INDOT contract B-40311-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on December 10, 2025, Floyd, Seymour. 6 bids received; low bid $8,348,999 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 10 DEC 2025
- Pay items
- 148
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $8,348,999 | Low |
| 2 | Force Construction Co Inc | $8,500,000 | +2.0% |
| 3 | Ragle, Inc. | $8,750,976 | +5.0% |
| 4 | Beaty Construction Inc | $8,940,659 | +7.0% |
| 5 | Mac Construction & Excavating Inc | $9,356,500 | +12% |
| 6 | E & B Paving LLC | $9,670,000 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Force Construction Co Inc | 3. Ragle, Inc. | 4. Beaty Construction Inc | 5. Mac Construction & Excavating Inc | 6. E & B Paving LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $64,800 | $133,070 | $140,000 | $150,000 | $75,000 | $167,287 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $415,000 | $425,000 | $435,000 | $447,000 | $450,000 | $470,500 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $354,000 | $44,050 | $110,000 | $89,000 | $450,000 | $99,145 |
| 0011 | Curb and gutter, remove (202-02279) | LFT | 408 | $26.00 | $15.00 | $5.00 | $10.00 | $20.00 | $7.00 |
| 0012 | Houses and buildings, remove, parcel no. 13 (202-03000) | LS | 1 | $130,000 | $268,620 | $75,000 | $75,000 | $125,000 | $250,000 |
| 0013 | Present structure, remove, structure no. 22-00051 (202-51330) | LS | 1 | $245,000 | $122,550 | $350,000 | $525,000 | $125,000 | $200,000 |
| 0014 | Sidewalk concrete, remove (202-52710) | SYS | 58 | $27.00 | $48.00 | $16.00 | $40.00 | $100.00 | $45.00 |
| 0015 | Sign and supports, channel posts, remove (202-74045) | EACH | 17 | $175.00 | $67.00 | $55.00 | $90.00 | $200.00 | $65.00 |
| 0016 | Guardrail end treatment, remove (202-93741) | EACH | 1 | $1,095.00 | $771.00 | $1,000.00 | $232.00 | $445.82 | $232.00 |
| 0017 | Excavation, common (203-02000) | CYS | 24,773 | $17.50 | $21.00 | $26.00 | $25.00 | $20.00 | $38.50 |
| 0018 | Excavation, rock (203-02010) | CYS | 1,274 | $179.00 | $168.00 | $50.00 | $68.00 | $90.00 | $150.00 |
| 0019 | Excavation, Y (203-02040) | CYS | 312 | $189.00 | $203.00 | $84.00 | $145.00 | $90.00 | $385.00 |
| 0020 | Borrow (203-02070) | CYS | 1,579 | $26.50 | $27.00 | $15.00 | $35.00 | $55.00 | $5.00 |
| 0021 | Excavation, waterway (203-51223) | CYS | 156 | $80.00 | $60.00 | $50.00 | $40.00 | $156.00 | $60.00 |
| 0022 | Temporary geotextile (205-11587) | SYS | 665 | $2.80 | $3.60 | $2.25 | $5.00 | $4.00 | $2.50 |
| 0023 | Stormwater management budget (205-12108) | DOL | 50,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0024 | Stormwater management implementation (205-12616) | LS | 1 | $17,000 | $65,060 | $75,000 | $50,000 | $295,500 | $65,000 |
| 0025 | SWQCP preparation (205-12618) | LS | 1 | $2,000.00 | $5,654.00 | $7,500.00 | $10,000 | $4,000.00 | $2,600.00 |
| 0026 | Cofferdam (206-51235) | LS | 1 | $185,000 | $122,980 | $350,000 | $600,000 | $562,775 | $350,000 |
| 0027 | Subgrade treatment, type II (207-08264) | SYS | 1,477 | $26.50 | $19.00 | $25.00 | $30.00 | $25.00 | $56.00 |
| 0028 | Subgrade treatment, type ibc (207-12635) | SYS | 14,712 | $20.00 | $13.00 | $12.65 | $14.00 | $11.15 | $20.00 |
| 0029 | Aggregate for end bent backfill (211-06467) | CYS | 33 | $184.65 | $131.00 | $130.00 | $250.00 | $150.00 | $260.00 |
| 0030 | Structure backfill, type 2 (211-09265) | CYS | 2,086 | $78.00 | $68.00 | $90.00 | $102.00 | $90.00 | $67.00 |
| 0031 | Geogrid, type IB (214-11796) | SYS | 1,119 | $3.25 | $4.50 | $4.25 | $5.00 | $3.00 | $2.50 |
| 0032 | Geotextile for pavement, type 2A (214-12238) | SYS | 3,812 | $4.19 | $3.80 | $4.50 | $3.00 | $4.00 | $2.50 |
| 0033 | Compacted aggregate, no. 2 (301-12231) | CYS | 222 | $135.00 | $86.00 | $58.00 | $130.00 | $98.00 | $135.00 |
| 0034 | Compacted aggregate, no. 5 (301-12232) | CYS | 613 | $57.00 | $67.00 | $57.00 | $60.00 | $105.00 | $65.00 |
| 0035 | Compacted aggregate, no. 53 (301-12234) | CYS | 320 | $185.00 | $68.00 | $79.00 | $60.00 | $115.00 | $120.00 |
| 0036 | Subbase for PCCP (302-06464) | CYS | 243 | $82.00 | $85.00 | $138.00 | $85.00 | $87.00 | $100.00 |
| 0037 | Dense graded subbase (302-07455) | CYS | 76 | $105.00 | $89.00 | $113.00 | $160.00 | $67.00 | $135.00 |
| 0038 | Compacted aggregate, no. 53 (303-01180) | TON | 958 | $39.00 | $33.00 | $42.00 | $70.00 | $55.00 | $45.00 |
| 0039 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 485 | $124.00 | $130.00 | $126.00 | $126.00 | $127.00 | $126.00 |
| 0040 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 809 | $112.50 | $102.00 | $98.90 | $98.90 | $108.00 | $98.90 |
| 0042 | QC/QA-HMA, 3, 58E, intermediate, OG, 19.0 MM (401-000062) | TON | 698 | $87.00 | $116.00 | $112.84 | $112.84 | $109.00 | $112.84 |
| 0043 | Joint adhesive (401-11526) | LFT | 2,041 | $1.55 | $0.01 | $0.01 | $0.01 | $1.00 | $0.01 |
| 0044 | Asphalt for tack coat (406-05520) | TON | 10 | $575.00 | $1.00 | $1.00 | $1.00 | $0.01 | $1.00 |
| 0045 | Terminal joint, type HMA (503-12477) | LFT | 82 | $510.00 | $446.00 | $445.00 | $1,500.00 | $200.00 | $415.00 |
| 0046 | Guardrail, remove (601-02241) | LFT | 349 | $7.00 | $8.20 | $7.50 | $10.00 | $5.33 | $10.00 |
| 0047 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 10 | $22.00 | $23.00 | $22.00 | $22.00 | $22.00 | $22.00 |
| 0048 | Guardrail, MGS W-beam, shop curved, 6 FT 3 in. spacing (601-12286) | LFT | 16 | $38.00 | $39.00 | $38.00 | $38.00 | $38.00 | $38.00 |
| 0049 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,400.00 | $3,495.00 | $3,400.00 | $3,400.00 | $3,400.00 | $3,400.00 |
| 0050 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $2,400.00 | $2,467.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 |
| 0051 | Sidewalk, concrete (604-06070) | SYS | 1,390 | $55.00 | $60.00 | $75.00 | $80.00 | $66.00 | $63.10 |
| 0052 | Curb ramp, concrete (604-08086) | SYS | 79 | $250.00 | $175.00 | $195.00 | $300.00 | $170.00 | $140.80 |
| 0053 | Detectable warning surfaces (604-12083) | SYS | 18 | $325.00 | $247.00 | $240.00 | $600.00 | $240.00 | $391.42 |
| 0054 | Curb, concrete (605-06120) | LFT | 155 | $68.00 | $40.00 | $39.05 | $45.00 | $39.05 | $54.33 |
| 0055 | Curb and gutter, concrete (605-06140) | LFT | 2,101 | $41.00 | $32.00 | $31.35 | $50.00 | $31.35 | $25.85 |
| 0056 | Curb and gutter, rolled curb (605-97937) | LFT | 607 | $54.00 | $36.00 | $35.50 | $60.00 | $35.50 | $27.37 |
| 0057 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 284 | $265.00 | $177.00 | $200.00 | $215.00 | $375.00 | $240.00 |
| 0058 | HMA for approaches, type B (610-07487) | TON | 500 | $139.00 | $144.00 | $140.31 | $140.31 | $126.00 | $140.31 |
| 0059 | PCCP for approaches, 6 in. (610-08446) | SYS | 161 | $115.00 | $85.00 | $83.00 | $110.00 | $83.00 | $114.55 |
| 0060 | PCCP for approaches, 9 in. (610-09108) | SYS | 294 | $120.00 | $110.00 | $107.00 | $125.00 | $107.00 | $122.63 |
| 0061 | Mailbox assembly, single (611-06497) | EACH | 1 | $260.00 | $267.00 | $260.00 | $260.00 | $260.00 | $260.00 |
| 0062 | Mailbox assembly, double (611-06498) | EACH | 5 | $375.00 | $386.00 | $375.00 | $375.00 | $375.00 | $375.00 |
| 0063 | Right-of-way marker (615-06490) | EACH | 50 | $184.00 | $189.00 | $184.00 | $184.00 | $184.00 | $184.00 |
| 0064 | Monument, type B (615-06505) | EACH | 13 | $1,075.00 | $1,105.00 | $1,075.00 | $1,075.00 | $1,075.00 | $1,075.00 |
| 0065 | Monument, type C (615-06510) | EACH | 2 | $1,025.00 | $1,054.00 | $1,025.00 | $1,025.00 | $1,025.00 | $1,025.00 |
| 0066 | Monument, type D (615-06515) | EACH | 1 | $141.00 | $145.00 | $141.00 | $141.00 | $141.00 | $141.00 |
| 0067 | Benchmark post (615-06530) | EACH | 1 | $1,000.00 | $154.00 | $1,000.00 | $1,500.00 | $896.18 | $900.00 |
| 0068 | Riprap, revetment (616-06405) | TON | 709 | $65.00 | $76.00 | $60.00 | $60.00 | $80.00 | $110.00 |
| 0069 | Geotextile for riprap, type 2A (616-12248) | SYS | 3,657 | $2.20 | $2.60 | $3.00 | $3.00 | $4.00 | $2.50 |
| 0070 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $900.00 | $925.00 | $900.00 | $975.00 | $975.00 | $900.00 |
| 0071 | Erosion control blanket (621-02770) | SYS | 523 | $2.25 | $2.30 | $2.25 | $4.47 | $4.47 | $2.25 |
| 0072 | Seed mixture, type U (621-06554) | LBS | 407 | $4.25 | $4.40 | $4.25 | $14.00 | $14.00 | $4.25 |
| 0073 | Mulching material (621-06565) | TON | 5 | $550.00 | $565.00 | $550.00 | $885.00 | $885.00 | $550.00 |
| 0074 | Water (621-06567) | KGAL | 41 | $20.00 | $21.00 | $20.00 | $2.00 | $2.00 | $20.00 |
| 0075 | Sodding, nursery (621-06575) | SYS | 1,718 | $6.50 | $6.70 | $10.00 | $6.60 | $6.60 | $6.50 |
| 0076 | Seed mixture, floodplain (621-12612) | LBS | 83 | $250.00 | $257.00 | $250.00 | $154.00 | $154.00 | $250.00 |
| 0077 | Plant, deciduous shrub, 18 in. to 24 in. (622-05639) | EACH | 544 | $35.00 | $36.00 | $35.00 | $72.60 | $72.60 | $35.00 |
| 0078 | Plant, deciduous tree, single stem, 1.25 in. to 2 in. (622-05649) | EACH | 1,088 | $400.00 | $411.00 | $400.00 | $454.00 | $454.00 | $400.00 |
| 0079 | Field office, type C (628-09403) | MOS | 24 | $3,950.00 | $3,392.00 | $2,800.00 | $3,400.00 | $3,000.00 | $3,800.00 |
| 0080 | Computer system equipment (628-11976) | EACH | 2 | $1,450.00 | $1,028.00 | $1,500.00 | $600.00 | $1,080.00 | $750.00 |
| 0081 | Topsoil processing and distribution (629-000149) | SYS | 17,186 | $6.55 | $5.00 | $3.25 | $7.50 | $7.15 | $7.00 |
| 0082 | Topsoil amendment budget (629-000150) | DOL | 34,372 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0083 | Cored hole in rock, diameter 24 in. (701-02938) | LFT | 36 | $1,116.00 | $586.00 | $1,650.00 | $1,600.00 | $1,200.00 | $2,280.00 |
| 0084 | Pile shoe, HP 12 X 53 (701-09739) | EACH | 12 | $135.00 | $129.00 | $165.00 | $250.00 | $145.00 | $150.00 |
| 0085 | Pile, steel H, HP 12 X 53 (701-51195) | LFT | 308 | $155.00 | $76.00 | $110.00 | $100.00 | $210.00 | $135.00 |
| 0086 | Grates, basins, and fittings, cast iron (702-12076) | EACH | 2 | $2,500.00 | $1,780.00 | $3,000.00 | $1,700.00 | $2,700.00 | $3,000.00 |
| 0087 | Concrete, B, footings (702-51015) | CYS | 375 | $677.00 | $346.00 | $550.00 | $350.00 | $530.00 | $670.00 |
| 0088 | Concrete, A (702-90915) | CYS | 849.50 | $825.00 | $872.00 | $930.00 | $800.00 | $1,015.00 | $1,250.00 |
| 0089 | Concrete, C , sidewalk (702-93722) | CYS | 22 | $730.00 | $962.00 | $800.00 | $1,200.00 | $1,120.00 | $1,000.00 |
| 0090 | Reinforcing bars (703-06028) | LBS | 124,184 | $1.70 | $1.30 | $1.90 | $1.35 | $1.75 | $1.75 |
| 0091 | Reinforcing bars, epoxy coated (703-06029) | LBS | 146,441 | $1.80 | $1.40 | $2.00 | $1.50 | $2.00 | $1.50 |
| 0092 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 56 | $50.00 | $43.00 | $65.00 | $39.00 | $90.00 | $35.00 |
| 0093 | Concrete, C, superstructure (704-51002) | CYS | 347 | $1,400.00 | $1,044.00 | $1,300.00 | $1,200.00 | $1,120.00 | $1,150.00 |
| 0094 | Concrete bridge railing transition, type TPS-1 (706-06353) | EACH | 4 | $8,000.00 | $7,285.00 | $4,800.00 | $7,500.00 | $9,000.00 | $5,300.00 |
| 0095 | Railing, concrete type PS-1 (706-09961) | LFT | 432.50 | $150.00 | $149.00 | $250.00 | $200.00 | $120.00 | $90.00 |
| 0096 | Railing, steel type PS-1 (706-11418) | LFT | 450 | $82.00 | $84.00 | $82.00 | $82.00 | $82.00 | $82.00 |
| 0097 | Structural member, concrete, I-beam, 45 in. X 16 in. (707-05984) | LFT | 1,495 | $550.00 | $474.00 | $700.00 | $500.00 | $470.00 | $384.00 |
| 0098 | Surface seal , 22-00051 (709-51821) | LS | 1 | $20,106 | $19,130 | $5,000.00 | $20,000 | $20,106 | $1.00 |
| 0099 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 1,219 | $20.00 | $11.00 | $18.00 | $25.00 | $22.00 | $25.00 |
| 0100 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 115 | $33.00 | $71.00 | $40.00 | $65.00 | $42.00 | $55.00 |
| 0101 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 1,186 | $90.00 | $88.00 | $68.00 | $90.00 | $100.00 | $150.00 |
| 0102 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 58 | $92.00 | $95.00 | $78.00 | $115.00 | $105.00 | $200.00 |
| 0103 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 220 | $86.00 | $102.00 | $85.00 | $125.00 | $115.00 | $195.00 |
| 0104 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 16 | $255.00 | $140.00 | $260.00 | $210.00 | $220.00 | $610.00 |
| 0105 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 60 | $38.00 | $32.00 | $15.00 | $35.00 | $40.00 | $35.00 |
| 0106 | Pipe, roadway drain casting extension (715-10238) | EACH | 2 | $1,630.00 | $925.00 | $1,000.00 | $1,000.00 | $1,000.00 | $450.00 |
| 0107 | Pipe end section, diameter 12 in. (715-46000) | EACH | 2 | $1,700.00 | $675.00 | $1,050.00 | $1,700.00 | $1,300.00 | $1,000.00 |
| 0108 | Pipe end section, diameter 18 in. (715-46010) | EACH | 1 | $1,900.00 | $845.00 | $1,250.00 | $1,900.00 | $1,700.00 | $1,500.00 |
| 0109 | Outlet protector, type 3 (718-06531) | EACH | 2 | $2,500.00 | $1,617.00 | $1,425.00 | $1,500.00 | $1,978.46 | $2,900.00 |
| 0110 | Geotextile for underdrains, type 2A (718-12307) | SYS | 1,214 | $2.00 | $2.40 | $2.75 | $1.00 | $6.00 | $3.00 |
| 0111 | Aggregate for underdrains (718-52610) | CYS | 109 | $150.00 | $85.00 | $80.00 | $50.00 | $100.00 | $91.00 |
| 0112 | Pipe, plug existing (720-02442) | EACH | 2 | $1,600.00 | $1,106.00 | $1,000.00 | $1,000.00 | $1,500.00 | $3,500.00 |
| 0113 | Casting, inlet, adjust to grade (720-12797) | EACH | 1 | $1,600.00 | $868.00 | $1,100.00 | $2,000.00 | $1,100.00 | $2,000.00 |
| 0114 | Casting, manhole, adjust to grade (720-12798) | EACH | 6 | $2,300.00 | $1,125.00 | $1,100.00 | $2,000.00 | $1,100.00 | $1,600.00 |
| 0115 | Inlet, type E7 (720-45030) | EACH | 4 | $3,500.00 | $1,795.00 | $3,800.00 | $2,700.00 | $3,100.00 | $5,800.00 |
| 0116 | Inlet, type F7 (720-45035) | EACH | 2 | $3,900.00 | $1,955.00 | $4,000.00 | $2,900.00 | $4,200.00 | $6,000.00 |
| 0117 | Inlet, type J10 (720-45045) | EACH | 3 | $4,000.00 | $2,189.00 | $4,200.00 | $3,200.00 | $3,200.00 | $6,000.00 |
| 0118 | Inlet, type M10 (720-45055) | EACH | 15 | $3,800.00 | $2,234.00 | $4,200.00 | $3,500.00 | $3,200.00 | $6,000.00 |
| 0119 | Inlet, type R13 (720-45075) | EACH | 5 | $4,200.00 | $2,433.00 | $4,500.00 | $3,600.00 | $2,900.00 | $6,000.00 |
| 0120 | Inlet, type M10, modified (720-45155) | EACH | 5 | $3,900.00 | $2,519.00 | $4,200.00 | $3,500.00 | $3,200.00 | $6,000.00 |
| 0121 | Manhole, type C4 (720-45410) | EACH | 1 | $5,500.00 | $3,133.00 | $6,500.00 | $5,200.00 | $7,400.00 | $10,000 |
| 0122 | Structure, manhole, reconstructed (720-45605) | LFT | 22 | $1,300.00 | $1,706.00 | $1,300.00 | $800.00 | $2,900.00 | $1,500.00 |
| 0123 | Structure, inlet, reconstructed (720-45615) | LFT | 1 | $5,500.00 | $1,963.00 | $1,500.00 | $1,000.00 | $5,800.00 | $3,400.00 |
| 0124 | Inlet, type R13, modified (720-94847) | EACH | 2 | $4,700.00 | $2,641.00 | $5,000.00 | $3,600.00 | $3,400.00 | $6,400.00 |
| 0125 | Inlet, type C15 (720-98555) | EACH | 3 | $4,350.00 | $2,849.00 | $4,600.00 | $3,800.00 | $3,400.00 | $6,400.00 |
| 0126 | Longitudinal grooving (722-12732) | SYS | 1,286 | $7.00 | $3.50 | $4.75 | $10.00 | $3.50 | $6.00 |
| 0127 | Construction sign, type D (801-03291) | EACH | 6 | $278.00 | $125.00 | $278.00 | $278.00 | $278.00 | $278.00 |
| 0128 | Road closure sign assembly (801-04308) | EACH | 14 | $278.00 | $232.00 | $278.00 | $278.00 | $278.00 | $278.00 |
| 0129 | Detour route marker assembly (801-06625) | EACH | 39 | $151.00 | $175.00 | $151.00 | $151.00 | $151.00 | $151.00 |
| 0130 | Construction sign, type A (801-06640) | EACH | 18 | $208.00 | $364.00 | $208.00 | $208.00 | $208.00 | $208.00 |
| 0131 | Construction sign, type B (801-06645) | EACH | 8 | $115.00 | $113.00 | $115.00 | $115.00 | $115.00 | $115.00 |
| 0132 | Maintaining traffic (801-06775) | LS | 1 | $56,499 | $968,638 | $300,000 | $244,416 | $200,000 | $268,152 |
| 0133 | Barricade, type III-A (801-07118) | LFT | 136 | $16.05 | $11.00 | $16.05 | $16.05 | $16.05 | $16.05 |
| 0134 | Barricade, type III-B (801-07119) | LFT | 56 | $16.05 | $13.00 | $16.05 | $16.05 | $16.05 | $16.05 |
| 0135 | Temporary pedestrian channelizer (801-12862) | LFT | 12 | $42.55 | $514.00 | $24.00 | $42.55 | $34.33 | $42.55 |
| 0136 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 108 | $28.00 | $39.00 | $30.00 | $28.00 | $28.00 | $38.00 |
| 0137 | Sign, sheet, relocate (802-07060) | EACH | 3 | $325.00 | $154.00 | $230.00 | $325.00 | $325.00 | $150.00 |
| 0138 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 53.75 | $39.00 | $31.00 | $22.00 | $39.00 | $39.00 | $30.00 |
| 0139 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 554 | $1.66 | $6.90 | $1.66 | $1.66 | $1.66 | $1.66 |
| 0140 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 544 | $1.66 | $6.90 | $1.66 | $1.66 | $1.66 | $1.66 |
| 0141 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 3,350 | $1.54 | $1.70 | $1.54 | $1.54 | $1.54 | $1.54 |
| 0142 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 3,394 | $1.54 | $1.70 | $1.54 | $1.54 | $1.54 | $1.54 |
| 0143 | Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278) | LFT | 71 | $4.33 | $7.50 | $4.33 | $4.33 | $4.33 | $4.33 |
| 0144 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 72 | $10.44 | $15.00 | $10.44 | $10.44 | $10.44 | $10.44 |
| 0145 | Transverse marking, thermoplastic, crosswalk line, white, 6 in. (808-75300) | LFT | 344 | $3.55 | $3.80 | $3.55 | $3.55 | $3.55 | $3.55 |
| 0146 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 3 | $235.00 | $336.00 | $235.00 | $235.00 | $235.00 | $235.00 |
| 0147 | Line, thermoplastic, solid, yellow, 8 in. (808-92027) | LFT | 336 | $1.96 | $2.10 | $1.96 | $1.96 | $1.96 | $1.96 |
| 0148 | QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053) | TON | 2,084 | $95.00 | $89.00 | $86.55 | $86.55 | $97.00 | $86.55 |
| 0149 | Pipe, ductile iron, 24 in. (715-02012) | LFT | 300 | $405.00 | $1,160.00 | $565.00 | $615.00 | $1,385.00 | $1,352.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.