Research record, not reviewed
Bradford Bypass (Highway 425)
- Location
- Simcoe County / York Region, ON, Canada. Location shown at city level. See it on the map
- Stage
- Stage not confirmed: Not collected yet.
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Ontario Ministry of Transportation | |
| Category | Highways | |
| Route length | 16.3 km | Ontario Ministry of Transportation |
| Amount | Not collected yet | |
| Threshold evidence | A comparable project-wide cost is still needed |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Brennan Paving & Construction Ltd. (a subsidiary of the Miller Group) | contractor | West Section (Highway 400 to west of Artesian Industrial Parkway) | Ontario Ministry of Transportation (Bradford Bypass project site) |
| AECOM Canada Ltd. | Environmental and Detail Design Study (designer) | West Section | Ontario Ministry of Transportation (Bradford Bypass project site) |
| Jacobs Consultancy Canada Inc. & Egis Canada Ltd. | Program Management Consultant (construction administration services) | West Section construction administration | Ontario Ministry of Transportation (Bradford Bypass project site) |
| WSP Canada Inc. | Environmental and Detail Design Study (designer) | Central Section | Ontario Ministry of Transportation (Bradford Bypass project site) |
| Stantec Consulting Ltd. | Environmental and Detail Design Study (designer) | East Section | Ontario Ministry of Transportation (Bradford Bypass project site) |
About the project
Controlled-access freeway (Highway 425) linking Highways 400 and 404, delivered by the province in three sections: West, Central and East. Construction has begun on the West Section; environmental field studies are underway for the Central and East sections, whose detail design contracts were awarded in fall 2025.
Sources
- Ontario’s highway programs, Ontario Ministry of Transportation. Bradford Bypass and Highway 413 early works sections. Consulted 9 Nov 2026.
- West Section, Ontario Ministry of Transportation (Bradford Bypass project site). 'Brennan Paving & Construction Ltd., a subsidiary of the Miller Group, has been retained by MTO as the contractor for the West Section.'. Consulted 18 Nov 2026.
- Central Section, Ontario Ministry of Transportation (Bradford Bypass project site). 'MTO has retained WSP Canada Inc. (WSP) to carry out an Environmental and Detail Design Study for the Central Section ... awarded to WSP in Fall 2025'. Consulted 18 Nov 2026.
- East Section, Ontario Ministry of Transportation (Bradford Bypass project site). 'MTO has retained Stantec Consulting Ltd. (Stantec) to undertake an Environmental and Detail Design Study for the East Section of the Bradford Bypass.'. Consulted 18 Nov 2026.
- Bradford Bypass Project Statement of Completion (letter to the Ministry of the Environment, Conservation and Parks), Ontario Ministry of Transportation, 27 Jun 2024. 'The Bradford Bypass is a proposed 16.3 kilometre, controlled-access freeway that will extend from Highway 400 between 8th Line and 9th Line in Bradford West Gwillimbury, will cross a small portion of King Township, and will connect to Highway 404'. Consulted 19 Nov 2026.
- Bradford Bypass (home page), Ontario Ministry of Transportation (Bradford Bypass project site). 'The Bradford Bypass Project is being implemented in three geographically divided sections: West, Central, and East. ... Major construction has begun on the West Section of the Bradford Bypass.'. Consulted 19 Nov 2026.