Research record, not reviewed
Hood River–White Salmon Bridge Replacement
- Location
- Hood River / White Salmon, OR / WA, United States. Location shown at city level. See it on the map
- Stage
- Stage not confirmed: Not collected yet.
- Status
- Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
- Research as of
Owners, scope and amount
| Field | Value | Source |
|---|---|---|
| Owner or sponsor | Not collected yet | |
| Category | Bridges | |
| Amount | Not collected yet | |
| Threshold evidence | A comparable project-wide cost is still needed |
Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.
| Amount | What it is | Scope | As of | Source |
|---|---|---|---|---|
| US$200 M | Federal grant | Whole project | Dec 2024 | Hood River-White Salmon Bridge Authority |
Contracts and teams
| Company | Role | Package | Source |
|---|---|---|---|
| Kiewit Infrastructure West | design-build contractor (design and pre-construction work under way) | Replacement bridge, design and pre-construction phase | Hood River-White Salmon Bridge Authority |
About the project
Replacement of a bistate Columbia River crossing connecting Hood River and White Salmon.
Sources
- Rebuilding 18 of America’s Most Economically Significant Bridges, U.S. Department of Transportation, Dec 2024. PDF page 18 · Project profile and grant. Consulted 9 Nov 2026.
- Hood River-White Salmon Bridge Replacement Project - FAQs, Hood River-White Salmon Bridge Authority. 'Kiewit Infrastructure West, one of North America's most experienced construction and engineering firms, was selected through a competitive procurement process to serve as the project's design-build contractor. (Authority update 'Bridge Authority Approves Design Contract': commissioners "voted unanimously to approve a contract with the engineering and construction firm Kiewit to complete the...'. Consulted 18 Nov 2026.
- Hood River-White Salmon Bridge Replacement Project - FAQs, Hood River-White Salmon Bridge Authority. 'This includes $200 million from a federal INFRA grant, and $125 million each from Oregon and Washington.'. Consulted 19 Nov 2026.