Research record, not reviewed
Contrecœur Container Terminal
- Location
- Contrecœur, QC, Canada. Location shown at city level. See it on the map
- Stage
- Under construction, as of August 14, 2026 (Privy Council Office, Canada).
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Montréal Port Authority | |
| Category | Ports | |
| Planned container capacity | 1,150,000 TEU/year | Prime Minister of Canada |
| Berths | 2 | Prime Minister of Canada |
| Wharf length approx | 675 m | Prime Minister of Canada |
| Amount | Not collected yet | |
| Threshold evidence | A comparable project-wide cost is still needed |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| C$1.16 bn | Financing | Whole project | 9 Apr 2026 | Prime Minister of Canada |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| CTCGP | delivery consortium | In-water works | Privy Council Office, Canada |
| Pomerleau | consortium member | In-water works | Privy Council Office, Canada |
| Aecon | consortium member | In-water works | Privy Council Office, Canada |
Milestones
| Date | Milestone | Scope | Source |
|---|---|---|---|
| April 9, 2026 | Groundbreaking | Whole project | Prime Minister of Canada |
| August 14, 2026 | Construction milestone | One package | Privy Council Office, Canada |
Illustrative 3D schematic
Container terminal on the St. Lawrence. Not to scale, not georeferenced; the only dimensions given are published ones. Illustrative: berth layout, handling yard footprint, rail yard footprint, cranes, vessels and containers (context layer). Open the illustrative 3D schematic on the map.
About the project
New container facility with two berths and a rail yard. The federal amount is financing through the Canada Infrastructure Bank, separately from the terminal cost.
Scope notes
- Federal project page records start of in-water works, as well as the earlier construction team announcement. Financing is separately labelled. Privy Council Office, Canada
- CTCGP, Aecon and Pomerleau named for in-water scope; August 2026 in-water works. Privy Council Office, Canada
- Figure 2 (PDF page 7), revised impact mapping. Figure 1 gives project location. Impact Assessment Agency of Canada
Sources
- Contrecœur Terminal expansion project, Montréal Port Authority. Terminal capacity and footprint components. Consulted 9 Nov 2026.
- Groundbreaking of the Contrecœur terminal expansion, Prime Minister of Canada, 9 Apr 2026. Groundbreaking, CIB financing and wharf size. Consulted 9 Nov 2026.
- Contrecœur Container Terminal – official project evidence, Privy Council Office, Canada, 14 Aug 2026. Federal project page records start of in-water works, as well as the earlier construction team announcement. Financing is separately labelled.. Consulted 9 Nov 2026.
- Projet de terminal à conteneurs de Contrecœur, Privy Council Office, Canada. CTCGP, Aecon and Pomerleau named for in-water scope; August 2026 in-water works.. Consulted 9 Nov 2026.
- Contrecœur project-change analysis, Impact Assessment Agency of Canada. Figure 2 (PDF page 7), revised impact mapping. Figure 1 gives project location.. Consulted 9 Nov 2026.
- Contrecoeur Port Terminal Expansion Project, Environmental Assessment Report, Impact Assessment Agency of Canada, Mar 2021. 'The project would also include the development of a seven-track rail yard, a container storage and handling area, an intermodal rail yard'. Consulted 19 Nov 2026.
Research leads not yet reviewed: www.renewcanada.net.