IDOT contract 74C56 bid tabulation

Section D7. Let by Illinois DOT on January 17, 2025, Moultrie, District 07. 3 bids received; low bid $3,994,275 by Samron Midwest Contracting, Inc..

Owner
Illinois DOT
Letting
17 JAN 2025
Pay items
89
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Samron Midwest Contracting, Inc.$3,994,275Low
2Sangamo Construction Company$4,036,003+1.0%
3Freesen, a div of UCM, Inc.$4,375,582+10%
IDOT contract 74C56: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Samron Midwest Contracting, Inc.2. Sangamo Construction Company3. Freesen, a div of UCM, Inc.
1Surf rem var DP (SPL) (X4400102)SY251$70.00$67.29$66.76
2BR deck grooving long (X5030250)SY1,755$20.00$16.36$17.08
3Rem & reloc end sect (X5427600)EACH3$900.00$899.79$892.50
4Jack & rem EX bearing (Z0001899)EACH10$2,860.00$1,685.68$2,229.78
5Struct steel remov (Z0001903)LB1,950$4.00$1.86$2.57
6Approach slab rem (Z0004552)SY971$68.00$69.82$92.97
7BRD flyash/slag 2 1/2 (Z0012111)SY1,238$180.00$181.68$277.34
8BR deck scar 3/4 (Z0012130)SY1,238$170.00$119.74$226.89
9Deck slab rep (FD-T1) (Z0016001)SY19$2,700.00$1,963.16$1,989.90
10Deck slab rep (FD-T2) (Z0016002)SY20$2,700.00$1,565.21$2,004.21
11Diamond grind BR sec (Z0029090)SY2,070$21.00$16.13$25.14
12Reset survey monument (Z0053700)EACH1$2,000.00$1,854.13$1,205.23
13Earth excavation (20200100)CY1,200$36.00$46.05$52.53
14Furnished excavation (20400800)CY1,200$40.00$48.17$47.78
15Seeding CL 2 (25000200)ACRE0.50$7,200.00$6,907.20$6,906.06
16Seeding CL 7 (25000350)ACRE0.50$3,600.00$3,413.90$3,413.34
17Nitrogen fert nutr (25000400)LB45$2.00$1.69$1.69
18Phosphorus fert nutr (25000500)LB45$2.00$1.69$1.69
19Potassium fert nutr (25000600)LB45$2.00$1.69$1.69
20Agr ground limestone (25000700)TON1$400.00$370.50$370.44
21Mulch method 2 (25100115)ACRE1$3,300.00$3,096.32$3,095.82
22Erosion contr blanket (25100630)SY1,637$2.20$2.06$2.06
23Temp eros contr seed (28000250)LB100$2.00$4.26$7.17
24Inlet & pipe protect (28000500)EACH1$350.00$216.89$651.29
25PCC base cse W 10 (35400500)SY1,457$140.00$133.52$179.27
26Aggregate-temp access (40201000)TON361$42.00$57.48$44.36
27Bit matls tack CT (40600290)LB2,515$1.00$0.91$0.91
28HMA surf rem butt JT (40600982)SY1,250$47.50$45.49$59.12
29Temporary ramp (40600990)SY210$64.00$74.58$51.94
30HMA SC IL-9.5 C N70 (40604052)TON123$700.00$669.94$932.58
31Incidental HMA surf (40800050)TON30$415.00$397.87$397.91
32PVT con HMA BR app SL (42000070)SY681$200.00$191.07$236.90
33Protective coat (42001300)SY1,065$2.50$3.41$5.34
34Pavement rem (44000100)SY876$54.00$38.54$92.90
35Paved SHLD removal (44004250)SY1,442$55.00$33.99$56.10
36PCC shoulders 10 (48300500)SY43$185.00$128.83$449.67
37Conc rem (50102400)CY33.30$3,100.00$3,023.05$3,837.69
38Structure excavation (50200100)CY32$200.00$47.83$181.02
39Conc struct (50300225)CY122.90$900.00$854.41$1,349.46
40Conc sup-STR (50300255)CY148.10$1,700.00$1,388.42$1,507.83
41Protective coat (50300300)SY2,415$2.50$3.57$5.87
42Conc supstr app slab (50301350)CY367.20$600.00$828.14$1,102.83
43F & E struct steel (50500405)LB6,220$8.50$9.42$7.47
44Reinf bars, epoxy CTD (50800205)LB192,390$1.45$2.10$1.56
45Bar splicers (50800515)EACH1,394$57.00$61.57$59.48
46Pref JT strip seal (52000110)LF104$330.00$352.00$315.59
47Elast bearing assy T1 (52100010)EACH10$2,100.00$2,637.81$1,988.23
48Anchor bolts 3/4 (52100510)EACH20$223.00$178.48$208.70
49P cul CL D 1 18 temp (5421D018)LF170$48.00$58.22$57.75
50P cul CL D 1 36 temp (5421D036)LF270$93.00$74.10$73.50
51Metal FL end sec 12" (54262712)EACH4$740.00$439.31$435.75
52Metal FL end sec 18" (54262718)EACH1$2,100.00$523.99$519.75
53Metal FL end sec 36" (54262736)EACH2$3,100.00$661.61$656.25
54Granular backfill STR (58600101)CY27$175.00$121.50$183.88
55Pipe drains 12 (60100945)LF40$55.00$101.62$100.80
56Remov inlets (60500060)EACH4$1,000.00$616.01$941.04
57Conc curb TB (60600605)LF78$105.00$65.34$122.03
58Conc thrust blocks (61000050)EACH4$600.00$735.71$729.75
59TY G inlet box 610001 (61000335)EACH4$5,000.00$3,350.89$3,360.00
60SPBGR TY A 6FT posts (63000001)LF1,412.50$30.00$38.11$28.58
61Traf bar term T6 (63100085)EACH19$4,850.00$4,234.29$4,656.96
62TR bar TRM T1 SPL tan (63100167)EACH15$3,975.00$3,175.72$3,704.40
63TR bar TRM T1 SPL FLR (63100169)EACH4$4,000.00$3,175.72$3,780.00
64Guardrail remov (63200310)LF2,982$12.30$8.96$5.29
65Imp atten FRD nar TL3 (64300260)EACH1$35,000$29,640$29,453
66Engr field office A (67000400)CAL MO18$2,400.00$2,556.04$4,151.11
67Mobilization (67100100)LS1$236,557$238,124$196,372
68Traf cont-prot 701316 (70100100)EACH5$0.01$9,803.98$895.71
69Traf cont-prot 701321 (70100405)EACH5$40,000$33,462$9,873.44
70Traf cont-prot 701201 (70100450)LS1$2,500.00$1.00$525.00
71Traf cont-prot 701326 (70100500)LS1$2,500.00$11,767$6,875.35
72TR cont surveillance (70103815)CAL DAY18$0.01$1.22$1.32
73Temp BR traf signals (70106500)EACH5$22,500$32,589$15,645
74Temp rumble strips (70106700)EACH30$1,500.00$1,485.93$735.00
75Pavt MK blkout tape 5 (70107005)LF3,817$3.00$5.04$2.42
76Changeable message SN (70107025)CAL DAY84$165.00$125.73$110.25
77Short term pavt mking (70300100)LF208$4.00$1.06$1.47
78SHRT TRM pavt MK rem (70300150)SF1,670$2.00$2.45$0.32
79Temp PVT MK line 4 - paint (70300221)LF2,728$0.01$2.72$2.70
80Temp conc barrier (70400100)LF2,087.50$35.00$48.80$54.70
81Pin temp conc barrier (70400125)EACH352$32.00$24.96$62.85
82Rel temp conc barrier (70400200)LF2,062.50$5.00$9.05$5.51
83Imp attn temp FRN TL3 (70600260)EACH10$11,000$8,203.12$5,715.36
84Imp attn rel FRN TL3 (70600332)EACH10$4,800.00$4,310.86$5,266.20
85Terminal marker - DA (72501000)EACH20$56.00$42.34$52.92
86Paint PVT MK line 4 (78001110)LF2,728$3.00$2.72$2.72
87Grdrail ref type A (78200005)EACH47$11.00$19.05$10.58
88Raised ref PVT MK rem (78300200)EACH4$135.00$12.20$59.24
89PVT MKG rem WTR blast (78300202)SF915$10.00$9.53$9.53
IDOT contract 74C56: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way