | $279.71 | $308.40 | $282.67 | $279.71 | $279.71 |
| 436 | Special 508. water main ductile iron 12 inch (SPV.0090) | LF | 28 | $274.42 | $259.41 | $400.86 | $274.42 | $274.42 |
| 437 | Special 509. water main ductile iron 8 inch (SPV.0090) | LF | 151 | $235.14 | $227.04 | $204.44 | $235.14 | $235.14 |
| 438 | Special 510. water main ductile iron 6 inch (SPV.0090) | LF | 233 | $219.67 | $179.42 | $186.04 | $219.67 | $219.67 |
| 439 | Special 511. water main ductile iron 4 inch (SPV.0090) | LF | 1 | $227.06 | $268.77 | $1,270.35 | $227.06 | $227.06 |
| 440 | Special 512. water main casing pipe 30 inch (SPV.0090) | LF | 60 | $2,082.84 | $2,623.69 | $1,875.70 | $2,082.84 | $2,082.84 |
| 441 | Special 513. water service CST SDR 9 - 2 inch (SPV.0090) | LF | 240 | $151.06 | $197.14 | $117.82 | $151.06 | $151.06 |
| 442 | Special 514. water service CST SDR 9 - 1.5 inch (SPV.0090) | LF | 741 | $174.63 | $196.50 | $117.18 | $174.63 | $174.63 |
| 443 | Special 515. water service CST SDR 9 - 1 inch (SPV.0090) | LF | 793 | $200.41 | $195.65 | $117.39 | $200.41 | $200.41 |
| 444 | Special 516. abandon existing water main (greater than 6 inch dia) (SPV.0090) | LF | 2,100 | $26.24 | $8.12 | $5.00 | $26.24 | $26.24 |
| 445 | Special 518. water main ductile iron 10 inch (SPV.0090) | LF | 4 | $246.32 | $250.81 | $817.09 | $246.32 | $246.32 |
| 446 | Special 001. salvaging and reinstalling brick pavers (SPV.0165) | SF | 2,015 | $15.00 | $15.00 | $25.00 | $5.00 | $15.00 |
| 447 | Special 500. 4 FT X 8 FT insulation board polystyrene 2 inch thick (sanitary sewer) (SPV.0165) | SF | 1,536 | $3.00 | $2.21 | $2.00 | $3.00 | $3.00 |
| 448 | Special 501. 4 FT X 8 FT insulation board polystyrene 2 inch thick (watermain) (SPV.0165) | SF | 736 | $3.00 | $2.21 | $2.00 | $3.00 | $3.00 |
| 449 | Special 001. excavation of phragmites contaminated soil (SPV.0180) | SY | 50 | $87.08 | $30.26 | $82.05 | $87.08 | $90.00 |
| 450 | Special 001. excavation, hauling, and disposal of metals contaminated soil (SPV.0195) | TON | 4,185 | $57.95 | $43.17 | $64.40 | $57.95 | $62.00 |
| 451 | Special 002. excavation, hauling, and disposal of voc contaminated soil (SPV.0195) | TON | 1,680 | $59.19 | $43.17 | $60.35 | $59.19 | $62.00 |
| 452 | Special 003. asphaltic repair (SPV.0195) | TON | 1,050 | $120.00 | $150.00 | $182.26 | $192.12 | $120.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.