Hollywood Burbank Airport Replacement Passenger Terminal (Elevate BUR)
- Location
- Burbank, CA, United States. Location shown at city level. See it on the map
- Stage
- Opened, as of October 2026 (Hollywood Burbank Airport (Burbank-Glendale-Pasadena Airport Authority)).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Burbank-Glendale-Pasadena Airport Authority | |
| Category | Airports | |
| Amount | US$1.299 billion (US dollars), as of October 2026 | Burbank-Glendale-Pasadena Airport Authority (Elevate BUR) |
| What the amount covers | Capital estimate. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$1.3 bn | Capital estimate | Whole project | Oct 2026 | Burbank-Glendale-Pasadena Airport Authority (Elevate BUR) |
| US$1.11 bn | Contract value | One package | Oct 2026 | Burbank-Glendale-Pasadena Airport Authority (Elevate BUR) |
| US$725 M | Funding commitment | Whole project | May 2024 | Burbank-Glendale-Pasadena Airport Authority (Elevate BUR) |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Holder, Pankow, TEC Joint Venture (HPTJV) | design-builder | Replacement Passenger Terminal | Burbank-Glendale-Pasadena Airport Authority (Elevate BUR) |
| Corgan | architect, in association with CannonDesign (Burns & McDonnell is the engineering subconsultant) | Replacement Passenger Terminal | Burbank-Glendale-Pasadena Airport Authority (Elevate BUR) |
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| May 30, 2024 | financing | Whole project | Burbank-Glendale-Pasadena Airport Authority (Elevate BUR) |
| January 2024 | Groundbreaking | Whole project | Hollywood Burbank Airport (Burbank-Glendale-Pasadena Airport Authority) |
| October 2026 | opening | Whole project | Hollywood Burbank Airport (Burbank-Glendale-Pasadena Airport Authority) |
About the project
355,000 sq ft, 14-gate terminal replacing Hollywood Burbank Airport's current terminal (the airport was built in 1930), with a new parking structure and on-airport access road, set farther from the runways and built to current earthquake design and ADA standards. Design-build by the Holder, Pankow, TEC joint venture, with Corgan as architect in association with CannonDesign; design and construction GMP $1,110,074,145, owner costs $164,225,855 and demolition $24,400,000, for an estimated total of $1,298,700,000; $724.78 million of airport revenue bonds closed May 30, 2024. Scheduled opening October 2026; the Authority's press-release list carries 'Hollywood Burbank Airport Opens New Passenger Terminal' (October 2026).
Sources
- BUR Replacement Passenger Terminal, Burbank-Glendale-Pasadena Airport Authority (Elevate BUR). Project overview: 'estimated total cost of the project is just under $1.3 billion'; cost breakdown table $1,298,700,000; scheduled opening October 2026; 355,000 sq ft, 14 gates. Consulted 12 Nov 2026.
- Press Releases, Hollywood Burbank Airport (Burbank-Glendale-Pasadena Airport Authority). Release list: 'Hollywood Burbank Airport Opens New Passenger Terminal' and 'Hollywood Burbank Airport Celebrates New Passenger Terminal with Ribbon-Cutting Ceremony', October 2026; 'Hollywood Burbank Airport Breaks Ground on Replacement Passenger Terminal', January 2024; 'BGPAA Closes on $724 Million of Airport Revenue Bonds for New Terminal', May 30, 2024. The releases themselves are Dropbox files that require a login, so only the index was read.. Consulted 12 Nov 2026.