San Diego International Airport New Terminal 1
- Location
- San Diego, CA, United States. Location shown at city level. See it on the map
- Stage
- Stage not confirmed: Not collected yet.
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | San Diego County Regional Airport Authority | |
| Category | Airports | |
| Amount | US$3.8 billion (US dollars) | San Diego County Regional Airport Authority |
| What the amount covers | Project value. | |
| Threshold evidence | A cited project-scope figure meets the threshold |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$3.8 bn | Project value | Whole project | Undated | San Diego County Regional Airport Authority |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Turner-Flatiron | design-build joint venture | New Terminal 1 terminals and roadways (design-build) | San Diego County Regional Airport Authority (NewT1.com) |
| Gensler | lead architect | New Terminal 1 terminals and roadways (Turner-Flatiron design-build team) | San Diego County Regional Airport Authority (NewT1.com) |
About the project
Terminal 1 replacement with staged improvements. The Airport Authority reports the overall project value and names Turner-Flatiron, a joint venture, as design-build firm for the terminal and roadways, with Gensler as lead architect.
Sources
- New Terminal 1 opens at San Diego International Airport, San Diego County Regional Airport Authority. Project value and first delivery partners. Consulted 9 Nov 2026.