Hood River–White Salmon Bridge Replacement

Location
Hood River / White Salmon, OR / WA, United States. Location shown at city level. See it on the map
Stage
Stage not confirmed: Not collected yet.
Status
Research record, not reviewed: compiled from the sources below, and each fact checked against them on 19 Nov 2026; an editor has not yet reviewed it.
Research as of

Owners, scope and amount

FieldValueSource
Owner or sponsorNot collected yet
CategoryBridges
AmountNot collected yet
Threshold evidenceA comparable project-wide cost is still needed
Sourced facts in the research record

Every figure the record holds, each a different object: a project cost, a financed scope, a grant or a contract value are never added together, and an older estimate stays as history.

AmountWhat it isScopeAs ofSource
US$200 MFederal grantWhole projectDec 2024Hood River-White Salmon Bridge Authority
Financial records, each with its kind and scope

Contracts and teams

CompanyRolePackageSource
Kiewit Infrastructure Westdesign-build contractor (design and pre-construction work under way)Replacement bridge, design and pre-construction phaseHood River-White Salmon Bridge Authority
Delivery parties, each named by the owner, a government or the company itself

About the project

Replacement of a bistate Columbia River crossing connecting Hood River and White Salmon.

Sources

  • Rebuilding 18 of America’s Most Economically Significant Bridges, U.S. Department of Transportation, Dec 2024. PDF page 18 · Project profile and grant. Consulted 9 Nov 2026.
  • Hood River-White Salmon Bridge Replacement Project - FAQs, Hood River-White Salmon Bridge Authority. 'Kiewit Infrastructure West, one of North America's most experienced construction and engineering firms, was selected through a competitive procurement process to serve as the project's design-build contractor. (Authority update 'Bridge Authority Approves Design Contract': commissioners "voted unanimously to approve a contract with the engineering and construction firm Kiewit to complete the...'. Consulted 18 Nov 2026.
  • Hood River-White Salmon Bridge Replacement Project - FAQs, Hood River-White Salmon Bridge Authority. 'This includes $200 million from a federal INFRA grant, and $125 million each from Oregon and Washington.'. Consulted 19 Nov 2026.

See it on the map. How the atlas qualifies a record.