Hollywood Burbank Airport Replacement Passenger Terminal (Elevate BUR)

Location
Burbank, CA, United States. Location shown at city level. See it on the map
Status
Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
Research as of

Owners, scope and amount

FieldValueSource
Owner or sponsorBurbank-Glendale-Pasadena Airport Authority
CategoryAirports
AmountUS$1.299 billion (US dollars), as of October 2026Burbank-Glendale-Pasadena Airport Authority (Elevate BUR)
What the amount coversCapital estimate.
Threshold evidenceA cited project-scope figure meets the threshold
Sourced facts in the research record

Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.

AmountWhat it isScopeAs ofSource
US$1.3 bnCapital estimateWhole projectOct 2026Burbank-Glendale-Pasadena Airport Authority (Elevate BUR)
US$1.11 bnContract valueOne packageOct 2026Burbank-Glendale-Pasadena Airport Authority (Elevate BUR)
US$725 MFunding commitmentWhole projectMay 2024Burbank-Glendale-Pasadena Airport Authority (Elevate BUR)
Financial records, each with its kind and scope

Contracts and teams

CompanyRolePackageSource
Holder, Pankow, TEC Joint Venture (HPTJV)design-builderReplacement Passenger TerminalBurbank-Glendale-Pasadena Airport Authority (Elevate BUR)
Corganarchitect, in association with CannonDesign (Burns & McDonnell is the engineering subconsultant)Replacement Passenger TerminalBurbank-Glendale-Pasadena Airport Authority (Elevate BUR)
Delivery parties, each named by the owner, a government or the company itself

Milestones

Dated milestones, at the precision of their source

About the project

355,000 sq ft, 14-gate terminal replacing Hollywood Burbank Airport's current terminal (the airport was built in 1930), with a new parking structure and on-airport access road, set farther from the runways and built to current earthquake design and ADA standards. Design-build by the Holder, Pankow, TEC joint venture, with Corgan as architect in association with CannonDesign; design and construction GMP $1,110,074,145, owner costs $164,225,855 and demolition $24,400,000, for an estimated total of $1,298,700,000; $724.78 million of airport revenue bonds closed May 30, 2024. Scheduled opening October 2026; the Authority's press-release list carries 'Hollywood Burbank Airport Opens New Passenger Terminal' (October 2026).

Sources

  • BUR Replacement Passenger Terminal, Burbank-Glendale-Pasadena Airport Authority (Elevate BUR). Project overview: 'estimated total cost of the project is just under $1.3 billion'; cost breakdown table $1,298,700,000; scheduled opening October 2026; 355,000 sq ft, 14 gates. Consulted 12 Nov 2026.
  • Press Releases, Hollywood Burbank Airport (Burbank-Glendale-Pasadena Airport Authority). Release list: 'Hollywood Burbank Airport Opens New Passenger Terminal' and 'Hollywood Burbank Airport Celebrates New Passenger Terminal with Ribbon-Cutting Ceremony', October 2026; 'Hollywood Burbank Airport Breaks Ground on Replacement Passenger Terminal', January 2024; 'BGPAA Closes on $724 Million of Airport Revenue Bonds for New Terminal', May 30, 2024. The releases themselves are Dropbox files that require a login, so only the index was read.. Consulted 12 Nov 2026.

See it on the map. How the atlas qualifies a record.