Durham-Scarborough Bus Rapid Transit
- Location
- Pickering, ON, Canada. Location shown at city level. See it on the map
- Stage
- Planning, as of June 2024 (Metrolinx).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Metrolinx | |
| Category | Urban transit | |
| Route length | 36 km | Metrolinx |
| Amount | C$1.115 billion (Canadian dollars), as of June 2024 | Metrolinx |
| What the amount covers | Capital estimate. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| C$1.11 bn | Capital estimate | Whole project | Jun 2024 | Metrolinx |
Contracts and teams
Contracts and teams: Not found in the sources consulted.
About the project
A 36 km bus rapid transit corridor along Highway 2 and Ellesmere Road between downtown Oshawa and Scarborough Centre, through Whitby, Ajax and Pickering. The Transit Project Assessment Process was completed on 20 January 2022, and Metrolinx's Preliminary Design Business Case of June 2024 gives a total capital cost of $1,115 million for full implementation (Option 1), with an option deferring high-cost segments that reduces total capital costs by $297 million.
Sources
- Durham-Scarborough Bus Rapid Transit Preliminary Design Business Case (Final, June 2024), Metrolinx, Jun 2024. Option 2 description: 'relative to Option 1 (total capital cost of $1,115 million)'; corridor 36 km between Downtown Oshawa and Scarborough Centre. Consulted 12 Nov 2026.
- Durham-Scarborough BRT - FAQs, Metrolinx. FAQ: approximately 36 kilometres along Highway 2 and Ellesmere Road; TPAP completed on January 20, 2022; construction timeline not yet announced. Consulted 12 Nov 2026.