INDOT contract B-42174-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on January 15, 2025, Lawrence, Vincennes. 8 bids received; low bid $2,633,000 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 15 JAN 2025
- Pay items
- 86
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $2,633,000 | Low |
| 2 | Force Construction Co Inc | $2,680,000 | +2.0% |
| 3 | CLR Inc | $2,979,753 | +13% |
| 4 | Morphey Construction Inc. | $3,059,000 | +16% |
| 5 | Crider & Crider Inc | $3,077,971 | +17% |
| 6 | His Constructors Inc | $3,203,973 | +22% |
| 7 | Ragle, Inc. | $3,272,509 | +24% |
| 8 | E & B Paving LLC | $3,397,100 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Force Construction Co Inc | 3. CLR Inc | 4. Morphey Construction Inc. | 5. Crider & Crider Inc | 6. His Constructors Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $22,395 | $14,038 | $50,000 | $15,000 | $32,500 | $28,500 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $131,825 | $134,000 | $146,800 | $152,950 | $73,750 | $84,735 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $25,500 | $30,620 | $29,300 | $30,850 | $34,250 | $44,160 |
| 0012 | Present structure, remove, structure no. 2 (202-51330) | LS | 1 | $30,000 | $39,520 | $60,000 | $25,000 | $40,665 | $57,915 |
| 0013 | Pipe, remove (202-96133) | LFT | 117 | $54.05 | $29.00 | $55.00 | $40.00 | $66.00 | $47.00 |
| 0014 | Fence, farm field, remove (202-99187) | LFT | 115 | $15.50 | $4.20 | $7.00 | $5.00 | $13.70 | $4.50 |
| 0016 | Borrow (203-02070) | CYS | 130 | $47.10 | $66.00 | $20.00 | $60.00 | $79.50 | $57.00 |
| 0017 | Excavation, waterway (203-51223) | CYS | 130 | $47.10 | $48.00 | $36.00 | $120.00 | $193.00 | $73.00 |
| 0018 | Pump around (205-11626) | EACH | 3 | $18,500 | $11,980 | $10,000 | $15,000 | $28,500 | $31,000 |
| 0019 | Stormwater management budget (205-12108) | DOL | 23,754 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0020 | Stormwater management implementation (205-12616) | LS | 1 | $7,000.00 | $12,940 | $2,500.00 | $5,000.00 | $14,700 | $7,500.00 |
| 0021 | Subgrade treatment, type II (207-08264) | SYS | 350 | $38.00 | $35.00 | $12.00 | $30.00 | $36.30 | $24.00 |
| 0022 | Subgrade treatment, type IC (207-09935) | SYS | 2,731 | $31.50 | $38.00 | $24.00 | $40.00 | $30.50 | $35.00 |
| 0023 | B borrow (211-02050) | CYS | 45 | $68.30 | $71.00 | $71.00 | $60.00 | $80.00 | $52.00 |
| 0024 | Structure backfill, type 2 (211-09265) | CYS | 151 | $56.00 | $80.00 | $94.00 | $85.00 | $81.50 | $98.00 |
| 0025 | Structure backfill, type 5 (211-09268) | CYS | 1,588 | $186.00 | $223.00 | $124.00 | $190.00 | $153.00 | $274.00 |
| 0026 | Geotextile for pavement, type 2B (214-12239) | SYS | 2,904 | $4.29 | $5.70 | $3.00 | $4.00 | $6.70 | $4.00 |
| 0027 | Compacted aggregate, no. 8 (301-12233) | CYS | 39 | $103.00 | $71.00 | $225.00 | $160.00 | $104.50 | $107.00 |
| 0028 | Compacted aggregate, no. 53 (301-12234) | CYS | 59 | $95.00 | $112.00 | $93.00 | $120.00 | $74.00 | $86.00 |
| 0029 | Compacted aggregate, no. 53 (303-01180) | TON | 282 | $42.18 | $51.00 | $62.00 | $60.00 | $41.00 | $41.00 |
| 0030 | Milling, transition (306-08043) | SYS | 446 | $13.25 | $12.00 | $25.00 | $30.00 | $24.00 | $12.00 |
| 0031 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 232 | $146.00 | $152.00 | $215.00 | $146.00 | $162.00 | $170.00 |
| 0032 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 322 | $118.00 | $123.00 | $106.00 | $118.00 | $131.00 | $136.00 |
| 0033 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 812 | $97.00 | $101.00 | $82.00 | $97.00 | $108.00 | $112.00 |
| 0034 | Joint adhesive, surface (401-10258) | LFT | 979 | $2.00 | $2.10 | $2.00 | $2.00 | $2.25 | $2.25 |
| 0035 | Joint adhesive, intermediate (401-10259) | LFT | 929 | $2.00 | $2.10 | $2.00 | $2.00 | $2.25 | $2.25 |
| 0036 | Liquid asphalt sealant (401-11785) | LFT | 1,079 | $2.00 | $2.10 | $2.00 | $2.00 | $2.25 | $2.25 |
| 0037 | Asphalt for tack coat (406-05521) | SYS | 6,145 | $0.13 | $0.15 | $0.13 | $0.13 | $0.20 | $0.20 |
| 0038 | Modified W-beam post (601-000132) | EACH | 2 | $280.00 | $291.00 | $315.00 | $1,500.00 | $312.00 | $325.00 |
| 0039 | Guardrail connector system, W-beam, curved, type 2 (601-01626) | EACH | 1 | $2,050.00 | $2,130.00 | $2,300.00 | $1,719.84 | $2,290.00 | $2,400.00 |
| 0040 | Guardrail terminal system, W-beam curved, type 3 (601-01846) | EACH | 1 | $2,750.00 | $2,857.00 | $3,075.00 | $2,379.35 | $3,060.00 | $3,230.00 |
| 0041 | Guardrail, remove (601-02241) | LFT | 1,134 | $4.50 | $4.70 | $6.00 | $5.00 | $5.00 | $5.25 |
| 0042 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 407 | $18.00 | $19.00 | $21.00 | $18.00 | $20.00 | $21.00 |
| 0043 | Guardrail height transition, MGS (601-12289) | EACH | 2 | $1,300.00 | $1,351.00 | $1,500.00 | $812.00 | $1,450.00 | $1,530.00 |
| 0044 | Guardrail, MGS, structure top-mounted post (601-12293) | EACH | 20 | $360.00 | $374.00 | $425.00 | $325.00 | $400.00 | $420.00 |
| 0045 | Modified MGS W-beam post (601-12404) | EACH | 6 | $250.00 | $260.00 | $280.00 | $500.00 | $280.00 | $290.00 |
| 0046 | Guardrail, W-beam, structure top-mounted posts (601-12422) | EACH | 8 | $360.00 | $374.00 | $405.00 | $1,128.00 | $400.00 | $420.00 |
| 0047 | Guardrail end treatment, type OS (601-94689) | EACH | 5 | $2,800.00 | $2,909.00 | $3,125.00 | $3,000.00 | $3,125.00 | $3,290.00 |
| 0048 | Guardrail end treatment, type OS , SKT-350 (601-94689) | EACH | 1 | $2,800.00 | $2,909.00 | $3,125.00 | $3,000.00 | $3,125.00 | $3,290.00 |
| 0049 | Guardrail end treatment, type OS , test level 2 (601-94689) | EACH | 1 | $2,475.00 | $2,572.00 | $2,775.00 | $3,000.00 | $2,760.00 | $2,900.00 |
| 0050 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 44 | $20.00 | $21.00 | $23.00 | $20.00 | $22.00 | $24.00 |
| 0051 | HMA for approaches, type B (610-07487) | TON | 77 | $123.00 | $128.00 | $123.00 | $204.95 | $137.00 | $142.00 |
| 0052 | Mailbox assembly, single (611-06497) | EACH | 2 | $165.00 | $171.00 | $165.00 | $225.00 | $184.00 | $195.00 |
| 0053 | Right-of-way marker (615-06490) | EACH | 23 | $165.00 | $171.00 | $75.00 | $175.00 | $184.00 | $195.00 |
| 0054 | Riprap, class 1 (616-05688) | TON | 575 | $102.32 | $82.00 | $60.00 | $140.00 | $91.00 | $82.00 |
| 0055 | Riprap, class 2 (616-05689) | TON | 759 | $108.52 | $70.00 | $66.00 | $140.00 | $90.00 | $93.00 |
| 0056 | Riprap, revetment (616-06405) | TON | 995 | $51.86 | $71.00 | $41.00 | $120.00 | $58.00 | $73.00 |
| 0057 | Geotextile for riprap, type 1B (616-12247) | SYS | 2,160 | $4.15 | $5.30 | $6.00 | $3.00 | $7.75 | $4.25 |
| 0058 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $100.00 | $104.00 | $500.00 | $1,000.00 | $120.00 | $1,050.00 |
| 0059 | Mulched seeding, type R (621-06559) | SYS | 3,623 | $2.00 | $2.10 | $2.25 | $8.00 | $2.40 | $1.15 |
| 0060 | Water (621-06567) | KGAL | 2 | $0.10 | $0.10 | $0.08 | $5.00 | $12.00 | $12.00 |
| 0061 | Sodding (621-06574) | SYS | 168 | $30.00 | $31.00 | $30.00 | $20.00 | $36.00 | $59.00 |
| 0062 | Computer system equipment (628-11976) | EACH | 3 | $1,100.00 | $889.00 | $100.00 | $200.00 | $2,790.00 | $540.00 |
| 0063 | Field office, type D (628-12683) | MOS | 12 | $4,150.00 | $3,558.00 | $950.00 | $4,000.00 | $4,685.00 | $6,105.00 |
| 0064 | Waterproofing membrane type 2 (714-000086) | SFT | 6,812 | $1.55 | $1.60 | $4.00 | $3.00 | $9.12 | $8.50 |
| 0065 | Pipe end section, diameter 48 in. (715-02246) | EACH | 2 | $3,309.98 | $3,815.00 | $2,750.00 | $6,000.00 | $3,025.00 | $5,025.00 |
| 0066 | Pipe, type 1, circular, diameter 30 in. (715-05125) | LFT | 78 | $140.10 | $112.00 | $125.00 | $150.00 | $160.00 | $154.00 |
| 0067 | Pipe, type 3, circular, diameter 48 in. (715-05186) | LFT | 74 | $244.65 | $279.00 | $150.00 | $260.00 | $275.00 | $247.00 |
| 0068 | Pipe end section, diameter 30 in. (715-46030) | EACH | 2 | $1,615.00 | $2,508.00 | $1,200.00 | $3,000.00 | $1,995.00 | $2,215.00 |
| 0069 | Structure, coated reinforced concrete, three-sided sections, 384 in. X 152 in. , coated (723-000101) | LFT | 42 | $12,580 | $11,260 | $22,000 | $15,000 | $15,017 | $13,955 |
| 0070 | Structure, reinforced concrete, three-sided (723-10171) | LFT | 58 | $11,450 | $10,620 | $13,000 | $13,000 | $14,329 | $13,980 |
| 0071 | Road closure sign assembly (801-04308) | EACH | 11 | $81.00 | $84.00 | $250.00 | $300.00 | $167.00 | $175.00 |
| 0072 | Construction sign, type A (801-06640) | EACH | 32 | $20.00 | $21.00 | $105.00 | $165.00 | $167.00 | $175.00 |
| 0073 | Maintaining traffic (801-06775) | LS | 1 | $28,076 | $123,200 | $30,242 | $28,050 | $41,085 | $6,000.00 |
| 0074 | Barricade, type III-A (801-07118) | LFT | 120 | $14.00 | $15.00 | $15.00 | $15.00 | $16.75 | $18.00 |
| 0075 | Barricade, type III-B (801-07119) | LFT | 108 | $16.00 | $17.00 | $17.00 | $15.00 | $16.75 | $18.00 |
| 0076 | Portable changeable message sign (801-11642) | EACH | 4 | $2,144.00 | $2,228.00 | $2,200.00 | $5,000.00 | $4,460.00 | $4,700.00 |
| 0077 | Reference post (802-04893) | EACH | 4 | $220.00 | $229.00 | $250.00 | $1,000.00 | $245.00 | $255.00 |
| 0078 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 36 | $30.00 | $31.00 | $34.00 | $40.00 | $33.50 | $35.00 |
| 0079 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 24 | $30.00 | $31.00 | $34.00 | $40.00 | $33.50 | $35.00 |
| 0080 | Sign, sheet, and supports, remove (802-07059) | EACH | 6 | $40.00 | $42.00 | $40.00 | $100.00 | $44.50 | $47.00 |
| 0081 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 22 | $18.00 | $19.00 | $21.00 | $50.00 | $20.00 | $21.00 |
| 0082 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 150 | $4.77 | $5.00 | $1.30 | $5.00 | $1.15 | $1.10 |
| 0083 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 1,955 | $1.32 | $1.40 | $1.30 | $2.00 | $1.15 | $1.10 |
| 0084 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 1,219 | $2.04 | $2.10 | $1.30 | $2.00 | $1.15 | $1.10 |
| 0085 | Snowplowable raised pavement marker (808-75998) | EACH | 20 | $125.00 | $520.00 | $75.00 | $125.00 | $139.50 | $145.00 |
| 0086 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $40,300 | $30,550 | $60,000 | $25,000 | $46,500 | $64,740 |
| 0087 | Excavation, unclassified (203-02020) | CYS | 545 | $82.00 | $67.00 | $76.00 | $90.00 | $195.00 | $159.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 15, 2025. Compiled by Mirage Metrics.